ML16340D505

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-275/83-20 on 830523-0606 & Notice of Violation.W/O Notice of Violation
ML16340D505
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 06/17/1983
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Schuyler J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340D506 List:
References
NUDOCS 8306270342
Download: ML16340D505 (4)


See also: IR 05000275/1983020

Text

~y,Ii A/40

ci V I+ ,:

~

o.

II

4

Vp

j/ .~t

+**4+

UtktTEO STATES

MUCLEAR REGULATORY COViVI!SStON

REGION V

1450 IbtIARIA LANE,SUITE 210

WALNUTCREEK, CAI.IFORNIA94596

JUg g 7,0~$ 3

Docket No. 50 275

Pacific Gas

and Electric Company

77 Scale Street,

Room 1435

San Francisco,

California

94106

Attention:

Mr. J. 0. Schuyler, Vice President

Nuclear Power Generatioa

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Unit No.

1

Th:".s refers to the routine inspection,

conducted

by Messrs.

G. H. Hernandez

and

M. M. Qendonca

of this office on May 23-June

6,

1983, of activities

authorized

by NRC License

No. DPR-76

and to the discussion of our findings

with Mr. R.

C. Thornberry

and other members of the Pacific

Gas and Electric

Company staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Bas,ed

on the results of this inspection, it appears

that one of your

activities was not conducted in full compliance with NRC requirements,

as set

forth in the Notice of Violatioa, enclosed

herewith as Appendix A.

Your response

to this Notice is to'e submitted ia accordance

with the

provisioas of 10

CPR 2.201

as stated in Appeadix A, Notice of Violation.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosures

will be placed ia the

NRC Public Document

Room unless

you notify this office,

by telephone, within ten days of the date of this letter aad submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consisteat

with the

requirements

of 2.790(b)(l).

SSO6n'Oisin

BS06aa

PDR ADOCK 05000275

8

PDR

Pacific

Gas

and Electric Company

2

>>N i7 F83

Should you have

any questions

concerning this inspection,

we wi11 be glad to

discuss

t.hem with you.

The responses

directed by this letter and the accompanying

Notice are not

subject lo the clearance

procedures

of the OHice of Management

and Budget as

required by the Paperwork Reduction

Act. of 1980,

PL 96-511.

Sincerely,

T.

W. Bishop, Chief

~

~

~

~

Reactor Project. Branch No.

2

Enclosures:

A.

Notice of Violation

B.

inspection Report

Nos

50-275/83-20

cc w/enclosure:

G. A. Maneatis,

PC&E

P. A. Crane,

PG&E

S. D. Skidmore,

PG&E

R.

C. Thornberry,

PG&E (Diablo Canyon)

R. D. Etzler,

FG&E (Diablo Canyon)