ENCLOSURE 1 NOTICE OF VIOLATION Duke Power Company Docket;Nos. 50-269 and 270 Oconee 1 and 2 License No. DPR-38 and DPR-47 During an NRC inspection conducted on August 23 - 28, 1993, a violation of NRC requirements was identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions, "10 CFR Part 2, Appendix C, the violation is listed below:
Technical Specification 6.4.1.e requires, in part, that the station shall be operated and maintained in accordance with approved procedures.
Written procedures with appropriate check-off lists and instructions shall be provided for preventive or corrective maintenance which could affect nuclear safety or radiation exposure to personnel.
Duke Power Company Procedure IP/0/A/3011/013, Change 2, "Molded Case Circuit Breaker Test and Inspection", requires in Step 10.3 that circuit breaker line and load side cables be marked and disconnected for breaker testing. The procedure requires in Step 10.21 that the cables be connected to the breaker as marked.
Duke Power Company Procedure IP/0/B/0325/003, Change 15, "ICS FWPT Speed Control Calibration", requires in Enclosure 11.3.9 that a Bailey Meter Co. Type 6620255-9 proportional plus integral controller be installed for the Feedwater Valve Differential Pressure Error Controller.
Contrary to the above, these requirements were not met in that:
- 1.
On May 18, 1993, cables to the circuit breaker in DC motor control center 2DCA compartment 3A were improperly connected during the performance of IP/0/A/3011/013.
- 2.
On December 28, 1992, work request 51316L installed a Bailey Meter Co. type 6620255-10 proportional plus integral controller with limiter for the Feedwater Valve Differential Pressure Error Controller on Oconee Unit 1.
This is a Severity Level IV violation (Supplement 1).
Pursuant to the provisions of 10 CFR 2.201, Duke Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector at the Oconee Nuclear Plant, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid 9310150089 930924 PDR ADOCK 05000269 G
Duke Power Company 2
Docket Nos. 50-269 and 270 Oconee 1 and 2 License No. DPR-38 and DPR-47 further violations, and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified in this Notice, an order or Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.
Dated at Atlanta, Georgia this 24 day of Sept 1993