Text
e
AUG 1.4
1981
Docket Hos
0-276,60-323
w..z
Pacific Gas
and Electric Company
P. 0.
Box 7442
San Francisco,
94106
Attention:
Nr. Philip A. Crane, Jr.
Assistant
General
Counsel
Gentlemen:
Subject:
HRC Inspection of Diablo Canyon Units
1 & 2
This refers to the routine inspection
conducted
by Nr. P. Norrill
of this office on July 20-24,
1981, of activities authorized
by
HRC Construction
Permit Hos.
CPPR-39
and CPPR-69,
and to the discussion of our findings held
by Nr. Norrill with Nr. Thornberry and other members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection
report.
Within these
areas
the inspection consisted of selective examinations
of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspector.
No items of noncompliance with HRC requirements
were identified within the
scope of this inspection.
In accordance
with 10 CFR 2.790 of the Commission's regulations,
a copy
of this letter and the enclosed
inspection report will be placed in the
NRC's Public Document
Room. If this report contains
any information that
you (or your contractors)
believe to be exempt from disclosure
under
10 CFR 9.6(a)(4), it is necessary
that you (a) notify this office by telephone
within ten (10) days from the date of this letter of your intention to file
a request for withholding; and (b) submit within 26 days from the date of
this letter a written application to this office to withhold such information.
If your receipt of this letter has
been delayed
such that less than seven
(7) days are available for your review, please notify this office promptly
so that a new due date
may be established.
Consistent with section 2.790
(b)(1), any such application must be accompanied
by an affidavit executed
by the owner of the information which identifies the document or part sought
to be withheld, and which contains
a full statement of the basis
on which
it is claimed that the information should
be withheld from public disclosure.
8109030221
SiOSi4
ADOCK 05000275
RV/doe
OFFICEP
SURNAME/
0ATEP
MORRILL
'"8/8/'8'l."'OUNG
8/12/81
I PDR
STERNBERG
8/13/81
NRC FORM.318 RO/80) NRCM 0240
OFFICIAL RECORD COPY
A USGP01 198~29.824
'e e
lt
e
~
e
i
e-
pe
e'(, ~A-',
tie
e
'e
e
~ e
e
e'"
e
,e
e
e e
Pacific Gas
and Electric Company
M200
AU6 14 88)
This section fur ther requires the statement
to address
with specificity
the considerations
listed in 10 CFR 2.790(b)(4).
The information sought
to be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not hear
from you in this regard within
the specified periods noted above, the report will be placed in the Public
Document
Room.
Should you have
any questions
concerning this inspection,
<<e will be glad
to discuss
them with you,
Sincerely,
Enclosure:
IE Inspection
Report
Nos. 50-275/81-19
50-323/81-13
cc w/o enclosure:
H. A. Raymond,
E.
B. Langley, Jr.,
R.
C. Thornberry,
PG&E (Diablo Canyon)
Sent to
DMB for
DCS processing.
Distributed by RV:
State of CA (Hahn
& Johnson)
Sandra Silver (Report only)
RV PDR
RHE (w/o enclosure)
D. N, Ster nberg, Chief
Reactor Operations
Pro)ects
Branch
a
V g
<<l'W lw,
a I'
I
f
//
va
I
Il aa'l vf
I!1
K
't'(j 'wa
'"
w
K t'
)
'I
ll
I
/IIK
'lb
s'/c
'kv'F'
j/tat
,WF ~,y
Cg
~t /
t
<<g,a
l
I
a
I'va
F I
k
~
~
I
aa'
K I't
I
~ g K*I(
,a
I ~
'
I) /
V
W
E / l
fig
I ~
$ $','
K
~ i )" 'y; 'I-
~
IIK
yea '
Kv>> a.;,,*I
aw>>
la
.
~
~ i
lv, va,K,'
I
ft
a 1f
t- / '
cf
/
Ct
F
'I
v
al
I
I F
'
a v/
V
ga
II V'
<<I