ML16204A054
Jump to navigation
Jump to search
| ML16204A054 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 06/10/2016 |
| From: | Mcneil D NRC/RGN-III/DRS/OLB |
| To: | Northern States Power Company, Minnesota |
| Shared Package | |
| ML15274A272 | List: |
| References | |
| 50-282/OL-16-301, 50-306/OL-16-301 | |
| Download: ML16204A054 (1) | |
Text
Page 1 of 1 PINGP 2016 Outline/Operating Test Comments There were no comments on the outline submitted by the licensee.
Operating Test Comments:
Administrative JPMs Admin JPM d (SRO) was replaced as a result of on-site validation. The procedure used in the JPM failed to supply the information required to complete the JPM.
Simulator Scenario Guides Additional information was added to the guides to assist the NRC examiners during execution of the EOPs.