Oct. 18, 2016 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2016-35205 USER INFORMATION:
GERLACH*ROSEY M Address: NUCSA2 Phone#:
542-3194 EMPL#: 02 8401 CA#:
03 63 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSEY M 10/18/2016 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
Page 1
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 09/12/2016 ADD MANUAL TABLE OF CONTENTS DATE: 10/17/2016 CATEGORY: DOCUMENTS TYPE: TRM2 of 2
Oct. 18, 2016 ID:
TEXT 3.11.2.6 ADD:
REV: 7 REMOVE:
REV:6 CATEGORY: DOCUMENTS TYPE: TRM2 ID:
TEXT 3.3.4 REMOVE:
REV: 9 ADD:
REV: 10 CATEGORY: DOCUMENTS TYPE: TRM2 ID:
TEXT B3.3.4 ADD:
REV: 6 REMOVE:
REV:S CATEGORY: DOCUMENTS TYPE: TRM2 ID:
TEXT LOES REMOVE:
REV: 9 0 ADD:
REV: 91 Page 2
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
of 2
-- -----I
t SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
10/17 /2016 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 91 10/17 /2016
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 25 05/10/2016
Title:
TABLE OF CONTENTS TEXT 1.1 0
11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1
02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 11 01/31 /2 014 Title : PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3. 0 6
03/05/2015
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4
05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATI ON TEXT 3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 12 11/10/2015
Title:
CORE OPERATING LIMITS REPORT (COLR)
Page 1.
of li Report Date : 10 / 17 /1 6
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3. 1 0
11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3
03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 10 10/17 /2016
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4
04/29/2014
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2
11/10/2015
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3. 3. 9 3
05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004 Title : INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3. 3.12 1
03/05/2015
, J0 Title : WATER MONITORING INSTRUMENTATION Page 2.
of 15 Report Date: 10/17/16
SSES MANITAL
'j Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1
04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 2
05/14/2009
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR.VESSEL MATERIALS TEXT 3.4.6 1
04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2
04/29/2014
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page.3-of 15 Report Date: 10/17/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 09/08/2016
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3
04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 4
05/16/2016
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2
04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2
04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2
04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1
04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 11 09/27/2012
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1
04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Page.4.
of li Report Date: 10/17/16
SSES MANUAL Manual Name:. TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 1
03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1
04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3
06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2
09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 9
03/05/2015
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1
08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 2
04/29/2014
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 1
10/02/2009
Title:
PLANT SYSTEMS TEXT 3.8.l 3
06/20/2012
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.l 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2
12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page.5.
of 15 Report Date: 10/17/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3 2
06/20/2012
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1
02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 1
11/14/2013
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 2
12/14/2006
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2
10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM
~."::.""::..
.. _ TEXT 3. 9. 1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2
06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3. 11. 1. 1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page.Q_
of li Report Date: 10/17/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3. 11. 1. 4 2
10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3. 11. 1. 5 3
03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTI"VE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
NOBLE GASES TEXT 3.11.2.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3. 11. 2. 5 4
07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 7
10/17/2016
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11. 4.1 4
03/05/2015
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM Page]_
of l5.
Report Date: 10/17/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION
- TEXT 4. 2 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1
12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS TRAINING Page.B.
of 15 Report Date: 10/17/16
SSES MANUAL Manual Name:
TRM2 Manual. Titl.e: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 6
03/05/2015
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 2
04/29/2014
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES.CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3
04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 1
01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2
03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMEN'I'ATION TEXT B3.3.3 2
11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 6
10/17/2016
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2
