St Lucie, Units 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station, and Point Beach, Units 1 and 2 - Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related InformationML16134A180 |
Person / Time |
---|
Site: |
Saint Lucie, Point Beach, Seabrook, Turkey Point ![NextEra Energy icon.png](/w/images/9/9b/NextEra_Energy_icon.png) |
---|
Issue date: |
05/11/2016 |
---|
From: |
Larry Nicholson NextEra Energy |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
Shared Package |
---|
ML16134A177 |
List: |
---|
References |
---|
L-2016-109 |
Download: ML16134A180 (2) |
|
|
---|
Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements IR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 2024-02-05
[Table view] |
Text
ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Re: Florida Power & Light Company St. Lucie Units 1 and 2 Docket Nos. 50-335, 50-389 Florida Power & Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250, 50-251 NextEra Energy Seabrook, LLC Seabrook Station Docket No. 50-443 NextEra Energy Point Beach, LLC Point Beach Units 1 and 2 Docket Nos. 50-266, 50-301 May 11, 2016 NEXTeraŽ ENERGY. L-2016-109 10 CFR 50.4 Official Service List Changes and Distribution for Safeguards Information and Official Use Only -Security-Related Information The purpose of this letter is to request changes to the official service lists and the distribution for Safeguards Information (SGI) and Official Use Only -Security-Related Information (NRR and Region) for Florida Power & Light Company, the licensee for the St. Lucie Nuclear Plant, Units 1 and 2, and the Turkey Point Nuclear Plant, Units 3 and 4, and on behalf of NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) the licensee for Seabrook Station; and NextEra Energy Point Beach, LLC (NextEra Energy Point Beach), the licensee for Point Beach Nuclear Plant, Units 1 and 2 (collectively referred to as NextEra Energy). Effective immediately, please make the following changes: CHANGE FROM CHANGE TO Dean Curtland Eric McCartney Site Vice President Site Vice President Seabrook Station Seabrook Station NextEra Energy NextEra Energy 626 Lafayette Road 626 Lafayette Road Seabrook, NH 03874 Seabrook, NH 03874 Dean.Curtland@fpl.com Eric.McCartney@fpl.com Electronic Mail Distribution Electronic Mail Distribution CHANGE FROM CHANGE TO Eric McCartney Robert Coffey Site Vice President Site Vice President Point Beach Point Beach NextEra Energy NextEra Energy 6610 Nuclear Road 6610 Nuclear Road Two Rivers, WI 54241 Two Rivers, WI 54241 Eric.McCartney@fpl.com Robert.Coffey@fpl.com Electronic Mail Distribution Electronic Mail Distribution NextEra Energy, Inc. 700 Universe Boulevard, Juno Beach, FL 33408 L-2016-109 Page 2 of2 The enclosed is a list for "SGI and Official Use Only -Security-Related Information" and "Carbon Copy Recipient for SGI Without SGI Included and Official Use Only -Security-Related Information" for NextEra Energy. These changes include Mr. Timothy Eck, who has been replaced with Mr. Orlando Hernandez, and Mr. Michael Kiley who has been replaced by Tom Summers at Turkey Point Nuclear Plant. Other changes include, Mr. Eric Katzman who has been replaced with Mr. Michael J. Snyder, Mr. Dean Curtland who has been replaced with Eric McCartney, Mr. Eric McCartney who has been replaced with Robert Coffey, and Mr. Michael Millen, who has been replaced with Mr. Bryan Woyak (changes noted in "Red" text). Please continue to ensure that all Safeguards Information (including Safeguards Advisories) are issued in keeping with the specified enclosed distribution list. Should you have any questions regarding this request, please contact Alison Brown at (561) 694-3673.
