2016 Quad Cities Nuclear Power Station Initial License Examination Forms ES-301-1 and ES-301-2
ML16216A613
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/02/2016
From: Palagi B
Operations Branch III
To:
Exelon Generation Co
Shared Package
ML15274A320 List:
References
SVP-16-001
Download: ML16216A613 (4)


Text

ES-301 Admi nistrative Topics Outl ine Form ES-301-1 Date of Examination: 4118/16 Operating Test Number: ILT 14-1 Facility: Ouad Cities Examination Level: RO X SnO n Administrative Topic (See Note)

Type Code*

Describe activity to be performed Conduct of Operations S,N Enter Substitute Value for RWCU Pump Flow KlA:2.1.19 Rating: 3.9 Ability to use plant computers to evaluate system or component status.

Conduct of Operations S,D Verification of SBGTS Lineup K/A:2.1.31 Rating: 4.6 Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup.

Equipment Control S,D,P Print Reading Exercise KIA: 2.2.41 Rating: 3.5 Ability to obtain and interpret station electrical and mechanical drawings.

Radiation Control S,N ARM Trip Unit Set Point Check KA: 2.3.5 Rating: 2.9 Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable instruments, personnel monitorinq equipment, etc.

Emergency Procedures/Plan N/A N/A NOTE: All ítems (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)

(N)ew or (M)odified f rom bank (> 1)

(P)revious 2 exams (< 1; randomly selected)

  • Type Codes & Critería:
301, e

ES-301 Administrative Topics Outl ine Form ES-301-1 Facility: Quad Cities Examination Level: RO n SRO X Date of Examination :411 8116 Operating Test Number: tLT 14-1 Administrative Topic (See Note)

Type Code*

Describe activity to be performed Conduct of Operations S,D Shift Staffing (SRO 26-l)

K/A: 2.1.5 Rating: 3.9 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.

Conduct of Operations S,D Pre Refueling Activities KA: 2.1.36 Rating: 4.1 Knowledge of procedures and limitations involved in core alterations.

Equipment Control S,M Fire lmpairment l(A: 2.2.14 Rating: 4.3 Knowledge of the process for controlling equipment configuration or status.

Radiation Control S,P Compensatory Measures for lnoperable Service Water Rad Monitor KA: 2.3.15 Rating: 3.1 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitorinq equipment, etc.

Emergency Procedures/Plan S

N Determine Protective Action Recommendations (PARS)

K/A: 2.4.44 Rating: 4.4 Knowledge of emergency plan protective action recommendations.

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)

(N)ew or (M)odified f rom bank (¿ 1)

(P)revious 2 exams (< 1; randomly selected)

ES 301, Page 22 o 27

ES-301 Control Room/ln-Plant Svstems Outline Form ES'301'2 Facility: Quad Cities Exam Level: RO X SRo-I T SRo-U T Date of Examination: 4118116 Operating Test No.: 14-1 Control Room Systems:'8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code.

Safety Function a.RMCS, SG 2.1.44 3.913.8 Perform One-Rod-Out I nterlock Surveillance S,D,L,P 1

b. Reactor Condensate System, 256000 42.06 3.213.2 lnjecting Standby Coolant S, EN, N, A 2
c. Main and Reheat Steam System, 239001 A4.02 3.213.2 Control Reactor Pressure using the Main Steam Line Drains S,N 3
d. Reactor Core lsolation Cooling System, 217000 44.03 3.413.3 RCIC Manual lnitiation (Hard Card)with an lnadvertent lsolation S,D,A 4
e. High Drywell Pressure, 295024 E41.14 3.4/3.5 Vent Containment lrrespective of Release Rates with APCV (Failure of Torus Valve to Open, Requiring Venting Through the Drywell)

S, D, EN, P, A

5 f, lnstrumentation, 216000 K1.01 3.9/4.1 lnstallOPRM Jumpers on RPS B S,N 7

g. Component Cooling Water System,400000 44.01 3.1/3.0 Reverse RHRSW Heat Exchanger Flow S,N I
h. A.C. Electrical Distribution, 262001 A4.01 3.4/3.7 Energize 480 VAC Bus 15 with a Failure of the Normal Feed S,D,A 6

ln-Plant Systems'(3 for RO); (3 for SRO-l); (3 or 2 for SRO-U)

i. Partial or Complete Loss of D.C. Power,295004 4A1.01 3.313.4 Flex 125/250 VDC Operation N,E,R 6
j. Control Room HVAC,290003 SG 2.1.20 4.614.6 Start the Control Room B Train HVAC with a Failure of the FCV N,A,R I
k. Fire Protection System, 286000 SG 2.1 3A 4.4/4.0 Locally Start Up the Tz A Fire Diesel D

I All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U A)lternate path (C)ontrolroom (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)cA (S)imulator 4-61 4-612-3

<91<8134

>11¿11>1

>1 l>1/ 1 (control room system)

>1 />1 l>1

>21>21>1

< 3 / < 3/ < 2 (randomly selected)

>1t>1/>1

ES-301 Control Room/ln-Plant Svstems Outline Form ES-301'2 Facility: Quad Cities Exam Level: Ro I sRo-l x sno-u I Date of Examination: 4118116 Operating Test No.: 14-1 Control Room Systems:.8 for RO; 7 for SRO-I; 2 or Slor SRO-U System / JPM Title Type Code" Safety Function

a. RMCS, SG 2.1.44 3.9/3.8 Perform One-Rod-Out lnterlock Surveillance S,D,L,P 1
b. Reactor Condensate System, 256000 42.06 3.213.2 lnjecting Standby Coolant S, EN, N, A 2
c. Main and Reheat Steam System,239001 A4.02 3.213.2 Control Reactor Pressure using the Main Steam Line Drains S,N 3
d. Reactor Core lsolation Cooling System, 217000 44.03 3.4/3.3 RCIC Manual lnitiation (Hard Card) with an lnadvertent lsolation S,D,A 4
e. High Drywell Pressure, 295024 E41.14 3.4/3.5 Vent Containment lrrespective of Release Rates with APCV (Failure of Torus Valve to Open, Requiring Venting Through the Drywell)

S, D, EN, P, A 5

f. lnstrumentation, 216000 K1.01 3.9/4.1 lnstallOPRM Jumpers on RPS B S,N 7

g

h. A.C. Electrical Distribution, 262001 A4.01 3.413.7 Energize 480 VAC Bus 15 with a Failure of the Normal Feed S,D,A 6

ln-Plant Systems'(3 for RO); (3 for SRO-I); (3 or 2 for SRO'U)

i. Partial or Complete Loss of D.C. Power, 295004 A41.01 3.313.4 Flex 125/250 VDC Operation N,E,R 6
j. Control Room HVAC, 290003 SG 2.1.20 4.614.6 Start the Control Room B Train HVAC with a Failure of the FCV N,A,R I
k. Fire Protection System, 286000 SG 2.1.30 4.4/4.0 Locally Start Up lhe Vz A Fire Diesel D

I All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U A)lternate palh (C)ontrolroom (D)irect from bank (E)mergency or abnormal in-plant (EN) gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)cA (S)imulator 4-6 /4-6 /2-3

<91<81s4

>11>11>1

>1 l>1/ > 1 (control room system)

>1t>11>1

>2t>21>1 s 3 / < 3 / < 2 (randomly selected)

>'t l>11¿1