ML16298A387

From kanterella
Jump to navigation Jump to search
Revision to Technical Requirements Manual
ML16298A387
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 10/18/2016
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16298A387 (45)


Text

Oct. 18, 2016 Page 1 of 2

  • MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2016-35205 USER INFORMATION:

GERLACH*ROSEY M EMPL#: 02 8401 CA#: 03 63 Address: NUCSA2 Phone#: 542-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSEY M 10/18/2016 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 09/12/2016 ADD MANUAL TABLE OF CONTENTS DATE: 10/17/2016 CATEGORY: DOCUMENTS TYPE: TRM2

Oct. 18, 2016 Page 2 of 2

  • ID: TEXT 3.11.2.6 ADD: REV: 7 REMOVE: REV:6 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT 3.3.4 REMOVE: REV: 9 ADD: REV: 10 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT B3.3.4 ADD: REV: 6 REMOVE: REV:S CATEGORY: DOCUMENTS TYPE: TRM2
  • ID: TEXT LOES REMOVE:

ADD:

REV: 9 0 REV: 91 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX .

t SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 10/17 /2016 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 91 10/17 /2016

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 25 05/10/2016

Title:

TABLE OF CONTENTS TEXT 1 .1 0 11/19/2002

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS

  • TEXT 2.2 11 01/31 /2 014 Title : PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3 . 0 6 03/05/2015

Title:

APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1 .2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4 05/14/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATI ON TEXT 3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE 12 11/10/2015 TEXT 3.2.1

Title:

CORE OPERATING LIMITS REPORT (COLR)

Page 1. of li Report Date : 10 / 17 /1 6

SSES MANUAL .,

Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3 .3. 1 0 11/19/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 10 10/17 /2016

Title:

INSTRUMENTATION TRM POST - ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4 04/29/2014

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2 11/10/2015

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3. 3 . 9 3 05/14/2009

Title:

INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004 Title : INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION

,J 0 TEXT 3. 3 .12 Page 2.

1 03/05/2015 Title : WATER MONITORING INSTRUMENTATION of 15 Report Date: 10/17/16

SSES MANITAL

'j

    • Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.4 2 05/14/2009

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR.VESSEL MATERIALS

  • TEXT 3.4.6 1 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2 04/29/2014

Title:

SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION

  • TEXT 3.6.3 Page .3-0 11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION of 15 Report Date: 10/17/16

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0 11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 09/08/2016

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 4

Title:

PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 05/16/2016 04/16/2009

Title:

PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006

Title:

PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 11 09/27/2012

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 Page .4.

1 04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM of li Report Date: 10/17/16

SSES MANUAL

  • Manual Name: . TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 1 03/05/2015

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION

  • - TEXT 3.7.8 MONITORING INSTRUMENTATION

Title:

PLANT SYSTEMS SNUBBERS 9

1 03/05/2015 08/28/2006 TEXT 3.7.9

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 2 04/29/2014

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 1 10/02/2009

Title:

PLANT SYSTEMS TEXT 3.8.l 3 06/20/2012

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.l 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS

  • TEXT 3.8.2.2 Page .5. of AUTOMATIC 15 2 12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

Report Date: 10/17/16

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3 2 06/20/2012

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 2 12/14/2006

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2 10/22/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM

~."::.""::..

.. _ TEXT 3 . 9 . 1 TEXT 3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS DECAY TIME 0 11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

Page .Q_

TEXT 3 . 11. 1. 1 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION of li Report Date: 10/17/16

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3 . 11 . 1. 4 2 10/09/2012

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3 . 11 . 1 . 5 3 03/05/2015

Title:

RADIOACTIVE EFFLUENTS RADIOACTI"VE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE RATE

    • TEXT 3.11.2.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3 . 11 . 2 . 5 4 07/03/2013

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 7 10/17/2016

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3 .11.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE

  • TEXT 3 .11. 4 .1 4 03/05/2015

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM Page]_ of l5. Report Date: 10/17/16

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4 04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION

  • TEXT 4. 2 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS TRAINING Page .B. of 15 Report Date: 10/17/16

SSES MANUAL Manual Name: TRM2 Manual. Titl.e: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 6 03/05/2015

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 2 04/29/2014

Title:

REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES .CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 1 01/31/2014

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMEN'I'ATION TEXT B3.3.3 2 11/09/2007

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 6 10/17/2016

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK

    • TEXT B3.3.6 5 01/31/2014

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION of 15 Report Date: 10/17/16 Page~

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7 2 11/10/2015

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003

Title:

INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3 05/14/2009

Title:

INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3 02/22/2012

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION

~-:-: TEXT B3 . 3 . 12 0 04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.4.6 Page 10 1 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION of 15 Report Date: 10/17/16

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0 11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002

.Title: CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION

  • TEXT B3.6.3 INDICATION 1 04/19/2007

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS i TEXT B3. 7. 3. 3 0 11/19/2002

Title:

PLANT SYSTEMS BASES C02 SYSTEMS Page l l of 12 Report Date: 10/17/16

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIRETxIENTS MANUAL UNIT 2 TEXT B3.7.3.4 2 04/29/2014

Title:

PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3 09/27/2012

Title:

PLANT SYSTEMS BASES FIRE DETECTION INSTRUTxIENTATION TEXT B3.7.4 0 11/19/2002

Title:

PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATTx!ENT LOGARITHMIC RADIATION MONITORING INSTRUTx!ENTATION TEXT B3.7.8 Page 12 4

Title:

PLANT SYSTEMS BASES SNUBBERS of 15 01/31/2014 Report Date: 10/17/16

SSES MANUAL

  • Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 2 12/08/2011

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2 04/14/2010

Title:

STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

  • CONTINUOUS TEXT B3.8.2.2 1 09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

TEXT B3.8.3 AUTOMATIC 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3 06/20/2012

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM

  • TEXT B3.9.1 Page 13 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME of 15 Report Date: 10/17/16

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 04/10/2007

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3 . 10 . 3 0 11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.ll.1.l 1 05/10/2016

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.l.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3 . 11 . 1. 3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3 .11. l. 4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3 . 11 . 1. 5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.l 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.ll.2.2 Page 14 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES of 15 Report Date: 10/17/16

SSES MANUAL

  • Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.ll.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.ll.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.ll.2.5 5 07/03/2013

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3 .11. 2. 6 2 09/08/2016

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.ll.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE

  • TEXT B3 .11. 4 .1 5 03/05/2015

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS

  • Page 15 of li Report Date: 10/17/16

SU SQUEHANNA STEAM ELECTRIC STATION Rev. 9 1

  • LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MA NUAL)

Secti on TOC 1.0 Title TABLE OF CONTENTS USE AND APPLICATION Effecti ve Date 04/28/2016 Page TRM I 1.0-1 08/31/1998 Page TRM I 1.0-2 10/04/2002 Page TRM I 1.0-3 08/3 1/1998 2.0 PLA NT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM I 2.0-2 and TRM 2.0-3 01/28/2005 Page TR M I 2 .0-4 06/25/2002 Page TR M I 2.0-5 01/21/201 4 Page TRM I 2.0-6 04/15/2009 Page TRM I 2.0-7 05/15/2008 Pages TRM I 2.0-8 and TRM I 2.0-9 01/07/201 1 Page TRM I 2.0-10 02/02/2010 Page TRM I 2 .0-1 1 11/15/2004 Page TRM I 2.0-12 04/15/2009 Pages TRM I 2.0-13 and TRM I 2.0-1 4 11/15/2004 Page TRM I 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM I 3.0-1 and TRM I 3.0-2 02/19/2015 Page TRM I 3.0-3 03/15/2002 Page TRM I 3.0-4 02/19/2015 3.1 REACTIVITY CONTROL SYSTEMS Page TRM I 3.1-1 10/31 /2007 Pages TRM I 3.1-2 through TRM I 3.1-5 08/31 /1998 Page TRM I 3.1-6 03/27/2007 Page TRM I 3.1-7 04/15/2009 Page TRM I 3.1-8 03/27/2007 Pages TRM I 3.1-9 and TRM I 3.1-9a 02/18/1999 Page TRM I 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM I 3.2-1 08/31/1998 Pages TRM I 3.2-2 through TRM I 3.2-63 11/04/2015 3.3 INSTRUMENTATION Pages TRM I 3.3-1 through TRM I 3.3-3 07/16/1999 Pages TRM I 3.3-4 and TRM I 3.3-5 10/31/2007 Page TRM I 3.3-6 03/10/2011 Page TRM 3.3-7 10/31 /2007 Page 3.3-8 08/31 /1998 4t SUSQUEHANNA - UNIT 2 TRM I LOES-1 EFFECTIVE DATE 10/06/2016

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section Title Page TRM I 3.3-9 Page TRM I 3.3-9a Page TRM I 3.3-10 Effective Date 10/07/2015

. 06/30/2010 10/31/2007 Page TRM I 3.3-11 10/07/2015 Page TRM/ 3.3-11 a 10/06/2016 I Page TRM I 3.3-12 03/30/2001 Page TRM I 3.3-13 01/07/2011 Page TRM I 3.3-14 12/14/1998 Page TRM I 3.3-15 04/11/2014 Page TRM I 3.3-16 01/07/2011 Page TRM I 3.3-17 11/04/2015 Page TRM I 3.3-17a 11/04/2015 Page TRM I 3.3-18 10/31/2007 Pages TRM I 3.3-19 and TRM I 3.3-20 10/22/2003 Page TRM I 3.3-21 04/15/2009 Page TRM I 3.3-21a 11/15/2004 Pages TRM /3.3-21b through TRM I 3.3-21d 03/27/2007 Page TRM I 3.3-22 12/03/2004 Pages TRM I 3.3-23 and TRM I 3.3-24 05/16/2003 Page TRM I 3.3-25 10/22/2003 Page TRM I 3.3-26 02/19/2015 Page TRM I 3.3-27 0410712009 3.4 REACTOR COOLANT SYSTEM Page TRM I 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM I 3.4-6 through TRM I 3.4-8 04/01/2009 Page 3.4-9 08/31/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM I 3.4-12 04/17/2009 Page TRM I 3.4-13 03/31/2006 Page TRM I 3.4-14 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM I 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM /.3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 and 3.6-2 08/31/1998 Pages TRM I 3.6-3 and TRM I 3.6-3a 04/16/2014 Page 3.6-4 08/31/1998 Page TRM I 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM I 3.6-7 through TRM I 3.6-9 12/31/2002 SUSQUEHANNA - UNIT 2 TRM I LOES-2 EFFECTIVE DATE 10/06/2016