11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 5
01/31/2014
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION Page~
of 15 Report Date: 10/17/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7 2
11/10/2015
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1
10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3
05/14/2009
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3
02/22/2012
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1
10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION
~-:-: TEXT B3. 3. 12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1
04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.4.6 1
04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Page 10 of 15 Report Date: 10/17/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
.Title: CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1
04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3
06/15/2010
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2
04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS i TEXT B3. 7. 3. 3 0
11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS Page ll of 12 Report Date: 10/17/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIRETxIENTS MANUAL UNIT 2 TEXT B3.7.3.4 2
04/29/2014
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1
04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1
04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0
11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3
09/27/2012
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUTxIENTATION TEXT B3.7.4 0
11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0
11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4
06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2
01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATTx!ENT LOGARITHMIC RADIATION MONITORING INSTRUTx!ENTATION TEXT B3.7.8 4
01/31/2014
Title:
PLANT SYSTEMS BASES SNUBBERS Page 12 of 15 Report Date: 10/17/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 2
12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2
04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2
03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0
11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1
09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0
11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0
11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1
11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3
06/20/2012
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2
06/04/2013
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Page 13 of 15 Report Date: 10/17/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1
04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3. 10. 3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.ll.1.l 1
05/10/2016
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.l.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3. 11. 1. 3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11. l. 4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3. 11. 1. 5 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.l 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.ll.2.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
NOBLE GASES Page 14 of 15 Report Date: 10/17/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.ll.2.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.ll.2.4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.ll.2.5 5
07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11. 2. 6 2
09/08/2016
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.ll.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11. 4.1 5
03/05/2015
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1
10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1
12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 15 of li Report Date: 10/17/16
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 04/28/2016 1.0 USE AND APPLICATION Page TRM I 1.0-1 08/31/1998 Page TRM I 1.0-2 10/04/2002 Page TRM I 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM I 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM I 2.0-4 06/25/2002 Page TRM I 2.0-5 01/21/201 4 Page TRM I 2.0-6 04/15/2009 Page TRM I 2.0-7 05/15/2008 Pages TRM I 2.0-8 and TRM I 2.0-9 01/07/201 1 Page TRM I 2.0-10 02/02/2010 Page TRM I 2.0-1 1 11/15/2004 Page TRM I 2.0-12 04/15/2009 Pages TRM I 2.0-13 and TRM I 2.0-1 4 11/15/2004 Page TRM I 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM I 3.0-1 and TRM I 3.0-2 02/19/2015 Page TRM I 3.0-3 03/15/2002 Page TRM I 3.0-4 02/19/2015 3.1 REACTIVITY CONTROL SYSTEMS Page TRM I 3.1-1 10/31/2007 Pages TRM I 3.1-2 through TRM I 3.1-5 08/31 /1998 Page TRM I 3.1-6 03/27/2007 Page TRM I 3.1-7 04/15/2009 Page TRM I 3.1-8 03/27/2007 Pages TRM I 3.1-9 and TRM I 3.1-9a 02/18/1999 Page TRM I 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM I 3.2-1 08/31/1998 Pages TRM I 3.2-2 through TRM I 3.2-63 11/04/2015 3.3 INSTRUMENTATION Pages TRM I 3.3-1 through TRM I 3.3-3 07/16/1999 Pages TRM I 3.3-4 and TRM I 3.3-5 10/31/2007 Page TRM I 3.3-6 03/10/2011 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31 /1998 4t SUSQUEHANNA - UNIT 2 TRM I LOES-1 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM I 3.3-9 10/07/2015 Page TRM I 3.3-9a
. 06/30/2010 Page TRM I 3.3-10 10/31/2007 Page TRM I 3.3-11 10/07/2015 Page TRM/ 3.3-11 a 10/06/2016 I
