2016 BYRON STATION INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 January 28, 2015 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS, BYRON STATION, UNITS 1 AND 2

Dear Mr. Hanson:

We have received your corporate letter RS-14-164, dated May 29, 2014, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations." In the letter, you requested an initial operator licensing examinations be scheduled for March 2016, December 2017, and October 2019, at the Byron Station. These dates have changed from your previous submittal in corporate letter RS-13-183 and our NRC response letter dated January 27, 2014.

In response, we have scheduled initial operator licensing examinations for the weeks of:

March 14 and 21, 2016, with an on-site validation date the week of February 15, 2016.

February 5 and 12, 2018, with an on-site validation date the week of January 8, 2018.

October 7 and 14, 2019, with an on-site validation date the week of September 9, 2019.

In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations, unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately.

The examinations have been individually scheduled for two weeks because your letter indicated that there were more than nine applicants being considered for each of these examinations.

Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

In accordance with Title 10 of the Code of Federal Regulations (1 0 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via LISTSER~

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety

In accordance with Title 10 of the Code of Federal Regulations (1 0 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via LISTSERy DISTRIBUTION:

Kimyata MorganButler RidsNrrDorllpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Eric Duncan Allan Barker Carole Ariano Linda Linn DRPIII DRS III Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number ML15030A058 Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety

~ Publicly Available 0 Non-Publicly Available 0 Sensitive

~ Non-Sensitive To receive a copy of this document Indicate In the concurrence box "C" =Copy without attach/encl E" =Copy with attach/encl "N" =No copy OFFICE Rill I

Rill I

Rill I

Rill NAME RKWalton:jw HPeterson DATE 01/23/15 01/28/15 OFFICIAL RECORD COPY I

Exelon Generation, RS-14-164 May 29,2014 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-37 4 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRC Docket Nos. 50-220 and 50-410 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

May 29,2014 U. S. Nuclear Regulatory Commission Page2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 R. E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2014-05, 11Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations,~~ dated April29, 2014 The referenced Regulatory Issue Summary (RIS} requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2016 through 2019, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2016 and 2017. Attachments 1 through 14 provide responses to RIS 2014-05 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

For Limerick Generating Station (LGS) and Peach Bottom Atomic Power Station (PBAPS), the Limited Senior Reactor Operator (LSRO) initial license examination can be a dual-site examination which involves both stations. In lieu of repeating the same information on LGS and PBAPS attachments, the LSRO examination scheduling information is provided on Attachment 7 for LGS. Attachment 11 for PBAPS references Attachment 7 where appropriate. There are no candidates currently expected to take the dual-site LSRO initial license examination for calendar years 2016 through 2019, as indicated on Attachment 7.

May 29,2014 U. S. Nuclear Regulatory Commission Page 3 There are no regulatory commitments contained within this letter. Should you have any questions regarding this letter, please contact Dwi Murray at (630) 657-3695.

Respectfully, v--r~~---------*-**

David M. Gullatt Manager-Licensing Exelon Generation Company, LLC cc:

Regional Administrator-NRC Region I Regional Administrator-NRC Region Ill - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Calvert Cliffs Nuclear Power Station - Completed NRC Form 536 for Clinton Power Station -*completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Nine Mile Point Nuclear Station - Unit 1 - Completed NRC Form 536 for Nine Mile Point Nuclear Station - Unit 2 0 -Completed NRC Form 536 for Oyster Creek Nuclear Generating Station 1 -Completed NRC Form 536 for Peach Bottom Atomic Power Station 2-Completed NRC Form 536 for Quad Cities Nuclear Power Station 3-Completed NRC Form 536 for R.E. Ginna Nuclear Power Plant 4-Completed NRC Form 536 for Three Mile Island Nuclear Station

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary Information coUection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information collection is used to plan budgets and resources for operator OPERATOR LICENSING examinations: Send comments regarding burden estimate to the Information Services Branch

{T-5 F53), U.S. Nuclear Regulatory Commission, Weshing!Dn, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov. and lo the Desk Officer. Office of Information and Regula\\ol'f Affaifi, NEOB-10202, {3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a curranUy valid OMB control number, the NRC mev not conduct or sponsor. and a pefion Is not required to respond to. the information collection.

FACILITY

'NRC REGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY20l9 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 8

0 10 0

OPERATORS NUMBER OF SENIOR REACTOR 8

0 8

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS - LIMITED PROPOSED DATES PRIMARY DATE 9/5/2016 N/A 5/14/2018 N/A ALTERNATE DATE 9/12/2016 N/A 5/21/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 20 0

0 0

CANDIDATES NRC FORM 536 (00.2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160.0131 EXPIRES: 09/30/2014 (09-2011)

EsUmated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection Is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T*5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet a-EXAMINATION DATA mall to lnfocohects.Resourca@nrc.gov, and to the Desk Officer, Office of lnfollllatlon and Regulatory Affairs, NEOB-10202, (315().0131), Office of Management and Budget, Washington, DC 20503.

If a means used to Impose an information colection does not display a currentiy valid OMB control number, !he NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.

FACILITY NRC KEGION Byron Station, Units 1 and 2 III Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 6

8 0

7 OPERATORS NUMBER OF SENIOR REACTOR 6

7 0

7 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 03/14/2016 12/ll/20 17 N/A 10/06/2019 ALTERNATE DATE 03/21/2016 12/18/2017 N/A 10/20/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

15 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014~05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 011/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary infonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This lnfonnation collection is used to plan budgets and resources for aperator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the lnfonnaUon Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mall to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of lnfonnatlon and Regulatory Affairs, NEOB-10202, (315().0131), Office of Management and Budge~ Washington, DC 20503.

If a means used to impose an ilfonnation colection does not display a currentiy valid OMS control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the lnfonnation collection.

FACILITY tNK<.;Rt:GON Calvert Cliffs Nuclear Power Plant, Units 1 and 2 I

Renewed Facility Operating License Nos. DPR~53 and DPR-69 NRC Docket Nos. 50~317 and 50~318 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 5

0 5

0 OPERATORS NUMBER OF SENIOR REACTOR 6

0 6

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3

0 3

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 08/08/2016 NIA 08/06/2018 N/A ALTERNATE DATE 09/12/2016 N/A 09/10/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

CANDIDATES 11 0

0 0

0 NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRCFORM636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 8160*0131 EXPIRES: 0913012014 (09-2011)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coiection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocoHects.Resource@nrc.gov, and to the Desk Officer, Office of lnfonnatlon and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washington, DC 20503.

If a means used to impose an fnfonnation coOection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a pernon is not required to respond to, the lnfonnation collection.

FACILITY JNRCRtGION Clinton Power Station, Unit 1 III Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 4

0 4

0 OPERATORS NUMBER OF SENIOR REACTOR 6

0 6

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/10/2016 N/A 10/22/2018 N/A ALTERNATE DATE 10/17/2016 N/A 10/29/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 10 0

CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09130/2014 (09-2011)

Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information coHection Is used to plan budgets and re$0urces for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information SeiVIces Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mail to lnfoooNects.Resouroe@nrc.gov, and to the Desk Officer, OffiCe of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Menegement and Budget Washington, DC 20503.

~ a means used to Impose an Information ooKection does not display a currently valid OMB conl!ol number, the NRC mey not condUct or sponsor, and a person Is not required to respond to, the Information collection.

FACIUTY NR'-' REGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0

2 0

3 OPERATORS NUMBER OF SENIOR REACTOR 8

10 0

6 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/08/2016 08/28/2017 N/A 03/25/2019 ALTERNATE DATE 08/15/2016 08/21/2017 N/A 04/01/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 0

0 0

0 0

9 0

CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014~05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09*2011)

Estimated burden per response to comply with this voluntary lnf01111ation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coHection Is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53). U.S. Nuclear Regulatory Commission, Washington, DC 2055>0001, or by internet e*

EXAMINATION DATA mall to lnfocollects.Resource@nrc.gov. and to the Desk Officer, Office of Information and Regulatory Affairs. NEOB-10202. {3150-0131), Office of Management and Budget. Washington, DC 20503.

If a means used to impose an information colaction does not display a currentiy valid OMB control number,lhe NRC may not conduct or sponsor, and a person Is not required to respond to, the Information coHection.

FACIUlY Nt<Ct<EGIUN LaSalle County Station, Units 1 and 2 III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 10 0

10 0

OPERATORS NUMBER OF SENIOR REACTOR 9

0 9

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR l

0 1

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/17/2016 N/A 10/15/2018 N/A ALTERNATE DATE 10/24/2016 N/A 10/22/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

19 0

0 CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with !his voluntary Information ooHection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information coiection Is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send commenm regarding burden estimate to the lnfonnetion Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA maU to lnfooollects.Resource@nrc.gov, and to !he Desk Officer, OffiCe of Information and Regulatory Affairs, NEOB-10202, (315~131), Oflice of Management and Budge~ Washington, DC 20503.

If a means used to impose an Information oolection does not display a currently vaHd OMS oonkot number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information ooHection.

FACILITY

'NRC REGION Limerick Generating Station, Units I and 2 I

Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 I

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 8

7 8

6 OPERATORS NUMBER OF SENIOR REACTOR 5

5 5

5 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1

2 2

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 01118/2016 02/06/2017 02/05/2018 02/04/2019 ALTERNATE DATE 01125/2016 02/13/2017 02/12/2018 02111/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 13 0

0 0

11 0

CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160..()131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply wi1h this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coKaction is usad to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), u.s. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internal e-EXAMINATION DATA mall to lnfocollects.Resource@nro.gov, and to the Desk Otrrcer, Office of Information and Regulatory Affairs, NE0£3..10202, (315().0131), Office of Management and Budge~ Washington, DC 20503.

If a means used to impose an information colection does not display a currenUy vaDd OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Nine Mile Point Nuclear Station, Unit I I

Renewed Facility Operating License No. DPR-63 NRC Docket No. 50-220 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0

8 0

8 OPERATORS NUMBER OF SENIOR REACTOR 0

10 0

10 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE N/A 03/06/2017 NIA 03/04/2019 ALTERNATE DATE N/A 03/13/2017 N/A 03/11/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 18 0

CANDIDATES NRC FORM 536 (09-2011}

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection Is used to plan budgets and resources lor operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to tnlocollects.Resource@nro.gov, and to the Desk Officer, OffiCe of Information and Regulatory Affairs, NEOB-10202, (315(}0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currenUy valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.

FACILITY NRC REGION Nine Mile Point Nuclear Station, Unit 2 I

Renewed Facility Operating License No. NPF-69 NRC Docket No. 50-410 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0

0 8

0 OPERATORS NUMBER OF SENIOR REACTOR 0

0 10 0

OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A NIA 03/05/2018 N/A ALTERNATE DATE N/A N/A 03/12/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 18 0

0 0

0 0

CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 0 Page 1 of 1 NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary information coHection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information coVection Is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mail to lnfocollects.Resourca@nrc.gov, and to the Desk Olf~eer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washington, DC 20503.

ff a means used to Impose an inlormation colection does not display a currently vaNd OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.

