ML16340B089

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 80-28, Prompt Reporting of Info in Accordance W/10CFR50.55(e). No Written Response Required
ML16340B089
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/13/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8007290086
Download: ML16340B089 (6)


Text

C,&~8 REGS 0

'Cy

-p 4~

yj

++*<<+

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIASOULEVARD SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94596 June 13, 1980 Docket Nos. 50-275, 50-323 Pacific Gas and Electric Company 77 Beale Street San Francisco, Cali fornia 94106 Attention:

Hr. Philip A. Crane, Jr.

Assistant General Counsel Gentlemen:

This Information Notice is being forwarded to you for information.

No written response to this Information Notice is required.

If you have any questions related to the subject, please contact this office.

Sincerely, R.

H. Engelken Director

Enclosures:

l.

IE Information Notice No. 80-28 2.

List of Recently Issued Information Notices cc w/enclosures:

M. A. Raymond,.

PG8E E.

B. Langley, Jr.,

PG8E R. Ramsay, PG8E (Diablo Canyon) 8oovs90 ~

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCPi1ENT llASHINGTON, D.C.

20555 June 13, 1980 SSINS Ho.: 6835 Accession No.:

8005050063 IE Information Notice No. 80-28 PROMPT REPORTIHG OF INFOfMTION IN ACCORDANCE MITH 10 CFR 50.55(e)

The recently implemented expansion of the HRC Resident Inspection Program at nuclear power plants and fuel facilities, has led to some misunderstandings regarding the required reporting of information to the NRC.,

In order to clarify this matter, the following is provided for your information.

Some licensees have been making the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reports required by 10 CFR 50.55(e)(2) orally to NRC resident inspectors.

This does not satisfy either the letter or the intent of the regulation.

Adherence by all licensees to the explicit requirements of the regulation provides, for each Regional Office to be the single focal point for reporting, and minimizes the possibility of inadvertent oversight.

l<hile we continue to enlist your cooperation in fully informing our resident inspectors, where appropriate, or'ny other NRC inspector who may be at your facility at such a time, such informational exchanges do not satisfy the reporting requirements of 10 CFR 50.55(e)(2).

Your cooperation in assuring that the appropriate members of your staff are fully aware of this information will be appreciated.

No written response to this information notice is required.

If you require additional information regarding this matter contact the Director of the appropriate NRC Regional Office.

IE Information Notice No. 80-28 June 13, 1980 RECENTLY ISSUED IE INFORMATION NOTICES Enclosure 80-27 Degradation of Reactor Coolant Pump Studs Information Subject Notice No.

Date Issued 6/11/30 Issued To All Pressurized Water Reactor Facilities holding power reactor OLs or CPs 80-26 80-25 80-24 80-23 80-22 80-21 80-20 80-19 Evaluation of Contractor gA Programs Transportation of Pyrophoric Uranium

- Low Level Radioactive Waste Burial Criteria Loss of Suction to to Emergency Feedwater Pumps Breakdown In Contamination Control Programs Anchorage and Support of Safety-Related Electrical Equipment Loss of Decay Heat Removal Capability at Davis-Besse Unit 1 While in a Refueling Mode NIOSH Recall of Recircu-1 ating-Mode (Closed-.Circui t)

Selt-Contained Breathing Apparatus (Rebreathers) 6/10/80 5/30/80 5/30/80 5/29/80

.5/28/80 5/16/80 5/8/80 5/6/80 All Part 50 Licensees Material Licensee in Priority/Categories II-A, II-D, III-I and IV-DI; Agreement State Licensees in equivalent categories All NRC and Agreement State Licensees All power reactor facilities with an OL or CP All power reactor OLs and near term CPs All power reactor facilities with an OL or CP All light water reactor facilities holding power reactor OLs or CPs All holders of a power reactor OL, Research Reactor

License, Fuel Cycle Facility License and Priority I Material License

V; w

)