Page TRM I 3.3-12 03/30/2001 Page TRM I 3.3-13 01/07/2011 Page TRM I 3.3-14 12/14/1998 Page TRM I 3.3-15 04/11/2014 Page TRM I 3.3-16 01/07/2011 Page TRM I 3.3-17 11/04/2015 Page TRM I 3.3-17a 11/04/2015 Page TRM I 3.3-18 10/31/2007 Pages TRM I 3.3-19 and TRM I 3.3-20 10/22/2003 Page TRM I 3.3-21 04/15/2009 Page TRM I 3.3-21a 11/15/2004 Pages TRM /3.3-21b through TRM I 3.3-21d 03/27/2007 Page TRM I 3.3-22 12/03/2004 Pages TRM I 3.3-23 and TRM I 3.3-24 05/16/2003 Page TRM I 3.3-25 10/22/2003 Page TRM I 3.3-26 02/19/2015 Page TRM I 3.3-27 0410712009 3.4 REACTOR COOLANT SYSTEM Page TRM I 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM I 3.4-6 through TRM I 3.4-8 04/01/2009 Page 3.4-9 08/31/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM I 3.4-12 04/17/2009 Page TRM I 3.4-13 03/31/2006 Page TRM I 3.4-14 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM I 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM /.3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 and 3.6-2 08/31/1998 Pages TRM I 3.6-3 and TRM I 3.6-3a 04/16/2014 Page 3.6-4 08/31/1998 Page TRM I 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM I 3.6-7 through TRM I 3.6-9 12/31/2002 SUSQUEHANNA - UNIT 2 TRM I LOES-2 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title
- 3. 7 PLANT SYSTEMS Pages TRM I 3.7-1 and TRM I 3.7-2 Page 3.7-3 Page TRM I 3.7-4 Pages TRM I 3. 7-5 through TRM I 3. 7-7 Page TRM / 3.7-8 Pages TRM I 3.7-9 and TRM I 3.7-10 Page TRM I 3.7-11 Page TRM I 3.7-12 Page TRM I 3.7-13 Page TRM I 3.7-14 Pages TRM I 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM I 3. 7-20 through TRM I 3. 7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Page TRM / 3.7-25 Page TRM / 3.7-26 Page TRM / 3.7-27 Pages TRM I 3. 7-28 through TRM I 3. 7-32a Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Page TRM / 3.7-37 Page TRM / 3.7-38 Page TRM / 3.7-39 Page TRM i 3.7~40 Pages TRM I 3. 7-40a through TRM / 3. 7-40c Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM I 3. 7-43 Pages TRM / 3.7-44 and TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM I 3. 7-55 Page TRM I 3.7-56 SUSQUEHANNA - UNIT 2 TRM I LOES-3 Effective Date 07/29/1999 08/31/1998 03/31/2006 08/18/2016 08/02/1999 04/07/2009 01/21/2000 08/02/1999 05/09/2016 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 09/25/2012 11/24/2011 09/25/2012 09/25/2012 03/31/2006 02/01/1999 02/19/2015 08/31/1998 03/31/2006 05/24/2012 05/24/2012 09/04/2008 08/31/1998 02/19/2015 10/05/2006 06/07/2007 09/05/2012 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 0410212002 Page TRM / 3.8-2 01/28/2005 Pages TRM / 3.8-3 and TRM / 3.8-4 06/12/2012 Pages TRM / 3.8-5 and TRM / 3.8-6 0410212002 Pages TRM / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM / 3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 06/12/2012 Page TRM / 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 0410212002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM I 3.8-21 and TRM / 3.8-22 06/06/1999 Page TRM / 3.8-23 11/07/2013 Page TRM / 3.8-24 11/30/2011 Page TRM / 3.8-25 06/11/2012 Pages TRM I 3.8-25a and TRM / 3.8-25b 11/30/2011 Page TRM / 3.8-26 05/28/2009 Page_ TRM / 3.8-27 11/29/2006 Page TRM / 3.8-28 05/28/2009 Page TRM / 3.8-29 10/20/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Pages TRM I 3.10-5 and TRM / 3.10-6 03/27/2007 Page TRM / 3.10-7 06/10/2010 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 and TRM / 3.11-8 08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10 10/09/2012 Pages TRM { 3.11-11 and TRM I 3.11-12 08/31/1998 SUSQUEHANNA - UNIT2 TRM I LOES-4 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM I 3.11-13 02/19/2015 Page TRM I 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM I 3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM I 3.11-19 08/15/2005 Pages TRM I 3.11-20 and TRM I 3.11-21 03/31/2006 Page TRM I 3.11-22 0410212002 Page TRM I 3.11-23 11/14/2006 Page TRM I 3.11-24 06/18/2013 Page TRM I 3.11-25 04/12/2007 Page TRM I 3.11-26 01/21/2004 Page TRM I 3.11-27 08/11/2016 Page TRM I 3.11-28 10/06/2016 Page TRM I 3.11-29 12/03/2004 Page TRM I 3.11-30 01/21/2004 Page TRM I 3.11-31 08/11/2016 Page TRM I 3.11-32 10/06/2016 Page TRM I 3.11-33 03/31/2006 Page 3. 11-34 08/31/1998 Page TRM I 3.11-35 03/31/2006 Pages TRM I 3.1 ~-36 through TRM I 3.11-39 11/30/2005 Page TRM I 3.11-40
. 02/19/2015 Pages TRM I 3.11-41 through TRM I 3.11-44 08/31/1998 Page TRM I 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM I 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM I 3.12-1 through TRM I 3.12-3 02/05/1999 Page TRM I 3.12-4 03/14/2008 Page TRM I 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages TRM I 4.0-1 through TRM I 4.0-3 08/31/1998 Page TRM I 4.0-4 12/11/2008 Pages TRM I 4.0-5 through TRM I 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM I LOES-5 EFFECTIVE DATE 10/06/2016
- -~*
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.0 B 3.1 B 3.2 B 3.3 APPLICABILITY BASES Pages TRM I B 3.0-1 through TRM I B 3.0-3 Page TRM I B 3.0-4 Pages TRM I B 3.0-4a and TRM I B 3.0-4b Page TRM I B 3.0-5 Page TRM I B 3.0-6 Pages TRM I B 3.0-7 through TRM I B 3.0-9 Pages TRM I B 3.0-10 and TRM I B 3.0-11 Page TRM I B 3.0-12 Pages TRM I B 3.0-13 through TRM I B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Page TRM I B 3.1-1 Page TRM I B 3.1-2 Page TRM I B 3.1-3 Page B 3.1-4 Pages TRM I B 3.1-5 through TRM I B 3.1-7 Page TRM I B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM I B 3.3-1 Page TRM I B 3.3-2 Page TRM I B-3.3-2a Pages TRM I B 3.3-3 and TRM I B 3.3-3a Page TRM I B 3.3-4 Pages TRM I B 3.3-5 and TRM I B 3.3-5a Page TRM I B 3.3-6 Page TRM I B 3.3-7 Page TRM I B 3.3-8 Page TRM I B 3.3-9 Page TRM I B 3.3-10 Page TRM I B 3.3-11 Pages TRM I B 3.3-12 and. TRM I B 3.3-13 Page TRM I B 3.3-14 Page TRM I B 3.3-14a Page TRM I B 3.3-14b Page TRM I B 3.3-14c Pages TRM I B 3.3-15 through TRM I B 3.3-17 Pages TRM I B 3.3-18 and TRM I B 3.3-19 Pages TRM I B 3.3-19a and TRM I B 3.3-19b Page TRM I B 3.3-19c SUSQUEHANNA - UNIT 2 TRM/ LOES-6 Effective Date 08/31/1998 02/19/2015 02/19/2015 02/19/2015 06/12/2012 08/31/1998 03/15/2002 11/30/2005 02/19/2015 07/13/1999 04/16/2014 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 01/21/2014 03/10/2011 10/31/2007 10/31/2007 06/30/2010 10/06/2016 10/06/2016 10/07/2015 06/30/2010 10/31/2007 01/07/2011 02/21/2014 01/07/2011 06/25/2002 11/04/2015 11/04/2015 11/04/2015 10/22/2003 0312712007 0312712007 04/17/2009.
EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM I B 3.3-19d and TRM I B 3.3-19e 03/27/2007 Page TRM I B 3.3-20 02/16/2012 Page TRM I B 3.3-21 08/03/2010 Page TRM I B 3.3-22 10/22/2003 Page TRM I B 3.3-23 05/16/2003 Pages TRM I B 3.3-24 and TRM I B 3.3-25 0410712009 B 3.4 REACTOR COOLANT SYSTEM BASES Page TRM I B 3.4-1.
08/31/1998 Pages TRM I B 3.4-2 and TRM I 83.4-3.
04/01/2009 Pages TRM I B 3.4-4 and TRM I B 3.4-4a 10/31/2007
.Page TRM I B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Page TRM I B 3.4-7 04/25/2013 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM I B 3.5-3 and TRM I B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM I B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM I B 3.6-1 07/26/2001 Page TRM I B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM I B 3.6-4 03/29/2007 Page TRM I B 3.6-5 0410412007 Page TRM I B 3.6-6 12/03/2004 Pages TRM I B 3.6-7 through TRM I B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM I B 3.7-3 06/10/2010 Page TRM I B 3.7-3a 12/27/2007 Page TRM I B 3.7-4 03/31/2006 Page TRM I B 3.7-5 08/02/1999 Pages TRM I B 3. 7-6 and TRM I B 3. 7.-6a 03/31/2006 Pages TRM I B 3.7-7 and TRM I B 3.7-7a 08/02/1999 Page TRM I B 3.7-8 08/02/1999 Page TRM I B 3.7-9 04/11/2014 Page TRM I B 3.7-10 08/02/1999 SUSQUEHANNA - UNIT 2 TRM I LOES-7 EFFECTIVE DA TE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.8 Pages TRM I B 3.7-10a through TRM I B 3.7-11a Pages TRM I B 3.7-12 and TRM I B 3.7-13 Pages TRM I B 3.7-14 through TRM I B 3.7-14b Pages TRM I B 3.7-15 and TRM I B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM I B 3.7-21 Pages TRM I B 3.7-21a through TRM I B 3.7-21d Pages TRM I B 3.7-21e through TRM I B 3.7-21g Pages TRM I B 3.7-22 and TRM I B 3.7-23 Page TRM I B 3. 7-24 Page TRM I B 3. 7-25 Pages TRM I B 3. 7-26 through TRM I B 3. 7-29 Page TRM I B 3.7-30 Page TRM I B 3.7-30a Page TRM I B 3.7-30b Page TRM I B 3.7-31 Page TRM I B 3. 7-32 Page TRM I B 3.7-33 Page TRM I B 3.7-34 Page TRM I B 3.7-35 Pages TRM I B 3. 7-36 and TRM I B 3. 7-37 Page TRM I B 3. 7-38 Page TRM I B 3. 7-39 Page TRM I B 3. 7-40 ELECTRICAL POWER BASES Page TRM I B 3.8-1 Pages TRM I B 3.8-2 Page TRM I B 3.8-2a Pages TRM I B 3.8-3 and TRM I B 3.8-3a
. Page TRM I B 3. 8-4 Page TRM I B 3.8-4a Page TRM I B 3.8-5 Pages TRM I B 3.8-6 through TRM I B 3.8-15 Page TRM I B 3.8-16 Page TRM I B 3.8-17 Page TRM I B 3.8-17a Page TRM I B 3.8-17b Pages TRM I B 3.8-18 through TRM I B 3.8-20 Pages TRM I B 3.8-21 and TRM I B 3.8-22 Page TRM I B 3.8-23 Page TRM I B 3.8-24 SUSQUEHANNA - UNIT 2 TRM I LOES-8 Effective Date 03/31/2006 08/02/1999 09/25/2012 02/01/1999 08/31/1998 05/29/2013 05/24/2012 05/29/2013 01/30/2008 10/05/2006 01/21/2014 10/05/2006 06/07 /2007.
10/05/2006 01/21/2014 11/30/2011 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/01/2009 09/25/2009 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 09/03/2004 0410212002 08/31/1998 04/02/2002 11/07/2013 11/30/2011 06/11/2012 11/30/2011 05/29/2013 05/28/2009 05/29/2013 05/28/2009 EFFECTIVE DATE 10/06/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 1_0/23/! 998 B 3.10 MISCELLANEOWS BASES Page B 3.10-1 08/31/1998 Pages TRM I B 3.10-2 and TRM I B 3.10-3 03/27/2007 Pages TRM I B 3.10-4 and TRM I 8 3.10-5 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages TRM I B 3.11-1 and TRM I B 3.11-2 08/31/1998 Page TRM I B 3.11-3 04/28/2016 Pages B 3.11-4 through B 3.11-9 08/31/1998 Page TRM I B 3.11-10 02/01/1999 Pages TRM I B 3.11-11 and TRM I B 3.11-11a 04/07/2000 Pages TRM I B 3.11-12 and TRM I B 3.11-13 02/01/1999 Page TRM I B 3.11-14 12/03/2004 Page TRM I B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Pages TRM I B 3.11-20 and TRM I B 3.11-20a 04/02/2002 Page TRM I B 3.11-21 05/13/2005 Pages TRM I B 3.11-22 and TRM I B 3.11-23 11/14/2006 Pages TRM I B 3.11-23a and TRM I B 3.11-23b 06/18/2013 Pages TRM I B 3.11-24 and TRM I B 3.11-24a 08/11/2016 Page TRM I B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Page TRM./ B 3.11-28 11/30/2005 Page TRM I B 3.11-29 02/19/2015 Pages TRM I B 3.11-30 and TRM I B 3.11-31 05/29/2013 Page TRM I B 3.11-32 08/31/1998 Page TRM I B 3.11-33 06/30/2010 Pages TRM I B 3.11-34 and TRM I B 3.11-35 08/31/1998 Page TRM I B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM I B 3.12-1 09/19/2007 Page TRM I B 3.12-2 11/29/2010 Page TRM I B 3.12-3 02/05/1999 SUSQUEHANNA-UNIT 2 TRM I LOES-9 EFFECTIVE DATE 10/06/2016
Rev. 10 TRM Post Accident Monitoring Instrumentation 3.3.4 3.3 Instrumentation 3.3.4 TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.3.4-1 ACTIONS
N 0 TES-------------------------------~------------------------
- 1. Separate condition entry is allowed for each Function.