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section
3. 7 Title PLANT SYSTEMS Pages TRM I 3.7-1 and TRM I 3.7-2 Page 3.7-3 Effective Date 07/29/1999 08/31/1998 Page TRM I 3.7-4 03/31/2006 Pages TRM I 3. 7-5 through TRM I 3. 7-7 08/18/2016 Page TRM / 3.7-8 08/02/1999 Pages TRM I 3.7-9 and TRM I 3.7-10 04/07/2009 Page TRM I 3.7-11 01/21/2000 Page TRM I 3.7-12 08/02/1999 Page TRM I 3.7-13 05/09/2016 Page TRM I 3.7-14 08/09/2005 Pages TRM I 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM I 3. 7-20 through TRM I 3. 7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Page TRM / 3.7-25 08/02/1999 Page TRM / 3.7-26 09/25/2012 Page TRM / 3.7-27 11/24/2011 Pages TRM I 3. 7-28 through TRM I 3. 7-32a 09/25/2012
  • Page TRM / 3.7-33 09/25/2012 Page TRM / 3.7-34 03/31/2006 Pages TRM / 3.7-35 and TRM / 3.7-36 02/01/1999 Page TRM / 3.7-37 02/19/2015 Page TRM / 3.7-38 08/31/1998 Page TRM / 3.7-39 03/31/2006 Page TRM i 3.7~40 05/24/2012 Pages TRM I 3. 7-40a through TRM / 3. 7-40c 05/24/2012 Page TRM / 3.7-41 09/04/2008 Page TRM / 3.7-42 08/31/1998 Pages TRM I 3. 7-43 02/19/2015 Pages TRM / 3.7-44 and TRM / 3.7-45 10/05/2006 Page TRM / 3.7-46 06/07/2007 Page TRM / 3.7-47 09/05/2012 Page TRM / 3.7-48 06/07/2007 Page TRM / 3.7-49 03/09/2001 Page TRM / 3.7-50 08/16/2006 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 Page TRM / 3.7-54 04/01/2009 Page TRM I 3. 7-55 09/25/2009 Page TRM I 3.7-56 04/01/2009
  • SUSQUEHANNA - UNIT 2 TRM I LOES-3 EFFECTIVE DATE 10/06/2016

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section 3.8 Title ELECTRICAL POWER Page TRM / 3.8-1 Page TRM / 3.8-2 Effective Date 0410212002 01/28/2005 Pages TRM / 3.8-3 and TRM / 3.8-4 06/12/2012 Pages TRM / 3.8-5 and TRM / 3.8-6 0410212002 Pages TRM / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM / 3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 06/12/2012 Page TRM / 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 0410212002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM I 3.8-21 and TRM / 3.8-22 06/06/1999 Page TRM / 3.8-23 11/07/2013 Page TRM / 3.8-24 11/30/2011 Page TRM / 3.8-25 06/11/2012 Pages TRM I 3.8-25a and TRM / 3.8-25b 11/30/2011 Page TRM / 3.8-26 05/28/2009 Page_ TRM / 3.8-27 11/29/2006 Page TRM / 3.8-28 05/28/2009 Page TRM / 3.8-29 10/20/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Pages TRM I 3.10-5 and TRM / 3.10-6 03/27/2007 Page TRM / 3.10-7 06/10/2010 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 and TRM / 3.11-8 08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10 10/09/2012 Pages TRM { 3.11-11 and TRM I 3.11-12 08/31/1998 SUSQUEHANNA - UNIT2 TRM I LOES-4 EFFECTIVE DATE 10/06/2016

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section Title Page TRM I 3.11-13 Page TRM I 3.11-14 Pages 3.11-15 and 3.11-16 Effective Date 02/19/2015 12/03/2004 09/01/1998 Page TRM I 3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM I 3.11-19 08/15/2005 Pages TRM I 3.11-20 and TRM I 3.11-21 03/31/2006 Page TRM I 3.11-22 0410212002 Page TRM I 3.11-23 11/14/2006 Page TRM I 3.11-24 06/18/2013 Page TRM I 3.11-25 04/12/2007 Page TRM I 3.11-26 01/21/2004 Page TRM I 3.11-27 08/11/2016 Page TRM I 3.11-28 10/06/2016 Page TRM I 3.11-29 12/03/2004 Page TRM I 3.11-30 01/21/2004 Page TRM I 3.11-31 08/11/2016 Page TRM I 3.11-32 10/06/2016 Page TRM I 3.11-33 03/31/2006 Page 3. 11-34 08/31/1998 Page TRM I 3.11-35 03/31/2006 Pages TRM I 3.1 ~-36 through TRM I 3.11-39 11/30/2005 Page TRM I 3.11-40 . 02/19/2015 Pages TRM I 3.11-41 through TRM I 3.11-44 08/31/1998 Page TRM I 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM I 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM I 3.12-1 through TRM I 3.12-3 02/05/1999 Page TRM I 3.12-4 03/14/2008 Page TRM I 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages TRM I 4.0-1 through TRM I 4.0-3 08/31/1998 Page TRM I 4.0-4 12/11/2008 Pages TRM I 4.0-5 through TRM I 4.0-8 08/31/1998
  • SUSQUEHANNA - UNIT 2 TRM I LOES-5 EFFECTIVE DATE 10/06/2016