FACILITY INRCRE.GION Oyster Creek Nuclear Generating Station I

Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED I

0 0

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 5

0 0

0 OPERATORS NUMBER OF SENIOR REACTOR 8

0 0

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 5

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 02/01/2016 N/A N/A N/A ALTERNATE DATE 02/08/2016 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 1 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coHection Is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mall to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, {3150-0131 ), Office of Management and Budge~ Washington, DC 20503.

If a means used to Impose an information colection does not display a currantiy vaHd OMB control number, the NRC may not conduct or sponsor, and a person Is not requlrod to respond to, the Information collection.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I

Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0

6 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

7 0

7 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

3 0

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR

  • see LGS OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 03/20/2017 N/A 03/25/2019 ALTERNATE DATE N/A 03/27/2017 N/A 04/01/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 13 0

CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 2 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGUL.A TORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09-2011)

Esllmated burden per response lo comply wilh this volunlary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coNection is used lo plan budgels and resources for operator OPERA TOR LICENSING examinations. Send commen1S regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mail to lnfocollecls.Resource@nrc.gov, end to lhe Desk OffiCer, Office of Information and Regulatory Affan, NEOB-10202, (3150-0131), Office of Managemantand Budget Washington, DC 20503.

If a means used to Impose an Information colection does not display a currentiy valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, lha Information coUection.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units I and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Dockets Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY20I9 ESTIMATED NUMBER OF LICENSEE-PREPARED I

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 3

0 4

0 OPERATORS NUMBER OF SENIOR REACTOR 7

0 8

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 04/25/2016 N/A 08/20/2018 N/A ALTERNATE DATE 08/0l/2016 N/A 09/17/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 12 0

0 0

CANDIDATES NRCfORM536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 3 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09*2011)

Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information colaction Is used to plan budge1s and resouroes for operator OPERA TOR LICENSING examlnallons. Send commen1s regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to lha Desk Officer, Olllce of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Mansgement and 8udga~ Washington, DC 20503.

If a means used to Impose an information colection does not display a correnUy valid OM8 control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACILITY NRC REGION R. E. Ginna Nuclear Power Plant I

Renewed Facility Operating License No. DPR-I 8 NRC Docket No. 50-244 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 10 0

8 0

OPERATORS NUMBER OF SENIOR REACTOR 1

0 3

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3

0 3

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/05/2016 NIA 12/03/2018 N/A ALTERNATE DATE 12/12/2016 N/A 12/10/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

II 0

0 CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 4 Page 1 of 1 NRCFORM636 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09*2011)

Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information collection Is used to plan budgets and resouroes for operator OPERA TOR LICENSING examinations. Send commen1S regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mall to lnfocollects.Resource@nrc.gov, and to tha Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (315!Hl131), Office of Management end Budget Washington, DC 20503.

If a means used to impose an information colecUon does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACILITY NRC REGION Three Mile Island Nuclear Station, Unit I I

Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

9 0

12 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0

3 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

5 0

5 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

1 0

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE N/A 09/25/2017 N/A 09/23/2019 ALTERNATE DATE N/A 10/02/2017 N/A 09/30/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

8 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (09-2011)

Mr. Michael J. Pacilio UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 27, 2014 Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

BYRON STATION, UNITS 1 AND 2

Dear Mr. Pacilio:

We have received your corporate letters RS-12-114, dated July 5, 2012, and RS-13-183 dated July 8, 2013. In these letters, you requested that initial operator licensing examinations be scheduled at the Byron Station in August 2015, March 2016, August 2017, and December 2018.

We recognize that letter RS-13-183 had deleted the previously requested exam scheduled in August 2015 at the Byron Station. In response, we have scheduled the following initial license exams for the Byron Station:

Weeks of March 28 and April 4, 2016, with an onsite validation date of March 7, 2016; Weeks of August 14 and 21, 2017, with an onsite validation date of July 24, 2017; and Weeks of December 3 and 10, 2018, with an onsite validation date of November 12, 2018.

We note that you were previously scheduled for an initial operator licensing exam the weeks of June 2 and 9, 2014, with an onsite validation date of May 12, 2014. This exam date has not changed. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via ListServ' Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via ListServ' DISTRIBUTION:

Ernesto Quinones RidsNrrDorllpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRS III Tammy Tomczak Patricia Buckley John McHale Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: Ltr 012714 Byron Confirmation of Initial OL Exam.docx

~ Publicly Available D Non-Publicly Available D Sensitive

~ Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

====r====r=========r==r===========~

OFFICE Rill I

Rill Rill Rill NAME RKWalton:bl HPeterson 01/27/14 ----+-------+--------1!

~====~==============~~O~F~F~IC~IA~L~R~E~C~O~R~D~C~O~P~Y========~==========~

DATE 01/22/14

=~

Exelon Generation,,.

4300 Winfie!d Road W<H'rPIW<I!e IL 60555 630 657 2000 Offrce RS-12-114 July 5, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-37 4 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

July 5, 2012 U. S. Nuclear Regulatory Commission Page2

Subject:

Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," dated June 8, 2012 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2014 through 2017, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2014 and 2015. Attachments 1 through 11 provide responses to RIS 2012-07 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2016, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 7. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 7 for LGS. Attachment 9 for PBAPS references Attachment 7 where appropriate.

There are no regulatory commitments contained within this letter. Shouid you have any questions regarding this letter, please contact Dwi Murray at (630) 657-3695.

~*

~vidM.G~

Manager-Licensing Exelon Generation Company, LLC - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - IL T - Completed NRC Form 536 for Limerick Generating Station-LSRO - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station 0 - Completed NRC Form 536 for Quad Cities Nuclear Power Station 1 - Completed NRC Form 536 for Three Mile Island Nuclear Station

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150..0131 EXPIRES: 09/30/2014 (9-2011)

Estimated bulden per response to eomply with this voluntary InfOrmation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Thia lnformaUon coVection Is used to plan budgets and mources for operalor OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Brandl (T*5 F53), U.S. Nuclear Regulatory Commlaion, Washington, DC 20555-0001, or by lntamet e-EXAMINATION DATA mall 10 lnlocdlecls.Resource@rtc.gov, and to 1he Desk Officer, omce af Information and Regulatory Affairs, NEOB-10202. (315fl.0131), Office or Management and Budge~ Washington, DC 20503.

II a means used to impou an infonnation cdlection does not display a oorranlly valid OMB control number, the NRC may not conduct or sponsor, and a person il not raqulll!d !D respond lo, the infonnation collection.

FACILITY NRC REGIOIII Braidwood Station, Units l and 2 Facility Operating License Nos. NPF-72 and NPF-77 III NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

l 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 0

6 6

0 OPERATORS NUMBER OF SENIOR REACTOR 0

10 6

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 01/05/2015 11/07/2016 N/A ALTERNATE DATE N/A 01/26/2015 10/24/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

CANDIDATES 0

0 12 0

0 NRC FORM 538 (g.2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM53t U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150..0131 EXPIRES: 09130/2014 (9*2011)

Estimated burden per response to ccmply with lhill voluntary Information IXIHedion request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This infannation tolfadlon Is used to plan budgell and resouttel for opetatcr OPERA TOR LICENSING examinations. Send comments regarding burden estimale to the lnformalion Se!Vices Br.tnc:h (T-5 F53), U.S. Nuclear Regulatory Comtriukln, Washinglon, IX: 20555-0001, or by internet e-EXAMINATION DATA mal to lnfocallecls.Rasourca@nn:.gov, and to the Desk Ofltoar. Oflioa of Information and R!l{jUalory Allalr&, NEOB-10202, (315D-0131), Offtoa of Management and Budge~ Wasl'inglon, DC 20503.

If a means used 10 impose an infonnation colleelion does not display a currently valid OMS control number, lhe NRC may not conduct or sponsor, and a person ia not required 10 ntspond to, the information colledlm.

FACILITY NRCRI:GION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 Ill NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

I EXAMINATIONS ESTIMATED NUMBER OF NRC. PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 6

4 0

8 OPERATORS NUMBER OF SENIOR REACTOR 9

7 0

7 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR l

l 0

I OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS

  • UMITED PROPOSED DATES PRIMARY OATE 06/02/14-06/13/14 08/17/15-08/28/15 N/A 06/19/17- 06/30/17 ALTERNATE DATE 06/16/14- 06/27/14 08/31115 - 09/11/15 N/A 07/03/17- 07/!4/17 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF II 0

0 CANDIDATES 0

0 0

0 15 NRCFORM536 (9*20111

Exelon Generation Company,LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 0913012014 (9-2011)

EsUmaled burden per responae to comply wilh lhis vokmtary lnlonnalion collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information c::ollectlon Is used to plan budgels and I'8SOUI'CIIS lor oparator OPERA TOR LICENSING examlnaUons. Send c::ommenls regarding bunlen asUmale to !he lnformallon S81Vices 6ranch (T-5 F53), U.S. Nuclear Regulalory Commission, Washington, DC 20555-0001, or by lnlsmet e-EXAMINATION DATA mal to lnroc::otleets.Rescurce@nrc.gov, an:l to lhe Desk Officer, Office or Information and Regullllory Affairs, NEOS-10202, (3150.()131), Office of Management and Budget. Washington, DC 20503.

If a means used to impose illl lnfonneUon coll1ctlon does not display 1 currandy valkl OMB c::ontrol number, the NRC may not conduct or sponsor, and a person is not required 1o re$1lorrllo, !he Information c::olectlon.

FACIUTY iNRCREGION Clinton Power Station Facility Operating License No. NPF-62 III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY201S CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 0

4 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

6 0

6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

4 0

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 03/16/2015 N/A 02/21/2017 ALTERNATE DATE N/A 03/23/2015 N/A 02/27/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBEB DECEMBER MARCH JUNE SEPTEMBEI' DECEMBER ESTIMATED NUMBER OF 10 0

0 0

0 0

0 12 CANDIDATES NRC FORM 536 (9-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (9-2011)

Estimated butden per response lO comply willt this volunlaly infomlatlon collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coHecticn Is used to plan budgets and resources ror operator OPERATOR LICENSING eiCllmlnaUons. Send comments regarding burden estimate lO lha Information SIMces Branch (T-5 F53), U.S. Nuclear RIIQUalcry Commission, Washington, DC 20555-0001, ot ~Internet e-EXAMINATION DATA mail to lnfocoHecls.Resourte@nrc.gov, end to the Desk Clfflalr, Office at lnfonnation and Regullllory Alfalr&, NEOB-10202, (3150.0131), Ol!ice of Management and Budget, Washington, DC 20503.

If a means used Ia Impose an lnfonnalian collection does not display a cunenUy vald OMB control number, lhe NRC may not conduct or spomor, and

  • pman is not required 1o respond to, lhe information colectian.