- 2. The provisions of TRO 3.06 are not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required A.1 Enter the Condition Immediately channel inoperable.
referenced in Table 3.3.4-1 for the channel.
B.
As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of in Table 3.3.4-1.
monitoring the appropriate parameter(s)_.
AND B.2 Restore the required channel 7 days I 30 days (c) to OPERABLE status.
C.
As required by Required C. 1 Restore the required 30 days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.
D.
As required by Required D.1 Verify a minimum 14 of the Immediately Action A.1 and referenced associated acoustic monitor in Table 3.3.4-1 channels and 5 of the ADS AND SRV acoustic monitor channels are operable.
Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter lCJ COMPLETION TIME for REQUIRED ACTION B.2 is extended from 7 days to 30 days during construction activities associated with the replacement of SPING equipment with VERMS equipment.
SUSQUEHANNA - UNIT 2 TRM I 3.3-9 EFFECTIVE DATE 10/07/2015 I
Rev. 10 ACTIONS (continued)
CONDITION SUSQUEHANNA - UNIT 2 OR D.2 OR D.3 AND D.4.
TRM Post Accident Monitoring Instrumentation 3.3.4 REQUIRED ACTION COMPLETION TIME Verify SRV tailpipe Immediately temperature indication and alarm are available for the AND tailpipe associated with the inoperable acoustic monitor.
Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter Verify that the following Immediately alternate monitoring methods in TS Table 3.3.3.1-1 are OPERABLE:
AND (I Function 1
- Function 2
- Function 3 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 9
Function 10 thereafter Restore the required 30 days channel(s) to OPERABLE OR status.
At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.
TRM I 3.3-9a EFFECTIVE DATE 06/30/2010
Rev. 10 TRM Post Accident Monitoring Instrumentation 3.3.4 TECHNICAL REQUIREMENT SURVEILLANCE
N 0 TES--------------------------------------------------------
- 1.
Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.
- 2.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or an associated function is available.
SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level.
TRS 3.3.4.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATION of the Primary 92 days Containment H2 and 0 2 Analyzers.
SUSQUEHANNA - UNIT 2 TRM I 3.3-10 EFFECTIVE DATE 10/31/2007
- 1.
- 2.
- 3.
- 4.
- 5.
Rev. 10 TRM Post Accident Monitoring Instrumentation 3.3.4 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION*
CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE Suppression Chamber Air 1,2 2
c TRS 3.3.4.1 Temperature TRS 3.3.4.4 Main Steam Safety/Relief Valve 1,2 1/valve D
TRS 3.3.4.1 Position Indicator (Acoustic TRS 3.3.4.2 Monitor)
TRS 3.3.4.3 Reactor Building Vent Noble Gas Monitor
- a. Mid Range(bl 1,2, (a)
- b. High Range(bJ 1,2, (a) 1 B
TRS 3.3.4.1 TRS 3.3.4.4 Standby Gas Treatment System Vent Noble Gas Monitor
- a. Mid Range(b) 1,2, (a) 1 B
- b. High Range(bJ 1,2, (a) 1 B
TRS 3.3.4.1 TRS 3.3.4.4 Turbine Building Vent Noble Gas Monitor
- a. Mid Range(bl 1,2 B
- b. High Range(bJ 1,2 B
TRS 3.3.4.1 TRS 3.3.4.4 (continued)
SUSQUEHANNA - UNIT 2 TRM I 3.3-11 EFFECTIVE DATE 10/07/2015
- 6.
- 7.
- 8.
Rev. 10 TRM Post Accident Monitoring Instrumentation 3.3.4 TABLE 3.3.4-1 (continued)
TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE MODES OR OTHER SPECIFIED REQUIRED FUNCTION CONDITIONS CHANNELS Standby. Gas Treatment System Vent Stack Sampling System Flow
- a.
Effluent System 1,2, (a) flow rate monitor(bl
- b.
- Sample flow rate monitor(bl 1,2, (a)
(Mid/High Range &
Bypass)
Turbine Building Vent Stack Sampling System Flow
- a.
Effluent System 1,2 flow rate monitor(bl
- b. Sample flow rate monitor(bl 1,2 (Mid/High Range &
Bypass)
Containment H2 and 0 2 Analyzer(bl
- 1,2 2
(a)
When moving irradiated fuel in the secondary containment.