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section B 3.0 Title APPLICABILITY BASES Pages TRM I B 3.0-1 through TRM I B 3.0-3 Page TRM I B 3.0-4 Effective Date 08/31/1998 02/19/2015 Pages TRM I B 3.0-4a and TRM I B 3.0-4b 02/19/2015 Page TRM I B 3.0-5 02/19/2015 Page TRM I B 3.0-6 06/12/2012 Pages TRM I B 3.0-7 through TRM I B 3.0-9 08/31/1998 Pages TRM I B 3.0-10 and TRM I B 3.0-11 03/15/2002 Page TRM I B 3.0-12 11/30/2005 Pages TRM I B 3.0-13 through TRM I B 3.0-15 02/19/2015 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM I B 3.1-1 07/13/1999 Page TRM I B 3.1-2 04/16/2014 Page TRM I B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Pages TRM I B 3.1-5 through TRM I B 3.1-7 03/27/2007 Page TRM I B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM I B 3.3-1 01/21/2014 Page TRM I B 3.3-2 03/10/2011 Page TRM I B-3.3-2a 10/31/2007 Pages TRM I B 3.3-3 and TRM I B 3.3-3a 10/31/2007 Page TRM I B 3.3-4 06/30/2010 Pages TRM I B 3.3-5 and TRM I B 3.3-5a 10/06/2016 Page TRM I B 3.3-6 10/06/2016 Page TRM I B 3.3-7 10/07/2015 Page TRM I B 3.3-8 06/30/2010 Page TRM I B 3.3-9 10/31/2007 Page TRM I B 3.3-10 01/07/2011 Page TRM I B 3.3-11 02/21/2014 Pages TRM I B 3.3-12 and. TRM I B 3.3-13 01/07/2011 Page TRM I B 3.3-14 06/25/2002 Page TRM I B 3.3-14a 11/04/2015 Page TRM I B 3.3-14b 11/04/2015 Page TRM I B 3.3-14c 11/04/2015 Pages TRM I B 3.3-15 through TRM I B 3.3-17 10/22/2003 Pages TRM I B 3.3-18 and TRM I B 3.3-19 0312712007 Pages TRM I B 3.3-19a and TRM I B 3.3-19b 0312712007 Page TRM I B 3.3-19c 04/17/2009 .
  • -~* SUSQUEHANNA - UNIT 2 TRM/ LOES-6 EFFECTIVE DATE 10/06/2016

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section Title Pages TRM I B 3.3-19d and TRM I B 3.3-19e Page TRM I B 3.3-20 Page TRM I B 3.3-21 Effective Date 03/27/2007 02/16/2012 08/03/2010 Page TRM I B 3.3-22 10/22/2003 Page TRM I B 3.3-23 05/16/2003 Pages TRM I B 3.3-24 and TRM I B 3.3-25 0410712009 B 3.4 REACTOR COOLANT SYSTEM BASES Page TRM I B 3.4-1 . 08/31/1998 Pages TRM I B 3.4-2 and TRM I 83.4-3 . 04/01/2009 Pages TRM I B 3.4-4 and TRM I B 3.4-4a 10/31/2007

.Page TRM I B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Page TRM I B 3.4-7 04/25/2013 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM I B 3.5-3 and TRM I B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM I B 3.5-5 10/31/2007

  • B 3.6 CONTAINMENT BASES Page TRM I B 3.6-1 Page TRM I B 3.6-2 Page B 3.6-3 Page TRM I B 3.6-4 Page TRM I B 3.6-5 07/26/2001 02/01/1999 08/31/1998 03/29/2007 0410412007 Page TRM I B 3.6-6 12/03/2004 Pages TRM I B 3.6-7 through TRM I B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM I B 3.7-3 06/10/2010 Page TRM I B 3.7-3a 12/27/2007 Page TRM I B 3.7-4 03/31/2006 Page TRM I B 3.7-5 08/02/1999 Pages TRM I B 3. 7-6 and TRM I B 3. 7.-6a 03/31/2006 Pages TRM I B 3.7-7 and TRM I B 3.7-7a 08/02/1999 Page TRM I B 3.7-8 08/02/1999 Page TRM I B 3.7-9 04/11/2014 Page TRM I B 3.7-10 08/02/1999
  • SUSQUEHANNA - UNIT 2 TRM I LOES-7 EFFECTIVE DATE 10/06/2016

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section Title Pages TRM I B 3.7-10a through TRM I B 3.7-11a Pages TRM I B 3.7-12 and TRM I B 3.7-13 Pages TRM I B 3.7-14 through TRM I B 3.7-14b Effective Date 03/31/2006 08/02/1999 09/25/2012 Pages TRM I B 3.7-15 and TRM I B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM I B 3.7-21 05/29/2013 Pages TRM I B 3.7-21a through TRM I B 3.7-21d 05/24/2012 Pages TRM I B 3.7-21e through TRM I B 3.7-21g 05/29/2013 Pages TRM I B 3.7-22 and TRM I B 3.7-23 01/30/2008 Page TRM I B 3. 7-24 10/05/2006 Page TRM I B 3. 7-25 01/21/2014 Pages TRM I B 3. 7-26 through TRM I B 3. 7-29 10/05/2006 Page TRM I B 3.7-30 06/07 /2007.

Page TRM I B 3.7-30a 10/05/2006 Page TRM I B 3.7-30b 01/21/2014 Page TRM I B 3.7-31 11/30/2011 Page TRM I B 3. 7-32 03/09/2001 Page TRM I B 3.7-33 04/15/2003 Page TRM I B 3.7-34 12/03/2004 Page TRM I B 3.7-35 07/05/2000 Pages TRM I B 3. 7-36 and TRM I B 3. 7-37 04/01/2009 Page TRM I B 3. 7-38 09/25/2009 Page TRM I B 3. 7-39 04/01/2009 Page TRM I B 3. 7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM I B 3.8-1 04/02/2002 Pages TRM I B 3.8-2 01/28/2005 Page TRM I B 3.8-2a 03/01/2010 Pages TRM I B 3.8-3 and TRM I B 3.8-3a 04/02/2002