FACILITY NKCKEU!ON Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 III NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 l

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 0

6 4

0 OPERATORS NUMBER OF SENIOR REACTOR 0

5 7

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

l 1

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE NIA 03/02/2015 08/08/2016 N/A ALTERNATE DATE N/A 03/23/2015 08/22/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

12 0

0 CANDIDATES NRC FORM 536 (9*2011)

Exelon Generation Company. LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BYOMB: NO. 3150.0131 EXPIRES: 091301201" (9-2011)

Estimated burden per response to comply wMh lhis voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This infonnation coUec:tton is used to plan budgets and resources for cpe;ator OPERA TOR LICENSING examinations. Send comments regardng burden estimate to lhe lnfonnatlon SeJVices Branch (T*5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet a-EXAMINATION DATA mail to lnfocollec:ts.RilSWCS@nrc.gov, and to the Desk Officer, Oftlce o1 Information and Regulatory Alflll111, NEOB-10202, (3150.{1131), Ollice of Management and Budget WaShington, DC 20503.

II a means u&&d to impose an infolmllllon caleellon does nat display 11 c:ummUy valid OMB control number, lhe NRC may not conr:luct or sponsor, and a parson is not required to respond lo. lhe Information collection.

FACILITY M<t; Kt:.GION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 m

NRC Docket Nos. STN 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 5

0 7

0 OPERATORS NUMBER OF SENIOR REACTOR 4

0 5

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3

0 l

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/14/2014 NIA 10/11/2016 NIA ALTERNATE DATE 10/20/2014 N/A 10/17/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

13 0

0 CANDIDATES NRC FORM 536 i9*2011 J

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Attacnment o Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 0113012014 19-2011)

Estimated burden per response to compfy with this voluntary lnf011118tion collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection Is used to plan budgets and resources for operelcr OPERATOR LICENSING tllllminations. Send comments regarding burden estimate to the Wormation Services Branch (1'-5 F53), U.S. Nuclear Regulalcly Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfacoKects.Resource@nrc.gov, am to H\\11 Detk Officer, Otlic:e of Information and Regulatory Affairs, NEOB-10202, (3150.0131), Ofllce of Management and Budget, Wuhington, DC 20503.

If a means used to impose an information colection does not display a currenUy vald OM8 cantrot number, the NRC may not conduct or sponsor, and a ptnon is not required to mpond to, lhelnfcnnation colection.

FACILITY NRCRI:GION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I

NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 6

0 8

0 OPERATORS NUMBER OF SENIOR REACTOR 10 0

6 0

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 4

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 10/06/2014 N/A 10/03/2016 N/A ALTERNATE DATE 10/14/2014 N/A 10/11/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

14 0

0 CANDIDATES NRC FORM 536 (9-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 09/30/2014 (9*2011)

Estimated burden per mponse to comply with this voluntary lnfonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This 1nrormalion collection Is used to plan budgets and resources for operator OPERATOR LICENSING examinations. Send comments regarding burden estimate to lhe Information S&M:es Branch (T-5 F53), U.S. Nuclear Regulaloly Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mal to lnfocollacts.R8SOU!Ce@m:.gov, and lo lhe Desk Officer, Office d Information and Regulaklly Affairs, NEOB*10202, (3150.0131), Offtal of Management and Budge~ Washington, DC 20503.

lr a mean$ used lo impose an lnlormallon collection does not display 1 CU!Tindy vUd OMS control number, lhe NRC may not conduct or aponaor, and a person is nol required 1o respond to.lhe lntonnatloo collection.

FACILilY JNRCREGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I

NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE*PREPARED 0

0 l

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 0

0 0

0 OPERATORS NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 6

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A NIA 07/18/2016 N/A ALTERNATE DATE N/A N/A 07/25/2016 NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBEJ; DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (9*20111

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Anacnmem~

Page 1 of 1 NRC FORM 53&

U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..C131 EXPIRES: 0913012014

{9-2011)

Esllmated burden per response to COI'f'4lly with this volootaty Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This inlonnatian collll:lon is used lo Jian budgets and reSDUn:es lor operator OPERATOR LICENSING examinations. Send comments regarding burden eslimale to the lnronnatian Sl!l'11ices Branch (T-5 F53), U.S. Nuclear Ragulalo!y Commission, Washington. OC 20555-0001, or by Internet e-EXAMINATION DATA maR lo lnfocolecfs.Resoun:e@nre.gov, and lo the Desk Ollicer, Office ri klformation and Regulatory Affairs. NEOB-10202, (3150-ll131), Ollice of Management and Budoe~ WasNngton, DC 20503.

If a means used to impose an Information collecUon daft not display a cun-enUy veld OMB control number, the NRC may not conduct or sponsor, and a p8!SD11 is not reqUired to respond to, the information colecticn.

FACILITY jNf<<; RI::GION Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 I

NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2(ll7 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 0

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 4

0 0

0 OPERATORS NUMBER OF SENIOR REACTOR 2

0 0

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 05/19/2014 N/A N/A N/A ALTERNATE DATE 06/02/2014 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (g.201t)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 09/30/2014 (9*2011)

EsUmated burden per response to comply with fhil voklntary infonnatlon collecUan request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information collection is used to pl1111 budgets and resources lor operator OPERATOR LICENSING examinations. S1111d comments regatdlng burden estimate to lhe lnlonnallon Services Branch (H F53~ U.S. Nuclear RlglAatay Commission, Wuhlngtan, DC 205Sfr0001, or by internet e-EXAMINATION DATA mal lo lnfoccleds.Resource@nro.gov, and to lhe Desk Officer, Ollice rt lnformadan and R~atoly Mails, NEOB-10202. (3150.0131), Offtce of Management and Budget, Washington, DC 20503.

If a 111811 used tD Impose an inlormiillon co1tect1on does not display a cummuy vllid OMB control number, the NRC may not conduct or sponsor, and a pereon is not ntqUilad to respond lo,lhe ir1formRon colecllon.

FACILITY NRCHt:l:iiUI'I Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 I

NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY 2016 CY2017 NUMBER OF REACTOR 0

6 0

3 OPERATORS NUMBER OF SENIOR REACTOR 0

3 0

5 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

2 0

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR

  • See LOS OPERA TORS
  • LIMITED PROPOSED DATES PRIMARY DATE NIA 03/23/2015 NIA 03/20/2017 ALTERNATE DATE N/A 03/30/2015 NIA 03/27/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION {GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBEfi DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 8

0 CANDIDATES NRC FORM 538 (11-2011 I

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 0 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 09/30/2014 (9-2011)

Eslinaled burden per response lo comply with lhts voluntary irlormation collection request 1 htu.

This information collection is used to plan budgets and I'ISCIUit8S for cpel'liiDr OPERA TOR LICENSING examinations. Send comments regarding burden estimate 10 the information Services Branch

{T*5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet

  • EXAMINATION DATA mail to infocoliecls.Resource@nrc.gav, and to the Desll Officer, Office of Information and Regulatory Mairs. NEQB.10202, (3150.0131), Office of Managemenl and Budge~ Washinglon, DC 20503.

If a means used lo implll8 1n lnfOrtnltion coledion does not display a ourrentty vaid OMS conlroii'Mllber, the NRC may not conduct or spon&Ol', and a person is not requlled to respond to, the rnrormauon collection.

FACIUTY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 III NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 I

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 5

0 5

0 OPERATORS NUMBER OF SENIOR REACTOR 5

0 5

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS-LIMITED PROPOSED DATES PRIMARY DATE 04/21/2014 N/A 04/25/2016 N/A ALTERNATE DATE 05/19/2014 N/A 05/23/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

CANDIDATES 10 0

0 0

0 NRC FORM 536 (9*2011 I

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 1 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 09/30/2014 (9*2011)

Estimated burden per response to comply will this voluntary infomtalion collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coUeetion is used to plan budgets and resourcea lor operator OPERATOR LICENSING examinations. Send comments regarding burden eslimate to the lnfonnation Services Brandl (T-5 F53), u.s. Nuclear Reg~a!oly Commission, Washington, DC 20555-0001, orbyintamet e-EXAMINATION DATA mail to lnfocollects.Resoun:e@m:.~v. and lo the Desk Offioer, Office of lnfonnalion and RegulatofY Allalrs, NEOB-10202. (3150..()131), Office of Management and Budget, Washington, DC 20503.

If a means used to in11oae an ln!ormation ~on does not display a currenUy vliid OM8 cootrol number, the NRC may not conduct or sponsor, and a p111on is not raquired to respond to, the Information coMedian.

FACIUTY NKCKt:UIUN Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 I

NRC Docket No. 50~289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMA TEO NUMBER OF LICENSEE-PREPARED 1

l 0

1 EXAMINATIONS ESTIMA TEO NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 4

4 0

5 OPERATORS NUMBER OF SENIOR REACTOR 8

9 0

10 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

1 0

1 OPERATORS~UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 02/10/2014 08/17/2015 NIA 08/21/2017 ALTERNATE DATE 04/07/2014 09/14/2015 N/A 09/11/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 0

0 0

0 0

0 0

CANDIDATES NRC FORM 536 (9-20111

Exelon Generation 4300 Wtnfie!d Road Warrenville, IL 60555 630 657 2000 Office RS-13-183 July 8, 2013 U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

July 8, 2013 U. S. Nuclear Regulatory Commission Page2

Subject:

Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2013-06, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2013-06, "Preparation and Scheduling of Operator Licensing Examinations," dated June 7, 2013 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2015 through 2018, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2015 and 2016. Attachments 1 through 10 provide responses to RIS 2013-06 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

For the Limerick Generating Station (LGS) and the Peach Bottom Atomic Power Station (PBAPS), the Limited Senior Reactor Operator (LSRO) initial license examination can be a dual-site examination. Rather than repeat the same information on both attachments, the examination scheduling information is provided on Attachment 6 for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate. There are no candidates currently expected to take the dual-site LSRO initial license examination for calendar years 2015 through 2018, as indicated on Attachment 6.

There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Richard W. Mcintosh at (630) 657-2816.

Respectfully,

/:;;¥~

David M. Gullatt Manager - Licensing Exelon Generation Company, LLC - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station cc:

Regional Administrator-NRC Region I Regional Administrator-NRC Region Ill

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch

{T-5 F53), U.S. Nudear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mall to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to Impose an information collection does not display a currenUy valid OMB conlrol number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Braidwood Station, Units 1 and 2 Ill Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 0

9 0

9 OPERATORS NUMBER OF SENIOR REACTOR 0

11 0

8 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 08/29/2016 N/A 05/14/2018 ALTERNATE DATE N/A 09112/2016 N/A 05/29/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

20 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 0913012014 (09-2011)

Estimated burden per response to comply with this voluniEI)' irformalion colleclion request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This irformalion collection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations Serd commenls regardi'1J burden estimate to the Information Serv~es Branch (f-5 F53), U.S. Nuclear Regulalory Commission, Washington, DC 205ffi-00l1, or by ir1emel e-EXAMINATION DATA mail lo lnfocdlects.Resource@ITc.gov, and Ia the Desk Officer, Office of Information and Regulatory Affars, NEOB-*10202, (3150-0131), Office of Management and ButtJet, Washington, DC 20503.

