MONTHYEARML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23079A2262023-03-20020 March 2023 Form 5.1-1 Post-Examination Check Sheet (Quad Cities, 2023) IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23079A2222023-02-21021 February 2023 Form 2.1-1 Examination Preparation Checklist ML23079A2192023-02-21021 February 2023 Form 1.3-1 Exam Security Agreement SVP-23-007, Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023)2023-02-0909 February 2023 Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023) ML23079A2282023-02-0808 February 2023 Post-Exam Review Comments (None) ML23020A4132023-01-23023 January 2023 Operator License Examination Approval - Quad Cities Nuclear Power Station, January 2023 ML23079A2072023-01-13013 January 2023 Form 2.3-4 Written Examination Quality Checklist (Quad Cities, 2023) ML23079A2042023-01-13013 January 2023 Form 2.3-2 Operating Test Quality Checklist (Quad Cities, 2023) ML23079A2032022-11-11011 November 2022 Licensee Proposed Exam Cover Letter (SVP-22-065, Quad Cities, 2023) ML23079A0842022-10-17017 October 2022 Form 3.4-1 Events and Evolutions Checklist (Quad Cities, 2023) ML23079A0432022-10-17017 October 2022 Form 2.3-1 Examination Outline Quality Checklist (Quad Cities, 2023).pdf ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22188A1752022-07-11011 July 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21281A1242021-10-0808 October 2021 GFE Results, September 2021 IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 ML22192A2062021-07-0909 July 2021 2021 QC Ile Outline Submittal Comments ML22192A2052021-07-0909 July 2021 2021 QC Ile ES-401-9 Written Examination Review Worksheet-Final ML22192A2032021-07-0909 July 2021 2021 QC Ile ES-301-7 Operating Test Review Worksheet-Final ML22192A1922021-07-0909 July 2021 2021 QC Ile ES-201-1 ML22192A1932021-07-0909 July 2021 2021 QC Ile ES-201-3 Security Agreement-Final ML22192A1952021-07-0909 July 2021 2021 QC Ile ES-403-1 Written Exam Quality Checklist ML22192A2042021-07-0909 July 2021 2021 QC Ile ES-401-4 Rejected KAs ML22192A1962021-06-22022 June 2021 2021 QC Ile Post-Exam Submittal Letter-06-22-2021 ML22193A2862021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Written Exam-Final ML22193A2872021-06-14014 June 2021 2021 QC Ile Administered RO and SRO List of Reference Handouts-Final ML22193A0932021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Admin JPMs-Final ML22193A1072021-06-14014 June 2021 2021 QC Ile Administered Simulator Scenarios-Final ML22193A1052021-06-14014 June 2021 2021 QC Ile Administered Simulator and Inplant JPMs-Final ML21152A1022021-06-0202 June 2021 Operator Licensing Examination Approval ML22193A3112021-05-0505 May 2021 2021 QC Ile Proposed Simulator Scenarios ML22193A3102021-05-0505 May 2021 2021 QC Ile Proposed Simulator and Inplant JPMs ML22193A3012021-05-0505 May 2021 2021 QC Ile ES-301-6 Competencies Checklist ML22193A3082021-05-0505 May 2021 2021 QC Ile Proposed RO and SRO Admin JPMs ML22193A3002021-05-0505 May 2021 2021 QC Ile ES-301-4 Simulator Scenario Quality Checklist ML22193A3032021-05-0505 May 2021 2021 QC Ile ES-401-6 Written Exam Quality Checklist ML22193A2992021-05-0505 May 2021 2021 QC Ile ES-301-3 Operating Test Quality Checklist ML22193A3122021-05-0505 May 2021 2021 QC Ile Proposed Written Exam-RO and SRO ML22193A3222021-04-0707 April 2021 2021 Quad-Cities Ile ES-D-1 Scenario Outlines ML22193A3202021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-2 RO and SRO Sim-Inplant Systems Outlines ML22193A3142021-04-0707 April 2021 2021 Quad-Cities Ile ES-201-2 Outline Quality Checklist ML22193A3192021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-1 RO and SRO Admin Topics Outlines 