(b)
TRO 3.0.4.c is applicable.
SUSQUEHANNA - UNIT 2 TRM I 3.3-11a CONDITIONS REFERENCED FROM REQUIRED REQUIRED ACTION A.1 SURVEILLANCE c
TRS 3.3.4.1 TRS 3.3.4.5 EFFECTIVE DATE 10/06/2016
Rev. 7 3.11 Radioactive Effluents 3.11.2 Gaseous Effluents Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation TRO 3.11.2.6 The radioactive gaseous effluent monitoring instrumentation channels shown in Table 3.11.2.6-1 shall be OPERABLE with their setpoints established in accordance with the ODCM to ensure that the limits of Requirement 3.11.2.1 are not exceeded.
APPLICABILITY:
According to Table 3.11.2.6-1 ACTIONS
NOTE--------------------------------------------------------
- 1. Separate condition entry is allowed for each channel.
- 2. The provisions of TRO 3.0.6 are not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
Radioactive gaseous A.1 Suspend the release of Immediately effluent monitoring radioactive gaseous effluents instrumentation channel monitored by the affected alarm/trip setpoint less channel conservative than OR required to ensure that the limits of Requirement A.2 Declare the channel Immediately 3.11.2.1 are not inoperable exceeded (continued)
SUSQUEHANNA - UNIT 2 TRM I 3.11-25 EFFECTIVE DA TE 04/12/2007
Rev. 7 ACTIONS (continued)
CONDITION B.
Reactor Building B.1 Ventilation System Noble Gas Activity Monitor low range channel inoperable AND B.2 AND B.3 C.
Deleted D.
Reactor Building D.1 Ventilation Monitoring System Effluent System Flow Rate Monitor or AND Sampler Flow Rate Monitor inoperable D.2 SUSQUEHANNA-UNIT 2 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 REQUIRED ACTION COMPLETION TIME Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress.
Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of isotopic activity to the grab sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1)
Restore monitoring 30 days instrumentation.
Estimate flowrate.
Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> while release is in progress Restore monitoring 30 days.
instrumentation.
(continued)
TRM / 3.11-26 EFFECTIVE DATE 01/21/2004
-**'-"<=-*
~
Rev. 7 ACTIONS (continued)
CONDITION E.
Turbine Building Ventilation System Noble Gas Activity Monitor low range channel inoperable F.
Deleted G.
Turbine Building Ventilation Monitoring System: Effluent Flow Rate Monitor or Sample (Bypass or Low Range) Flow Rate Monitor inoperable SUSQUEHANNA - UNIT 2 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 REQUIRED ACTION COMPLETION TIME E.1 Verify mechanical vacuum Immediately pump is not in operation.
AND E.2 Take grab samples.
Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress AND E.3 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after isotopic activity to the sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1).
AND E.4 Restore monitoring 30 days instrumentation G.1 Estimate flow rate.
Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> while release is in progress.
AND G.2 Restore monitoring 30 days instrumentation (continued)
TRM I 3.11-27 EFFECTIVE DATE 08/11/2016
Rev. 7 ACTIONS (continued)
- coNDITION H.
Standby Gas Treatment System Noble Gas Activity Monitor low range channel inoperable I.
Deleted J.
SGTS Ventilation Monitoring System:
Effluent flow rate monitor or sample (Bypass or Low Range) flow rate monitor Inoperable.
SUSQUEHANNA - UNIT 2 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 REQUIRED ACTION COMPLETION TIME H.1 Take grab samples.
Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during operation of SGTS AND H.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of isotopic activity to the required grab sample being LLDs for principal noble gas taken.
gamma emitters (Table 3.11.2.1-1).
AND H.3 Restore monitoring 30 days instrumentation.
J.1 Estimate flow rate.
Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during operation of SGTS AND J.2 Restore monitoring 30 days Instrumentation.
(continued)
TRM I 3.11-28 EFFECTIVE DATE 10/06/2016
Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 Rev. 7 ACTIONS (continued)
CONDITION K.
Required Actions and Completion Times not met for Conditions B through J.
REQUIRED ACTION K.1 Explain why this inoperability was not corrected in a timely manner.
TECHNICAL REQUIREMENT SURVEILLANCE COMPLETION TIME In the next Radioactive Effluent Release Report per TS Section 5.6.
NOTE----------------------------------------------------
Refer to Table 3.11.2.6-1 to determine which TRSs apply for each Monitoring Function.
SURVEILLANCE FREQUENCY TRS 3.11.2.6.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.11.2.6.2 Deleted TRS 3.11.2.6.3 Perform Source Check 31 days TRS 3.11.2.6.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.11.2.6.5 Perform CHANNEL CALIBRATION 24 months SUSQUEHANNA - UNIT 2 TRM I 3.11-29 EFFECTIVE DA TE 12/03/2004
/
Rev. 7 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 TABLE 3.11.2.6-1 (Page 1 of 3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION FUNCTION
- 1.
REACTOR BUILDING VENTILATION MONITORING SYSTEM
- a.
Noble Gas Activity Monitor (Low Range)
- b.
Deleted
- c.
Deleted d
Effluent System Flow Rate Monitor
- e.
