ML16138A754

From kanterella
Jump to navigation Jump to search
Corrected TS Pages 3.3-3 & 3.3-6,inadvertently Omitted from Amends 197,197 & 194 to Licenses DPR-38,DPR-47 & DPR-55
ML16138A754
Person / Time
Site: Oconee  
Issue date: 01/21/1993
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML16138A755 List:
References
NUDOCS 9301250258
Download: ML16138A754 (2)


Text

3.3.3 Core Flood Tank (CFT) System When the RCS is in a condition with pressure above 800 psig both CFT's shall be operable with the electrically operated discharge valves open and breakers locked open and tagged; a minimum level of 13 +.44 feet (1040 + 30 ft.') and one level instrument channel per CFT; a minimum boron concentration within the limit specified in the Core Operating Limits Report in each CFT; and pressure at 600 + 25 psig with one pressure instrument channel per CFT.

3.3.4 Borated Water Storage Tank (BWST)

When the RCS, with fuel in the core, is in a condition with pressure equal to or greater than 350 psig or temperature equal to or greater than 250OF:

a.

The BWST shall have operable two level instrument channels.

(1) Tests or maintenance shall be allowed on one channel of BWST level instrumentation provided the other channel is operable.

(2)

If the BWST level instrumentation is not restored to meet the requirements of Specification 3.3.4.a above within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the reactor shall be placed in a hot shutdown condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

If the requirements of Specification 3.3.4.a are not met within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following hot shutdown, the reactor shall be placed in a condition with RCS pressure below 350 psig and RCS temperature below 250*F within an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

The BWST shall contain a minimum level of 46 feet of water having a minimum concentration of boron within the limit specified in the Core Operating Limits Report at a minimum temperature of 500F. The manual valve, LP-28, on the discharge line shall be locked open. If these requirements are not met,the BWST shall be considered unavailable and action initiated in accordance with Specification 3.2.

3.3.5 Reactor Building Cooling (RBC) System

a.

When the RCS, with fuel in the core, is in a condition with pressure equal to or greater than 350 psig or temperature equal to or greater than 250OF and subcritical:

(1)

Two independent RBC trains, each comprised of an RBC fan, associated cooling unit, and associated ESF valves shall be operable.

(2)

Tests or maintenance shall be allowed on any component of the RBC system provided one train of the RBC and one train of the RBS are operable. If the RBC system is not restored to meet the requirements of Specification 3.3.5a(l) above within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the reactor shall be placed in a condition with RCS pressure below 350 psig and RCS temperature below 2500 F within an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Oconee 1, 2, and 3 3.3-3 Amendment No. 197 (Unit 1)

Amendment No. 197 (Unit 2) 9301250258 930121 Amendment No. 194 (Unit 3)

PDR ADOCK 05000269 P

_PDR

Bases Specification 3.3 assures that, for whatever condition the reactor coolant system is in, adequate engineered safety feature equipment is operable.

For operation up to 60% FP, two high pressure injection pumps are specified.

Also, two low pressure injection pumps and both core flood tanks are required.

In the event that the need for emergency core cooling should occur, func tioning of one high pressure injection pump, one low pressure injection pump, and both core flood tanks will protect the core, and in the event of a main coolant loop severance, limit the peak clad temperature to less than 2,200*F and the metal-water reaction to that representing less than 1 percent of the clad. (1) Both core flooding tanks are required as a single core flood tank has insufficient inventory to reflood the core.

The requirement to have three HPI pumps and two HPI flowpaths operable during power operation above 60% FP is based on considerations of potential small breaks at the reactor coolant pump discharge piping for which two HPI trains (two pumps and two flow paths) are required to assure adequate core cooling.

(2) The analysis of these breaks indicates that for operation at or below 60%

FP only a single train of the HPI system is needed to provide the necessary core cooling.

The requirement for a flowpath from LPI discharge to HPI pump suction is provided to assure availability of long term core cooling following a small break LOCA in which the BWST is depleted and RCS pressure remains above the shutoff head of the LPI pumps.

The borated water storage tanks are used for two purposes:

(a) As a supply of borated water for accident conditions.

(b) As a supply of borated water for flooding the fuel transfer canal during refueling operation.(3)

Three-hundred and fifty thousand (350,000) gallons of borated water ( a level of 46 feet in the BWST) are required to supply emergency core cooling and reactor building spray in the event of a loss-of-core cooling accident. This amount fulfills requirements for emergency core cooling. The borated water storage tank capacity of 388,000 gallons is based on refueling volume require ments. Heaters maintain the borated water supply at a temperature above 50OF to lessen the potential for thermal shock of the reactor vessel during high pressure injection system operation. The boron concentration is set at the amount of boron required to maintain the core 1 percent Ak/k subcritical at 70*F without any control rods in the core. The minimum boron concentration is specified in the Core Operating Limits Report.

It has been shown for the worst design basis loss-of-coolant accident (a 14.1 ft2 hot leg break) that the Reactor Building design pressure will not be exceeded with one spray and two coolers operable. (4) Therefore, a mainte nance period of seven days is acceptable for one Reactor Building cooling fan and its associated cooling unit provided two Reactor Building spray systems are operable for seven days or one Reactor Building spray system provided all three Reactor Building cooling units are operable.

Oconee 1, 2, and 3 3.3-6 Amendment No. 197 (Unit 1)

Amendment No. 197 (Unit 2)

Amendment No. 194 (Unit 3)