. Page TRM I B 3. 8-4 09/03/2004 Page TRM I B 3.8-4a 0410212002 Page TRM I B 3.8-5 08/31/1998 Pages TRM I B 3.8-6 through TRM I B 3.8-15 04/02/2002 Page TRM I B 3.8-16 11/07/2013 Page TRM I B 3.8-17 11/30/2011 Page TRM I B 3.8-17a 06/11/2012 Page TRM I B 3.8-17b 11/30/2011 Pages TRM I B 3.8-18 through TRM I B 3.8-20 05/29/2013 Pages TRM I B 3.8-21 and TRM I B 3.8-22 05/28/2009 Page TRM I B 3.8-23 05/29/2013 Page TRM I B 3.8-24 05/28/2009

  • SUSQUEHANNA - UNIT 2 TRM I LOES-8 EFFECTIVE DATE 10/06/2016

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 91 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

  • Section B.3.9 Title REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Effective Date 08/31/1998 Pages B 3.9-3 through B 3.9-7 1_0/23/! 998 B 3.10 MISCELLANEOWS BASES Page B 3.10-1 08/31/1998 Pages TRM I B 3.10-2 and TRM I B 3.10-3 03/27/2007 Pages TRM I B 3.10-4 and TRM I 8 3.10-5 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages TRM I B 3.11-1 and TRM I B 3.11-2 08/31/1998 Page TRM I B 3.11-3 04/28/2016 Pages B 3.11-4 through B 3.11-9 08/31/1998 Page TRM I B 3.11-10 02/01/1999 Pages TRM I B 3.11-11 and TRM I B 3.11-11a 04/07/2000 Pages TRM I B 3.11-12 and TRM I B 3.11-13 02/01/1999 Page TRM I B 3.11-14 12/03/2004 Page TRM I B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Pages TRM I B 3.11-20 and TRM I B 3.11-20a 04/02/2002 Page TRM I B 3.11-21 05/13/2005 Pages TRM I B 3.11-22 and TRM I B 3.11-23 11/14/2006 Pages TRM I B 3.11-23a and TRM I B 3.11-23b 06/18/2013 Pages TRM I B 3.11-24 and TRM I B 3.11-24a 08/11/2016 Page TRM I B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Page TRM./ B 3.11-28 11/30/2005 Page TRM I B 3.11-29 02/19/2015 Pages TRM I B 3.11-30 and TRM I B 3.11-31 05/29/2013 Page TRM I B 3.11-32 08/31/1998 Page TRM I B 3.11-33 06/30/2010 Pages TRM I B 3.11-34 and TRM I B 3.11-35 08/31/1998 Page TRM I B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM I B 3.12-1 09/19/2007 Page TRM I B 3.12-2 11/29/2010 Page TRM I B 3.12-3 02/05/1999
  • SUSQUEHANNA- UNIT 2 TRM I LOES-9 EFFECTIVE DATE 10/06/2016

TRM Post Accident Monitoring Instrumentation Rev. 10 3.3.4

  • 3.3 3.3.4 Instrumentation TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.4-1 ACTIONS


N 0 TES-------------------------------~------------------------

1. Separate condition entry is allowed for each Function.
2. The provisions of TRO 3.06 are not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Enter the Condition Immediately channel inoperable. referenced in Table 3.3.4-1 for the channel.

B. As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

  • Action A.1 and referenced in Table 3.3.4-1.

AND B.2 alternate method of monitoring the appropriate parameter(s)_.

Restore the required channel 7 days I 30 days (c)

I to OPERABLE status.

C. As required by Required C. 1 Restore the required 30 days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.

D. As required by Required D.1 Verify a minimum 14 of the Immediately Action A.1 and referenced associated acoustic monitor in Table 3.3.4-1 channels and 5 of the ADS AND SRV acoustic monitor channels are operable. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter lCJ COMPLETION TIME for REQUIRED ACTION B.2 is extended from 7 days to 30 days during construction activities associated with the replacement of SPING equipment with VERMS equipment.

  • SUSQUEHANNA - UNIT 2 TRM I 3.3-9 EFFECTIVE DATE 10/07/2015

TRM Post Accident Monitoring Instrumentation Rev. 10 3.3.4

    • ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME OR D.2 Verify SRV tailpipe Immediately temperature indication and alarm are available for the AND tailpipe associated with the inoperable acoustic monitor. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter OR D.3 Verify that the following Immediately alternate monitoring methods in TS Table 3.3.3.1-1 are OPERABLE: AND (I

Function 1

  • Function 2
  • Function 3 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 9 Function 10 thereafter AND D.4. Restore the required 30 days channel(s) to OPERABLE status. OR At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components .
  • SUSQUEHANNA - UNIT 2 TRM I 3.3-9a EFFECTIVE DATE 06/30/2010

TRM Post Accident Monitoring Instrumentation Rev. 10 3.3.4

  • TECHNICAL REQUIREMENT SURVEILLANCE

N 0 TES--------------------------------------------------------

1. Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or an associated function is available.

SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 Perform CHANNEL FUNCTIONAL TEST 92 days

      • TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip Setpoint shall be less than or equal to 0.25 of the full open noise level.

24 months TRS 3.3.4.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATION of the Primary 92 days Containment H2 and 0 2 Analyzers .