If a means used Ia impose an irformalion collection does not display a currently valid OMB control number, the NRC may not conduct or sponsCf, and a person is not requ1red to respond to, the information collection.

FACILITY IN~\\,; ~I:<.;IUN Byron Station, Units I and 2 Facility Operating License Nos. NPF-37 and NPF-66 ill NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 0

5 8

7 OPERATORS NUMBER OF SENIOR REACTOR 0

7 7

8 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

1 1

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 03/28/16- 04/01/16 08/14/17- 08/18/17 12/03/18-12/07/18 ALTERNATE DATE N/A 04/04/16 - 04/08/16 08/21117 - 08/25/17 12/10/18-14/18 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION {GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Page 1 of 1 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OIIIB: NO. 31110.0131 EXPIRES: 09/3112014 (09-2011)

Eslimaled burden per f8IIJOOS8 lo ~ly 'Mti ll'is QrUry lnbmalim callec1ioJn teqUest 1 haUl.

Thill mmatlcn t'OIIedloo Ia Uled b plln llUdgeCs ard resou~a~~ for operat1:1r OPERATOR LICENSING llXBITlllalim. Send aJ111111erfl reganing burtJen estiln to f1e lnlornwlioo Slntces Blmd1 (T-5F53~ u.s.~~

Commission, Washingbl. DC 2055$0001, orbykltamete-EXAMINATION DATA mai kl lnfoaileds.R8IOII'QI@on:.QOY, IOd to Ilia Desk Ofbr, Oftlco of 1n1cnna11cn IOd RegWalory Mairs, Neal-10202, (3150-0131), Oftlco of ManagemerUnd Budget, Wlllllinglon, DC 20503.

If a means used 10 Impose an inl:fmatiln CQIIecfon does not lk!*IY 1 CUlTIII'I8y vald OMII oontrcl number, 1lte NRC may not conduc:l or sponsor,aod a peqon Is not r;quirud 1o relllOOd lo, 11te lnlormatloo colecllon.

FACli.ITY

'NRC REGION Clinton Power Station, Unit I Facility Operating License No. NPF-62 lli NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 4

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 6

0 6

0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 4

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED OATES PRIMARY DATE 03/16/2015 N/A 02/2112017 N/A ALTERNATE DATE 03/23/2015 N/A 02/27/2017 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

12 0

0 0

0 CANDIDATES NRC FORM 536 (09-2011}

Exelon Generation Company, LLC Response to Regulatory Issue Summery 2013-06 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 09/30/2014 (09*2011)

Estinaled burden per response to ccmply with this vcf\\Jntary infll!mation calection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This tnronnation coleclon Is used to plan budgets and resources far aperalllr OPERA TOR LICENSING examinations. Send OOIIUlllnls regarding bunltn estimate to the tnformaUan Services Branch

{T*S F53), U.S. Nudear Regutaloly COIT1ITilnion, Washington, DC 20555.0001, or by internet e-EXAMINATION DATA mal to tnfocolects.Resoun:e@nrc.gov, and to the Desk Officer, Office of lnfonnation and Regulatory Affairs, NEOB-10202, (315CJ.0131), Office of Management and Budge~ Washtngkln.

DC 20503.

W a meane used to imposa an Information colection doas nat display a currently vald OMB control rrumber, the NRC may not COilduct or sponsor, and a person is not required to re1111ond to. the information colecticln.

FACILITY

,NK<;KJ::GIUN Dresden Nuclear Power Station, Units 2 and 3 Ill Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 6

4 0

4 OPERATORS NUMBER OF SENIOR REACTOR 5

7 0

3 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 1

1 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 03/02/2015 08/08/2016 NIA 10/01/2018 ALTERNATE DATE 03/23/2015 08/22/2016 N/A 10/15/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

12 0

CANDIDATES 0

0 0

0 7

NRC FORM 538 (09*201 I)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 AttachmentS Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply wi1fl this vnillntary infonnation collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This lnfOnnatfon CXlllectlon is used to plan budgets and resources tor operator OPERA TOR LICENSING examnalions. Send comments regilding burden eslimate to the lnfoonalion Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail ro lnlocolects.ReSOU'Ce@m:.gov, and to 111e Desk Officer, Office of tnfonnauon and Regutalary Affairs, NEOS-10202, (3150-0131), Offw;e of Management arid Budget, Washingtoo.

DC 20503.

If a means used to impose an inlonnation collection does not display a currenuy valid OMS control number. lhe NRC may not conduct or sponsor and a person is not required to respond to, the inlonnation collection.

FACILITY jNI<C~EGION LaSalle County Station, Units I and 2 Ill Facility Operating License Nos. NPF-11 and NPF -18 NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 0

7 0

7 OPERATORS NUMBER OF SENIOR REACTOR 0

5 0

5 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

I 0

I OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 10/10/2016 N/A 10115/2018 ALTERNATE DATE NIA 10/17/2016 NIA 10/22/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

12 0

0 0

0 0

0 CANDIDATES NRC FORM 5J6 (09-201 1)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..(1131 EXPIRES: 09/3012014 (09-2011)

Eslinated burden per response Ia comply with this voluntary information collection requnt 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information Cllllec1lon Is used to pta"~ budgab end rtsoun:es ror open~lar OPERATOR LICENSING elllll11inationa, Send comments regarding burden estimate lo lht tnfonnatlon SeMcls Branch (T-5 F53), U.S. Nuclear Reguta101Y CommiSSion, Wuhioglon, DC 205SS.C001, or by inl111181e-EXAMINATION DATA mall to lnfocolects.Resourte@nrc.gav, and to lht Desk Officer, Ollice of lnlonnation and Regulatory Atlah. NEQ8.10202, (3151Hl131), Oftlct of Management and Budgtl, WashingCgn, DC 20503.

ff a means used to lmpose111 informttion colfec:tion does not display a r:unenUy vaUd OMS control numller, tltt NRC may not conduct or sponsor, and a petSOn is not reqund to respond to. !he information codlction, FACIUTY NRCRt:UIUN Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 l

NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

I 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 6

6 0

5 OPERATORS NUMBER OF SENIOR REACTOR 5

4 0

5 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR I

3 0

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 12/07/2015 12/05/2016 N/A 12/03/2018 ALTERNATE DATE 12/14/2015 12/12/2016 N/A 12110/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

13 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (09-201 I)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OM8: NO. 3150-0131 EXPIRES: 011131112014 (08-20111 E&linalad buldan per mplllSII kl COIJ'4lly wilh lhls VIJiunlary lnfamalmn Cllladlon ~

1 hOUr.

11111 ilfcnnltion co11e11on Is used to plan budgets ll1d,_

fer oparalllr OPERATOR LICENSING uarritalolis. Selld COIIIIIIRIB lllgllnlilg bwtlan eslfmala Ia Ill lni11maliln Salvlces l!nlncb (H F53), U.S. NuclearRaguialolyCommialm, Wallilglcn, DC 3:1555-0001, orbyiftlamet e-EXAMINATION DATA mal Ill lnloallects.Ruo~rceC~nrc.gov, and to li1e Oaslt Olbr, Of1lce of lntlnnldon IIUI

~Allah, NEOB-10202, (3150-0131), Ollice of Manlgemanl and Bucfoe~ ~n, OC 20503.

If a 111111111 used lo inpose an lnlarmatlon colledion doea nul dl&play a cwanVy vaolld OMB conflollliiNJar, lhe NRC may nat conduct or ljiOIID', and 1 peraon Ia nat rlqlhd to respond to, tile kmrmation cohc:lion.

FACILITY INRCRI:GIQN Oyster Creek Nuclear Generating Station Region I Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-2 t 9 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

I 0

0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 0

6 0

0 OPERATORS NUMBER OF SENIOR REACTOR 0

4 0

0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 0

2 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS *LIMITED PROPOSED DATES PRIMARY DATE 5/16/2016 ALTERNATE DATE 5/1212016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 538 (08-20111

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 AttachmentS Page 1 of 1 NRCFORM1536 U.S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3110.0131 EXPIRES: OS/301Z014 (09-20111 EsllmllMd burden p!lr response fo c:o~tW wifl this valunlaly lnfol111&tblooifacfan l8qll8SI: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Thls Jnfo11111tton coledlan Is used 1D Pill oodgels and lllsourt:eS tr opalli!Or OPERA TOR LICENSING examfnallons. Send c:ommeniS IIQlldng burden estlmllll to 1118 lnilnn811on Sel'lfcea Blanch (T-5 F53), U.S. Nuclear Regutalory COIIIII!s$1on, WashMgton, DC 205550001, Q( by Internet a-EXAMINATION DATA mall ID lntx:olacls.Rasoun:eQnrt:.gov, il1d 10 Ole Desk Oftlcer, Olllce 01 lnlormallon and Regulalry Alfalrs, NEOB-10202. (3150-0131), O!b of Managemenl end Budget. W~n.

DC 20503.

If a means used to lmpoce illlnfonnatlon eo1ecton dces not cHsplay a currently vald OMB COIWol number, llle NRC may not conduct or sponsar, and I PIIIIOIIIs not requhld 10 respond to, the lnlonnaton c:otlection.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I

Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED I

0 I

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY20I8 NUMBER OF REACTOR 6

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 7

0 7

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3

0 3

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR

  • see LOS
  • see LOS
  • see LOS
  • see LOS OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 03/23/2015 N/A 03/20/2017 N/A ALTERNATE DATE 03/30/2015 NIA 03/27/2013 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 13 0

0 0

0 0

CANDIDATES NRC FORM 538 (08-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Page 1 of 1 NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES: 09/30/2014 (09*2011)

Estimated burden per response to comply with this voluntary information coQection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This infonnatlon collection is used to plan budgets and resources for operator OPERATOR LICENSING examinations. Send comments regarding burden estimate to the lnfonnation Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mall to lnfocOIIects.Resource@nrc.gov, 8l1d to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently vaNd OMB conlroj number, the NRC may not conduct or sponsor. and a pe~on is not required to respond to, the inlonnation collection.

FACILITY NRC REGION Quad Cities Nuclear Power Station. Units I and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 m

NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

I 0

I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 0

3 0

3 OPERATORS NUMBER OF SENIOR REACTOR 0

8 0

8 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 8/1/16 N/A 8/6/18 ALTERNATE DATE N/A 9/6/16 N/A 9/4/18 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF II 0

0 0

0 0

0 0

CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 0 Page 1 of 1 NRCFORM636 U.S. NUCLEAR REGULA TORY COMMISSION APPROVED IllY OMS: NO. 31&0.0131 EXPIRES: 01/30/2014 (Q9.2011)

EsUmaled burden per rasponse ID comply with Ulll voluntary Wonnation c:ollaction request 1 hoilr.