2023-08-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23079A2262023-03-20020 March 2023 Form 5.1-1 Post-Examination Check Sheet (Quad Cities, 2023) IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23079A2192023-02-21021 February 2023 Form 1.3-1 Exam Security Agreement ML23079A2222023-02-21021 February 2023 Form 2.1-1 Examination Preparation Checklist SVP-23-007, Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023)2023-02-0909 February 2023 Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023) ML23079A2282023-02-0808 February 2023 Post-Exam Review Comments (None) ML23020A4132023-01-23023 January 2023 Operator License Examination Approval - Quad Cities Nuclear Power Station, January 2023 ML23079A2072023-01-13013 January 2023 Form 2.3-4 Written Examination Quality Checklist (Quad Cities, 2023) ML23079A2042023-01-13013 January 2023 Form 2.3-2 Operating Test Quality Checklist (Quad Cities, 2023) ML23079A2032022-11-11011 November 2022 Licensee Proposed Exam Cover Letter (SVP-22-065, Quad Cities, 2023) ML23079A0842022-10-17017 October 2022 Form 3.4-1 Events and Evolutions Checklist (Quad Cities, 2023) ML23079A0432022-10-17017 October 2022 Form 2.3-1 Examination Outline Quality Checklist (Quad Cities, 2023).pdf ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22188A1752022-07-11011 July 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 ML22192A1952021-07-0909 July 2021 2021 QC Ile ES-403-1 Written Exam Quality Checklist ML22192A2032021-07-0909 July 2021 2021 QC Ile ES-301-7 Operating Test Review Worksheet-Final ML22192A1932021-07-0909 July 2021 2021 QC Ile ES-201-3 Security Agreement-Final ML22192A2052021-07-0909 July 2021 2021 QC Ile ES-401-9 Written Examination Review Worksheet-Final ML22192A2062021-07-0909 July 2021 2021 QC Ile Outline Submittal Comments ML22192A2042021-07-0909 July 2021 2021 QC Ile ES-401-4 Rejected KAs ML22192A1922021-07-0909 July 2021 2021 QC Ile ES-201-1 ML22192A1962021-06-22022 June 2021 2021 QC Ile Post-Exam Submittal Letter-06-22-2021 ML22193A1052021-06-14014 June 2021 2021 QC Ile Administered Simulator and Inplant JPMs-Final ML22193A2862021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Written Exam-Final ML22193A2872021-06-14014 June 2021 2021 QC Ile Administered RO and SRO List of Reference Handouts-Final ML22193A0932021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Admin JPMs-Final ML22193A1072021-06-14014 June 2021 2021 QC Ile Administered Simulator Scenarios-Final ML21152A1022021-06-0202 June 2021 Operator Licensing Examination Approval ML22193A2992021-05-0505 May 2021 2021 QC Ile ES-301-3 Operating Test Quality Checklist ML22193A3082021-05-0505 May 2021 2021 QC Ile Proposed RO and SRO Admin JPMs ML22193A3032021-05-0505 May 2021 2021 QC Ile ES-401-6 Written Exam Quality Checklist ML22193A3102021-05-0505 May 2021 2021 QC Ile Proposed Simulator and Inplant JPMs ML22193A3122021-05-0505 May 2021 2021 QC Ile Proposed Written Exam-RO and SRO ML22193A3002021-05-0505 May 2021 2021 QC Ile ES-301-4 Simulator Scenario Quality Checklist ML22193A3012021-05-0505 May 2021 2021 QC Ile ES-301-6 Competencies Checklist ML22193A3112021-05-0505 May 2021 2021 QC Ile Proposed Simulator Scenarios ML22193A3202021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-2 RO and SRO Sim-Inplant Systems Outlines ML22193A3142021-04-0707 April 2021 2021 Quad-Cities Ile ES-201-2 Outline Quality Checklist ML22193A3162021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-5 Transient and Event Checklists ML22193A3192021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-1 RO and SRO Admin Topics Outlines ML22193A3222021-04-0707 April 2021 2021 Quad-Cities Ile ES-D-1 Scenario Outlines ML22193A3212021-04-0707 April 2021 2021 Quad-Cities Ile ES-401-1 and ES-401-3 2023-08-07