Ve?y;;(___
Ison Director, Nuclear Licensing and Regulatory Compliance cc: Enclosure Electronic Distribution:
Regional Administrator, Region I Regional Administrator, Region II Regional Administrator, Region Ill USNRC Project Manager, Turkey Point and St. Lucie Senior Resident Inspector, USNRC, Turkey Point
- Senior Resident Inspector, USNRC, St. Lucie USNRC Project Manager, Seabrook Station Senior Resident Inspector, USNRC, Seabrook Station USN RC Project Manager, Duane Arnold Senior Resident Inspector, USNRC, Duane Arnold USNRC Project Manager, Point Beach Senior Resident Inspector, Point Beach Vanette Travick, USN RC Yvonne Edmonds, NRR ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Re: Florida Power & Light Company St. Lucie Units 1 and 2 Docket Nos. 50-335, 50-389 Florida Power & Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250, 50-251 NextEra Energy Seabrook, LLC Seabrook Station Docket No. 50-443 NextEra Energy Point Beach, LLC Point Beach Units 1 and 2 Docket Nos. 50-266, 50-301 May 11, 2016 NEXTeraŽ ENERGY. L-2016-109 10 CFR 50.4 Official Service List Changes and Distribution for Safeguards Information and Official Use Only -Security-Related Information The purpose of this letter is to request changes to the official service lists and the distribution for Safeguards Information (SGI) and Official Use Only -Security-Related Information (NRR and Region) for Florida Power & Light Company, the licensee for the St. Lucie Nuclear Plant, Units 1 and 2, and the Turkey Point Nuclear Plant, Units 3 and 4, and on behalf of NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) the licensee for Seabrook Station; and NextEra Energy Point Beach, LLC (NextEra Energy Point Beach), the licensee for Point Beach Nuclear Plant, Units 1 and 2 (collectively referred to as NextEra Energy). Effective immediately, please make the following changes: CHANGE FROM CHANGE TO Dean Curtland Eric McCartney Site Vice President Site Vice President Seabrook Station Seabrook Station NextEra Energy NextEra Energy 626 Lafayette Road 626 Lafayette Road Seabrook, NH 03874 Seabrook, NH 03874 Dean.Curtland@fpl.com Eric.McCartney@fpl.com Electronic Mail Distribution Electronic Mail Distribution CHANGE FROM CHANGE TO Eric McCartney Robert Coffey Site Vice President Site Vice President Point Beach Point Beach NextEra Energy NextEra Energy 6610 Nuclear Road 6610 Nuclear Road Two Rivers, WI 54241 Two Rivers, WI 54241 Eric.McCartney@fpl.com Robert.Coffey@fpl.com Electronic Mail Distribution Electronic Mail Distribution NextEra Energy, Inc. 700 Universe Boulevard, Juno Beach, FL 33408 L-2016-109 Page 2 of2 The enclosed is a list for "SGI and Official Use Only -Security-Related Information" and "Carbon Copy Recipient for SGI Without SGI Included and Official Use Only -Security-Related Information" for NextEra Energy. These changes include Mr. Timothy Eck, who has been replaced with Mr. Orlando Hernandez, and Mr. Michael Kiley who has been replaced by Tom Summers at Turkey Point Nuclear Plant. Other changes include, Mr. Eric Katzman who has been replaced with Mr. Michael J. Snyder, Mr. Dean Curtland who has been replaced with Eric McCartney, Mr. Eric McCartney who has been replaced with Robert Coffey, and Mr. Michael Millen, who has been replaced with Mr. Bryan Woyak (changes noted in "Red" text). Please continue to ensure that all Safeguards Information (including Safeguards Advisories) are issued in keeping with the specified enclosed distribution list. Should you have any questions regarding this request, please contact Alison Brown at (561) 694-3673.
Ve?y;;(___
Ison Director, Nuclear Licensing and Regulatory Compliance cc: Enclosure Electronic Distribution:
Regional Administrator, Region I Regional Administrator, Region II Regional Administrator, Region Ill USNRC Project Manager, Turkey Point and St. Lucie Senior Resident Inspector, USNRC, Turkey Point
- Senior Resident Inspector, USNRC, St. Lucie USNRC Project Manager, Seabrook Station Senior Resident Inspector, USNRC, Seabrook Station USN RC Project Manager, Duane Arnold Senior Resident Inspector, USNRC, Duane Arnold USNRC Project Manager, Point Beach Senior Resident Inspector, Point Beach Vanette Travick, USN RC Yvonne Edmonds, NRR