Sampler Flow Rate Monitor SUSQUEHANNA - UNIT 2 REQUIRED APPLICABILITY CHANNELS At all Times At all Times At all Times SURVEILLANCE REQUIREMENTS TRS 3.11.2.6.1 TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)
TRM I 3.11-30 EFFECTIVE DA TE 01/21/2004
Rev. 7 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 TABLE 3.11.2.6-1 (Page 2 of 3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION FUNCTION
- 2.
TURBINE BUILDING VENTILATION MONITORING SYSTEM
- a.
Noble Gas Activity Monitor (Low Range)
- b.
Deleted
- c.
Deleted
- d.
- e.
- f.
Effluent System Flow Rate Monitor Sample Flow Rate Monitor (Bypass)
Sample Flow Rate Monitor (Low Range)
SUSQUEHANNA - UNIT 2 APPLICABILITY At all Times At all Times At all Times At all Times TRM I 3.11-31 REQUIRED CHANNELS SURVEILLANCE REQUIREMENTS TRS 3.11.2.6.1 TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)
EFFECTIVE DATE 08/11/2016
Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 Rev. 7 TABLE 3.11.2.6-1 (Page 3 of 3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS
- 3.
STANDBY GAS TREATMENT SYSTEM (SGTS) MONITOR
- a.
Noble Gas Activity Monitor During TRS 3.11.2.6.1 (Low Range) operation of TRS 3.11.2.6.3 SGTS(a)
- b.
Deleted
- c.
Deleted
- d.
Effluent System Flow Rate Monitor During TRS 3.11.2.6.1 operation of TRS 3.11.2.6.4 SGTS(aJ TRS 3.11.2.6.5
- e.
Sample Flow Rate Monitor (Bypass)
During TRS 3.11.2.6.1 operation of TRS 3.11.2.6.4 SGTS(aJ TRS 3.11.2.6.5
- f.
Sample Bypass Flow Rate Monitor During TRS 3.11.2.6.1 (Low Range) operation of TRS 3.11.2.6.4 SGTS(aJ TRS 3.11.2.6.5 (a)
TRO 3.0.4.c is applicable.
SUSQUEHANNA - UNIT 2 TRM I 3.11-32 EFFECTIVE DATE 10/06/2016
Rev. 6 TRM Post Accident Monitoring Instrumentation B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to display plant variables that provide informati~m required by the control room operators during accident situations. The OPERABILITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables following an accident. This capability is consistent with the recommendations of Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Ass.ess Plant Conditions During and following an Accident,"
NUREG-0578, "TMl-2 Lessons Learned Task Force Status Report and Short-Term Recommendations" and NED0-33160-A Revision 1; "Regulatory Relaxation For The Post Accident SRV Position Indication System" (Reference 6). It should be noted that the Technical Specifications LCO 3.3.3.1 contains all Category 1, non-type A instruments and Regulatory Guide 1.97 Type A instrument (References 1 and 2). This TRO requires instruments outside of these criteria.
Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pressure suppression system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for the purposes of this TRM. The recorders are the primary method of indication used by operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.
TE-25725 TT-25703 TT-25725 TR-25795A TR-257958 Main Steam Safety/Relief Valve Position Indicators (Acoustic Monitors) provide indication when the valves are functioning. Alternate methods for monitoring SRV position include SRV Tailpipe Temperature and the following Functions from Technical Specification Table 3.3.3.1-1:
Suppression Chamber Water Level (Function 3)
Suppression Chamber Water Temperature (Function 10)
Reactor Vessel Water Level (Function 2)
Reactor Steam Dome Pressure (Function 1)
(continued)
SUSQUEHANNA - UNIT 2 TRM I B 3.3-4 EFFECTIVE DATE 06/30/2010
Rev.6 TRM Post Accident Monitoring Instrumentation B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO (continued)
The required channels for REACTOR BUILDING VENT Noble Gas Monitor, Standby Gas Treatment System Vent Noble Gas Monitor, and Turbine Building Vent Noble Gas Monitor provide information regarding the release of radioactive materials to allow for early indication of the need to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat.
For the Noble Gas Monitors the only required channels are the mid range and high range.
The drywell and suppression chamber hydrogen and oxygen concentrations gas an.alyzers monitor hydrogen and oxygen concentration to detect combustible gas levels in primary containment. The analyzers are capable of determining hydrogen concentration in the range of O to 30% by volume and oxygen
- concentration in the range of 0 to 10% by volume, and each provide control room indication and output to a control room recorder. Each gas analyzer must be
- capable of sampling either the drywell or the suppression chamber. The recorders are the primary method of indication available for use by the operator during an accident, therefore the PAM Specification deals specifically with this portion of the instrument channel. The gas analyzer piping is provided with heat tracing to reduce the buildup of condensation in the system. H202 Analyzers can be considered OPERABLE for accident monitoring for up to 100 days with their heat tracing INOPERABLE.