[Table view] |
Text
ES-301 Transient and Event Checklist Form ES-301-5 2016 Crew A Facility: Quad Cities Date of Exam:4118/16 Operating Test No.: 14-1 A E Scenarios P V 3 4 T M 1 2 P E L N CREW CREW POSITION CREW POSITION CREW POSITION o I N
I T POSITION T I
c S A B S A B A B s A B A
M A T o o L R T o R T o R T R T U
N c o c o c P o c P o P P M(
T P E R U RO RX 5 o 2 1 1 0 TSRO-I NOR 1 1 2 1 1 1 vc 2,3,7, 2,3,6 3,7 10 4 4 2 Eh 8,9 SRO-U MAJ b 7 I 3 2 2 1 T TS 4,5 2 0 2 2 RX 5 4 2 1 1 0 RO TSRO-I NOR 1 1 2,5 2 1 4
1 4
1 2
vc 3,7 2,3,5, Ez 6,8 SRO-U MAJ 6 7 I 3 2 2 1 TS 5,6 2 0 2 2 RO 4 6 2 1 1 0 RX TSRO.I NOR 1 1 2 1 1 1 vc 2,8 5,8 2,3,5, I 4 4 2 Eg 7,9 SRO-U 7 I 3 2 2 n 6 1 MAJ TS 2,4 2 0 2 2 RO 1 1 0 RX nSRO-NOR 1 1 1 T
SRO- U vc 4 2
4 2
2 1
MAJ TS 0 2 2 lnstructions:
1 Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicble for RO applicants. ROs must-serve in both the "at-the-controls'(ATC) and "balance-of-plant" (BOP) positions. lnstant SROS (SRO-l) must serve in both the SRO and the ATC positions, including at least two instrument or omponent (l/C) malfunctions and one major transent, in the ATC position. lf an SRO-I additionally sewes in the BOP posiiion, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.
- 2. Reactivity manpulations may be conducted under normal or controlled abnormal conditions (refer to Section D.S.d) but must be ignificnt per Sectin C.2.a ot Appendix D. (-) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions thai provide insight to the applicant's competnce count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manioulatinq olant controls.
ES-301 Transient and Event Checklist Form ES-301-5 2016 Crew B Facility: Quad Cities Date of Exam:4118/16 Operating Test No.: 14-1 A E Scenarios P V 3 4 T M 1 2 P E CREW CREW POSITION CREW POSITION CREW POSITION o I L N N I T POSITION T I
c A S A B A B A B S A B M A T o o o L R T o R T R T R T U N
o c P o c P o c P o c P M(.)
T P E R I U RO RX 5 2 6 3 1 1 0 n
SRO-I NOR 1 1 2 1 1 1 vc 2,3,7, 3,5,6, 3,7 12 4 4 2 Eq 8,9 7,9 SRO-U I 8 3 2 2 n
1 MAJ 6 TS 4,5 4,5 4 0 2 2 HX 5 6 2 1 1 0 RO n
SRO.I NOR 1 1 2,3,5, 2
I 1
4 1
4 1
2 vc 3,7 6,7 trs 7,9 SRO-U MAJ 6 I 8 3 2 2 1 l TS 2,4 2 0 2 2 RO RX 2 1 1 1 0 trr NOR 1 1 2 1 1 1 SRO-I 2,5 7 4 4 2 vc 2,8 3,5, T
SRO-U 9
MAJ o I I 3 2 2 1 T TS 0 0 2 2
.,l RO RX 1 0 T
SRO-I NOR 1 1 1 T
SRO-U vc 4 2
4 2
2 1
MAJ 0 2 2 TS lnstructions:
1 . Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not apflicble for RO applicants. ROs must serve in both the "at-the-controls" (ATC) and "balance-of-plant" (BOP) positions. lnstant SROS (Si{O-l) must serve in both the SRO and the ATC positions, ncluding at least two instrument or omponent (l/C) malfunctons and one maor transient, in the ATC position. lf an SRO-I addtonaily seves in the BOP posiiion, on U malfunction can be credited toward the two l/C malfunctions required for the ATC position'
- 2. Reactivity manipulations may be conducted under normal ot controlled abnormal conditions (refer to Section D.5'd) but must be óignificnt per Secti'on C.2.ao'f Appendix D. (.) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3 Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions thai provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I aoplicants in either the ATC or BOP position to best evaluate the SRO-I in manpulatin
ES-301 Transient and Event Checklist Form ES-301-5 2016 Crew C Facility: Quad Cities Date of xam:4118116 Operating Test No.: 14-1 A E Scenarios P V 4 T M 1 2 3 P E L N CREW CREW POSITION CREW POSITION CREW POSITION o I N
I T POSITION T I
c S A B A B S A B s A B A
M A T o o L N
R T o H T o R T R T U o c P o c P o c P o c P M(.)
