Text
May. 11, 2016 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2016-18 7 71 USER INFORMATION:
GERLACH*ROSEY M Address: NUCSA2 Phone#:
254-3194 EMPL#: 028401 CA#:
0363 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSEY M 05/11/2016 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
Page 1
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be iss~ed with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 05/09/2016 ADD MANUAL TABLE OF CONTENTS DATE: 05/10/2016 CATEGORY: DOCUMENTS TYPE: TRM2 of 2
)
May. 11, 2016 ID:
TEXT 3.7.3.1 REMOVE:
REV: 2 ADD:
REV: 3 CATEGORY: DOCUMENTS TYPE: TRM2 ID:
TEXT B3.11.1.1 REMOVE:
REV: 0 ADD:
REV: 1 CATEGORY: DOCUMENTS TYPE: TRM2 ID:
TEXT LOES ADD:
REV: 88 REMOVE:
REV: 87 CATEGORY: DOCUMENTS TYPE: TRM2 ID:
TEXT TOC ADD:
REV: 25 REMOVE:
REV:24 Page 2
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
of 2
-~
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
05/10/2016 Procedure Name Rev Issue Date Change ID Change Nwnber TEXT LOES 88 05/10/2016
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 25 05/10/2016
Title:
TABLE OF CONTENTS TEXT 1.1 0
11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1
02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT,. PROGRAMS *.
TEXT 2.2 11
- 01;3:i:;2oi4 *
Title:
PLANT PROGRAMS AND SETPOINTS 'INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 03/05/2015
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1
11/09/2007
Title:
REACTIVITY'CbNTROL' SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0
11/19/2002
Title:
REACTIVITY.CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4
05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/19/2002 Titleg REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 12 11/10/2015
Title:
CORE OPERATING LIMITS REPORT (COLR)
Page.l of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2
-*-.;I
- ~
- t~~: I. Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0
11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3
03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 8
10/14/2015 '
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK
~~f 1
TEXT 3. 3. 6 4
04/29/2014
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2
11/10/2015
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3
05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 1
03/05/2015
Title:
WATER MONITORING INSTRUMENTATION Page 2.
of 1..5.
Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1
04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1
11/09/2007 Title~ REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 2
05/14/2009
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 1
04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2
04/29/2014
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page.3.
of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2 I **: ;-* Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 3
05/10/2016
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3
04/16/2009 Title~ PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3
04/16/2009
Title:
PLANT SYSTEMS C02 SYSTEMS LDCN 5254 TEXT 3.7.3.4 2
04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2
04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2
04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1
04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 11 09/27/2012
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1
04/26/2006
- -:~:-:~~;
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Page.4 of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2
.* Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2
~~j TEXT 3.7.5.l 1
03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1
04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3
06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2
09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 9
03/05/2015
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1
08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 2
04/29/2014
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 1
10/02/2009
Title:
PLANT SYSTEMS TEXT 3.8.1 3
06/20/2012
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS
- ~* TEXT 3. 8. 2. 2 2
12/14/2004
~
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page.2.
of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2
.*.~
- ~-:_~:~-- -
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3 2
06/20/2012
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1
02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 1
11/14/2013
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 2
12/14/2006
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2
10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.l 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2
06/15/2010 '
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3. 11.1.1 1
04/26/2006
'-~-~'.)'
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page Q.
of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3. 11. 1. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3. 11. 1. 4 2
10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3. 11. 1. 5 3
03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11. 2. 1 3
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE
-~~ * ;. TEXT 3. 11. 2. 2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
NOBLE GASES TEXT 3.11.2.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11. 2. 4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3. 11. 2. 5 4
07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 5
03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 4
03/05/2015
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM Page]_
of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2
- '°'.::- '-- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3. 11. 4. 2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11. 4. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1
12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0
09/27/2003
~~~:-
""-:_* --~~'
Title:
ADMINISTRATIVE CONTROLS TRAINING Page _a of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 6
03/05/2015
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 2
04/29/2014
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3
04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION
~-
AND CHECK VALVE
, }
TEXT B3. 2. 1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 1
01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2
03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2
11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 5
10/14/2015
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2
11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK
__ TEXT B3. 3. 6 5
01/31/2014
~
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION Page.2.
of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7 2
11/10/2015
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1
10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3
05/14/2009
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3
02/22/2012
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1
10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.l 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1
04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS
- ~=~:-;, TEXT B3. 4. 6 1
04/25/2013
~,~
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Page 10 of 15 Report Date: 05/10/16
Manual Name:
TRM2 r;:,
SSES MANUAL Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION
<*.-.. *.:*** TEXT B3. 6. 3 1
04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3
06/15/2010
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2
04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0
11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS Page 11 of.15.
Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2
- ~~,I Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2
)_.
l
~:1 /
TEXT B3.7.3.4 2
04/29/2014
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1
04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7;3.6 1
04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0
11/19/2002 Title~ PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3
09/27/2012
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0
11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.l 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0
11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4
06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2
01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 4
01/31/2014
Title:
PLANT SYSTEMS BASES SNUBBERS Page 12 of 15 Report Date: 05/10/16
~-' fJ SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 2
12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2
04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.l 2
03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.l 0
11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1
09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0
11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0
11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1
11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3
06/20/2012
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2
06/04/2013
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Page 13 of 15 Report Date: 05/10/16
SSES MANUAL Manual* Name:
TRM2 1 ***A' Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2
'.-:~~~~~
1,:-**.-:-:-
TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.l 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1
04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3. 11. 1. 1 1
05/10/2016
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3. 11. 1. 2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1. 3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3. 11. 1. 4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MON~TORING INSTRUMENTATION TEXT B3. 11. 1. 5 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.l 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3. 11. 2. 2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
NOBLE GASES Page 14 of 15 Report Date: 05/10/16
9
__._,,..!,j'
"".;~~-
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3. 11. 2. 5 5
07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11. 2. 6 1
01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11. 3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 5
03 /05 /2 0*15
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEX:T B3. 11. 4. 2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1
10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1
12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 15 of 15 Report Date: 05/10/16
~i SUSQUEHANNA STEAM ELECTRIC STATION Rev.25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION 1.0 1.1 2.0 2.1 2.2 3.0 3.0 3.0 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.2 3.2.1 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 3.3.7 3.3.8 3.3.9 3.3.10 3.3.11 3.3.12 3.4 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 3.4.6 TITLE PAGE USE AND APPLICATION............................................................................. 1.0-1 Definitions................................................................................................ 1.0-1 PLANT PROGRAMS AND SETPOINTS....................................................... 2.0-1 Plant Programs....................................................................................... 2.0-1 Instrument Trip Setpoint Table........................................................ TRM/2.0-5 APPLICABILITY................................................................................... TRM/3.0-1 Technical Requirement for Operation (TRO) Applicability............... TRM/3.0-1 Technical Requirement Surveillance (TRS) Applicability.... _.:<::-.~*.::>>.TRM/3.0-3 r -.
'\\
(
\\
REACTIVITY CONTROL SYSTEMS................................ !.'.*........,.... :.. TRM/3.1-1 Anticipated Transient Without Scram Alternate Rod'i'i)je{;:tio'ri," '"</
(A TWS-ARI) Instrumentation................................. ~'.... '.';(.!....* ~.. :/... TRM/3.1-1 Control Rod Drive (CRD) Housing Support.............. >,... S:(./....... TRM/3.1-4
~ '
Control Rod Block lnstrumentat1on.............. :.:..:.::*.-::*****:,,-_;.,_.-::............ TRM/3.1-5 Control Rod Scram Accumulators lnstrumentation'and)
/
Check Valve........................................ ::.::... :*****.. **~**-*... *:..................... TRM/3.1-9
.........,../*_:>v CORE OPERATING LIMITS REPORT,.-...... :*:.::,..... /............................ TRM/3.2-1
\\ "'
/
Core Operating Limits Report.... \\...'.,.... :*:*,... *;**:::*................................ TRM/3.2-1
/.....,............ \\*',....,
........... _... ) //
INSTRUMENTATION........... *.'..:::,... ;.. >*...... ~~........................................ TRM/3.3-1 Radiation Monitoring 1nSinfme_otatior;i.............................................. TRM/3.3-1 Seismic Monitoring lnstrumeritatior(............................................... TRM/3.3-4 Meteorological rv]onitonrm 11istrumentation...................................... TRM/3.3-7 TRM Post-Acc;id~nt Monitoling' Instrumentation.............................. TRM/3.3-9 Section Not_ L!se9 :~.. ~...... :-.J............................................................. TRM/3.3-12 TRM Isolation Actuation Instrumentation......................................... TRM/3.3-13 Main Turbi_ne Overs peed Protection System................................... TRM/3.3-17 Section Not Lisec:L.......................................................................... TRM/3.3-19 OPRM Instrumentation Configuration.............................................. TRM/3.3-21
.* Reactor Redrculation Pump MG Set Stops..................................... TRM/3.3-22
- *MVP Isolation Instrumentation........................................................ TRM/3.3-24
- vyater Monitoring Instrumentation................................................... TRM/3.3-26 REACTOR COOLANT SYSTEM.......................................................... TRM/3.4-1 Reactor Coolant System Chemistry................................................ TRM/3.4-1 Not Used......................................................................................... TRM/3.4-6 High/Low Pressure Interface Leakage Monitors.............................. TRM/3.4-9 Reactor Recirculation Flow and Rod Line Limit............................... TRM/3.4-12 Reactor Vessel Materials............................................................... TRM/3.4-13 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction...................................................................... TRM/3.4-14 SUSQUEHANNA - UNIT 2 TRM /TOC-1 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION 3.5 EMERGENCY CORE COOLING AND RCIC........................................ TRM/3.5-1 3.5.1 ADS Manual Inhibit......................................................................... TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring lnstrumentation...................... TRM/3.5-3 3.5.3 Long Term Nitrogen Supply to ADS.............................. *.......................... 3.5-6 3.6 CONTAINMENT........................................................................................... 3.6-1 3.6.1 Venting or Purging.................................................................................. 3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication......................................................................................... TRM/3.6-3 3.6.3 Suppression Pool Alarm Instrumentation................................................ 3.6-4 3.6.4 Primary Containment Closed System Boundaries TRM/3.6-7 3.7 PLANT SYSTEMS TRM/3.7-1 3.7.1 Emergency Service Water System (ESW) Shutdown TRM/3.7-1 3.7.2 Ultimate Heat Sink (UHS) and Ground Water Level................................ 3.7-3 3.7.3 Fire Protection................................................................................ TRM/3.7-4 3.7.3.1 Fire Suppression Water Supply System.......................................... TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems.......................................................... TRM/3.7-8 3.7.3.3 C02 systems.................................................................................. TRM/3.7-12 3.7.3.4 Halon Systems................................................................................ TRM/3.7-16 3.7.3.5 Fire Hose Stations.......................................................................... TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses............................... TRM/3.7-22 3.7.3.7 Fire Rated Assemblies.................................................................... TRM/3. 7-24 3.7.3.8 Fire Detection Instrumentation........................................................ TRM/3. 7-26 3.7.4 Solid Radwaste System.................................................................. TRM/3.7-34 3.7.5 Explosive Gas and Storage Tank Radioactivity Monitoring Program........................................................................ TRM/3.7-37 3.7.5.1 Main Condenser Off gas Hydrogen Monitor..................................... TRM/3. 7-37 3.7.5.2 Main Condenser Offgas Explosive Gas Mixture.......... ;........................... 3.7-38 3.7.5.3 Liquid Holdup Tanks....................................................................... TRM/3.7-39 3.7.6 ESSW Pump house Ventilation........................................................ TRM/3. 7-40 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation.............................................................. TRM/3. 7-41 3.7.8 Snubbers........................................................................................ TRM/3.7-43 3.7.9 Control Structure HVAC.................................................................. TRM/3.7-49 3.7.10 Spent Fuel Storage Pools (SFSPs)................................................. TRM/3.7-51 3.7.11 Structural lntegrity................................................................... :....... TRM/3.7-54 3.8 ELECTRICAL POWER......................................................................... TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices.......................................................................... TRM/3.8-1 3.8.2 Motor Operated Valves Thermal Overload Protection..................... TRM/3.8.5 3.8.2.1 Motor Operated Valves (MOV) Thermal Overload Protection -
Continuous...................................................................................... TRM/3.8-5 3.8.2.2 Motor Operated Valves (MOV) Thermal Overload Protection -