Thil Wonnafon IXIUIIctlon Ia Ultld ID pl!ll budgata tl1d r-far opendor OPERA TOR LICENSING examinations. Sand canmtnlll regarding burden tlti11lle Ia lhe tnfomlaton S81Yfrlea Bnlnch (T-5 F53), U.S. Nude* Reat*1orY Commlalon, Waahlnglon, DC 2055~, or by lnltmtle-EXAMINATION DATA mall to lnfocolecta.ResOUfC8Cimtl.gav, and to U1e Desk Ofllcer, Office of Information and Rag!Uioly Allaia, NEQ8.10202, (3150-0131), Ollica ot Managemllll and Budget. WlslmgiDn, DC 20503.

~ a muns Ull8d to Impose an lnformllion coloclion doea not display a cunenHy valid Of.1B control number, U1e NRC may not concb:t or !pOMOI, and a penon Is not ra<<Jjjrecclo rupond to, the lnilnnllion collldion.

FACILITY fNRC""""...,.

Three Mile Island Nuclear Station, Unit 1 I

Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 I

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS

. PROPOSED-NUMBER CY2015...

CY2016

. CY20l'7

~*..

CY2of8 NUMBER OF REACTOR 4

0 5

0 OPERATORS NUMBER OF SENIOR REACTOR 9

0 10 0

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 1

0 I

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* UMITED PROPOSED DATES PRIMARY DATE 10/12/2015 05/2212017 ALTERNATE DATE 11/09/2015 06/1212017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 IS CANDIDATES NRCFORM538 (09-20111

2016 BYRON STATION INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 January 28, 2015 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS, BYRON STATION, UNITS 1 AND 2

Dear Mr. Hanson:

We have received your corporate letter RS-14-164, dated May 29, 2014, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations." In the letter, you requested an initial operator licensing examinations be scheduled for March 2016, December 2017, and October 2019, at the Byron Station. These dates have changed from your previous submittal in corporate letter RS-13-183 and our NRC response letter dated January 27, 2014.

In response, we have scheduled initial operator licensing examinations for the weeks of:

March 14 and 21, 2016, with an on-site validation date the week of February 15, 2016.

February 5 and 12, 2018, with an on-site validation date the week of January 8, 2018.

October 7 and 14, 2019, with an on-site validation date the week of September 9, 2019.

In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations, unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately.

The examinations have been individually scheduled for two weeks because your letter indicated that there were more than nine applicants being considered for each of these examinations.

Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

In accordance with Title 10 of the Code of Federal Regulations (1 0 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via LISTSER~

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety

In accordance with Title 10 of the Code of Federal Regulations (1 0 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via LISTSERy DISTRIBUTION:

Kimyata MorganButler RidsNrrDorllpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Eric Duncan Allan Barker Carole Ariano Linda Linn DRPIII DRS III Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number ML15030A058 Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety

~ Publicly Available 0 Non-Publicly Available 0 Sensitive

~ Non-Sensitive To receive a copy of this document Indicate In the concurrence box "C" =Copy without attach/encl E" =Copy with attach/encl "N" =No copy OFFICE Rill I

Rill I

Rill I

Rill NAME RKWalton:jw HPeterson DATE 01/23/15 01/28/15 OFFICIAL RECORD COPY I

Exelon Generation, RS-14-164 May 29,2014 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-37 4 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRC Docket Nos. 50-220 and 50-410 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

May 29,2014 U. S. Nuclear Regulatory Commission Page2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 R. E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2014-05, 11Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations,~~ dated April29, 2014 The referenced Regulatory Issue Summary (RIS} requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2016 through 2019, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2016 and 2017. Attachments 1 through 14 provide responses to RIS 2014-05 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

For Limerick Generating Station (LGS) and Peach Bottom Atomic Power Station (PBAPS), the Limited Senior Reactor Operator (LSRO) initial license examination can be a dual-site examination which involves both stations. In lieu of repeating the same information on LGS and PBAPS attachments, the LSRO examination scheduling information is provided on Attachment 7 for LGS. Attachment 11 for PBAPS references Attachment 7 where appropriate. There are no candidates currently expected to take the dual-site LSRO initial license examination for calendar years 2016 through 2019, as indicated on Attachment 7.

May 29,2014 U. S. Nuclear Regulatory Commission Page 3 There are no regulatory commitments contained within this letter. Should you have any questions regarding this letter, please contact Dwi Murray at (630) 657-3695.

Respectfully, v--r~~---------*-**

David M. Gullatt Manager-Licensing Exelon Generation Company, LLC cc:

Regional Administrator-NRC Region I Regional Administrator-NRC Region Ill - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Calvert Cliffs Nuclear Power Station - Completed NRC Form 536 for Clinton Power Station -*completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Nine Mile Point Nuclear Station - Unit 1 - Completed NRC Form 536 for Nine Mile Point Nuclear Station - Unit 2 0 -Completed NRC Form 536 for Oyster Creek Nuclear Generating Station 1 -Completed NRC Form 536 for Peach Bottom Atomic Power Station 2-Completed NRC Form 536 for Quad Cities Nuclear Power Station 3-Completed NRC Form 536 for R.E. Ginna Nuclear Power Plant 4-Completed NRC Form 536 for Three Mile Island Nuclear Station

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary Information coUection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information collection is used to plan budgets and resources for operator OPERATOR LICENSING examinations: Send comments regarding burden estimate to the Information Services Branch

{T-5 F53), U.S. Nuclear Regulatory Commission, Weshing!Dn, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov. and lo the Desk Officer. Office of Information and Regula\\ol'f Affaifi, NEOB-10202, {3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a curranUy valid OMB control number, the NRC mev not conduct or sponsor. and a pefion Is not required to respond to. the information collection.

FACILITY

'NRC REGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY20l9 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 8

0 10 0

OPERATORS NUMBER OF SENIOR REACTOR 8

0 8

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS - LIMITED PROPOSED DATES PRIMARY DATE 9/5/2016 N/A 5/14/2018 N/A ALTERNATE DATE 9/12/2016 N/A 5/21/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 20 0

0 0

CANDIDATES NRC FORM 536 (00.2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160.0131 EXPIRES: 09/30/2014 (09-2011)

EsUmated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection Is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T*5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet a-EXAMINATION DATA mall to lnfocohects.Resourca@nrc.gov, and to the Desk Officer, Office of lnfollllatlon and Regulatory Affairs, NEOB-10202, (315().0131), Office of Management and Budget, Washington, DC 20503.

If a means used to Impose an information colection does not display a currentiy valid OMB control number, !he NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.

FACILITY NRC KEGION Byron Station, Units 1 and 2 III Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 6

8 0

7 OPERATORS NUMBER OF SENIOR REACTOR 6

7 0

7 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 03/14/2016 12/ll/20 17 N/A 10/06/2019 ALTERNATE DATE 03/21/2016 12/18/2017 N/A 10/20/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

15 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014~05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 011/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary infonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This lnfonnation collection is used to plan budgets and resources for aperator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the lnfonnaUon Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mall to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of lnfonnatlon and Regulatory Affairs, NEOB-10202, (315().0131), Office of Management and Budge~ Washington, DC 20503.

If a means used to impose an ilfonnation colection does not display a currentiy valid OMS control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the lnfonnation collection.

FACILITY tNK<.;Rt:GON Calvert Cliffs Nuclear Power Plant, Units 1 and 2 I

Renewed Facility Operating License Nos. DPR~53 and DPR-69 NRC Docket Nos. 50~317 and 50~318 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 5

0 5

0 OPERATORS NUMBER OF SENIOR REACTOR 6

0 6

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3

0 3

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 08/08/2016 NIA 08/06/2018 N/A ALTERNATE DATE 09/12/2016 N/A 09/10/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

CANDIDATES 11 0

0 0

0 NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRCFORM636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 8160*0131 EXPIRES: 0913012014 (09-2011)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coiection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocoHects.Resource@nrc.gov, and to the Desk Officer, Office of lnfonnatlon and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washington, DC 20503.

If a means used to impose an fnfonnation coOection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a pernon is not required to respond to, the lnfonnation collection.

FACILITY JNRCRtGION Clinton Power Station, Unit 1 III Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 4

0 4

0 OPERATORS NUMBER OF SENIOR REACTOR 6

0 6

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/10/2016 N/A 10/22/2018 N/A ALTERNATE DATE 10/17/2016 N/A 10/29/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 10 0

CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09130/2014 (09-2011)

Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information coHection Is used to plan budgets and re$0urces for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information SeiVIces Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mail to lnfoooNects.Resouroe@nrc.gov, and to the Desk Officer, OffiCe of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Menegement and Budget Washington, DC 20503.

~ a means used to Impose an Information ooKection does not display a currently valid OMB conl!ol number, the NRC mey not condUct or sponsor, and a person Is not required to respond to, the Information collection.

FACIUTY NR'-' REGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0

2 0

3 OPERATORS NUMBER OF SENIOR REACTOR 8

10 0

6 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/08/2016 08/28/2017 N/A 03/25/2019 ALTERNATE DATE 08/15/2016 08/21/2017 N/A 04/01/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 0

0 0

0 0

9 0

CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014~05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09*2011)

Estimated burden per response to comply with this voluntary lnf01111ation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coHection Is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53). U.S. Nuclear Regulatory Commission, Washington, DC 2055>0001, or by internet e*

EXAMINATION DATA mall to lnfocollects.Resource@nrc.gov. and to the Desk Officer, Office of Information and Regulatory Affairs. NEOB-10202. {3150-0131), Office of Management and Budget. Washington, DC 20503.

If a means used to impose an information colaction does not display a currentiy valid OMB control number,lhe NRC may not conduct or sponsor, and a person Is not required to respond to, the Information coHection.

FACIUlY Nt<Ct<EGIUN LaSalle County Station, Units 1 and 2 III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 10 0

10 0

OPERATORS NUMBER OF SENIOR REACTOR 9

0 9

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR l

0 1

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/17/2016 N/A 10/15/2018 N/A ALTERNATE DATE 10/24/2016 N/A 10/22/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

19 0

0 CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with !his voluntary Information ooHection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information coiection Is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send commenm regarding burden estimate to the lnfonnetion Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA maU to lnfooollects.Resource@nrc.gov, and to !he Desk Officer, OffiCe of Information and Regulatory Affairs, NEOB-10202, (315~131), Oflice of Management and Budge~ Washington, DC 20503.

If a means used to impose an Information oolection does not display a currently vaHd OMS oonkot number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information ooHection.

FACILITY

'NRC REGION Limerick Generating Station, Units I and 2 I

Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 I

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 8

7 8

6 OPERATORS NUMBER OF SENIOR REACTOR 5

5 5

5 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1

2 2

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 01118/2016 02/06/2017 02/05/2018 02/04/2019 ALTERNATE DATE 01125/2016 02/13/2017 02/12/2018 02111/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 13 0

0 0

11 0

CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160..()131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply wi1h this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coKaction is usad to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), u.s. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internal e-EXAMINATION DATA mall to lnfocollects.Resource@nro.gov, and to the Desk Otrrcer, Office of Information and Regulatory Affairs, NE0£3..10202, (315().0131), Office of Management and Budge~ Washington, DC 20503.

