ML16340A747

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-275/79-19 on 790917-19.No Noncompliance Noted
ML16340A747
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 10/11/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340A748 List:
References
NUDOCS 8001100546
Download: ML16340A747 (4)


See also: IR 05000275/1979019

Text

pe REC0

+a**+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUT C R E E K P LAZA

WALNUTCREEK, CALIFORNIA94996

E

October ll, 1979

Docket No. 50-275

Pacific Gas

and Electric Company

77 Beale Street

'an

Francisco,

California

94106

Attention:

Mr. Philip A. Crane

Assistant General

Counsel

Gentlemen:

Subject:

NRC Inspection - Diablo Canyon Unit

1

This refers to the inspection

conducted

by Mr. T.

W. Bishop and

Ms.

E. A. Kleinsorg of this office on September

17-19,

1979 of activities

authorized

by NRC Construction Permit No.

CPPR-39,

and to the discussion

.

of our findings held by Mr. Bishop with Mr. R. 0. Etzler and other

members of'our staff at the conclusion of the inspection.

Areas

examined during this inspection are described

in the enclosed

inspection report.

Within these areas,

the inspection consisted of

selective

examinations of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section 2.790 of the NRC's "Rules ot Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room. If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include

a full statement of the reasons

why it is claimed that

the information is proprietary.

The application should

be prepared

so

that any proprietary information identified is contained in an enclosure

so oix oo. < l4

Pacific Gas

and Electric Company

-2-

October ll, 1979

to the application,

since the application without the enclosure will

also

be placed in the Public Document

Room.

If we do not hear from you

in this regard within the specified period,

the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

Enclosure:

.

IE Inspection

Report

No. 50-275/79-19

cc w/o enclosure:

J.

D. Worthington,

PGSE

14. A. Raymond,

PG&E

R.

D. Ramsay,

PGSE (Diablo Canyon)

cc w/enclosure:

R.

D. Etzler,

PG8E (Diablo Canyon)

J.

B. Hoch,

PGSE, Project Engineer

Reactor Construction

and

Engineering

Support Branch