  • SUSQUEHANNA - UNIT 2 TRM I 3.3-10 EFFECTIVE DATE 10/31/2007

TRM Post Accident Monitoring Instrumentation Rev. 10 3.3.4

  • TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION* CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
1. Suppression Chamber Air 1,2 2 c TRS 3.3.4.1 Temperature TRS 3.3.4.4
2. Main Steam Safety/Relief Valve 1,2 1/valve D TRS 3.3.4.1 Position Indicator (Acoustic TRS 3.3.4.2 Monitor) TRS 3.3.4.3
3. Reactor Building Vent Noble Gas Monitor
a. Mid Range(bl 1,2, (a) B TRS 3.3.4.1 TRS 3.3.4.4
b. High Range(bJ 1,2, (a) 1 B TRS 3.3.4.1 TRS 3.3.4.4
4. Standby Gas Treatment System Vent Noble Gas Monitor
a. Mid Range(b) 1,2, (a) 1 B TRS 3.3.4.1 TRS 3.3.4.4
b. High Range(bJ 1,2, (a) 1 B TRS 3.3.4.1 TRS 3.3.4.4
5. Turbine Building Vent Noble Gas Monitor
a. Mid Range(bl 1,2 B TRS 3.3.4.1 TRS 3.3.4.4
b. High Range(bJ 1,2 B TRS 3.3.4.1 TRS 3.3.4.4 (continued)
    • SUSQUEHANNA - UNIT 2 TRM I 3.3-11 EFFECTIVE DATE 10/07/2015

TRM Post Accident Monitoring Instrumentation Rev. 10 3.3.4

  • TABLE 3.3.4-1 (continued)

TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE

6. Standby. Gas Treatment System Vent Stack Sampling System Flow
a. Effluent System 1,2, (a) c TRS 3.3.4.1 flow rate monitor(bl TRS 3.3.4.4
b.
  • Sample flow rate monitor(bl 1,2, (a) c TRS 3.3.4.1 (Mid/High Range & TRS 3.3.4.4 Bypass)
7. Turbine Building Vent Stack Sampling System Flow
  • a. Effluent System flow rate monitor(bl
b. Sample flow rate monitor(bl (Mid/High Range &

1,2 1,2 c c TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.4 Bypass)

8. Containment H2 and 0 2 1,2 2 c TRS 3.3.4.1 Analyzer(bl

(b) TRO 3.0.4.c is applicable.

SUSQUEHANNA - UNIT 2 TRM I 3.3-11a EFFECTIVE DATE 10/06/2016

Radioactive Gaseous Effluent Monitoring Instrumentation Rev. 7 3.11.2.6

  • 3.11 3.11.2 Radioactive Effluents Gaseous Effluents 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation TRO 3.11.2.6 The radioactive gaseous effluent monitoring instrumentation channels shown in Table 3.11.2.6-1 shall be OPERABLE with their setpoints established in accordance with the ODCM to ensure that the limits of Requirement 3.11.2.1 are not exceeded.

APPLICABILITY: According to Table 3.11.2.6-1 ACTIONS


NOTE--------------------------------------------------------

1. Separate condition entry is allowed for each channel.
2. The provisions of TRO 3.0.6 are not applicable .
  • A.

CONDITION Radioactive gaseous effluent monitoring instrumentation channel A.1 REQUIRED ACTION Suspend the release of radioactive gaseous effluents monitored by the affected COMPLETION TIME Immediately alarm/trip setpoint less channel conservative than OR required to ensure that the limits of Requirement A.2 Declare the channel Immediately 3.11.2.1 are not inoperable exceeded (continued)

  • SUSQUEHANNA - UNIT 2 TRM I 3.11-25 EFFECTIVE DATE 04/12/2007

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6

  • Rev. 7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Reactor Building B.1 Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Ventilation System Noble while release is in Gas Activity Monitor low progress.

range channel inoperable AND B.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of isotopic activity to the grab sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1)

AND B.3 Restore monitoring 30 days instrumentation.

C. Deleted

Restore monitoring Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> while release is in progress 30 days.

instrumentation.

(continued)

SUSQUEHANNA- UNIT 2 TRM / 3.11-26 EFFECTIVE DATE 01/21/2004

- -- ------- ----- ------------------------------~

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 Rev. 7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Turbine Building Ventilation E.1 Verify mechanical vacuum Immediately System Noble Gas Activity pump is not in operation.

Monitor low range channel inoperable AND E.2 Take grab samples. Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress AND E.3 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after isotopic activity to the sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1).

AND E.4 Restore monitoring 30 days instrumentation F. Deleted G. Turbine Building Ventilation G.1 Estimate flow rate. Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Monitoring System: Effluent while release is in Flow Rate Monitor or progress.

Sample (Bypass or Low AND Range) Flow Rate Monitor inoperable G.2 Restore monitoring 30 days instrumentation (continued)

-**'-"<=-*

SUSQUEHANNA - UNIT 2 TRM I 3.11-27 EFFECTIVE DATE 08/11/2016

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6

  • Rev. 7 ACTIONS (continued)
  • coNDITION REQUIRED ACTION COMPLETION TIME H. Standby Gas Treatment H.1 Take grab samples. Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> System Noble Gas Activity during operation of Monitor low range channel SGTS inoperable AND H.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of isotopic activity to the required grab sample being LLDs for principal noble gas taken.

gamma emitters (Table 3.11.2.1-1).

AND H.3 Restore monitoring 30 days instrumentation .

  • I.

J.

Deleted SGTS Ventilation Monitoring System:

Effluent flow rate monitor or J.1 Estimate flow rate. Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during operation of SGTS sample (Bypass or Low AND Range) flow rate monitor Inoperable. J.2 Restore monitoring 30 days Instrumentation.

(continued)

  • SUSQUEHANNA - UNIT 2 TRM I 3.11-28 EFFECTIVE DATE 10/06/2016

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6

  • Rev. 7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME K. Required Actions and K.1 Explain why this inoperability In the next Completion Times not was not corrected in a timely Radioactive Effluent met for Conditions B manner. Release Report per through J. TS Section 5.6.

TECHNICAL REQUIREMENT SURVEILLANCE


NOTE----------------------------------------------------

Refer to Table 3.11.2.6-1 to determine which TRSs apply for each Monitoring Function.

