Text
NOV 16
1981
Docket Nos.L50-275,
50-323
Pacific Gas
and Electric Company
5EHQzrrzc~
P. 0.
Box 7442
San Francisco, California
94120
Attention:
Mr. Philip A. Crane, Jr.
Assistant
General
Counsel
.,'b
ig
O
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units
1 and
2
This refe} s to the inspection
conducted
by Mr. J. F. Burdoin of this office
on October 5-9,
1981 of activities authorized
by
NRC Construction Permit
Nos.
CPPR-39
and CPPR-69,
and to the discussions
of our findings with Mr.
D. A. Rockwell
and other
members of your staff on October 9, 1981.
Areas examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective examinations
of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspector.
No items of noncompliance with
NRC requirements
were identified within
the scope of'his inspection.
In accordance
with 10 CFR 2.790 of the Commission's regulations,
a copy
of this letter
and the enclosed
inspection report will be placed in the
NRC's Public Document
Room. If this report contains
any information that
you (or your contractors)
believe to be exempt from disclosure
under
10
CFR)945(a)(4), it is necessary
that you (a) notify this office by telephone
within ten (10) days from the date of this letter of your intention to
file a request for withholding; and (b) submit within 25 days from the
date of this letter
a written application to this off'ice to withhold such
information. If your receipt of this letter has
been delayed
such that
less than seven
(7) days are available for yo'ur review, please notify this
office promptly so that
a new due date
may be established.
Consistent
with section 2.790(b)(l),
any such application must
be accompanied
by an
affidavit executed
by the owner of the information which identifies the
document or part sought to be withheld,
and which contains
a full statement
of the basis
on which it is claimed that the information should
be withheld
from public disclosure.
This section further requires the statement to
address with specificity the cons1derations
listed
1n
O(9(
tt2080446 81st~
DR ADQCK 05000275(
51
OFF1CCP
RQ/4Pt
sURNAMEJ),
BUADOI
""'lt/g/
DATE
NRC FORM 318110/80)NRCM 0240
OFFlCIAL RECORD COPY
!k USGPO: 1980
329.824
~ ~
U
~ '
~
~
1
~
4
I
1
'Sr
(
'
'
4
~ ~
.L
~ ~
I
~
~
1
I I
~
4
'
f cc ('
(
r
4
c
If
4
4
c ~
I
I
~ .El
rv
I
4
v
s
'4
II
~
'1
4
~
4
4 ~
'h ~
"
1
~
(
~
'
1
I
4
4
'I
/
.
'
4
I'
~
~ I
~gc
\\
4
~
Il
4
1
r'
~
1
r ~
I'
4
1
~ UE
1
~ ~
I
1
~ '
'I
U'4 '
~
~
j(
1
~
~
4
I
~
I'r
4,
1
~
v
Ui
'E
I
~, ~
I*
0
Pacific Gas
and Electric Company
-2-
NOV $ 6
1g81
The information sought to be, withheld shall
be incorporated
as far as possible
into'a separate
part of the affidavit. If we do not hear from you in this
regard within the specified periods
noted above,
the report wi 11 be placed
in the Public Document
Room.
S hould you have
any questions
concerning this inspection,
we will be glad
'o discuss
them with you.
Sincerely,
(Pl d
) ~~p /)cA'P
B.
H,
aulkenberry,
Chief
Reactor Construction Projects
Branch
E nclosure:
IE Inspection Report
Nos. 50-275/81-26
50-323/81-16
c c w/enclosure:
ll. A. Raymond,
PGEE
R.
C. Thornberry,
PGLE (Diablo Canyon)
b cc:
DNB/Document Control
Desk
(RIDS)
D istributed by RV:
State of CA (Hahn
8 Johnson)
Resident
Inspectors
(3)
RHE (w/o enclosure)
Sandra Silver (Report only)
I'I
I
l
I
ll
II I
I
lt,
'Ir
'
y
tt
IIt
f
I
t
I
It ttt'
h I
'f4
tt I
I
~1
l
.
I
tttt,g
I
~ tt't/
tl
fly'I
~ .""
t.
tt
cI
fgW
't
I'
+tt
It
.
'll
~
'
o
~ I
'I
t I
l
t
0