Automatic........................................................................................ TRM/3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities................................ TRM/3.8-13 SUSQUEHANNA-UNIT 2 TRM /TOC-2 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev.25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION 3.8.4 3.8.5 3.8.6 3.8.7 3.9 3.9.1 3.9.2 3.9.3 3.10 3.10.1 3.10.2 3.10.3 3.11 3.11.1 3.11.1.1 3.11.1.2 3.11.1.3 3.11.1.4 3.11.1.5 3.11.2 3.11.2.1 3.11.2.2 3.11.2.3 3.11.2.4 3.11.2.5 3.11.2.6 3.11.3 3.11.4 3.11.4.1 3.11.4.2 3.11.4.3 3.12 3.12.1 3.12.2 3.12.3 24 VDC Electrical Power Subsystem.............................................. TRM/3.8-15 Degraded Voltage Protection.......................................................... TRM/3.8-21 Emergency Switchgear Room Cooling............................................ TRM/3.8-24 Battery Monitoring and Maintenance Program................................ TRM/3."8-26 REFUELING OPERATIONS......................................................................... 3.9-1 Decay Time............................................................................................. 3.9-1 Communications..................................................................................... 3.9-2 Refueling Platform.................................................................................. 3.9-3 MISCELLANEOUS............................................'................................... TRM/3.10-1 Sealed Source Contamination......................................................... TRM/3.10-1 Shutdown Margin Test RPS Instrumentation........................................... 3.10-4 Independent Spent Fuel Storage Installation (ISFSI)...................... TRM/3.10-7 RADIOACTIVE EFFLUENTS................................................................ TRM/3.11-1 Liquid Effluents............................................................................... TRM/3.11-1 Liquid Effluents Concentration........................................................ TRM/3.11-1 Liquid Effluents Dose...................................................................... TRM/3.11-4 Liquid Waste Treatment System..................................................... TRM/3.11-6 Liquid Radwaste Effluent Monitoring lnstrumentation...................... TRM/3.11-8 Radioactive Liquid Process Monitoring Instrumentation.................. TRM/3.11-13 Gaseous Effluents........................................................................... TRM/3.11-17 Dose Rate....................................................................................... TRM/3.11-17 Dose - Noble Gases........................................................................ TRM/3.11-20 Dose - Iodine, Tritium, and Radionuclides in Particulate Form.............................................................................. TRM/3.11-21 Gaseous Radwaste Treatment System........................................... TRM/3.11-22 Ventilation Exhaust Treatment System........................................... TRM/3.11-23 Radioactive Gaseous Effluent Monitoring Instrumentation............................................................................... TRM/3.11-25 Total Dose...................................................................................... TRM/3.11-33 Radiological Environmental Monitoring........................................... TRM/3.11-35 Monitoring Program........................................................................ TRM/3.11-35 Land Use Census........................................................................... TRM/3.11-45 lnterlaboratory Comparison*Program.............................................. TRM/3.11-47 LOADS CONTROL PROGRAM............................................................ TRM/3.12-1 Crane Travel - Spent Fuel Storage Pool......................................... TRM/3.12-1 Heavy Loads Requirements............................................................ TRM/3.12.3 Light Loads Requirements.............................................................. TRM/3.12-5 SUSQUEHANNA-UNIT 2 TRM /TOC-3 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM-ELECTRIC STATION Rev. 25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION 4.0 ADMINISTRATIVE CONTROLS................................................................... 4.0-1 4.1 Organization........................................................................................... 4.0-1 4.2 Reportable Event Action......................................................................... 4.0-2 4.3 Safety Limit Violation.............................................................................. 4.0-3 4.4 Procedures and Programs.............................................................. TRM/4.0-4 4.5 Reporting Requirements......................................................................... 4.0-5 4.5.1 Startup Reports....................................................................................... 4.0-5 4.5.2 Annual Reports....................................................................................... 4.0-6 4.5.3 Special Reports....................................................................................... 4.0-6 4.6 Radiation Protection Program................................................................. 4.0-7 4.7 Training................................................................................................... 4.0-8 SUSQUEHANNA - UNIT 2 TRM/TOC-4 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION B 3.0 B 3.0 B 3.1.1 B 3.1.2 B 3.1.3 B 3.1.4 B 3.2.1 B 3.3.1 B 3.3.2 B 3.3.3 B 3.3.4 B 3.3.5 B 3.3.6 B 3.3.7 B 3.3.8 B 3.3.9 B 3.3.10 B 3.3.11 B 3.3.12 B 3.4.1 B 3.4.2 B 3.4.3 B 3.4.4 B 3.4.5 B 3.4.6 B 3.5.1 B 3.5.2 B 3.5.3 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.7.1 B 3.7.2 B 3.7.3.1 Technical Requirement for Operation (TRO) Applicability............... TRM/B 3.0-1 Technical Requirement Surveillance (TRS) Applicability................. TRM/B 3.0-9 Anticipated Transient Without Scram Alternate Rod Injection (ATWS-ARI) lnstrumentation........................................................... TRM/B 3.1-1 Control Rod Drive (CRD) Housing Support............................................. B 3.1-4 Control Rod Block lnstrumentation.................................................. TRM/B 3.1-5 Control Rod Scram Accumulators Instrumentation and Check Valve............................................................................. TRM/B 3.1-8 Core Operating Limits Report (COLR).................................................... B 3.2-1 Radiation Monitoring lnstrumentation.............................................. TRM/B 3.3-1 Seismic Monitoring Instrumentation................................................ TRM/B 3.3-2 Meteorological Monitoring lnstrumentation...................................... TRM/B 3.3-3 TRM Post-Accident Monitoring Instrumentation.............................. TRM/B 3.3-4 Section Not Used............................................................................ TRM/B 3.3-9 TRM Isolation Actuation lnstrumentation......................................... TRM/B 3.3-10 Turbine Overspeed Protection System............................................ TRM/B 3.3-14 Section Not Used............................................................................ TRM/B 3.3-15 OPRM lnstrumentation.................................................................... TRM/B 3.3-18 Reactor Recirculation Pump MG Set Stops..................................... TRM/B 3.3-20 MVP Isolation Instrumentation..........................................".............. TRM/B 3.3-22 Water Monitoring Instrumentation................................................... TRM/B 3.3-24 Reactor Coolant System Chemistry........................................................ B 3.4-1 Not Used......................................................................................... TRM/B 3.4-2 High/Low Pressure Interface Leakage Monitor................................ TRM/B 3.4-4 Reactor Recirculation Flow and Rod Line Limit............................... TRM/B 3.4-5 Reactor Vessel Materials........................................................................ B 3.4-6 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction...................................................................... TRM/B3.4-7 ADS Manual Inhibit................................................................................. B 3.5-1 ECCS and RCIC System Monitoring lnstrumentation...................... TRM/B 3.5-3 Long Term Nitrogen Supply to ADS................................................ TRM/B 3.5-4 Venting or Purging.......................................................................... TRM/B 3.6-1 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication................................................................................................ B 3.6-3 Suppression Pool Alarm Instrumentation........................................ TRM/B 3.6-4 Primary Containment Closed System Boundaries........................... TRM/B 3.6-6 Emergency Service Water System (Shutdown)....................................... B 3.7-1 Ultimate Heat Sink (UHS) Ground Water Level....................................... B 3.7-2 Fire Suppression Water Supply System............ :................. ~........... TRM/B 3.7-3 SUSQUEHANNA - UNIT 2 TRM /TOC-5 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev.25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION 8 3.7.3.2 Spray and Sprinkler Systems.......................................................... TRM/B 3.7-5 8 3.7.3.3 C02 Systems.................................................................................. TRM/B 3.7-7 8 3.7.3.4 Halon Systems................................................................................ TRM/B 3.7-8 8 3.7.3.5 Fire Hose Stations................................................... :...................... TRM/8 3.7-10 8 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses............................... TRM/B 3.7-11 8 3.7.3.7 Fire Rated Assemblies.................................................................... TRM/B 3.7-12 B 3.7.3.8
~Fire Detection Instrumentation........................................................ TRM/8 3.7-14 8 3.7.4 Solid Radwaste System.................................................................. TRM/B 3.7-15 8 3.7.5.1 Main Condenser Offgas Hydrogen Monitor............................................. B 3.7-17 8 3.7.5.2 Main Condenser Offgas Explosive Gas Mixture...................................... B 3.7-19 8 3.7.5.3 Liquid Holdup Tanks............................................................................... B 3.7-20 8 3.7.6 ESSW Pumphouse Ventilation........................................................ TRM/B 3.7-21 8 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring lnstrumentation.............................................................. TRM/B 3.7-22 8 3.7.8 Snubbers........................................................................................ TRM/8 3.7-24 B 3.7.9 Control Structure HVAC.:................................................................ TRM/B 3.7-31 83.7.10 Spent Fuel Storage Pools............................................................... TRM/B 3.7-33 83.7.11 Structural lntegrity........................................................................... TRM/B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices.......................................................................... TRM/B 3.8-1 8 3.8.2.1 Motor Operated Valves (MOV) Thermal Overload Protection -
Continuous...................................................................................... TRM/B 3.8-3 8 3.8.2.2 Motor Operated Valves (MOV) Thermal Overload Protection -
Automatic........................................................................................ TRM/B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintenance Activities........................................ B 3.8-5 B 3.8.4 24 VDC Electrical Power Subsystem.............................................. TRM/B 3.8-6 8 3.8.5 Degraded Voltage Protection.......................................................... TRM/8 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling............................................ TRM/B 3.8-17 8 3.8.7 Battery Monitoring and Maintenance Program................................ TRM/8 3.8-18 8.3.9.1 Decay Time............................................................................................. 8 3.9-1 8 3.9.2 Communications..................................................................................... B 3.9-2 8 3.9.3 Refueling Platform........................................................ :......................... 8 3.9-3 8 3.10.1
- Sealed Source Contamination................................................................. B 3.10-1 B 3.10.2 Shutdown Margin Test RPS Instrumentation........................................... B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI)...................... TRM/B 3.10-4 8 3.11.1.1 Liquid Effluents Concentration........................................................ TRM/8 3.11-1 8 3.11.1.2 Liquid Effluents Dose.............................................................................. B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System............................................................. B 3.11-6 8 3.11.1.4 83.11.1.5 Liquid Radwaste Effluent Monitoring Instrumentation.............................. B 3.11-7 Radioactive Liquid Process Monitoring lnstrumentation............... TRM/B 3.11-10 SUSQUEHANNA - UNIT 2 TRM /TOC-6 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev.25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 83.11.4.3 B.3.12.1 B.3.12.2 B.3.12.3 Dose Rate.................................................................................... TRM/B 3.11-12 Dose - Noble Gases............................................................................. B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in Particulates Form................................................................................. B 3.11-18 Gaseous Radwaste Treatment System............................ :........... TRM/B 3.11-20 Ventilation Exhaust Treatment System........................................ TRM/B 3.11-21 Radioactive Gaseous Effluent Monitoring Instrumentation............................................................................ TRM/B 3.11-24 Total Dose........................................................................................... B 3.11-26 Monitoring Program..................................................................... TRM/B 3.11-28 Land Use Census................................................................................ B 3.11-34 lnterlaboratory Comparison Program........................................... TRM/B 3.11-36 Crane Travel - Spent Fuel Storage Pool..................................... TRM/B 3.12-1 Heavy Loads Requirements......................................................... TRM/B 3.12-2 Light Loads Requirements........................................................... TRM/B 3.12-3 SUSQUEHANNA - UNIT 2 TRM /TOC-7 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 04/28/2016 1.0 USE AND APPLICATION Page TRM I 1.0-1 08/31/1998 Page TRM I 1.0-2 10/04/2002 Page TRM I 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM I 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 01/21/2014 Page TRM / 2.0-6 04/15/2009 Page TRM / 2.0-7 05/15/2008 Pages TRM I 2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 04/15/2009 Pages TRM I 2.0-13 and TRM I 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM I 3.0-1 and TRM I 3.0-2 02/19/2015
~
Page TRM I 3.0-3 03/15/2002 Page TRM I 3.0-4 02/19/2015 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM I 3.1-2 through TRM I 3.1-5 08/31/1998 Page TRM / 3.1-6 03/27/2007 Page TRM / 3.1-7 04/15/2009 Page TRM / 3.1-8 03/27/2007 Pages TRM I 3.1-9 and TRM I 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERA TING LIMITS REPORT Page TRM / 3.2-1 08/31/1998 Pages TRM I 3.2-2 through TRM / 3.2-63 11/04/2015 3.3 INSTRUMENTATION Pages TRM I 3.3-1 through TRM I 3.3-3 07/16/1999 Pages TRM I 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 03/10/2011 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM I LOES-1 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / 3.3-9 10/07/2015 Page TRM / 3.3-9a 06/30/2010 Page TRM / 3.3-10 10/31/2007 Page TRM / 3.3-11 10/07/2015 Page TRM / 3.3-11a 10/07/2015 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 04/11/2014 Page TRM / 3.3-16 01/07/2011 Page TRM / 3.3-17 11/04/2015 Page TRM / 3.3-17a 11/04/2015 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 04/15/2009 Page TRM / 3.3-21a 11/15/2004 Pages TRM /3.3-21b through TRM / 3.3-21d 03/27/2007 Page TRM / 3.3-22 12/03/2004 Pages TRM I 3.3-23 and TRM I 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 Page TRM / 3.3-26 02/19/2015 Page TRM / 3.3-27 0410712009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page 3.4-9 08/31/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM I 3.4-12 04/17/2009 Page TRM / 3.4-13 03/31/2006 Page TRM / 3.4-14 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/$1/1998 3.6 CONTAINMENT Pages 3.6-1 and 3.6-2 08/31/1998 Pages TRM I 3.6-3 and TRM / 3.6-3a 04/16/2014 Page 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-9 12/31/2002 SUSQUEHANNA - UNIT 2 TRM/ LOES-2 EFFECTIVE DA TE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title
- 3. 7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Page TRM / 3.7-6 Pages TRM / 3.7-7 and TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3. 7-23 Page TRM / 3.7-24 Page TRM / 3.7-25 Page TRM / 3.7-26 Page TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-32a Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Page TRM / 3.7-37 Page TRM / 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Pages TRM I 3. 7-40a through TRM / 3. 7-40c Page TRM / 3.7-41 Page TRM I 3. 7.-42 Pages TRM / 3.7-43 Pages TRM / 3.7-44 and TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM / 3.7-55 Page TRM / 3.7-56 SUSQUEHANNA - UNIT 2 TRM /LOES-3 Effective Date 07/29/1999 08/31/1998 03/31/2006 04/07/2009 04/28/2016 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 0410712009 08/02/1999 0410712009 08/02/1999 0410712009 03/31/2006 08/02/1999 09/25/2012 11/24/2011 09/25/2012 09/25/2012 03/31/2006.