T P E R U RO RX 5 2 4 3 1 1 0 TSRO-I NOR 'l 1 2 1 1 1 vÇ 2,3,7, 3,5,6, 5,8 12 4 4 2 tro 8,9 7,9 SRO-U MAJ 6 7 3 2 2 1 T TS 4,5 B
4,5 4 0 2 2 2 'I ',l 0
RX 5 4 RO TSRO-I NOR '1 1 2 1 1 1 t/c 3,7 6,7 2,3,5, I 4 4 2 Bz 6,8 SRO-U MAJ 6 I 7 3 2 2 1 TS 5,6 2 0 2 2 RO RX 2 1 1 1 0 8z NOR 1 1 2 1 1 1 SRO.I I 4 4 2 vc 2,8 3,5, 2,3,6 TSRO-U 9
MAJ 6 I 7 3 2 2 1 TS 0 0 2 2 RO RX 1 1 0 TSRO-I NOR 1 1 1 TSRO-U vc 4 2
4 2
2 MAJ 1 TS 0 2 2 lnstructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls' (ATC) and "balance-of-plant" (BOP) positions. lnstant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (l/C) malfunctions and one maor transient, in the ATC position. lf an SRO-I additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.S.d) but must be significant per Section C.2.a of Appendix D. (-) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one{or-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant qqltrq.
ES-301 Transient and Event Checklist Form ES-301-5 2016 Crew D Facility: Quad Cities Date of Exam:4/18/16 Operating Test No.: 14-1 A E Scenarios P V 2 3 4 T M 1
P E L N CREW CREW POSITION CREW POSITION CREW POSITION o I N
I T POSITION T I
c S A B S A B S A B S A B A
M A T o o o L N
R T o R T R T R T U o c P o c P o c P o c P M(.)
T P E R I U RO RX 2 6 2 1 1 0 nSRO-I NOR '1 1 2 1 1 1 vc 3,5,6, 2,3,6 3,7 10 4 4 2 tre 7,9 SRO-U MAJ I 7 I 3 2 2 1 TS 4,5 2 0 2 2 RX 2 4 b 3 1 1 0 RO TSRO.I NOR 1
'1 2 1 1 1 vc 3,5, 2,3,5, 2,3,5, 13 4 4 2 trg I 6,8 7,9 SRO-U MAJ I 7 I 3 2 2 1 TS 5,6 2,4 4 0 2 2 RO RX 4 1 1 1 0 trs NOR 1 1 2 1 1 1 SRO-I 5,8 2,5 6 4 4 2 vc 6,7 T
SRO-U MAJ I 7 I 3 2 2 1 0 0 2 2 TS RO RX 1 1 0 tr SRO-NOR 1 1 1 T
SRO. U vc 4 2
4 2
2 MAJ 1 TS 0 2 2 lnstructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each eveft rype; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls" (ATC) and "balance-of-plant" (BOP) positions. lnstant SROS (SRO-l) must serve in both the SRO and the ATC positions, including at least two instrument or omponent (l/C) malfunctions and one major transient, in the ATC position. lf an SRO-I additionally serves in the BOP posiiion, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position'
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D'S.d) but must be óignificant per Section C.2.a ol Appendix D. (.) Reactivity and normal evolutions may be replaced wth additional instrument or component malfunctions on a one'for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions thai provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I aoolicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.