If a means used to impose an information colection does not display a currenUy vaDd OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Nine Mile Point Nuclear Station, Unit I I

Renewed Facility Operating License No. DPR-63 NRC Docket No. 50-220 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0

8 0

8 OPERATORS NUMBER OF SENIOR REACTOR 0

10 0

10 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE N/A 03/06/2017 NIA 03/04/2019 ALTERNATE DATE N/A 03/13/2017 N/A 03/11/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 18 0

CANDIDATES NRC FORM 536 (09-2011}

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection Is used to plan budgets and resources lor operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to tnlocollects.Resource@nro.gov, and to the Desk Officer, OffiCe of Information and Regulatory Affairs, NEOB-10202, (315(}0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currenUy valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.

FACILITY NRC REGION Nine Mile Point Nuclear Station, Unit 2 I

Renewed Facility Operating License No. NPF-69 NRC Docket No. 50-410 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0

0 8

0 OPERATORS NUMBER OF SENIOR REACTOR 0

0 10 0

OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A NIA 03/05/2018 N/A ALTERNATE DATE N/A N/A 03/12/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 18 0

0 0

0 0

CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 0 Page 1 of 1 NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary information coHection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information coVection Is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mail to lnfocollects.Resourca@nrc.gov, and to the Desk Olf~eer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washington, DC 20503.

ff a means used to Impose an inlormation colection does not display a currently vaNd OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.

FACILITY INRCRE.GION Oyster Creek Nuclear Generating Station I

Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED I

0 0

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 5

0 0

0 OPERATORS NUMBER OF SENIOR REACTOR 8

0 0

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 5

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 02/01/2016 N/A N/A N/A ALTERNATE DATE 02/08/2016 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 1 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coHection Is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mall to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, {3150-0131 ), Office of Management and Budge~ Washington, DC 20503.

If a means used to Impose an information colection does not display a currantiy vaHd OMB control number, the NRC may not conduct or sponsor, and a person Is not requlrod to respond to, the Information collection.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I

Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0

6 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

7 0

7 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

3 0

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR

  • see LGS OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 03/20/2017 N/A 03/25/2019 ALTERNATE DATE N/A 03/27/2017 N/A 04/01/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 13 0

CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 2 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGUL.A TORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09-2011)

Esllmated burden per response lo comply wilh this volunlary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coNection is used lo plan budgels and resources for operator OPERA TOR LICENSING examinations. Send commen1S regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mail to lnfocollecls.Resource@nrc.gov, end to lhe Desk OffiCer, Office of Information and Regulatory Affan, NEOB-10202, (3150-0131), Office of Managemantand Budget Washington, DC 20503.

If a means used to Impose an Information colection does not display a currentiy valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, lha Information coUection.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units I and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Dockets Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY20I9 ESTIMATED NUMBER OF LICENSEE-PREPARED I

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 3

0 4

0 OPERATORS NUMBER OF SENIOR REACTOR 7

0 8

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 04/25/2016 N/A 08/20/2018 N/A ALTERNATE DATE 08/0l/2016 N/A 09/17/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 12 0

0 0

CANDIDATES NRCfORM536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 3 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09*2011)

Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information colaction Is used to plan budge1s and resouroes for operator OPERA TOR LICENSING examlnallons. Send commen1s regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to lha Desk Officer, Olllce of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Mansgement and 8udga~ Washington, DC 20503.

If a means used to Impose an information colection does not display a correnUy valid OM8 control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACILITY NRC REGION R. E. Ginna Nuclear Power Plant I

Renewed Facility Operating License No. DPR-I 8 NRC Docket No. 50-244 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 10 0

8 0

OPERATORS NUMBER OF SENIOR REACTOR 1

0 3

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3

0 3

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/05/2016 NIA 12/03/2018 N/A ALTERNATE DATE 12/12/2016 N/A 12/10/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

II 0

0 CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 4 Page 1 of 1 NRCFORM636 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09*2011)

Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information collection Is used to plan budgets and resouroes for operator OPERA TOR LICENSING examinations. Send commen1S regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mall to lnfocollects.Resource@nrc.gov, and to tha Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (315!Hl131), Office of Management end Budget Washington, DC 20503.

If a means used to impose an information colecUon does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACILITY NRC REGION Three Mile Island Nuclear Station, Unit I I

Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

9 0

12 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0

3 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

5 0

5 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

1 0

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE N/A 09/25/2017 N/A 09/23/2019 ALTERNATE DATE N/A 10/02/2017 N/A 09/30/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

8 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (09-2011)

Mr. Michael J. Pacilio UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 27, 2014 Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

BYRON STATION, UNITS 1 AND 2

Dear Mr. Pacilio:

We have received your corporate letters RS-12-114, dated July 5, 2012, and RS-13-183 dated July 8, 2013. In these letters, you requested that initial operator licensing examinations be scheduled at the Byron Station in August 2015, March 2016, August 2017, and December 2018.

We recognize that letter RS-13-183 had deleted the previously requested exam scheduled in August 2015 at the Byron Station. In response, we have scheduled the following initial license exams for the Byron Station:

Weeks of March 28 and April 4, 2016, with an onsite validation date of March 7, 2016; Weeks of August 14 and 21, 2017, with an onsite validation date of July 24, 2017; and Weeks of December 3 and 10, 2018, with an onsite validation date of November 12, 2018.

We note that you were previously scheduled for an initial operator licensing exam the weeks of June 2 and 9, 2014, with an onsite validation date of May 12, 2014. This exam date has not changed. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via ListServ' Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via ListServ' DISTRIBUTION:

Ernesto Quinones RidsNrrDorllpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRS III Tammy Tomczak Patricia Buckley John McHale Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: Ltr 012714 Byron Confirmation of Initial OL Exam.docx

~ Publicly Available D Non-Publicly Available D Sensitive

~ Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

====r====r=========r==r===========~

OFFICE Rill I

Rill Rill Rill NAME RKWalton:bl HPeterson 01/27/14 ----+-------+--------1!

~====~==============~~O~F~F~IC~IA~L~R~E~C~O~R~D~C~O~P~Y========~==========~

DATE 01/22/14

=~

Exelon Generation,,.

4300 Winfie!d Road W<H'rPIW<I!e IL 60555 630 657 2000 Offrce RS-12-114 July 5, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-37 4 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

July 5, 2012 U. S. Nuclear Regulatory Commission Page2

Subject:

Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," dated June 8, 2012 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2014 through 2017, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2014 and 2015. Attachments 1 through 11 provide responses to RIS 2012-07 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2016, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 7. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 7 for LGS. Attachment 9 for PBAPS references Attachment 7 where appropriate.

There are no regulatory commitments contained within this letter. Shouid you have any questions regarding this letter, please contact Dwi Murray at (630) 657-3695.

~*

~vidM.G~

Manager-Licensing Exelon Generation Company, LLC - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - IL T - Completed NRC Form 536 for Limerick Generating Station-LSRO - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station 0 - Completed NRC Form 536 for Quad Cities Nuclear Power Station 1 - Completed NRC Form 536 for Three Mile Island Nuclear Station

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150..0131 EXPIRES: 09/30/2014 (9-2011)

Estimated bulden per response to eomply with this voluntary InfOrmation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Thia lnformaUon coVection Is used to plan budgets and mources for operalor OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Brandl (T*5 F53), U.S. Nuclear Regulatory Commlaion, Washington, DC 20555-0001, or by lntamet e-EXAMINATION DATA mall 10 lnlocdlecls.Resource@rtc.gov, and to 1he Desk Officer, omce af Information and Regulatory Affairs, NEOB-10202. (315fl.0131), Office or Management and Budge~ Washington, DC 20503.

II a means used to impou an infonnation cdlection does not display a oorranlly valid OMB control number, the NRC may not conduct or sponsor, and a person il not raqulll!d !D respond lo, the infonnation collection.

FACILITY NRC REGIOIII Braidwood Station, Units l and 2 Facility Operating License Nos. NPF-72 and NPF-77 III NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

l 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 0

6 6

0 OPERATORS NUMBER OF SENIOR REACTOR 0

10 6

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 01/05/2015 11/07/2016 N/A ALTERNATE DATE N/A 01/26/2015 10/24/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

CANDIDATES 0

0 12 0

0 NRC FORM 538 (g.2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM53t U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150..0131 EXPIRES: 09130/2014 (9*2011)

Estimated burden per response to ccmply with lhill voluntary Information IXIHedion request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This infannation tolfadlon Is used to plan budgell and resouttel for opetatcr OPERA TOR LICENSING examinations. Send comments regarding burden estimale to the lnformalion Se!Vices Br.tnc:h (T-5 F53), U.S. Nuclear Regulatory Comtriukln, Washinglon, IX: 20555-0001, or by internet e-EXAMINATION DATA mal to lnfocallecls.Rasourca@nn:.gov, and to the Desk Ofltoar. Oflioa of Information and R!l{jUalory Allalr&, NEOB-10202, (315D-0131), Offtoa of Management and Budge~ Wasl'inglon, DC 20503.

If a means used 10 impose an infonnation colleelion does not display a currently valid OMS control number, lhe NRC may not conduct or sponsor, and a person ia not required 10 ntspond to, the information colledlm.

FACILITY NRCRI:GION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 Ill NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

I EXAMINATIONS ESTIMATED NUMBER OF NRC. PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 6

4 0

8 OPERATORS NUMBER OF SENIOR REACTOR 9

7 0

7 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR l

l 0

I OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS

  • UMITED PROPOSED DATES PRIMARY OATE 06/02/14-06/13/14 08/17/15-08/28/15 N/A 06/19/17- 06/30/17 ALTERNATE DATE 06/16/14- 06/27/14 08/31115 - 09/11/15 N/A 07/03/17- 07/!4/17 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF II 0

0 CANDIDATES 0

0 0

0 15 NRCFORM536 (9*20111

Exelon Generation Company,LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 0913012014 (9-2011)

EsUmaled burden per responae to comply wilh lhis vokmtary lnlonnalion collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information c::ollectlon Is used to plan budgels and I'8SOUI'CIIS lor oparator OPERA TOR LICENSING examlnaUons. Send c::ommenls regarding bunlen asUmale to !he lnformallon S81Vices 6ranch (T-5 F53), U.S. Nuclear Regulalory Commission, Washington, DC 20555-0001, or by lnlsmet e-EXAMINATION DATA mal to lnroc::otleets.Rescurce@nrc.gov, an:l to lhe Desk Officer, Office or Information and Regullllory Affairs, NEOS-10202, (3150.()131), Office of Management and Budget. Washington, DC 20503.

If a means used to impose illl lnfonneUon coll1ctlon does not display 1 currandy valkl OMB c::ontrol number, the NRC may not conduct or sponsor, and a person is not required 1o re$1lorrllo, !he Information c::olectlon.