02/01/1999 02/19/2015 08/31/1998 03/31/2006 05/24/2012 05/24/2012 09/04/2008 08/31/1998 02/19/2015 10/05/2006 0610712007 09/05/2012 0610712007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 EFFECTIVE DA TE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Page TRM / 3.8-2 Pages TRM / 3.8-3 and TRM / 3.8-4 Pages TRM / 3.8-5 and-TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17
- Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 and TRM / 3.8-22 Page TRM / 3.8-23 Page TRM / 3.8-24 Page TRM / 3.8-25 Pages TRM / 3.8-25a and TRM / 3.8-25b Page TRM / 3.8-26 Page TRM / 3.8-27 Page TRM / 3.8-28 Page TRM / 3.8-29 3.9 REFUELING OPERATIONS 3.10 3.11 Pages 3.9-1 through 3.9-3 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM I 3.10-5 and TRM I 3.10-6 Page TRM / 3.10-7 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 and TRM I 3.11-8 Pages TRM I 3.11-9 and TRM / 3.11-10 Pages TRM / 3.11-11 and TRM / 3.11-12 SUSQUEHANNA - UNIT 2 TRM I LOES-4 Effective Date 04/02/2002 01/28/2005 06/12/2012 04/02/2002 10/31/2007 09/03/2004 12/03/2004 06/12/2012 08/31/1998 01/28/2005
'04/02/2002 02/01/1999 0410212002 02/01/1999 06/06/1999 11/07/2013 11/30/2011 06/11/2012 11/30/2011 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 06/10/2010 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 10/09/2012 08/31/1998 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LISTOF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title 3.12 4.0 Page TRM I 3.11-13 Page TRM I 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM I 3.11-17 Page 3.11-18 Page TRM I 3.11-19 Pages TRM I 3.11-20 and TRM I 3.11-21 Page TRM I 3.11-22 Page TRM I 3.11-23 Page TRM I 3.11-24 Page TRM I 3. 11-25 Pages TRM I 3.11-26 and TRM I 3.11-27 Page TRM I 3.11-28 Page TRM I 3.11-29 Pages TRM 3.11-30 and TRM I 3.11-31 Page TRM I 3.11-32 Page TRM I 3.11-33 Page 3.11-34 Page TRM I 3.11-35 Pages TRM I 3.11-36 through TRM I 3.11-39 Page TRM I 3. 11-40 Pages TRM I 3.11-41 through TRM I 3.11-44 Page TRM I 3.11-45 Page 3.11-46 Page TRM I 3.11-47 LOADS CONTROL PROGRAM Pages TRM I 3.12-1 through TRM I 3.12-3 Page TRM I 3.12-4 Page TRM I 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM I 4.0-1 through TRM I 4.0-3 Page TRM I 4.0-4 Pages TRM I 4.0-5 throug.h TRM I 4.0-8 SUSQUEHANNA - UNIT 2 TRM I LOES-5 Effective Date 02/19/2015 12/03/2004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 06/18/2013 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 02/19/2015 03/31/2006 08/31/1998 03/31/2006 11/30/2005 02/19/2015.
08/31/1998 03/31/2006 08/31/1'998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.0 APPLICABILITY BASES Pages TRM I B 3.0-1 through TRM I B 3.0-3 Page TRM I B 3.0-4 Pages TRM I B 3.0-4a and TRM I B 3.0-4b Page TRM I B 3.0-5 Pages TRM I B 3.0-6 and TRM I B 3.0-7 Pages TRM I B 3.0-8 through TRM I B 3.0-10 Pages TRM I B 3.0-11 and TRM I B 3.0-12 Pages TRM I B 3.0-13 through TRM I B 3.0-15 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM I B 3.1-1 Page TRM I B 3.1-2 Page TRM I B 3.1-3 Page B 3.1-4 Pages TRM I B 3.1-5 through TRM I B 3.1-7 Page TRM I B 3.1-8 B 3.2 CORE OPERA TING LIMITS BASES Page B 3.2-1 B 3.3 INSTRUMENTATION BASES Page TRM I B.3.3-1 Page TRM I. B 3.3-2 Page TRM I B-3.3-2a Pages TRM I B 3.3-3 and TRM I B 3.3-3a Page TRM I B 3.3-4 Pages TRM I B 3.3-5 through TRM I B 3.3-7 Page TRM I B 3.3-8 Page TRM I B 3.3-9 Page TRM I B 3.3-10 Page TRM I B 3.3-11 Pages TRM I B 3.3-12 and TRM I B 3.3-13 Page TRM I B 3.3-14 Page TRM I B 3.3-14a Page TRM I B 3.3-14b Page TRM I B 3.3-14c Pages TRM I B 3.3-15 through TRM I B 3.3-17 Pages TRM I B 3.3-18 and TRM I B 3.3-19 Pages TRM I B 3.3-19a and TRM I B 3.3-19b Page TRM I B 3.3-19c SUSQUEHANNA - UNIT 2 TRM/ LOES-6 Effective Date 08/31/1998 02/19/2015 0211w2015 02/19/2015 06/12/2012 08/31/1998 03/15/2002 02/19/2015 07/13/1999 04/16/2014 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 01/21/2014 03/10/2011 10/31/2007 10/31/2007 06/30/2010 10/07/2015 06/30/2010 10/31/2007 01/07/2011 02/21/2014 01/07/2011 06/25/2002 11/04/2015 11/04/2015 11/04/2015 10/22/2003 03/27/2007 03/27/2007 04/17/2009 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM I B 3.3-19d and TRM I B 3.3-19e 03/27/2007 Page TRM I B 3.3-20 02/16/2012 Page TRM I B 3.3-21 08/03/2010 Page TRM I B 3.3-22 10/22/2003 Page TRM I B 3.3-23 05/16/2003 Pages TRM I B 3.3-24 and TRM I B 3.3-25 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES Page TRM I B 3.4-1 08/31/1998 Pages TRM I B 3.4-2 and TRM I 83.4-3 04/01/2009 Pages TRM I B 3.4-4 and TRM I B 3.4-4a 10/31/2007 Page TRM I B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Page TRM I B 3.4-7 04/25/2013 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM I B 3.5-3 and TRM I B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM I B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM I B 3.6-1 07/26/2001 Page TRM I B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM I B 3.6-4 03/29/2007 Page TRM I B 3.6-5 0410412007 Page TRM I B 3.6-6 12/03/2004 Pages TRM I B 3.6-7 through TRM I B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASE=S Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM I B 3.7-3 06/10/2010 Page TRM I B 3.7-3a 12/27/2007 Page TRM I B 3.7-4 03/31/2006 Page TRM I B 3.7-5 08/02/1999 Pages TRM I B 3.7-6 and TRM I B 3.7-6a 03/31/2006 Pages TRM I B 3.7-7 and TRM I B 3.7-7a 08/02/1999 Page TRM I B 3.7-8 08/02/1999 Page TRM I B 3.7-9 04/11/2014 Page TRM I B 3.7-10 08/02/1999 SUSQUEHANNA - UNIT 2 TRM/LOES-7 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section B 3.8 Title Pages TRM I B 3.7-10a through TRM I B 3.7-11a Pages TRM I B 3.7-12 and TRM I B 3.7-13 Pages TRM I B 3.7-14 through TRM I B 3.7-14b Pages TRM I B 3.7-15 and TRM I B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM I B 3.7-21.
Pages TRM I B 3.7-21a through TRM I B 3.7-21d Pages TRM I B 3.7-21e through TRM I B 3.7-21g Pages TRM I B 3.7-22 and TRM I B 3.7-23 Page TRM I B 3.7-24 Page TRM I B 3.7-25 Pages TRM I B 3. 7-26 through TRM I B 3. 7-29 Page TRM I B 3.7-30 Page TRM I B 3. 7-30a Page TRM I B 3. 7-30b Page TRM I B 3.7-31 Page TRM I B 3.7-32 Page TRM I B 3. 7-33 Page TRM I B 3. 7-34 Page TRM I B 3.7-35 Pages TRM I B 3. 7-36 and TRM I B 3. 7-37 Page TRM I B 3. 7-38 Page TRM I B 3.7-39 Page TRM I B 3. 7-40 ELECTRICAL POWER BASES
. Page TRM I B 3.8-1 Pages TRM I B 3.8-2 Page TRM I B 3.8-2a Pages TRM I B 3.8-3 and TRM I B 3.8-3a Page TRM I B 3.8-4 Page TRM I B 3.8-4a Page TRM I B 3.8-5 Pages TRM I B 3.8-6 through TRM I B 3.8-15 Page TRM I B 3.8-16 Page TRM I B 3.8-17
. Page TRM I B 3.8-17a Page TRM I B 3.8-17b Pages TRM I B 3.8-18 through TRM I B 3.8-20 Pages TRM I B 3.8-21 and TRM I B 3.8-22 Page TRM I B 3.8-23 Page TRM I B 3.8-24 SUSQUEHANNA - UNIT 2 TRM/ LOES-8 Effective Date 03/31/2006 08/02/1999 09/25/2012 02/01/1999 08/31/1998 05/29/2013 05/24/2012 05/29/2013 01/30/2008 10/05/2006 01/21/2014 10/05/2006 06/07/2007 10/05/2006 01/21/2014 11/30/2011 03/09/2001 04/15/2003 12/03/2004 0710512000 04/01/2009 09/25/2009 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 09/03/2004 04/02/2002 08/31/1998 04/02/2002 11/07/2013 11/30/2011 06/11/2012 11/30/2011 05/29/2013 05/28/2009 05/29/2013 05/28/2009.
EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM I B 3.10-2 and TRM I B 3.10-3 Pages TRM I B 3.10-4 and TRM I B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages TRM I B 3.11-1 and TRM I B 3.11-2 Page TRM I B 3.11-3 Pages B 3.11-4 through B 3.11-9 Page TRM I B 3.11-10 Pages TRM I B 3.11-11 and TRM I B 3.11-11 a Pages TRM I B 3.11-12 and TRM I B 3.11-13 Page TRM I B 3.11-14 Page TRM I B 3.11-15 Pages B 3.11-16 through B 3.11-19 Pages TRM I B 3.11-20 and TRM I B 3.11-20a Page TRM I B 3.11-21 Pages TRM I B 3.11-22 and TRM I B 3.11-23 Pages TRM I B 3.11-23a and TRM I B 3.11-23b Pages TRM I B 3.11-24 and TRM I B 3.11-25 Pages B 3.11-26 through B 3.11-27 Page TRM I B 3.11-28 Page TRM I B 3.11-29 Pages TRM I B 3.11-30 and TRM I B 3.11-31 Page TRM I B 3.11-32 Page TRM I B 3.11-33 Pages TRM I B 3.11-34 and TRM I B 3.11-35 Page TRM I B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM I B 3.12-1 Page TRM I B 3.12-2 Page TRM I B 3.12-3 SUSQUEHANNA - UNIT 2 TRM/ LOES-9 Effective Date 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 08/31/1998 04/28/2016 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 0410212002 05/13/2005 11/14/2006 06/18/2013 01/21/2004 08/31/1998 11/30/2005 02/19/2015 05/29/2013 08/31/1998 06/30/2010 08/31/1998 02/12/1999 09/19/2007 11/29/2010 02/05/1999 EFFECTIVE DATE 04/28/2016
Rev. 3
- 3. 7.3 Fire Protection Fire Suppression Water Supply System
.3.7.3.1
- 3. 7.3.1 Fire Suppression Water Supply System TRO 3.7.3.1 Two Fire Suppression Water Supply Subsystems shall be OPERABLE APPLICABILITY:
At all times ACTIONS
NOTE ------------------------~---------------------------------
- 1.
The provisions of TRO 3.0.4 are not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One fire suppression water A.1 Restore the inoperable 7 days supply subsystem fire suppression water inoperable.
supply subsystem to OPERABLE status OR A.2 Establish an alternate fire 7 days suppression water supply subsystem.
B.
Both fire suppression water B.1 Establish an alternate fire 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> supply subsystems suppression water supply inoperable.
subsystem AND B.2 Restore an inoperable 7 days fire suppression water supply subsystem to OPERABLE status
- SUSQUEHANNA - UNIT 2 TRM I 3.7-4 EFFECTIVE DATE 03/31/2006
Rev. 3 Fire Suppression Water Supply System 3.7.3.1 TECHNICAL REQUIREMENT SURVEILLANCE
N 0 TE ------------------------------------------------------
When a system is placed in an inoperable status solely for the performance of required Surveillances, entry into associated Conditions and required Actions may be delayed up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
SURVEILLANCE FREQUENCY TRS 3.7.3.1.1 Verify the minimum contained fire suppression water 7 days supply volume.
TRS 3.7.3.1.2 Verify that the overall diesel driven fire pump diesel 31 days engine starting 24 volt battery bank and charger battery voltage is greater than or equal to 24 volts.
TRS 3.7.3.1.3 Verify that the diesel driven fire pump diesel engine 31 days starting 24 volt battery bank and charger pilot cell specific gravity, corrected to 77°F, is greater than or equal to 1.200.
TRS 3.7.3.1.4 Verify that the diesel driven fire pump diesel engine 31 days starting 24 volt battery bank and charger electrolyte level of each pilot cell is above the plates.
TRS 3.7.3.1.5 Start the electric motor driven fire pump and operate 31 days it for at least 15 minutes on recirculation flow.
TRS 3.7.3.1.6 Verify that each manual, power operated or automatic 92 days valve, in the fire suppression water supply system flow path is in its correct position.
TRS 37.3.1.7 Verify the diesel driven fire pump fuel storage tank 31 days contains at least 250 gallons of fuel.
TRS 3.7.3.1.8 Start the diesel driven fire pump from ambient 31 days conditions and operate for greater than or equal to 30 minutes on recirculation flow.
(continued)
SUSQUEHANNA - UNIT 2 TRM / 3.7-5 EFFECTIVE DATE 04/07/2009
Rev. 3 Fire Suppression Water Supply System 3.7.3.1 TECHNICAL REQUIREMENT SURVEILLANCE (continued)
SURVEILLANCE FREQUENCY TRS 3.7.3.1.9 Verify that a sample of the diesel driven fire pump 92 days diesel fuel from the fuel storage tank is within the acceptable limits when checked for viscosity, water and sediment.
TRS 3.7.3.1.10 Verify that the diesel driven fire pump diesel engine 92 days 24 volt battery bank specific gravity is appropriate for continued service of the battery.
TRS 3.7.3.1.11 Cycle each fire suppression water supply system 12 months testable valve in the flow path through at least one complete cycle of full travel.
TRS3.7.3.1.12 Perform a system flush of the fire suppression water 12 months supply system.
TRS 3.7.3.1.13 Perform a system functional test of the fire 18 months suppression water supply system.
TRS 3.7.3.1.14 This TRS is not used.
TRS 3.7.3.1.15 Verify that each fire pump develops at least 18 months 2500 gpm at a system head of 125 psig.
TRS 3.7.3.1.16 Verify that the diesel engine driven fire pump diesel 18 months engine 24 volt battery bank cell and battery racks show no visual indication of physical damage or abnormal deterioration.
TRS 3.7.3.1.17 Verify that each fire pump starts sequentially to 18 months maintain the fire suppression water supply system pressure greater than or equal to 85 psig.
(continued)
SUSQUEHANNA.: UNIT 2 TRM /3.7-6 EFFECTIVE DATE 04/28/2016
Rev. 3 Fire Suppression Water Supply System 3.7.3.1 TECHNICAL REQUIREMENT SURVEILLANCE (continued)
SURVEILLANCE FREQUENCY TRS 3.7.3.1.18 Verify that the diesel driven fire pump diesel engine 18 months starting 24 volt battery bank Terminal connections ar_e clean, tight, free of corrosion and coated with anti-corrosion material.
TRS 3.7.3.1.19 Perform diesel driven fire pump diesel engine 18 months inspection.
TRS 3.7.3.1.20 Perform a fire suppression water supply system flow 3 years test.
SUSQUEHANNA - UNIT 2 TRM I 3.7-7 EFFECTIVE DA TE 08/02/1999
~*
Rev.1 83.11.1.1 BASES TRO Actions TRS Liquid Effluents Concentration Liquid Effluents Concentration B 3.11.1.1 This requirement is provided to ensure that the concentration of radioactive materials released in liquid waste effluents to UNRESTRICTED AREAS will be less than 1 O times the concentration levels specified in 1 O CFR Part 20.1001 to 20.2402, Appendix B, Table 2, Column 2. The requirement provides operational flexibility for releasing liquid effluents in concentrations to follow the Section II.A and 11.C design objectives of Appendix I to '.10 CFR part 50. This limitation provides reasonable assurance that the levels of radioactive materials in bodies of water in UNRESTRICTED AREAS will result in exposures within (1) the Section II.A design objectives of Appendix I, 1 O CFR 50, to a Member of the Public and (2) restrictions authorized by 1 O CFR 20.1301 (e). The concentration limit for dissolved or entrained noble gases is based upon the assumptions that Xe-135 is the controlling radionuclide and its effluent concentration in air (submersion) was converted to an equivalent concentration in water. This requirement does not affect the requirement to comply with the annual limitations of 1 O CFR 20.1301 (a). This requiremen~ applies to the release of radioactive materials in liquid effluents from all units at the site. The required detection capabilities for radioactive materials in liquid waste samples are tabulated in terms of the lower limits of detection (LLDs). Detailed discussion of the LLD and the other detection limits can be found in Curie, L.A., "Lower Limit of Detection: Definition and Elaboration of a Proposed Position for Radiological Effluent and Environmental Measurements." (References 2, 3, and 4)
This section of the TRM is also part of the ODCM (Reference 2).
The Actions are defined to ensure proper corrective measures are taken in response to exceeding the TRO limits.
The TRSs are defined to be performed at the specified Frequency to ensure that the parameters are maintained within the TRO limits. Table 3.11.1.1-1 defines Radioactive Liquid Waste Sampling and Analysis Program. The lower limit of detection (LLD) is defined, for purposes of these Requirements, as the smallest concentration of radioactive material in a.sample that (continued)
SUSQUEHANNA - UNIT 2 TRM/83.11-1 EFFECTIVE DATE 08/31/1998
Rev. 1 Liquid Effluents Concentration B 3.11.1.1 B 3.11.1.1 Liquid Effluents Concentration BASES (continued)
TRS (continued) will yield a net count, above system background, that will be detected with 95% probability with only 5% probability of falsely concluding that a blank observation represents a "real" signal. For a particular measurement system, which may include radiochemical separation:
LLD= ____
4_.6_6_sb ___ _
Ee V
- 2.22E6 e Y
- exp(-Mt)
Where:
LLD is the a priori lower limit of detection as defined above (as microcuries per unit mass or volume).
Sb is the standard deviation of the background counting rate or of the counting rate of a blank sample as appropriate "(as counts per minute),
E is the counting efficiency, as counts per disintegration, V is the sample size, in units of mass or volume, 2.22 E6 is the number of disintegrations per minute per microcurie, Y is the fractional radiochemical yield, when applicable.
.11, is the radioactive decay GOnstant for the particular radionuclide, and lit for plant effluents is the elapsed time between the midpoint of sample collection and time of counting.
Typical values of E, V, Y, and lit should be used in the calculation.
It should be recognized that the LLD is defined as an a priori (before the fact) limit representing the capability of a measurement system and not as an a posteriori (after the fact) limit for a particular measurement.
A batch release is the discharge of liquid wastes of a discrete volume. Prior to sampling for analyses, each batch shall be isolated, and then thoroughly mixed to assure representative sampling.
. (continued)
SUSQUEHANNA - UNIT 2 TRM I B 3.11-2 EFFECTIVE DATE 08/31/1998
Rev.~
Liquid Effluents Concentration B 3.11.1.1 B 3.11.1.1 Liquid Effluents Concentration BASES (continued)
TRS (continued)
The principal gamma emitters for which the LLD specification applies include the following radionuclides: Mn-54, Fe-59, Co-58, Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141 and Ce-144. The dissolved and entrained gases (gamma emitters) for which the LLD specification applies include the following radionuclides: Kr-85, Kr-85m. Kr-87, Kr-88, Ar-41, Xe-133, Xe-133m, Xe-135, and Xe-135m. This list does not mean that only these nuclides are to be considered. Other gamma peaks that are identifiable, together with those of the above nuclides, shall also be analyzed and reported in accordance with the ODCM.
A composite sample is one in which the quantity of liquid sampled is proportional to the quantity of liquid waste discharged and in which the method of sampling employed results in a specimen that is representative of the liquids released over a period no longer than the Minimum Analysis Frequency.
The Minimum Analysis Frequency as listed for the Composite Samples shall mean the minimum frequency for initiation of the required analyses, not completion of the analyses and evaluation of the results. Since the analysis involves sending the samples to an offsite laboratory and performance of involved sample preparation and wet chemical analyses, there will be a delay between initiation of the analysis and receipt of the results.
The analysis initiation shall normally be done on a calendar month for the 31 day frequency or calendar quarter for a 92 day frequency.
REFERENCES
- 1.
Technical Specification 5.5.4 - Radioactive Effluent Controls program.
Technical Specification 5.5.1 - Offsite Dose Calculation Manual.
NUREG/CR-4007, September, 1984.
- 2.
- 3.
- 4.
