Forwards IE Insp Repts 50-275/78-12 & 50-323/78-12 on 780824-0922 & Notice of Violation
ML16340A369
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/06/1978
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340A368 List:
References
NUDOCS 7902260610
Download: ML16340A369 (4)


See also: IR 05000275/1978012

Text

1P,R A60II

,

E~JPldj)

+w*w+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

SUITE 202, WALNUTCREEK PLAZA

1990 N. CALIFORNIA BOULEVARD

WALNUT CREEK, CALIFORNIA 94596

Docket Nos. 50-275

50-323

Pacific Gas

and Electric Company

77 Beale Street

San Francisco,

California 94106

Attention:

tlr. Philip A. Crane

Assistant

General

Counsel

Gentlemen:

Subject:

NRC inspection of Diablo Canyon Unit Nos.

1 and

2

This refers to the inspection

conducted

by Messrs.

D. F. Kirsch and

L. E. Vorderbrueggen of this office on August 24 through September

22,

1978 of activities authorized

by

NRC Construction

Permits

No. CPPR-39

and CPPR-69,

and to the discussion of'ur findings held with Messrs.

R. D. Etzler and T. G. DeUriarte and other members of your staff at the

conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection report.

Within these

areas,

the inspection .consisted of

selective examinations of procedures

and representative

records,

.

interviews with personnel,

and observations

by the inspectors.

Based

on the results of this inspection, it appears that one of

your activities was not conducted in full compliance with the

NRC

requirements,

as set forth in the Notice of Violation, enclosed

herewith as Appendix A.

This item of noncompliance

has

been cate-

gorized into a level as described

in our correspondence

to all

NRC

licensees

dated

December

31, 1974.

.This notice is sent to you pursuant to the provisions of Section

2.201

of the NRC's "Rules of Practice," Part 2, Title 10,

Code of Federal

Regulations.

Section

2.201 requires

you to submit to this office,

within thirty (30) days of your receipt of this notice,

a written

. ~

Pacific Gas

and Electric Company

-2-

OCT

> S)S

statement

or explanation in reply including:

(1) corrective steps

which have

been taken

by you and the results achieved;

(2) corrective

steps

which will be taken to avoid further violations;

and

(3) the

date when full compliance will be achieved.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter

and the enclosed

inspection report will be placed in the

NRC's Public

Document

Room.

If this report contains

any information that you be-

. lieve to be proprietary, it is necessary

that you submit

a written

application to this office, within 30 days of the date of this letter,

requesting that such information be withheld from public disclosure.

The application must include a full statement of the reasons

why it

is claimed that the information is proprietary.

The application

should

be prepared

so that any proprietary information identified is

contained in an enclosure to the application,

since the application

without the enclosure will also

be placed in the Public Document

Room.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document

Room.'hould

you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

Enclosures:

l.

Appendix A Notice of Violation

2.

IE Inspection

Report

Nos. 50-275/78-12

50-323/78-12

cc w/o enclosure

2:

R. P. Mischow,

PGKE

J.

D. Worthington,

PGSE

Reactor Construction

and

Engineering

Support Branch