FACIUTY iNRCREGION Clinton Power Station Facility Operating License No. NPF-62 III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY201S CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 0

4 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

6 0

6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

4 0

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 03/16/2015 N/A 02/21/2017 ALTERNATE DATE N/A 03/23/2015 N/A 02/27/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBEB DECEMBER MARCH JUNE SEPTEMBEI' DECEMBER ESTIMATED NUMBER OF 10 0

0 0

0 0

0 12 CANDIDATES NRC FORM 536 (9-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (9-2011)

Estimated butden per response lO comply willt this volunlaly infomlatlon collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coHecticn Is used to plan budgets and resources ror operator OPERATOR LICENSING eiCllmlnaUons. Send comments regarding burden estimate lO lha Information SIMces Branch (T-5 F53), U.S. Nuclear RIIQUalcry Commission, Washington, DC 20555-0001, ot ~Internet e-EXAMINATION DATA mail to lnfocoHecls.Resourte@nrc.gov, end to the Desk Clfflalr, Office at lnfonnation and Regullllory Alfalr&, NEOB-10202, (3150.0131), Ol!ice of Management and Budget, Washington, DC 20503.

If a means used Ia Impose an lnfonnalian collection does not display a cunenUy vald OMB control number, lhe NRC may not conduct or spomor, and

  • pman is not required 1o respond to, lhe information colectian.

FACILITY NKCKEU!ON Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 III NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 l

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 0

6 4

0 OPERATORS NUMBER OF SENIOR REACTOR 0

5 7

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

l 1

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE NIA 03/02/2015 08/08/2016 N/A ALTERNATE DATE N/A 03/23/2015 08/22/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

12 0

0 CANDIDATES NRC FORM 536 (9*2011)

Exelon Generation Company. LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BYOMB: NO. 3150.0131 EXPIRES: 091301201" (9-2011)

Estimated burden per response to comply wMh lhis voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This infonnation coUec:tton is used to plan budgets and resources for cpe;ator OPERA TOR LICENSING examinations. Send comments regardng burden estimate to lhe lnfonnatlon SeJVices Branch (T*5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet a-EXAMINATION DATA mail to lnfocollec:ts.RilSWCS@nrc.gov, and to the Desk Officer, Oftlce o1 Information and Regulatory Alflll111, NEOB-10202, (3150.{1131), Ollice of Management and Budget WaShington, DC 20503.

II a means u&&d to impose an infolmllllon caleellon does nat display 11 c:ummUy valid OMB control number, lhe NRC may not conr:luct or sponsor, and a parson is not required to respond lo. lhe Information collection.

FACILITY M<t; Kt:.GION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 m

NRC Docket Nos. STN 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 5

0 7

0 OPERATORS NUMBER OF SENIOR REACTOR 4

0 5

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3

0 l

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/14/2014 NIA 10/11/2016 NIA ALTERNATE DATE 10/20/2014 N/A 10/17/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

13 0

0 CANDIDATES NRC FORM 536 i9*2011 J

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Attacnment o Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 0113012014 19-2011)

Estimated burden per response to compfy with this voluntary lnf011118tion collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection Is used to plan budgets and resources for operelcr OPERATOR LICENSING tllllminations. Send comments regarding burden estimate to the Wormation Services Branch (1'-5 F53), U.S. Nuclear Regulalcly Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfacoKects.Resource@nrc.gov, am to H\\11 Detk Officer, Otlic:e of Information and Regulatory Affairs, NEOB-10202, (3150.0131), Ofllce of Management and Budget, Wuhington, DC 20503.

If a means used to impose an information colection does not display a currenUy vald OM8 cantrot number, the NRC may not conduct or sponsor, and a ptnon is not required to mpond to, lhelnfcnnation colection.

FACILITY NRCRI:GION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I

NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 6

0 8

0 OPERATORS NUMBER OF SENIOR REACTOR 10 0

6 0

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 4

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 10/06/2014 N/A 10/03/2016 N/A ALTERNATE DATE 10/14/2014 N/A 10/11/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

14 0

0 CANDIDATES NRC FORM 536 (9-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 09/30/2014 (9*2011)

Estimated burden per mponse to comply with this voluntary lnfonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This 1nrormalion collection Is used to plan budgets and resources for operator OPERATOR LICENSING examinations. Send comments regarding burden estimate to lhe Information S&M:es Branch (T-5 F53), U.S. Nuclear Regulaloly Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mal to lnfocollacts.R8SOU!Ce@m:.gov, and lo lhe Desk Officer, Office d Information and Regulaklly Affairs, NEOB*10202, (3150.0131), Offtal of Management and Budge~ Washington, DC 20503.

lr a mean$ used lo impose an lnlormallon collection does not display 1 CU!Tindy vUd OMS control number, lhe NRC may not conduct or aponaor, and a person is nol required 1o respond to.lhe lntonnatloo collection.

FACILilY JNRCREGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I

NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE*PREPARED 0

0 l

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 0

0 0

0 OPERATORS NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 6

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A NIA 07/18/2016 N/A ALTERNATE DATE N/A N/A 07/25/2016 NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBEJ; DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (9*20111

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Anacnmem~

Page 1 of 1 NRC FORM 53&

U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..C131 EXPIRES: 0913012014

{9-2011)

Esllmated burden per response to COI'f'4lly with this volootaty Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This inlonnatian collll:lon is used lo Jian budgets and reSDUn:es lor operator OPERATOR LICENSING examinations. Send comments regarding burden eslimale to the lnronnatian Sl!l'11ices Branch (T-5 F53), U.S. Nuclear Ragulalo!y Commission, Washington. OC 20555-0001, or by Internet e-EXAMINATION DATA maR lo lnfocolecfs.Resoun:e@nre.gov, and lo the Desk Ollicer, Office ri klformation and Regulatory Affairs. NEOB-10202, (3150-ll131), Ollice of Management and Budoe~ WasNngton, DC 20503.

If a means used to impose an Information collecUon daft not display a cun-enUy veld OMB control number, the NRC may not conduct or sponsor, and a p8!SD11 is not reqUired to respond to, the information colecticn.

FACILITY jNf<<; RI::GION Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 I

NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2(ll7 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 0

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 4

0 0

0 OPERATORS NUMBER OF SENIOR REACTOR 2

0 0

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 05/19/2014 N/A N/A N/A ALTERNATE DATE 06/02/2014 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (g.201t)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 09/30/2014 (9*2011)

EsUmated burden per response to comply with fhil voklntary infonnatlon collecUan request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information collection is used to pl1111 budgets and resources lor operator OPERATOR LICENSING examinations. S1111d comments regatdlng burden estimate to lhe lnlonnallon Services Branch (H F53~ U.S. Nuclear RlglAatay Commission, Wuhlngtan, DC 205Sfr0001, or by internet e-EXAMINATION DATA mal lo lnfoccleds.Resource@nro.gov, and to lhe Desk Officer, Ollice rt lnformadan and R~atoly Mails, NEOB-10202. (3150.0131), Offtce of Management and Budget, Washington, DC 20503.

If a 111811 used tD Impose an inlormiillon co1tect1on does not display a cummuy vllid OMB control number, the NRC may not conduct or sponsor, and a pereon is not ntqUilad to respond lo,lhe ir1formRon colecllon.

FACILITY NRCHt:l:iiUI'I Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 I

NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY 2016 CY2017 NUMBER OF REACTOR 0

6 0

3 OPERATORS NUMBER OF SENIOR REACTOR 0

3 0

5 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

2 0

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR

  • See LOS OPERA TORS
  • LIMITED PROPOSED DATES PRIMARY DATE NIA 03/23/2015 NIA 03/20/2017 ALTERNATE DATE N/A 03/30/2015 NIA 03/27/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION {GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBEfi DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 8

0 CANDIDATES NRC FORM 538 (11-2011 I

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 0 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 09/30/2014 (9-2011)

Eslinaled burden per response lo comply with lhts voluntary irlormation collection request 1 htu.

This information collection is used to plan budgets and I'ISCIUit8S for cpel'liiDr OPERA TOR LICENSING examinations. Send comments regarding burden estimate 10 the information Services Branch

{T*5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet

  • EXAMINATION DATA mail to infocoliecls.Resource@nrc.gav, and to the Desll Officer, Office of Information and Regulatory Mairs. NEQB.10202, (3150.0131), Office of Managemenl and Budge~ Washinglon, DC 20503.

If a means used lo implll8 1n lnfOrtnltion coledion does not display a ourrentty vaid OMS conlroii'Mllber, the NRC may not conduct or spon&Ol', and a person is not requlled to respond to, the rnrormauon collection.

FACIUTY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 III NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 I

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 5

0 5

0 OPERATORS NUMBER OF SENIOR REACTOR 5

0 5

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS-LIMITED PROPOSED DATES PRIMARY DATE 04/21/2014 N/A 04/25/2016 N/A ALTERNATE DATE 05/19/2014 N/A 05/23/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

CANDIDATES 10 0

0 0

0 NRC FORM 536 (9*2011 I

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 1 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 09/30/2014 (9*2011)

Estimated burden per response to comply will this voluntary infomtalion collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information coUeetion is used to plan budgets and resourcea lor operator OPERATOR LICENSING examinations. Send comments regarding burden eslimate to the lnfonnation Services Brandl (T-5 F53), u.s. Nuclear Reg~a!oly Commission, Washington, DC 20555-0001, orbyintamet e-EXAMINATION DATA mail to lnfocollects.Resoun:e@m:.~v. and lo the Desk Offioer, Office of lnfonnalion and RegulatofY Allalrs, NEOB-10202. (3150..()131), Office of Management and Budget, Washington, DC 20503.

If a means used to in11oae an ln!ormation ~on does not display a currenUy vliid OM8 cootrol number, the NRC may not conduct or sponsor, and a p111on is not raquired to respond to, the Information coMedian.

FACIUTY NKCKt:UIUN Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 I

NRC Docket No. 50~289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMA TEO NUMBER OF LICENSEE-PREPARED 1

l 0

1 EXAMINATIONS ESTIMA TEO NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 4

4 0

5 OPERATORS NUMBER OF SENIOR REACTOR 8

9 0

10 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

1 0

1 OPERATORS~UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 02/10/2014 08/17/2015 NIA 08/21/2017 ALTERNATE DATE 04/07/2014 09/14/2015 N/A 09/11/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 0

0 0

0 0

0 0

CANDIDATES NRC FORM 536 (9-20111

Exelon Generation 4300 Wtnfie!d Road Warrenville, IL 60555 630 657 2000 Office RS-13-183 July 8, 2013 U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

July 8, 2013 U. S. Nuclear Regulatory Commission Page2

Subject:

Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2013-06, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2013-06, "Preparation and Scheduling of Operator Licensing Examinations," dated June 7, 2013 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2015 through 2018, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2015 and 2016. Attachments 1 through 10 provide responses to RIS 2013-06 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

For the Limerick Generating Station (LGS) and the Peach Bottom Atomic Power Station (PBAPS), the Limited Senior Reactor Operator (LSRO) initial license examination can be a dual-site examination. Rather than repeat the same information on both attachments, the examination scheduling information is provided on Attachment 6 for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate. There are no candidates currently expected to take the dual-site LSRO initial license examination for calendar years 2015 through 2018, as indicated on Attachment 6.