SUSQUEHANNA - UNIT 2 TRM I B 3.11-3 EFFECTIVE DATE 04/28/2016
May. 11, 2016 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2016-18 7 71 USER INFORMATION:
GERLACH*ROSEY M Address: NUCSA2 Phone#:
254-3194 EMPL#: 028401 CA#:
0363 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSEY M 05/11/2016 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
Page 1
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be iss~ed with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 05/09/2016 ADD MANUAL TABLE OF CONTENTS DATE: 05/10/2016 CATEGORY: DOCUMENTS TYPE: TRM2 of 2
)
May. 11, 2016 ID:
TEXT 3.7.3.1 REMOVE:
REV: 2 ADD:
REV: 3 CATEGORY: DOCUMENTS TYPE: TRM2 ID:
TEXT B3.11.1.1 REMOVE:
REV: 0 ADD:
REV: 1 CATEGORY: DOCUMENTS TYPE: TRM2 ID:
TEXT LOES ADD:
REV: 88 REMOVE:
REV: 87 CATEGORY: DOCUMENTS TYPE: TRM2 ID:
TEXT TOC ADD:
REV: 25 REMOVE:
REV:24 Page 2
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
of 2
-~
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
05/10/2016 Procedure Name Rev Issue Date Change ID Change Nwnber TEXT LOES 88 05/10/2016
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 25 05/10/2016
Title:
TABLE OF CONTENTS TEXT 1.1 0
11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1
02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT,. PROGRAMS *.
TEXT 2.2 11
- 01;3:i:;2oi4 *
Title:
PLANT PROGRAMS AND SETPOINTS 'INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 03/05/2015
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1
11/09/2007
Title:
REACTIVITY'CbNTROL' SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0
11/19/2002
Title:
REACTIVITY.CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4
05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/19/2002 Titleg REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 12 11/10/2015
Title:
CORE OPERATING LIMITS REPORT (COLR)
Page.l of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2
-*-.;I
- ~
- t~~: I. Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0
11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3
03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 8
10/14/2015 '
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK
~~f 1
TEXT 3. 3. 6 4
04/29/2014
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2
11/10/2015
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3
05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 1
03/05/2015
Title:
WATER MONITORING INSTRUMENTATION Page 2.
of 1..5.
Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1
04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1
11/09/2007 Title~ REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 2
05/14/2009
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 1
04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2
04/29/2014
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page.3.
of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2 I **: ;-* Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 3
05/10/2016
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3
04/16/2009 Title~ PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3
04/16/2009
Title:
PLANT SYSTEMS C02 SYSTEMS LDCN 5254 TEXT 3.7.3.4 2
04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2
04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2
04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1
04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 11 09/27/2012
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1
04/26/2006
- -:~:-:~~;
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Page.4 of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2
.* Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2
~~j TEXT 3.7.5.l 1
03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1
04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3
06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2
09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 9
03/05/2015
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1
08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 2
04/29/2014
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 1
10/02/2009
Title:
PLANT SYSTEMS TEXT 3.8.1 3
06/20/2012
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS
- ~* TEXT 3. 8. 2. 2 2
12/14/2004
~
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page.2.
of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2
.*.~
- ~-:_~:~-- -
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3 2
06/20/2012
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1
02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 1
11/14/2013
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 2
12/14/2006
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2
10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.l 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2
06/15/2010 '
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3. 11.1.1 1
04/26/2006
'-~-~'.)'
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page Q.
of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3. 11. 1. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3. 11. 1. 4 2
10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3. 11. 1. 5 3
03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11. 2. 1 3
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE
-~~ * ;. TEXT 3. 11. 2. 2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
NOBLE GASES TEXT 3.11.2.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11. 2. 4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3. 11. 2. 5 4
07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 5
03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 4
03/05/2015
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM Page]_
of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2
- '°'.::- '-- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3. 11. 4. 2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11. 4. 3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1
12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0
09/27/2003
~~~:-
""-:_* --~~'
Title:
ADMINISTRATIVE CONTROLS TRAINING Page _a of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 6
03/05/2015
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 2
04/29/2014
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3
04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION
~-
AND CHECK VALVE
, }
TEXT B3. 2. 1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 1
01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2
03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2
11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 5
10/14/2015
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2
11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK
__ TEXT B3. 3. 6 5
01/31/2014
~
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION Page.2.
of 15 Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7 2
11/10/2015
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1
10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3
05/14/2009
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3
02/22/2012
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1
10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.l 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1
04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1
11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS
- ~=~:-;, TEXT B3. 4. 6 1
04/25/2013
~,~
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Page 10 of 15 Report Date: 05/10/16
Manual Name:
TRM2 r;:,
SSES MANUAL Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION
<*.-.. *.:*** TEXT B3. 6. 3 1
04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3
06/15/2010
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2
04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0
11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS Page 11 of.15.
Report Date: 05/10/16
SSES MANUAL Manual Name:
TRM2
- ~~,I Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2
)_.
l
~:1 /
TEXT B3.7.3.4 2
04/29/2014
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1
04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7;3.6 1
04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0
11/19/2002 Title~ PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3
09/27/2012
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0
11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.l 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0
11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4
06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2
01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 4
01/31/2014
Title:
PLANT SYSTEMS BASES SNUBBERS Page 12 of 15 Report Date: 05/10/16
~-' fJ SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 2
12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2
04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.l 2
03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.l 0
11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1
09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0
11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0
11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1
11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3
06/20/2012
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2
06/04/2013
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Page 13 of 15 Report Date: 05/10/16
SSES MANUAL Manual* Name:
TRM2 1 ***A' Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2
'.-:~~~~~
1,:-**.-:-:-
TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.l 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1
04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3. 11. 1. 1 1
05/10/2016
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3. 11. 1. 2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1. 3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3. 11. 1. 4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MON~TORING INSTRUMENTATION TEXT B3. 11. 1. 5 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.l 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3. 11. 2. 2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
NOBLE GASES Page 14 of 15 Report Date: 05/10/16
9
__._,,..!,j'
"".;~~-
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3. 11. 2. 5 5
07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11. 2. 6 1
01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11. 3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 5
03 /05 /2 0*15
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEX:T B3. 11. 4. 2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1
10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1
12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 15 of 15 Report Date: 05/10/16
~i SUSQUEHANNA STEAM ELECTRIC STATION Rev.25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION 1.0 1.1 2.0 2.1 2.2 3.0 3.0 3.0 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.2 3.2.1 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 3.3.7 3.3.8 3.3.9 3.3.10 3.3.11 3.3.12 3.4 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 3.4.6 TITLE PAGE USE AND APPLICATION............................................................................. 1.0-1 Definitions................................................................................................ 1.0-1 PLANT PROGRAMS AND SETPOINTS....................................................... 2.0-1 Plant Programs....................................................................................... 2.0-1 Instrument Trip Setpoint Table........................................................ TRM/2.0-5 APPLICABILITY................................................................................... TRM/3.0-1 Technical Requirement for Operation (TRO) Applicability............... TRM/3.0-1 Technical Requirement Surveillance (TRS) Applicability.... _.:<::-.~*.::>>.TRM/3.0-3 r -.
'\\
(
\\
REACTIVITY CONTROL SYSTEMS................................ !.'.*........,.... :.. TRM/3.1-1 Anticipated Transient Without Scram Alternate Rod'i'i)je{;:tio'ri," '"</
(A TWS-ARI) Instrumentation................................. ~'.... '.';(.!....* ~.. :/... TRM/3.1-1 Control Rod Drive (CRD) Housing Support.............. >,... S:(./....... TRM/3.1-4
~ '
Control Rod Block lnstrumentat1on.............. :.:..:.::*.-::*****:,,-_;.,_.-::............ TRM/3.1-5 Control Rod Scram Accumulators lnstrumentation'and)
/
Check Valve........................................ ::.::... :*****.. **~**-*... *:..................... TRM/3.1-9
.........,../*_:>v CORE OPERATING LIMITS REPORT,.-...... :*:.::,..... /............................ TRM/3.2-1
\\ "'
/
Core Operating Limits Report.... \\...'.,.... :*:*,... *;**:::*................................ TRM/3.2-1
/.....,............ \\*',....,
........... _... ) //
INSTRUMENTATION........... *.'..:::,... ;.. >*...... ~~........................................ TRM/3.3-1 Radiation Monitoring 1nSinfme_otatior;i.............................................. TRM/3.3-1 Seismic Monitoring lnstrumeritatior(............................................... TRM/3.3-4 Meteorological rv]onitonrm 11istrumentation...................................... TRM/3.3-7 TRM Post-Acc;id~nt Monitoling' Instrumentation.............................. TRM/3.3-9 Section Not_ L!se9 :~.. ~...... :-.J............................................................. TRM/3.3-12 TRM Isolation Actuation Instrumentation......................................... TRM/3.3-13 Main Turbi_ne Overs peed Protection System................................... TRM/3.3-17 Section Not Lisec:L.......................................................................... TRM/3.3-19 OPRM Instrumentation Configuration.............................................. TRM/3.3-21
.* Reactor Redrculation Pump MG Set Stops..................................... TRM/3.3-22
- *MVP Isolation Instrumentation........................................................ TRM/3.3-24
- vyater Monitoring Instrumentation................................................... TRM/3.3-26 REACTOR COOLANT SYSTEM.......................................................... TRM/3.4-1 Reactor Coolant System Chemistry................................................ TRM/3.4-1 Not Used......................................................................................... TRM/3.4-6 High/Low Pressure Interface Leakage Monitors.............................. TRM/3.4-9 Reactor Recirculation Flow and Rod Line Limit............................... TRM/3.4-12 Reactor Vessel Materials............................................................... TRM/3.4-13 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction...................................................................... TRM/3.4-14 SUSQUEHANNA - UNIT 2 TRM /TOC-1 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION 3.5 EMERGENCY CORE COOLING AND RCIC........................................ TRM/3.5-1 3.5.1 ADS Manual Inhibit......................................................................... TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring lnstrumentation...................... TRM/3.5-3 3.5.3 Long Term Nitrogen Supply to ADS.............................. *.......................... 3.5-6 3.6 CONTAINMENT........................................................................................... 3.6-1 3.6.1 Venting or Purging.................................................................................. 3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication......................................................................................... TRM/3.6-3 3.6.3 Suppression Pool Alarm Instrumentation................................................ 3.6-4 3.6.4 Primary Containment Closed System Boundaries TRM/3.6-7 3.7 PLANT SYSTEMS TRM/3.7-1 3.7.1 Emergency Service Water System (ESW) Shutdown TRM/3.7-1 3.7.2 Ultimate Heat Sink (UHS) and Ground Water Level................................ 3.7-3 3.7.3 Fire Protection................................................................................ TRM/3.7-4 3.7.3.1 Fire Suppression Water Supply System.......................................... TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems.......................................................... TRM/3.7-8 3.7.3.3 C02 systems.................................................................................. TRM/3.7-12 3.7.3.4 Halon Systems................................................................................ TRM/3.7-16 3.7.3.5 Fire Hose Stations.......................................................................... TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses............................... TRM/3.7-22 3.7.3.7 Fire Rated Assemblies.................................................................... TRM/3. 7-24 3.7.3.8 Fire Detection Instrumentation........................................................ TRM/3. 7-26 3.7.4 Solid Radwaste System.................................................................. TRM/3.7-34 3.7.5 Explosive Gas and Storage Tank Radioactivity Monitoring Program........................................................................ TRM/3.7-37 3.7.5.1 Main Condenser Off gas Hydrogen Monitor..................................... TRM/3. 7-37 3.7.5.2 Main Condenser Offgas Explosive Gas Mixture.......... ;........................... 3.7-38 3.7.5.3 Liquid Holdup Tanks....................................................................... TRM/3.7-39 3.7.6 ESSW Pump house Ventilation........................................................ TRM/3. 7-40 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation.............................................................. TRM/3. 7-41 3.7.8 Snubbers........................................................................................ TRM/3.7-43 3.7.9 Control Structure HVAC.................................................................. TRM/3.7-49 3.7.10 Spent Fuel Storage Pools (SFSPs)................................................. TRM/3.7-51 3.7.11 Structural lntegrity................................................................... :....... TRM/3.7-54 3.8 ELECTRICAL POWER......................................................................... TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices.......................................................................... TRM/3.8-1 3.8.2 Motor Operated Valves Thermal Overload Protection..................... TRM/3.8.5 3.8.2.1 Motor Operated Valves (MOV) Thermal Overload Protection -
