ML16340D141
| ML16340D141 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 01/19/1983 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Crane P PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16340D142 | List: |
| References | |
| NUDOCS 8302070337 | |
| Download: ML16340D141 (2) | |
See also: IR 05000275/1982042
Text
~
J
h fhh
lv'JJ
Docket No. 50-275
Pacific
Gas
and Electric Company'
P. 0.
Box 7442
San Francisco,
94106
Attention:
Mr. Philip A. Crane Jr.
Assistant
General
Counsel
~ >> ~
~
~
Gentlemen:
This refers to the routine, monthly inspection
conducted
by Messrs.
J.
D. Garison
and
M. M. Mendonca of this office, during the period of December 5, 1982 through
January
1-, 1983,
and the inspection. effort of Mr. P. J. Morrill of this office
on December
2, 1982 at your corporate offices, of activities authorized
by NRC
License
No. DPR-76,
and to the discussions
of our findings held by Messrs.
Carlson
and
Mendonca with Mr. Thornberry and other
members of your staff at the conclusion
of the inspection.
Areas
examined during this inspection are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observations
by the inspectors.
No items of noncompliance with NRC requirements
were identified within the scope
of this inspection.
Should you have any questions
about this inspection,
we will be glad to discuss
them with you.
Sincerely,
cc w/enclosure:
R.
C. Tbornberry,
PGGE (Diablo Canyon)
T.
W. Bishop, Chief
Reactor Projects
Branch No.
2
bcc:
RSB/Document Control
Desk
(RIDS)
Distributed by RV:
RHE (w/o enc)
Sandra Silver (Report only)
Resident
Inspector
State of CA
Enclosure:
NRC Inspection
Report
No. 50-275/82-42
cc w/o enclosure:
J. L. Schuyler,
PGIIE
J.
D. Shiffer,
PGEE
W. S.
Raymond,
PG5E
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure will
be placed in the
NRC Public Document
Room unless
you notify this office, =by telephone,
within ten days of the'ate of this letter and submit written application to
withhold inform'ation contained
herein within thirty days of the date of this
letter.
'Such application must
be consistent with the requirements of 2.790(b)(1).
OFF1CEP
SUANAME$ CARLTON
ITig-/83---'--
DATE $
~ ~
- AC FOAM 310 (10-80) HACM 0240
MEND NCA
"Vjg/83"---
~
~ 0
~
0 ~ ~
~ a ~\\ ~ 0
MORRILL
-"'17i'$783'""
IS P
~ ~
~ ~ ~ ~ ~ r
0 ~I~ ~ ~ ~ ~ 0 ~
1/!F/83
~ ~ ~ ~ a ~ ~ ~ a ~ ~ a ~ 0 ~ ~ a
~ ~I~ 0 ~
a
OFFtCIAL RECORD COPY.
USGPO: 1961~900
'I