SURVEILLANCE FREQUENCY TRS 3.11.2.6.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.11.2.6.2 Deleted TRS 3.11.2.6.3 Perform Source Check 31 days TRS 3.11.2.6.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.11.2.6.5 Perform CHANNEL CALIBRATION 24 months

/

  • SUSQUEHANNA - UNIT 2 TRM I 3.11-29 EFFECTIVE DA TE 12/03/2004

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6

  • Rev. 7 TABLE 3.11.2.6-1 (Page 1 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIRED FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

1. REACTOR BUILDING VENTILATION MONITORING SYSTEM
a. Noble Gas Activity Monitor At all Times TRS 3.11.2.6.1 (Low Range) TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
b. Deleted
c. Deleted d Effluent System Flow Rate Monitor At all Times TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5
e. Sampler Flow Rate Monitor At all Times TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)
  • SUSQUEHANNA - UNIT 2 TRM I 3.11-30 EFFECTIVE DATE 01/21/2004

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 Rev. 7 TABLE 3.11.2.6-1 (Page 2 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

2. TURBINE BUILDING VENTILATION MONITORING SYSTEM
a. Noble Gas Activity Monitor At all Times TRS 3.11.2.6.1 (Low Range) TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
b. Deleted
c. Deleted
d. Effluent System Flow Rate Monitor At all Times TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5
e. Sample Flow Rate Monitor (Bypass) At all Times TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5
  • f. Sample Flow Rate Monitor (Low Range)

At all Times TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)

  • SUSQUEHANNA - UNIT 2 TRM I 3.11-31 EFFECTIVE DATE 08/11/2016

Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6

  • Rev. 7 TABLE 3.11.2.6-1 (Page 3 of 3)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS

3. STANDBY GAS TREATMENT SYSTEM (SGTS) MONITOR
a. Noble Gas Activity Monitor During TRS 3.11.2.6.1 (Low Range) operation of TRS 3.11.2.6.3 SGTS(a) TRS 3.11.2.6.4 TRS 3.11.2.6.5
b. Deleted
c. Deleted
d. Effluent System Flow Rate Monitor During TRS 3.11.2.6.1 operation of TRS 3.11.2.6.4 SGTS(aJ TRS 3.11.2.6.5
e. Sample Flow Rate Monitor (Bypass) During TRS 3.11.2.6.1 operation of TRS 3.11.2.6.4 SGTS(aJ TRS 3.11.2.6.5
f. Sample Bypass Flow Rate Monitor During TRS 3.11.2.6.1 (Low Range) operation of TRS 3.11.2.6.4 SGTS(aJ TRS 3.11.2.6.5 (a) TRO 3.0.4.c is applicable.
  • SUSQUEHANNA - UNIT 2 TRM I 3.11-32 EFFECTIVE DATE 10/06/2016

TRM Post Accident Monitoring Instrumentation Rev. 6 B 3.3.4

  • B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to display plant variables that provide informati~m required by the control room operators during accident situations. The OPERABILITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables following an accident. This capability is consistent with the recommendations of Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Ass.ess Plant Conditions During and following an Accident,"

NUREG-0578, "TMl-2 Lessons Learned Task Force Status Report and Short-Term Recommendations" and NED0-33160-A Revision 1; "Regulatory Relaxation For The Post Accident SRV Position Indication System" (Reference 6). It should be noted that the Technical Specifications LCO 3.3.3.1 contains all Category 1, non-type A instruments and Regulatory Guide 1.97 Type A instrument (References 1 and 2). This TRO requires instruments outside of these criteria.

Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pressure suppression system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for

  • - the purposes of this TRM. The recorders are the primary method of indication used by operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.

II LOOP A TE-25703 e LOOP B TE-25725

  • TT-25703
  • TT-25725
  • TR-25795A
  • TR-257958 Main Steam Safety/Relief Valve Position Indicators (Acoustic Monitors) provide indication when the valves are functioning. Alternate methods for monitoring SRV position include SRV Tailpipe Temperature and the following Functions from Technical Specification Table 3.3.3.1-1:

Suppression Chamber Water Level (Function 3)

Suppression Chamber Water Temperature (Function 10)

Reactor Vessel Water Level (Function 2)

Reactor Steam Dome Pressure (Function 1)

(continued)

  • SUSQUEHANNA - UNIT 2 TRM I B 3.3-4 EFFECTIVE DATE 06/30/2010

TRM Post Accident Monitoring Instrumentation Rev.6 B 3.3.4

  • B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The required channels for REACTOR BUILDING VENT Noble Gas Monitor, (continued) Standby Gas Treatment System Vent Noble Gas Monitor, and Turbine Building Vent Noble Gas Monitor provide information regarding the release of radioactive materials to allow for early indication of the need to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat.

For the Noble Gas Monitors the only required channels are the mid range and high range.

The drywell and suppression chamber hydrogen and oxygen concentrations gas an.alyzers monitor hydrogen and oxygen concentration to detect combustible gas levels in primary containment. The analyzers are capable of determining hydrogen concentration in the range of O to 30% by volume and oxygen

  • concentration in the range of 0 to 10% by volume, and each provide control room indication and output to a control room recorder. Each gas analyzer must be
  • capable of sampling either the drywell or the suppression chamber. The recorders are the primary method of indication available for use by the operator during an accident, therefore the PAM Specification deals specifically with this portion of the instrument channel. The gas analyzer piping is provided with heat tracing to reduce the buildup of condensation in the system. H202 Analyzers can be considered OPERABLE for accident monitoring for up to 100 days with their heat tracing INOPERABLE.