Continuous...................................................................................... TRM/3.8-5 3.8.2.2 Motor Operated Valves (MOV) Thermal Overload Protection -
Automatic........................................................................................ TRM/3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities................................ TRM/3.8-13 SUSQUEHANNA-UNIT 2 TRM /TOC-2 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev.25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION 3.8.4 3.8.5 3.8.6 3.8.7 3.9 3.9.1 3.9.2 3.9.3 3.10 3.10.1 3.10.2 3.10.3 3.11 3.11.1 3.11.1.1 3.11.1.2 3.11.1.3 3.11.1.4 3.11.1.5 3.11.2 3.11.2.1 3.11.2.2 3.11.2.3 3.11.2.4 3.11.2.5 3.11.2.6 3.11.3 3.11.4 3.11.4.1 3.11.4.2 3.11.4.3 3.12 3.12.1 3.12.2 3.12.3 24 VDC Electrical Power Subsystem.............................................. TRM/3.8-15 Degraded Voltage Protection.......................................................... TRM/3.8-21 Emergency Switchgear Room Cooling............................................ TRM/3.8-24 Battery Monitoring and Maintenance Program................................ TRM/3."8-26 REFUELING OPERATIONS......................................................................... 3.9-1 Decay Time............................................................................................. 3.9-1 Communications..................................................................................... 3.9-2 Refueling Platform.................................................................................. 3.9-3 MISCELLANEOUS............................................'................................... TRM/3.10-1 Sealed Source Contamination......................................................... TRM/3.10-1 Shutdown Margin Test RPS Instrumentation........................................... 3.10-4 Independent Spent Fuel Storage Installation (ISFSI)...................... TRM/3.10-7 RADIOACTIVE EFFLUENTS................................................................ TRM/3.11-1 Liquid Effluents............................................................................... TRM/3.11-1 Liquid Effluents Concentration........................................................ TRM/3.11-1 Liquid Effluents Dose...................................................................... TRM/3.11-4 Liquid Waste Treatment System..................................................... TRM/3.11-6 Liquid Radwaste Effluent Monitoring lnstrumentation...................... TRM/3.11-8 Radioactive Liquid Process Monitoring Instrumentation.................. TRM/3.11-13 Gaseous Effluents........................................................................... TRM/3.11-17 Dose Rate....................................................................................... TRM/3.11-17 Dose - Noble Gases........................................................................ TRM/3.11-20 Dose - Iodine, Tritium, and Radionuclides in Particulate Form.............................................................................. TRM/3.11-21 Gaseous Radwaste Treatment System........................................... TRM/3.11-22 Ventilation Exhaust Treatment System........................................... TRM/3.11-23 Radioactive Gaseous Effluent Monitoring Instrumentation............................................................................... TRM/3.11-25 Total Dose...................................................................................... TRM/3.11-33 Radiological Environmental Monitoring........................................... TRM/3.11-35 Monitoring Program........................................................................ TRM/3.11-35 Land Use Census........................................................................... TRM/3.11-45 lnterlaboratory Comparison*Program.............................................. TRM/3.11-47 LOADS CONTROL PROGRAM............................................................ TRM/3.12-1 Crane Travel - Spent Fuel Storage Pool......................................... TRM/3.12-1 Heavy Loads Requirements............................................................ TRM/3.12.3 Light Loads Requirements.............................................................. TRM/3.12-5 SUSQUEHANNA-UNIT 2 TRM /TOC-3 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM-ELECTRIC STATION Rev. 25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION 4.0 ADMINISTRATIVE CONTROLS................................................................... 4.0-1 4.1 Organization........................................................................................... 4.0-1 4.2 Reportable Event Action......................................................................... 4.0-2 4.3 Safety Limit Violation.............................................................................. 4.0-3 4.4 Procedures and Programs.............................................................. TRM/4.0-4 4.5 Reporting Requirements......................................................................... 4.0-5 4.5.1 Startup Reports....................................................................................... 4.0-5 4.5.2 Annual Reports....................................................................................... 4.0-6 4.5.3 Special Reports....................................................................................... 4.0-6 4.6 Radiation Protection Program................................................................. 4.0-7 4.7 Training................................................................................................... 4.0-8 SUSQUEHANNA - UNIT 2 TRM/TOC-4 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION B 3.0 B 3.0 B 3.1.1 B 3.1.2 B 3.1.3 B 3.1.4 B 3.2.1 B 3.3.1 B 3.3.2 B 3.3.3 B 3.3.4 B 3.3.5 B 3.3.6 B 3.3.7 B 3.3.8 B 3.3.9 B 3.3.10 B 3.3.11 B 3.3.12 B 3.4.1 B 3.4.2 B 3.4.3 B 3.4.4 B 3.4.5 B 3.4.6 B 3.5.1 B 3.5.2 B 3.5.3 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.7.1 B 3.7.2 B 3.7.3.1 Technical Requirement for Operation (TRO) Applicability............... TRM/B 3.0-1 Technical Requirement Surveillance (TRS) Applicability................. TRM/B 3.0-9 Anticipated Transient Without Scram Alternate Rod Injection (ATWS-ARI) lnstrumentation........................................................... TRM/B 3.1-1 Control Rod Drive (CRD) Housing Support............................................. B 3.1-4 Control Rod Block lnstrumentation.................................................. TRM/B 3.1-5 Control Rod Scram Accumulators Instrumentation and Check Valve............................................................................. TRM/B 3.1-8 Core Operating Limits Report (COLR).................................................... B 3.2-1 Radiation Monitoring lnstrumentation.............................................. TRM/B 3.3-1 Seismic Monitoring Instrumentation................................................ TRM/B 3.3-2 Meteorological Monitoring lnstrumentation...................................... TRM/B 3.3-3 TRM Post-Accident Monitoring Instrumentation.............................. TRM/B 3.3-4 Section Not Used............................................................................ TRM/B 3.3-9 TRM Isolation Actuation lnstrumentation......................................... TRM/B 3.3-10 Turbine Overspeed Protection System............................................ TRM/B 3.3-14 Section Not Used............................................................................ TRM/B 3.3-15 OPRM lnstrumentation.................................................................... TRM/B 3.3-18 Reactor Recirculation Pump MG Set Stops..................................... TRM/B 3.3-20 MVP Isolation Instrumentation..........................................".............. TRM/B 3.3-22 Water Monitoring Instrumentation................................................... TRM/B 3.3-24 Reactor Coolant System Chemistry........................................................ B 3.4-1 Not Used......................................................................................... TRM/B 3.4-2 High/Low Pressure Interface Leakage Monitor................................ TRM/B 3.4-4 Reactor Recirculation Flow and Rod Line Limit............................... TRM/B 3.4-5 Reactor Vessel Materials........................................................................ B 3.4-6 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction...................................................................... TRM/B3.4-7 ADS Manual Inhibit................................................................................. B 3.5-1 ECCS and RCIC System Monitoring lnstrumentation...................... TRM/B 3.5-3 Long Term Nitrogen Supply to ADS................................................ TRM/B 3.5-4 Venting or Purging.......................................................................... TRM/B 3.6-1 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication................................................................................................ B 3.6-3 Suppression Pool Alarm Instrumentation........................................ TRM/B 3.6-4 Primary Containment Closed System Boundaries........................... TRM/B 3.6-6 Emergency Service Water System (Shutdown)....................................... B 3.7-1 Ultimate Heat Sink (UHS) Ground Water Level....................................... B 3.7-2 Fire Suppression Water Supply System............ :................. ~........... TRM/B 3.7-3 SUSQUEHANNA - UNIT 2 TRM /TOC-5 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev.25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION 8 3.7.3.2 Spray and Sprinkler Systems.......................................................... TRM/B 3.7-5 8 3.7.3.3 C02 Systems.................................................................................. TRM/B 3.7-7 8 3.7.3.4 Halon Systems................................................................................ TRM/B 3.7-8 8 3.7.3.5 Fire Hose Stations................................................... :...................... TRM/8 3.7-10 8 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses............................... TRM/B 3.7-11 8 3.7.3.7 Fire Rated Assemblies.................................................................... TRM/B 3.7-12 B 3.7.3.8
~Fire Detection Instrumentation........................................................ TRM/8 3.7-14 8 3.7.4 Solid Radwaste System.................................................................. TRM/B 3.7-15 8 3.7.5.1 Main Condenser Offgas Hydrogen Monitor............................................. B 3.7-17 8 3.7.5.2 Main Condenser Offgas Explosive Gas Mixture...................................... B 3.7-19 8 3.7.5.3 Liquid Holdup Tanks............................................................................... B 3.7-20 8 3.7.6 ESSW Pumphouse Ventilation........................................................ TRM/B 3.7-21 8 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring lnstrumentation.............................................................. TRM/B 3.7-22 8 3.7.8 Snubbers........................................................................................ TRM/8 3.7-24 B 3.7.9 Control Structure HVAC.:................................................................ TRM/B 3.7-31 83.7.10 Spent Fuel Storage Pools............................................................... TRM/B 3.7-33 83.7.11 Structural lntegrity........................................................................... TRM/B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices.......................................................................... TRM/B 3.8-1 8 3.8.2.1 Motor Operated Valves (MOV) Thermal Overload Protection -
Continuous...................................................................................... TRM/B 3.8-3 8 3.8.2.2 Motor Operated Valves (MOV) Thermal Overload Protection -
Automatic........................................................................................ TRM/B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintenance Activities........................................ B 3.8-5 B 3.8.4 24 VDC Electrical Power Subsystem.............................................. TRM/B 3.8-6 8 3.8.5 Degraded Voltage Protection.......................................................... TRM/8 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling............................................ TRM/B 3.8-17 8 3.8.7 Battery Monitoring and Maintenance Program................................ TRM/8 3.8-18 8.3.9.1 Decay Time............................................................................................. 8 3.9-1 8 3.9.2 Communications..................................................................................... B 3.9-2 8 3.9.3 Refueling Platform........................................................ :......................... 8 3.9-3 8 3.10.1
- Sealed Source Contamination................................................................. B 3.10-1 B 3.10.2 Shutdown Margin Test RPS Instrumentation........................................... B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI)...................... TRM/B 3.10-4 8 3.11.1.1 Liquid Effluents Concentration........................................................ TRM/8 3.11-1 8 3.11.1.2 Liquid Effluents Dose.............................................................................. B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System............................................................. B 3.11-6 8 3.11.1.4 83.11.1.5 Liquid Radwaste Effluent Monitoring Instrumentation.............................. B 3.11-7 Radioactive Liquid Process Monitoring lnstrumentation............... TRM/B 3.11-10 SUSQUEHANNA - UNIT 2 TRM /TOC-6 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev.25 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 83.11.4.3 B.3.12.1 B.3.12.2 B.3.12.3 Dose Rate.................................................................................... TRM/B 3.11-12 Dose - Noble Gases............................................................................. B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in Particulates Form................................................................................. B 3.11-18 Gaseous Radwaste Treatment System............................ :........... TRM/B 3.11-20 Ventilation Exhaust Treatment System........................................ TRM/B 3.11-21 Radioactive Gaseous Effluent Monitoring Instrumentation............................................................................ TRM/B 3.11-24 Total Dose........................................................................................... B 3.11-26 Monitoring Program..................................................................... TRM/B 3.11-28 Land Use Census................................................................................ B 3.11-34 lnterlaboratory Comparison Program........................................... TRM/B 3.11-36 Crane Travel - Spent Fuel Storage Pool..................................... TRM/B 3.12-1 Heavy Loads Requirements......................................................... TRM/B 3.12-2 Light Loads Requirements........................................................... TRM/B 3.12-3 SUSQUEHANNA - UNIT 2 TRM /TOC-7 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 04/28/2016 1.0 USE AND APPLICATION Page TRM I 1.0-1 08/31/1998 Page TRM I 1.0-2 10/04/2002 Page TRM I 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM I 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 01/21/2014 Page TRM / 2.0-6 04/15/2009 Page TRM / 2.0-7 05/15/2008 Pages TRM I 2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 04/15/2009 Pages TRM I 2.0-13 and TRM I 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM I 3.0-1 and TRM I 3.0-2 02/19/2015
~
Page TRM I 3.0-3 03/15/2002 Page TRM I 3.0-4 02/19/2015 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM I 3.1-2 through TRM I 3.1-5 08/31/1998 Page TRM / 3.1-6 03/27/2007 Page TRM / 3.1-7 04/15/2009 Page TRM / 3.1-8 03/27/2007 Pages TRM I 3.1-9 and TRM I 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERA TING LIMITS REPORT Page TRM / 3.2-1 08/31/1998 Pages TRM I 3.2-2 through TRM / 3.2-63 11/04/2015 3.3 INSTRUMENTATION Pages TRM I 3.3-1 through TRM I 3.3-3 07/16/1999 Pages TRM I 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 03/10/2011 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM I LOES-1 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / 3.3-9 10/07/2015 Page TRM / 3.3-9a 06/30/2010 Page TRM / 3.3-10 10/31/2007 Page TRM / 3.3-11 10/07/2015 Page TRM / 3.3-11a 10/07/2015 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 04/11/2014 Page TRM / 3.3-16 01/07/2011 Page TRM / 3.3-17 11/04/2015 Page TRM / 3.3-17a 11/04/2015 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 04/15/2009 Page TRM / 3.3-21a 11/15/2004 Pages TRM /3.3-21b through TRM / 3.3-21d 03/27/2007 Page TRM / 3.3-22 12/03/2004 Pages TRM I 3.3-23 and TRM I 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 Page TRM / 3.3-26 02/19/2015 Page TRM / 3.3-27 0410712009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page 3.4-9 08/31/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM I 3.4-12 04/17/2009 Page TRM / 3.4-13 03/31/2006 Page TRM / 3.4-14 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/$1/1998 3.6 CONTAINMENT Pages 3.6-1 and 3.6-2 08/31/1998 Pages TRM I 3.6-3 and TRM / 3.6-3a 04/16/2014 Page 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-9 12/31/2002 SUSQUEHANNA - UNIT 2 TRM/ LOES-2 EFFECTIVE DA TE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title
- 3. 7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Page TRM / 3.7-6 Pages TRM / 3.7-7 and TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3. 7-23 Page TRM / 3.7-24 Page TRM / 3.7-25 Page TRM / 3.7-26 Page TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-32a Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Page TRM / 3.7-37 Page TRM / 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Pages TRM I 3. 7-40a through TRM / 3. 7-40c Page TRM / 3.7-41 Page TRM I 3. 7.-42 Pages TRM / 3.7-43 Pages TRM / 3.7-44 and TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM / 3.7-55 Page TRM / 3.7-56 SUSQUEHANNA - UNIT 2 TRM /LOES-3 Effective Date 07/29/1999 08/31/1998 03/31/2006 04/07/2009 04/28/2016 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 0410712009 08/02/1999 0410712009 08/02/1999 0410712009 03/31/2006 08/02/1999 09/25/2012 11/24/2011 09/25/2012 09/25/2012 03/31/2006.
