Amends 171,171 & 168 to Licenses DPR-38,DPR-47 & DPR-55, Respectively.Amends Revise Tech Specs to Test Only Initiation Control Circuitry of Reactor Bldg Spray Sys W/O Actually Energizing Pump
ML16293A744
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/14/1988
From: Matthews D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML16138A647 List:
References
NUDOCS 8810180403
Download: ML16293A744 (9)


Text

pfk REG(,

o

.UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO.

50-269 OCONEE NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 171 License No. DPR-38

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment to the Oconee Nuclear Station, Unit 1 (the facility) Facility Operating License No. DPR-38 filed by the Duke Power Company (the licensee) dated February 6, 1986, as supplemented August 20, 1986 and December 1, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this license amendment will riot be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied.,

2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment, and Paragraph 3.B. of Facility Operating License No. DPR-38 is hereby amended to read as follows:

PD10 18CK403 8 10 14, PDR ADOCK 05000269

S

-2 3.B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 171, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specificdtions.

3. This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects -

I/II

Attachment:

Technical Specification Changes Date of Issuance: October 14, 1988

R REG 0 S

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-270 OCONEE NUCLEAR STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 171 License No. DPR-47

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment to the Oconee Nuclear Station, Unit 2 (the facility) Facility Operating License No. DPR-47 filed by the Duke Power Company (the licensee) dated February 6, 1986, as supplemented August 20, 1986 and December 1, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied.

2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment, and Paragraph 3.B. of Facility Operating License No. DPR-47 is hereby amended to read as follows:

-2 3.B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 171, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects -

I/II

Attachment:

Technical Specification Changes Date of Issuance: October 14, 1988

RREG&q o 0UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DUKE POWER COMPANY DOCKET NO. 50-287 OCONEE NUCLEAR STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

168 License No. DPR-55

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment to the Oconee Nuclear Station, Unit 3 (the facility) Facility Operating License No. DPR-55 filed by the Duke Power Company (the licensee) dated February 6, 1986, as supplemented August 20, 1986 and December 1, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amenoed (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (I) that the activities authorized-by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied.

2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment, and Paragraph 3.B. of Facility Operating License No. DPR-55 is hereby amended to read as follows:

-2 3.B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 168, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects -

I/II

Attachment:

Technical Specification Changes Date of Issuance: October 14, 1988

ATTACHMENT TO LICENSE AMENDMENT NO.

171 FACILITY OPERATING LICENSE NO. DPR-38 DOCKET NO. 50-269 AND TO LICENSE AMENDMENT NO. 171 FACILITY OPERATING LICENSE NO. DPR-47 DOCKET NO. 50-270 AND TO LICENSE AMENDMENT NO.

168 FACILITY OPERATING LICENSE NO. DPR-55 DOCKET NO. 50-287 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment.number and contain vertical lines indicating the areas of change.

Amended Page 4.5-6 4.5-7

4.5.12 Reactor Building Cooling Systems Applicability Applies to testing of the Reactor Building Cooling Systems.

Objective To verify that the Reactor Building Cooling Systems are operable.

Specification 4.5.2.1 System Tests 4.5.2.1.1 Reactor Building Spray System

a. During each refueling outage, a system test shall be conducted to demonstrate proper operation of the system. A test signal will be applied to demonstrate actuation of the Reactor Building Spray System.
b. Station compressed air will be introduced into the spray headers to verify the availability of the headers and spray nozzles at least every five years.
c. The test will be considered satisfactory if visual observation and control board indication verifies that all components have responded to the actua tion signal properly; the appropriate pump breakers shall have closed, and all valves shall have completed their travel.

4.5.2.1.2 Reactor Building Cooling System

a. During each refueling outage, a system test shall be conducted to demonstrate proper operation of the system. The test shall be performed in accordance with the procedure summarized below:

(1) A test signal will be applied to actuate the Reactor Building Cooling System for reactor building cooling operation.

4.5-6 Amendment No. 171 (Unit 1)

Amendment No. 171 (Unit 2)

Amendment No. 168 (Unit 3)

(2)

Verification of the engineered safety features function of the Low Pressure Service Water System which supplies coolant to the reactor building coolers shall be made to demonstrate operability of the coolers.

(b)

The test will be considered satisfactory if control board indication verifies that all components have responded to, the actuation signal properly, the appropriate pump breakers have completed their travel, fans are running at half speed, LPSW flow through each cooler exceeds 1400 GPM and air flow through each fan exceeds 40,000 CFM.

4.5.2.2 Component Tests 4.5.2.2.1 Pumps The reactor building spray pumps shall be started and operated to verify proper operation in accordance with the requirements of Specification 4.0.4.

Acceptable performance will be indicated if the pump starts, operates for 15 minutes, and the measured discharge pressure and flow results in a point above the pump head curve.

(Figure 4.5.2-1).

4.5.2.2.2 Valves Valves of the reactor building spray system will be tested in accordance with the requirements of Specification 4.0.4.

Bases The.Reactor Building Coolant System and Reactor Building Spray System are designed to remove heat in the containment atmosphere to control the rate of depressurization in the containment.

The peak transient pressure in the containment is not affected by the two heat removal systems. Hence, the basis for the spray pump flow acceptance test is the flow rate required during recirculation (1,000 gpm).

The delivery capability of one reactor building spray pump at a time can be tested by opening the valve in the line from the borated water storage tank, opening the corresponding valve in the test line, and starting the corres ponding pump.

Pump discharge pressure and flow indication demonstrate per formance.

With the pumps shut down and the borated water storage tank outlet closed, the reactor building spray injection valves can each be opened and closed by operator. action.

With the reactor building spray inlet valves closed, low pressure air or fog can be blown through the test connections of the reactor building spray nozzles to demonstrate that the flow paths are open.

The equipment, piping, valves, and instrumentation of the Reactor Building Cooling System are arranged so that they can be visually inspected.

The cooling units and associated piping are located outside the secondary concrete shield.

Personnel can enter the Reactor Building during power operations to inspect and maintain this equipment.

The service water piping and valves outside the Reactor Building are inspectable at all times.

Operational tests and inspections will be performed prior to initial startup.

4.5-7 Amendment No. 171 (Unit 1)

Amendment No. 171 (Unit 2)

Amendment No. 168 (Unit 3)