The vent effluent monitor for the Turbine Building and Standby Gas Treatment System (SGTS) is a wide range noble gas monitor. The Effluent channel #4 for each of the Turbine and SGTS displays the release rate in uCi/min using the best detector in range. Upscale and failure alarms originate from the Effluent channel. There are 3 detectors for each wide range gas monitor, low, mid and high range. During normal plant operations, the low range channel will be selected for Effluent channel calculation. The mid and high range detectors are in standby mode. The mid and high range detectors are activated and selected automatically based upon the monitored noble gas concentration. During high range noble gas releases, the mid and high range detectors are activated and the low range noble gas detector loop is selected in standby mode. Faults detected by the vent effluent monitor will be annunciated in the main control room overhead annunciator via the Effluent channel.
These loops can be considered Operable if the Effluent release rate channel is not alarmed.
(continued)
SUSQUEHANNA - UNIT 2 TRM I B 3.3-5 EFFECTIVE DATE 10/06/2016
Rev. 6 TRM Post Accident Monitorjng Instrumentation B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO (continued)
ACTIONS The Turbine Building and SGTS vent sample flow system operates to support the detector selection requirements. Normally the low range sample flow is operating to support the low range detector. On detection of an upscale noble gas release, the mid/high range sample pump that is normally in standby mode is activated to draw a sample through the mid and high range noble gas detectors and low range sample flow system is in standby mode. The mid I high range sample is then selected and low range sample flow is activated automatically when noble gas concentrations return to normal levels. The bypass sample flow system is designed to make up the proper sample flow rate from the isokinetic nozzle array. For the Turbine Building monitor, the bypass system is required to operate continuously. For the SGTS, the bypass system is in standby mode until high range noble gas is sensed and the bypass system is automatically activated and selected as required. These loops can be considered Operable if the Effluent release rate channel is not alarmed.
The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
During construction activities that replace existing SPING equipment with new VERMS equipment, the Vent Noble Gas Monitor for each release path is anticipated to be inoperable for longer than 7 days. Restoration completion time to return the affected channel to OPERABLE status to support construction activities is extended to 30 days. This condition is. compensated for by the enhanced Preplanned Alternate Monitoring Plan per REQUIRED ACTION B.1.
Action D requirements were determined by balancing the safety significance of the system with the impact of the actions on the operating unit. The loss of the acoustic monitors is not safety significant providing the diverse and redundant alternate methods of determining SRV position are available. System components in the control room are restorable within 30 days without unit operation impact. Components located in containment require a unit shutdown to gain access to individual components; The system channels shall be restored to operable condition at earliest opportunity.
(continued)
SUSQUEHANNA - UNIT 2 TRM I B 3.3-Sa EFFECTIVE DATE 10/06/2016
Rev.6 TRM Post Accident Monitoring Instrumentation B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES ACTIONS
.(continued)
TRS Noble gas monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.
Components of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement. Tailpipe temperature is the direct process monitoring, alternate method and is not covered by Technical Specification LCO's as are the other alternative methods.
The Technical Requirement Surveillances (TRS) are modified by two Notes.
Note 1 states that the TRSs for each Post Accident Monitoring instrumentation Function are located in the SR column of Table 3.3.4-1.
Note 2 modifies the Surveillances to indicate that when a channel is placed in a inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or associated Function are available. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken.
(continued)
SUSQUEHANNA - UNIT 2 TRM I B 3.3-6 EFFECTIVE DATE 10/06/2016
Rev. 6 TRM Post Accident Monitoring Instrumentation B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS (continued)
The alternate means of monitoring the parameter or the associated function are:
Parameter Suppression Chamber Air Temperature Main Steam Safety/Relief Valve Position Indicator Containment H2 and 02 Analyzer Alternate Means/Associated Function One channel of Suppression Chamber Air Temperature Suppression Pool level Suppression Pool Temperature RPV level RPV pressure SRV Tailpipe Temperature One channel of Containment H2 and 0 2 The TRSs are defined to be performed at the specified Frequency to ensure that the TRM PAM Function is maintained OPERABLE.
(continued)
SUSQUEHANNA-UNIT 2 TRM I B 3.3-7 EFFECTIVE DATE 10/07/2015
Rev. 6 TRM Post Accident Monitoring Instrumentation B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation
- BASES TRS (continued)
TRS 3.3.4.1 Performance of the CHANNEL CHECK once every 31 days ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to operate properly between each
. CHANNEL CALIBRATION.
~
Agreement criteria, which are determined by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability.
If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.
REFERENCES
- 1.
Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident."
- 2.
NUREG-0578, "TMl-2 Lessons Learned Task Force Status Report and Short-Term Recommendations."
- 3.
Technical Specification Amendment No. 100 to License No. NPF-22 for failed Unit 2 "S" acoustic monitor.
- 4.
Technical Specification Amendment No. 169 to License No. NPF-14 for failed Unit 1 "S" acoustic monitor.
- 5.
Proposed amendment No. 183 to License No. NPF-22 failed Unit 2 "J" acoustic monitor.
- 6.
NED0-33160-A, Revision 1, "Regulatory Relaxation For The Post Accident SRV Position Indication System," dated October 2006.
- 7.
NRC letter, "Final Safety Evaluation For Boiling Water Reactor Owners' Group (BWROG) Topical Report (TR) NED0-33160, Regulatory Relaxation For The Post Accident SRV [Safety Relief Valve] Position Indication System (TAC No. MC5446)," dated September 26, 2006.
SUSQUEHANNA-UNIT 2 TRM I B 3.3-8 EFFECTIVE DATE 06/30/2010