02/01/1999 02/19/2015 08/31/1998 03/31/2006 05/24/2012 05/24/2012 09/04/2008 08/31/1998 02/19/2015 10/05/2006 0610712007 09/05/2012 0610712007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 EFFECTIVE DA TE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Page TRM / 3.8-2 Pages TRM / 3.8-3 and TRM / 3.8-4 Pages TRM / 3.8-5 and-TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17
- Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 and TRM / 3.8-22 Page TRM / 3.8-23 Page TRM / 3.8-24 Page TRM / 3.8-25 Pages TRM / 3.8-25a and TRM / 3.8-25b Page TRM / 3.8-26 Page TRM / 3.8-27 Page TRM / 3.8-28 Page TRM / 3.8-29 3.9 REFUELING OPERATIONS 3.10 3.11 Pages 3.9-1 through 3.9-3 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM I 3.10-5 and TRM I 3.10-6 Page TRM / 3.10-7 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 and TRM I 3.11-8 Pages TRM I 3.11-9 and TRM / 3.11-10 Pages TRM / 3.11-11 and TRM / 3.11-12 SUSQUEHANNA - UNIT 2 TRM I LOES-4 Effective Date 04/02/2002 01/28/2005 06/12/2012 04/02/2002 10/31/2007 09/03/2004 12/03/2004 06/12/2012 08/31/1998 01/28/2005
'04/02/2002 02/01/1999 0410212002 02/01/1999 06/06/1999 11/07/2013 11/30/2011 06/11/2012 11/30/2011 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 06/10/2010 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 10/09/2012 08/31/1998 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LISTOF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title 3.12 4.0 Page TRM I 3.11-13 Page TRM I 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM I 3.11-17 Page 3.11-18 Page TRM I 3.11-19 Pages TRM I 3.11-20 and TRM I 3.11-21 Page TRM I 3.11-22 Page TRM I 3.11-23 Page TRM I 3.11-24 Page TRM I 3. 11-25 Pages TRM I 3.11-26 and TRM I 3.11-27 Page TRM I 3.11-28 Page TRM I 3.11-29 Pages TRM 3.11-30 and TRM I 3.11-31 Page TRM I 3.11-32 Page TRM I 3.11-33 Page 3.11-34 Page TRM I 3.11-35 Pages TRM I 3.11-36 through TRM I 3.11-39 Page TRM I 3. 11-40 Pages TRM I 3.11-41 through TRM I 3.11-44 Page TRM I 3.11-45 Page 3.11-46 Page TRM I 3.11-47 LOADS CONTROL PROGRAM Pages TRM I 3.12-1 through TRM I 3.12-3 Page TRM I 3.12-4 Page TRM I 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM I 4.0-1 through TRM I 4.0-3 Page TRM I 4.0-4 Pages TRM I 4.0-5 throug.h TRM I 4.0-8 SUSQUEHANNA - UNIT 2 TRM I LOES-5 Effective Date 02/19/2015 12/03/2004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 06/18/2013 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 02/19/2015 03/31/2006 08/31/1998 03/31/2006 11/30/2005 02/19/2015.
08/31/1998 03/31/2006 08/31/1'998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.0 APPLICABILITY BASES Pages TRM I B 3.0-1 through TRM I B 3.0-3 Page TRM I B 3.0-4 Pages TRM I B 3.0-4a and TRM I B 3.0-4b Page TRM I B 3.0-5 Pages TRM I B 3.0-6 and TRM I B 3.0-7 Pages TRM I B 3.0-8 through TRM I B 3.0-10 Pages TRM I B 3.0-11 and TRM I B 3.0-12 Pages TRM I B 3.0-13 through TRM I B 3.0-15 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM I B 3.1-1 Page TRM I B 3.1-2 Page TRM I B 3.1-3 Page B 3.1-4 Pages TRM I B 3.1-5 through TRM I B 3.1-7 Page TRM I B 3.1-8 B 3.2 CORE OPERA TING LIMITS BASES Page B 3.2-1 B 3.3 INSTRUMENTATION BASES Page TRM I B.3.3-1 Page TRM I. B 3.3-2 Page TRM I B-3.3-2a Pages TRM I B 3.3-3 and TRM I B 3.3-3a Page TRM I B 3.3-4 Pages TRM I B 3.3-5 through TRM I B 3.3-7 Page TRM I B 3.3-8 Page TRM I B 3.3-9 Page TRM I B 3.3-10 Page TRM I B 3.3-11 Pages TRM I B 3.3-12 and TRM I B 3.3-13 Page TRM I B 3.3-14 Page TRM I B 3.3-14a Page TRM I B 3.3-14b Page TRM I B 3.3-14c Pages TRM I B 3.3-15 through TRM I B 3.3-17 Pages TRM I B 3.3-18 and TRM I B 3.3-19 Pages TRM I B 3.3-19a and TRM I B 3.3-19b Page TRM I B 3.3-19c SUSQUEHANNA - UNIT 2 TRM/ LOES-6 Effective Date 08/31/1998 02/19/2015 0211w2015 02/19/2015 06/12/2012 08/31/1998 03/15/2002 02/19/2015 07/13/1999 04/16/2014 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 01/21/2014 03/10/2011 10/31/2007 10/31/2007 06/30/2010 10/07/2015 06/30/2010 10/31/2007 01/07/2011 02/21/2014 01/07/2011 06/25/2002 11/04/2015 11/04/2015 11/04/2015 10/22/2003 03/27/2007 03/27/2007 04/17/2009 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM I B 3.3-19d and TRM I B 3.3-19e 03/27/2007 Page TRM I B 3.3-20 02/16/2012 Page TRM I B 3.3-21 08/03/2010 Page TRM I B 3.3-22 10/22/2003 Page TRM I B 3.3-23 05/16/2003 Pages TRM I B 3.3-24 and TRM I B 3.3-25 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES Page TRM I B 3.4-1 08/31/1998 Pages TRM I B 3.4-2 and TRM I 83.4-3 04/01/2009 Pages TRM I B 3.4-4 and TRM I B 3.4-4a 10/31/2007 Page TRM I B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Page TRM I B 3.4-7 04/25/2013 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM I B 3.5-3 and TRM I B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM I B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM I B 3.6-1 07/26/2001 Page TRM I B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM I B 3.6-4 03/29/2007 Page TRM I B 3.6-5 0410412007 Page TRM I B 3.6-6 12/03/2004 Pages TRM I B 3.6-7 through TRM I B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASE=S Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM I B 3.7-3 06/10/2010 Page TRM I B 3.7-3a 12/27/2007 Page TRM I B 3.7-4 03/31/2006 Page TRM I B 3.7-5 08/02/1999 Pages TRM I B 3.7-6 and TRM I B 3.7-6a 03/31/2006 Pages TRM I B 3.7-7 and TRM I B 3.7-7a 08/02/1999 Page TRM I B 3.7-8 08/02/1999 Page TRM I B 3.7-9 04/11/2014 Page TRM I B 3.7-10 08/02/1999 SUSQUEHANNA - UNIT 2 TRM/LOES-7 EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section B 3.8 Title Pages TRM I B 3.7-10a through TRM I B 3.7-11a Pages TRM I B 3.7-12 and TRM I B 3.7-13 Pages TRM I B 3.7-14 through TRM I B 3.7-14b Pages TRM I B 3.7-15 and TRM I B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM I B 3.7-21.
Pages TRM I B 3.7-21a through TRM I B 3.7-21d Pages TRM I B 3.7-21e through TRM I B 3.7-21g Pages TRM I B 3.7-22 and TRM I B 3.7-23 Page TRM I B 3.7-24 Page TRM I B 3.7-25 Pages TRM I B 3. 7-26 through TRM I B 3. 7-29 Page TRM I B 3.7-30 Page TRM I B 3. 7-30a Page TRM I B 3. 7-30b Page TRM I B 3.7-31 Page TRM I B 3.7-32 Page TRM I B 3. 7-33 Page TRM I B 3. 7-34 Page TRM I B 3.7-35 Pages TRM I B 3. 7-36 and TRM I B 3. 7-37 Page TRM I B 3. 7-38 Page TRM I B 3.7-39 Page TRM I B 3. 7-40 ELECTRICAL POWER BASES
. Page TRM I B 3.8-1 Pages TRM I B 3.8-2 Page TRM I B 3.8-2a Pages TRM I B 3.8-3 and TRM I B 3.8-3a Page TRM I B 3.8-4 Page TRM I B 3.8-4a Page TRM I B 3.8-5 Pages TRM I B 3.8-6 through TRM I B 3.8-15 Page TRM I B 3.8-16 Page TRM I B 3.8-17
. Page TRM I B 3.8-17a Page TRM I B 3.8-17b Pages TRM I B 3.8-18 through TRM I B 3.8-20 Pages TRM I B 3.8-21 and TRM I B 3.8-22 Page TRM I B 3.8-23 Page TRM I B 3.8-24 SUSQUEHANNA - UNIT 2 TRM/ LOES-8 Effective Date 03/31/2006 08/02/1999 09/25/2012 02/01/1999 08/31/1998 05/29/2013 05/24/2012 05/29/2013 01/30/2008 10/05/2006 01/21/2014 10/05/2006 06/07/2007 10/05/2006 01/21/2014 11/30/2011 03/09/2001 04/15/2003 12/03/2004 0710512000 04/01/2009 09/25/2009 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 09/03/2004 04/02/2002 08/31/1998 04/02/2002 11/07/2013 11/30/2011 06/11/2012 11/30/2011 05/29/2013 05/28/2009 05/29/2013 05/28/2009.
