ML16340C850

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-275/82-26 & 50-323/82-13 on 820726-30,0816-20 & 0830-0901.No Noncompliance Noted
ML16340C850
Person / Time
Site: Diablo Canyon  
Issue date: 09/17/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340C851 List:
References
NUDOCS 8210060133
Download: ML16340C850 (4)


See also: IR 05000275/1982026

Text

~P.R st Cti(

$ y*g4

UNITED STATES

LEAR REGULATORY COMMISSlO

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

September

17,

1982

s

Docket Nos.(50-27M

Pacific Gas

and Electric Company

P.

0.

Box 7442

San Francisco,

California

94120

Attention:

Mr. Philip A. Crane, Jr.

Assistant

General

Counsel

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units

1 and

2

This refers to the inspections

conducted

by Mr. J.

F. Burdoin of this

office on July 26-30, August 16-20 and August 30 - September

1,

1982 of

activities authorized

by

NRC License

No.

DPR-76

and Construction

Permit

No.

CPPR-69

and to the discussions

of our findings with Mr. R.

D. Etzler.

and other members of your staff on July 30, August 20, and September

1,

1982.

Areas

examined during these inspections

are described

in the enclosed

inspection report.

1Jithin these

areas,

the inspections

consisted of

selective examinations of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of these

inspections.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the

enclosure will be placed in the

NRC Public Document

Room unless

you

notify this office, by telephone,

within ten days of the date of this

letter and submit written application to withhold information contained

therein within thirty days of the date of this letter.

Such application

must be consistent with the requirements

of 2.790(b)(l).

1

Pacific

Gas

and Electric Company'eptember

17,

1982

Should you have

any questions

concerning

these inspections,

we will be

glad to discuss

them with you.

Sincerely,

~t

~

).g.! '~sJ -~

T.

M. Bishop, Chief

Reactor Projects

Branch

2

Enclosures:

Inspection

Report

No. 50-275/82-26

50-323/82-13

cc w/enclosures:

M. A.

Raymond,

PGKE

R.

C. Thornberry,

PGSE (Diablo Canyon)

, 4