Forwards IE Insp Repts 50-275/79-17 & 50-323/79-09 on 790723-26 & Notice of Violation
ML16340A642
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/24/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340A639 List:
References
NUDOCS 7911090239
Download: ML16340A642 (4)


See also: IR 05000275/1979017

Text

gag Bf0y4g

++*++

r'~)

~

,uNITED STATES

NUCLEAR REGUL~ATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

- SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

August 24,

1979

Docket Nos.

50-275

50-323

Pacific Gas

and Electric Company

77 Beale Street

San Francisco,

California

94106

Attention:

fir. Philip A. Crane, Jr.

Assistant

General

Counsel

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units

1 and

2

This refers to the inspection

conducted

by Hr. D. F. Kirsch of this

office on July 23-26,

1979 of activities authorized

by

NRC Construction

Permit Nos.

CPPR-39

and CPPR-69,

and to the discussion of our findings

held by Nr. Kirsch with Nr.

R.

D. Etzler and other members of your staff

at the conclusion of the inspection.

Areas

examined

during this inspection are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspector.

Based

on the results of this inspection, it appears

that one of your

activities was not conducted in full compliance with NRC requirements,

as set forth in .the Notice of Violations, enclosed

herewith as Appendix A.

This item of noncompliance

has

been categorized

into a level as described

in our correspondence

to all

NRC licensees

dated

December

31,

1974.

This notice is sent to you pursuant

to the provisions of Section 2.201,

of the NRC's "Rules of Practice,"

Part 2, Title 10,. Code of Federal

Regulations.

Section

2.201 requires

you to submit to this office,

within thirty (30) days of your receipt of this notice,

a written state-

ment or explanation in reply including (1) corrective steps

which have

been

taken

by you and the results

achieved;

(2) corrective steps

which

will be taken to avoid further violations;

and (3) the date

when full

compliance will be achieved.

tg911,090 + '1'

~

( S

4

A

1

e

l

Pacific Gas

and Electric Company

-2-

August 24.

1979

In accordance

with Section

2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room.

If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit

a written application

to this office, within 30 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include

a full statement of the reasons

why it is claimed that

the information is proprietary.

The application should

be prepared

so

that any proprietary information identified is contained in an enclosure

to the application,

since the appl',cation without the enclosure will

also

be placed in the Public Document

Room.

If we do not hear from you

in this regard within the specified period,

the report will be placed in

the Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

K4L.>z42mg

G. S. Spencer,

Chief

Reactor Construction

and

Fngineering

Support

Branch

Enclosures:

l.

Appendix A - Notice of Deviation

2.

IE Inspection

Report

Nos. 50-275/79-17

60-323/79-g

cc w/o enclosure

2:

H. A. Raymond,

PGSE

J.

D. Morthington,

PGKE

R.

D. Ramsay

PGEE {Diablo Canyon)

cc w/enclosures

1

8

2

R.

D. Etzler,

PGKE (Diablo Canyon)

J.

B. Hoch,

PGSE

C

I