EFFECTIVE DATE 04/28/2016
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 88 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM I B 3.10-2 and TRM I B 3.10-3 Pages TRM I B 3.10-4 and TRM I B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages TRM I B 3.11-1 and TRM I B 3.11-2 Page TRM I B 3.11-3 Pages B 3.11-4 through B 3.11-9 Page TRM I B 3.11-10 Pages TRM I B 3.11-11 and TRM I B 3.11-11 a Pages TRM I B 3.11-12 and TRM I B 3.11-13 Page TRM I B 3.11-14 Page TRM I B 3.11-15 Pages B 3.11-16 through B 3.11-19 Pages TRM I B 3.11-20 and TRM I B 3.11-20a Page TRM I B 3.11-21 Pages TRM I B 3.11-22 and TRM I B 3.11-23 Pages TRM I B 3.11-23a and TRM I B 3.11-23b Pages TRM I B 3.11-24 and TRM I B 3.11-25 Pages B 3.11-26 through B 3.11-27 Page TRM I B 3.11-28 Page TRM I B 3.11-29 Pages TRM I B 3.11-30 and TRM I B 3.11-31 Page TRM I B 3.11-32 Page TRM I B 3.11-33 Pages TRM I B 3.11-34 and TRM I B 3.11-35 Page TRM I B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM I B 3.12-1 Page TRM I B 3.12-2 Page TRM I B 3.12-3 SUSQUEHANNA - UNIT 2 TRM/ LOES-9 Effective Date 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 08/31/1998 04/28/2016 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 0410212002 05/13/2005 11/14/2006 06/18/2013 01/21/2004 08/31/1998 11/30/2005 02/19/2015 05/29/2013 08/31/1998 06/30/2010 08/31/1998 02/12/1999 09/19/2007 11/29/2010 02/05/1999 EFFECTIVE DATE 04/28/2016
Rev. 3
- 3. 7.3 Fire Protection Fire Suppression Water Supply System
.3.7.3.1
- 3. 7.3.1 Fire Suppression Water Supply System TRO 3.7.3.1 Two Fire Suppression Water Supply Subsystems shall be OPERABLE APPLICABILITY:
At all times ACTIONS
NOTE ------------------------~---------------------------------
- 1.
The provisions of TRO 3.0.4 are not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One fire suppression water A.1 Restore the inoperable 7 days supply subsystem fire suppression water inoperable.
supply subsystem to OPERABLE status OR A.2 Establish an alternate fire 7 days suppression water supply subsystem.
B.
Both fire suppression water B.1 Establish an alternate fire 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> supply subsystems suppression water supply inoperable.
subsystem AND B.2 Restore an inoperable 7 days fire suppression water supply subsystem to OPERABLE status
- SUSQUEHANNA - UNIT 2 TRM I 3.7-4 EFFECTIVE DATE 03/31/2006
Rev. 3 Fire Suppression Water Supply System 3.7.3.1 TECHNICAL REQUIREMENT SURVEILLANCE
N 0 TE ------------------------------------------------------
When a system is placed in an inoperable status solely for the performance of required Surveillances, entry into associated Conditions and required Actions may be delayed up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
SURVEILLANCE FREQUENCY TRS 3.7.3.1.1 Verify the minimum contained fire suppression water 7 days supply volume.
TRS 3.7.3.1.2 Verify that the overall diesel driven fire pump diesel 31 days engine starting 24 volt battery bank and charger battery voltage is greater than or equal to 24 volts.
TRS 3.7.3.1.3 Verify that the diesel driven fire pump diesel engine 31 days starting 24 volt battery bank and charger pilot cell specific gravity, corrected to 77°F, is greater than or equal to 1.200.
TRS 3.7.3.1.4 Verify that the diesel driven fire pump diesel engine 31 days starting 24 volt battery bank and charger electrolyte level of each pilot cell is above the plates.
TRS 3.7.3.1.5 Start the electric motor driven fire pump and operate 31 days it for at least 15 minutes on recirculation flow.
TRS 3.7.3.1.6 Verify that each manual, power operated or automatic 92 days valve, in the fire suppression water supply system flow path is in its correct position.
TRS 37.3.1.7 Verify the diesel driven fire pump fuel storage tank 31 days contains at least 250 gallons of fuel.
TRS 3.7.3.1.8 Start the diesel driven fire pump from ambient 31 days conditions and operate for greater than or equal to 30 minutes on recirculation flow.
(continued)
SUSQUEHANNA - UNIT 2 TRM / 3.7-5 EFFECTIVE DATE 04/07/2009
Rev. 3 Fire Suppression Water Supply System 3.7.3.1 TECHNICAL REQUIREMENT SURVEILLANCE (continued)
SURVEILLANCE FREQUENCY TRS 3.7.3.1.9 Verify that a sample of the diesel driven fire pump 92 days diesel fuel from the fuel storage tank is within the acceptable limits when checked for viscosity, water and sediment.
TRS 3.7.3.1.10 Verify that the diesel driven fire pump diesel engine 92 days 24 volt battery bank specific gravity is appropriate for continued service of the battery.
TRS 3.7.3.1.11 Cycle each fire suppression water supply system 12 months testable valve in the flow path through at least one complete cycle of full travel.
TRS3.7.3.1.12 Perform a system flush of the fire suppression water 12 months supply system.
TRS 3.7.3.1.13 Perform a system functional test of the fire 18 months suppression water supply system.
TRS 3.7.3.1.14 This TRS is not used.
TRS 3.7.3.1.15 Verify that each fire pump develops at least 18 months 2500 gpm at a system head of 125 psig.
TRS 3.7.3.1.16 Verify that the diesel engine driven fire pump diesel 18 months engine 24 volt battery bank cell and battery racks show no visual indication of physical damage or abnormal deterioration.
TRS 3.7.3.1.17 Verify that each fire pump starts sequentially to 18 months maintain the fire suppression water supply system pressure greater than or equal to 85 psig.
(continued)
SUSQUEHANNA.: UNIT 2 TRM /3.7-6 EFFECTIVE DATE 04/28/2016
Rev. 3 Fire Suppression Water Supply System 3.7.3.1 TECHNICAL REQUIREMENT SURVEILLANCE (continued)
SURVEILLANCE FREQUENCY TRS 3.7.3.1.18 Verify that the diesel driven fire pump diesel engine 18 months starting 24 volt battery bank Terminal connections ar_e clean, tight, free of corrosion and coated with anti-corrosion material.
TRS 3.7.3.1.19 Perform diesel driven fire pump diesel engine 18 months inspection.
TRS 3.7.3.1.20 Perform a fire suppression water supply system flow 3 years test.
SUSQUEHANNA - UNIT 2 TRM I 3.7-7 EFFECTIVE DA TE 08/02/1999
~*
Rev.1 83.11.1.1 BASES TRO Actions TRS Liquid Effluents Concentration Liquid Effluents Concentration B 3.11.1.1 This requirement is provided to ensure that the concentration of radioactive materials released in liquid waste effluents to UNRESTRICTED AREAS will be less than 1 O times the concentration levels specified in 1 O CFR Part 20.1001 to 20.2402, Appendix B, Table 2, Column 2. The requirement provides operational flexibility for releasing liquid effluents in concentrations to follow the Section II.A and 11.C design objectives of Appendix I to '.10 CFR part 50. This limitation provides reasonable assurance that the levels of radioactive materials in bodies of water in UNRESTRICTED AREAS will result in exposures within (1) the Section II.A design objectives of Appendix I, 1 O CFR 50, to a Member of the Public and (2) restrictions authorized by 1 O CFR 20.1301 (e). The concentration limit for dissolved or entrained noble gases is based upon the assumptions that Xe-135 is the controlling radionuclide and its effluent concentration in air (submersion) was converted to an equivalent concentration in water. This requirement does not affect the requirement to comply with the annual limitations of 1 O CFR 20.1301 (a). This requiremen~ applies to the release of radioactive materials in liquid effluents from all units at the site. The required detection capabilities for radioactive materials in liquid waste samples are tabulated in terms of the lower limits of detection (LLDs). Detailed discussion of the LLD and the other detection limits can be found in Curie, L.A., "Lower Limit of Detection: Definition and Elaboration of a Proposed Position for Radiological Effluent and Environmental Measurements." (References 2, 3, and 4)
This section of the TRM is also part of the ODCM (Reference 2).
The Actions are defined to ensure proper corrective measures are taken in response to exceeding the TRO limits.
The TRSs are defined to be performed at the specified Frequency to ensure that the parameters are maintained within the TRO limits. Table 3.11.1.1-1 defines Radioactive Liquid Waste Sampling and Analysis Program. The lower limit of detection (LLD) is defined, for purposes of these Requirements, as the smallest concentration of radioactive material in a.sample that (continued)
SUSQUEHANNA - UNIT 2 TRM/83.11-1 EFFECTIVE DATE 08/31/1998
Rev. 1 Liquid Effluents Concentration B 3.11.1.1 B 3.11.1.1 Liquid Effluents Concentration BASES (continued)
TRS (continued) will yield a net count, above system background, that will be detected with 95% probability with only 5% probability of falsely concluding that a blank observation represents a "real" signal. For a particular measurement system, which may include radiochemical separation:
LLD= ____
4_.6_6_sb ___ _
Ee V
- 2.22E6 e Y
- exp(-Mt)
Where:
LLD is the a priori lower limit of detection as defined above (as microcuries per unit mass or volume).
Sb is the standard deviation of the background counting rate or of the counting rate of a blank sample as appropriate "(as counts per minute),
E is the counting efficiency, as counts per disintegration, V is the sample size, in units of mass or volume, 2.22 E6 is the number of disintegrations per minute per microcurie, Y is the fractional radiochemical yield, when applicable.
.11, is the radioactive decay GOnstant for the particular radionuclide, and lit for plant effluents is the elapsed time between the midpoint of sample collection and time of counting.
Typical values of E, V, Y, and lit should be used in the calculation.
It should be recognized that the LLD is defined as an a priori (before the fact) limit representing the capability of a measurement system and not as an a posteriori (after the fact) limit for a particular measurement.
A batch release is the discharge of liquid wastes of a discrete volume. Prior to sampling for analyses, each batch shall be isolated, and then thoroughly mixed to assure representative sampling.
. (continued)
SUSQUEHANNA - UNIT 2 TRM I B 3.11-2 EFFECTIVE DATE 08/31/1998
Rev.~
Liquid Effluents Concentration B 3.11.1.1 B 3.11.1.1 Liquid Effluents Concentration BASES (continued)
TRS (continued)
The principal gamma emitters for which the LLD specification applies include the following radionuclides: Mn-54, Fe-59, Co-58, Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141 and Ce-144. The dissolved and entrained gases (gamma emitters) for which the LLD specification applies include the following radionuclides: Kr-85, Kr-85m. Kr-87, Kr-88, Ar-41, Xe-133, Xe-133m, Xe-135, and Xe-135m. This list does not mean that only these nuclides are to be considered. Other gamma peaks that are identifiable, together with those of the above nuclides, shall also be analyzed and reported in accordance with the ODCM.
A composite sample is one in which the quantity of liquid sampled is proportional to the quantity of liquid waste discharged and in which the method of sampling employed results in a specimen that is representative of the liquids released over a period no longer than the Minimum Analysis Frequency.
The Minimum Analysis Frequency as listed for the Composite Samples shall mean the minimum frequency for initiation of the required analyses, not completion of the analyses and evaluation of the results. Since the analysis involves sending the samples to an offsite laboratory and performance of involved sample preparation and wet chemical analyses, there will be a delay between initiation of the analysis and receipt of the results.
The analysis initiation shall normally be done on a calendar month for the 31 day frequency or calendar quarter for a 92 day frequency.
REFERENCES
- 1.
Technical Specification 5.5.4 - Radioactive Effluent Controls program.
Technical Specification 5.5.1 - Offsite Dose Calculation Manual.
NUREG/CR-4007, September, 1984.
- 2.
- 3.
- 4.
SUSQUEHANNA - UNIT 2 TRM I B 3.11-3 EFFECTIVE DATE 04/28/2016