The vent effluent monitor for the Turbine Building and Standby Gas Treatment System (SGTS) is a wide range noble gas monitor. The Effluent channel #4 for each of the Turbine and SGTS displays the release rate in uCi/min using the best detector in range. Upscale and failure alarms originate from the Effluent channel. There are 3 detectors for each wide range gas monitor, low, mid and high range. During normal plant operations, the low range channel will be selected for Effluent channel calculation. The mid and high range detectors are in standby mode. The mid and high range detectors are activated and selected automatically based upon the monitored noble gas concentration. During high range noble gas releases, the mid and high range detectors are activated and the low range noble gas detector loop is selected in standby mode. Faults detected by the vent effluent monitor will be annunciated in the main control room overhead annunciator via the Effluent channel.

These loops can be considered Operable if the Effluent release rate channel is not alarmed.

(continued)

SUSQUEHANNA - UNIT 2 TRM I B 3.3-5 EFFECTIVE DATE 10/06/2016

TRM Post Accident Monitorjng Instrumentation Rev. 6 B 3.3.4

  • B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The Turbine Building and SGTS vent sample flow system operates to (continued) support the detector selection requirements. Normally the low range sample flow is operating to support the low range detector. On detection of an upscale noble gas release, the mid/high range sample pump that is normally in standby mode is activated to draw a sample through the mid and high range noble gas detectors and low range sample flow system is in standby mode. The mid I high range sample is then selected and low range sample flow is activated automatically when noble gas concentrations return to normal levels. The bypass sample flow system is designed to make up the proper sample flow rate from the isokinetic nozzle array. For the Turbine Building monitor, the bypass system is required to operate continuously. For the SGTS, the bypass system is in standby mode until high range noble gas is sensed and the bypass system is automatically activated and selected as required. These loops can be considered Operable if the Effluent release rate channel is not alarmed.

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. *

  • During construction activities that replace existing SPING equipment with new VERMS equipment, the Vent Noble Gas Monitor for each release path is anticipated to be inoperable for longer than 7 days. Restoration completion time to return the affected channel to OPERABLE status to support construction activities is extended to 30 days. This condition is. compensated for by the enhanced Preplanned Alternate Monitoring Plan per REQUIRED ACTION B.1.

Action D requirements were determined by balancing the safety significance of the system with the impact of the actions on the operating unit. The loss of the acoustic monitors is not safety significant providing the diverse and redundant alternate methods of determining SRV position are available. System components in the control room are restorable within 30 days without unit operation impact. Components located in containment require a unit shutdown to gain access to individual components; The system channels shall be restored to operable condition at earliest opportunity.

(continued)

  • SUSQUEHANNA - UNIT 2 TRM I B 3.3-Sa EFFECTIVE DATE 10/06/2016

TRM Post Accident Monitoring Instrumentation Rev.6 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES ACTIONS Noble gas monitoring may be interrupted for up to 30 minutes to perform

.(continued) particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.

Components of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement. Tailpipe temperature is the direct process monitoring, alternate method and is not covered by Technical Specification LCO's as are the other alternative methods.

TRS The Technical Requirement Surveillances (TRS) are modified by two Notes.

Note 1 states that the TRSs for each Post Accident Monitoring instrumentation Function are located in the SR column of Table 3.3.4-1.

Note 2 modifies the Surveillances to indicate that when a channel is placed in a inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or associated

  • Function are available. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken.

(continued)

  • SUSQUEHANNA - UNIT 2 TRM I B 3.3-6 EFFECTIVE DATE 10/06/2016

TRM Post Accident Monitoring Instrumentation Rev. 6 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS The alternate means of monitoring the parameter or the associated function are:

(continued)

Parameter Alternate Means/Associated Function Suppression Chamber Air One channel of Suppression Chamber Temperature Air Temperature Main Steam Safety/Relief Suppression Pool level Valve Position Indicator Suppression Pool Temperature RPV level RPV pressure SRV Tailpipe Temperature Containment H2 and 02 Analyzer One channel of Containment H2 and 0 2 The TRSs are defined to be performed at the specified Frequency to ensure that the TRM PAM Function is maintained OPERABLE.

(continued)

SUSQUEHANNA- UNIT 2 TRM I B 3.3-7 EFFECTIVE DATE 10/07/2015

TRM Post Accident Monitoring Instrumentation Rev. 6 B 3.3.4

  • BASES TRS TRS 3.3.4.1 (continued)

Performance of the CHANNEL CHECK once every 31 days ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to operate properly between each

. CHANNEL CALIBRATION.

~

Agreement criteria, which are determined by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability.

If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable .

  • REFERENCES 1.

2.

Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident."

NUREG-0578, "TMl-2 Lessons Learned Task Force Status Report and Short-Term Recommendations."

3. Technical Specification Amendment No. 100 to License No. NPF-22 for failed Unit 2 "S" acoustic monitor.
4. Technical Specification Amendment No. 169 to License No. NPF-14 for failed Unit 1 "S" acoustic monitor.
5. Proposed amendment No. 183 to License No. NPF-22 failed Unit 2 "J" acoustic monitor.
6. NED0-33160-A, Revision 1, "Regulatory Relaxation For The Post Accident SRV Position Indication System," dated October 2006.
7. NRC letter, "Final Safety Evaluation For Boiling Water Reactor Owners' Group (BWROG) Topical Report (TR) NED0-33160, Regulatory Relaxation For The Post Accident SRV [Safety Relief Valve] Position Indication System (TAC No. MC5446)," dated September 26, 2006 .
  • SUSQUEHANNA- UNIT 2 TRM I B 3.3-8 EFFECTIVE DATE 06/30/2010