There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Richard W. Mcintosh at (630) 657-2816.

Respectfully,

/:;;¥~

David M. Gullatt Manager - Licensing Exelon Generation Company, LLC - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station cc:

Regional Administrator-NRC Region I Regional Administrator-NRC Region Ill

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch

{T-5 F53), U.S. Nudear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mall to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to Impose an information collection does not display a currenUy valid OMB conlrol number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Braidwood Station, Units 1 and 2 Ill Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 0

9 0

9 OPERATORS NUMBER OF SENIOR REACTOR 0

11 0

8 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 08/29/2016 N/A 05/14/2018 ALTERNATE DATE N/A 09112/2016 N/A 05/29/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

20 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 0913012014 (09-2011)

Estimated burden per response to comply with this voluniEI)' irformalion colleclion request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This irformalion collection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations Serd commenls regardi'1J burden estimate to the Information Serv~es Branch (f-5 F53), U.S. Nuclear Regulalory Commission, Washington, DC 205ffi-00l1, or by ir1emel e-EXAMINATION DATA mail lo lnfocdlects.Resource@ITc.gov, and Ia the Desk Officer, Office of Information and Regulatory Affars, NEOB-*10202, (3150-0131), Office of Management and ButtJet, Washington, DC 20503.

If a means used Ia impose an irformalion collection does not display a currently valid OMB control number, the NRC may not conduct or sponsCf, and a person is not requ1red to respond to, the information collection.

FACILITY IN~\\,; ~I:<.;IUN Byron Station, Units I and 2 Facility Operating License Nos. NPF-37 and NPF-66 ill NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 0

5 8

7 OPERATORS NUMBER OF SENIOR REACTOR 0

7 7

8 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

1 1

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 03/28/16- 04/01/16 08/14/17- 08/18/17 12/03/18-12/07/18 ALTERNATE DATE N/A 04/04/16 - 04/08/16 08/21117 - 08/25/17 12/10/18-14/18 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION {GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Page 1 of 1 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OIIIB: NO. 31110.0131 EXPIRES: 09/3112014 (09-2011)

Eslimaled burden per f8IIJOOS8 lo ~ly 'Mti ll'is QrUry lnbmalim callec1ioJn teqUest 1 haUl.

Thill mmatlcn t'OIIedloo Ia Uled b plln llUdgeCs ard resou~a~~ for operat1:1r OPERATOR LICENSING llXBITlllalim. Send aJ111111erfl reganing burtJen estiln to f1e lnlornwlioo Slntces Blmd1 (T-5F53~ u.s.~~

Commission, Washingbl. DC 2055$0001, orbykltamete-EXAMINATION DATA mai kl lnfoaileds.R8IOII'QI@on:.QOY, IOd to Ilia Desk Ofbr, Oftlco of 1n1cnna11cn IOd RegWalory Mairs, Neal-10202, (3150-0131), Oftlco of ManagemerUnd Budget, Wlllllinglon, DC 20503.

If a means used 10 Impose an inl:fmatiln CQIIecfon does not lk!*IY 1 CUlTIII'I8y vald OMII oontrcl number, 1lte NRC may not conduc:l or sponsor,aod a peqon Is not r;quirud 1o relllOOd lo, 11te lnlormatloo colecllon.

FACli.ITY

'NRC REGION Clinton Power Station, Unit I Facility Operating License No. NPF-62 lli NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 4

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 6

0 6

0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 4

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED OATES PRIMARY DATE 03/16/2015 N/A 02/2112017 N/A ALTERNATE DATE 03/23/2015 N/A 02/27/2017 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

12 0

0 0

0 CANDIDATES NRC FORM 536 (09-2011}

Exelon Generation Company, LLC Response to Regulatory Issue Summery 2013-06 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 09/30/2014 (09*2011)

Estinaled burden per response to ccmply with this vcf\\Jntary infll!mation calection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This tnronnation coleclon Is used to plan budgets and resources far aperalllr OPERA TOR LICENSING examinations. Send OOIIUlllnls regarding bunltn estimate to the tnformaUan Services Branch

{T*S F53), U.S. Nudear Regutaloly COIT1ITilnion, Washington, DC 20555.0001, or by internet e-EXAMINATION DATA mal to tnfocolects.Resoun:e@nrc.gov, and to the Desk Officer, Office of lnfonnation and Regulatory Affairs, NEOB-10202, (315CJ.0131), Office of Management and Budge~ Washtngkln.

DC 20503.

W a meane used to imposa an Information colection doas nat display a currently vald OMB control rrumber, the NRC may not COilduct or sponsor, and a person is not required to re1111ond to. the information colecticln.

FACILITY

,NK<;KJ::GIUN Dresden Nuclear Power Station, Units 2 and 3 Ill Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 6

4 0

4 OPERATORS NUMBER OF SENIOR REACTOR 5

7 0

3 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 1

1 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 03/02/2015 08/08/2016 NIA 10/01/2018 ALTERNATE DATE 03/23/2015 08/22/2016 N/A 10/15/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

12 0

CANDIDATES 0

0 0

0 7

NRC FORM 538 (09*201 I)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 AttachmentS Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply wi1fl this vnillntary infonnation collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This lnfOnnatfon CXlllectlon is used to plan budgets and resources tor operator OPERA TOR LICENSING examnalions. Send comments regilding burden eslimate to the lnfoonalion Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail ro lnlocolects.ReSOU'Ce@m:.gov, and to 111e Desk Officer, Office of tnfonnauon and Regutalary Affairs, NEOS-10202, (3150-0131), Offw;e of Management arid Budget, Washingtoo.

DC 20503.

If a means used to impose an inlonnation collection does not display a currenuy valid OMS control number. lhe NRC may not conduct or sponsor and a person is not required to respond to, the inlonnation collection.

FACILITY jNI<C~EGION LaSalle County Station, Units I and 2 Ill Facility Operating License Nos. NPF-11 and NPF -18 NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 0

7 0

7 OPERATORS NUMBER OF SENIOR REACTOR 0

5 0

5 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

I 0

I OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 10/10/2016 N/A 10115/2018 ALTERNATE DATE NIA 10/17/2016 NIA 10/22/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

12 0

0 0

0 0

0 CANDIDATES NRC FORM 5J6 (09-201 1)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..(1131 EXPIRES: 09/3012014 (09-2011)

Eslinated burden per response Ia comply with this voluntary information collection requnt 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information Cllllec1lon Is used to pta"~ budgab end rtsoun:es ror open~lar OPERATOR LICENSING elllll11inationa, Send comments regarding burden estimate lo lht tnfonnatlon SeMcls Branch (T-5 F53), U.S. Nuclear Reguta101Y CommiSSion, Wuhioglon, DC 205SS.C001, or by inl111181e-EXAMINATION DATA mall to lnfocolects.Resourte@nrc.gav, and to lht Desk Officer, Ollice of lnlonnation and Regulatory Atlah. NEQ8.10202, (3151Hl131), Oftlct of Management and Budgtl, WashingCgn, DC 20503.

ff a means used to lmpose111 informttion colfec:tion does not display a r:unenUy vaUd OMS control numller, tltt NRC may not conduct or sponsor, and a petSOn is not reqund to respond to. !he information codlction, FACIUTY NRCRt:UIUN Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 l

NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

I 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 6

6 0

5 OPERATORS NUMBER OF SENIOR REACTOR 5

4 0

5 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR I

3 0

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 12/07/2015 12/05/2016 N/A 12/03/2018 ALTERNATE DATE 12/14/2015 12/12/2016 N/A 12110/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

13 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (09-201 I)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OM8: NO. 3150-0131 EXPIRES: 011131112014 (08-20111 E&linalad buldan per mplllSII kl COIJ'4lly wilh lhls VIJiunlary lnfamalmn Cllladlon ~

1 hOUr.

11111 ilfcnnltion co11e11on Is used to plan budgets ll1d,_

fer oparalllr OPERATOR LICENSING uarritalolis. Selld COIIIIIIRIB lllgllnlilg bwtlan eslfmala Ia Ill lni11maliln Salvlces l!nlncb (H F53), U.S. NuclearRaguialolyCommialm, Wallilglcn, DC 3:1555-0001, orbyiftlamet e-EXAMINATION DATA mal Ill lnloallects.Ruo~rceC~nrc.gov, and to li1e Oaslt Olbr, Of1lce of lntlnnldon IIUI

~Allah, NEOB-10202, (3150-0131), Ollice of Manlgemanl and Bucfoe~ ~n, OC 20503.

If a 111111111 used lo inpose an lnlarmatlon colledion doea nul dl&play a cwanVy vaolld OMB conflollliiNJar, lhe NRC may nat conduct or ljiOIID', and 1 peraon Ia nat rlqlhd to respond to, tile kmrmation cohc:lion.

FACILITY INRCRI:GIQN Oyster Creek Nuclear Generating Station Region I Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-2 t 9 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

I 0

0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 0

6 0

0 OPERATORS NUMBER OF SENIOR REACTOR 0

4 0

0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 0

2 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS *LIMITED PROPOSED DATES PRIMARY DATE 5/16/2016 ALTERNATE DATE 5/1212016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 538 (08-20111

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 AttachmentS Page 1 of 1 NRCFORM1536 U.S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3110.0131 EXPIRES: OS/301Z014 (09-20111 EsllmllMd burden p!lr response fo c:o~tW wifl this valunlaly lnfol111&tblooifacfan l8qll8SI: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Thls Jnfo11111tton coledlan Is used 1D Pill oodgels and lllsourt:eS tr opalli!Or OPERA TOR LICENSING examfnallons. Send c:ommeniS IIQlldng burden estlmllll to 1118 lnilnn811on Sel'lfcea Blanch (T-5 F53), U.S. Nuclear Regutalory COIIIII!s$1on, WashMgton, DC 205550001, Q( by Internet a-EXAMINATION DATA mall ID lntx:olacls.Rasoun:eQnrt:.gov, il1d 10 Ole Desk Oftlcer, Olllce 01 lnlormallon and Regulalry Alfalrs, NEOB-10202. (3150-0131), O!b of Managemenl end Budget. W~n.

DC 20503.

If a means used to lmpoce illlnfonnatlon eo1ecton dces not cHsplay a currently vald OMB COIWol number, llle NRC may not conduct or sponsar, and I PIIIIOIIIs not requhld 10 respond to, the lnlonnaton c:otlection.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I

Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED I

0 I

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY20I8 NUMBER OF REACTOR 6

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 7

0 7

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3

0 3

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR

  • see LOS
  • see LOS
  • see LOS
  • see LOS OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 03/23/2015 N/A 03/20/2017 N/A ALTERNATE DATE 03/30/2015 NIA 03/27/2013 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 13 0

0 0

0 0

CANDIDATES NRC FORM 538 (08-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Page 1 of 1 NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES: 09/30/2014 (09*2011)

Estimated burden per response to comply with this voluntary information coQection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This infonnatlon collection is used to plan budgets and resources for operator OPERATOR LICENSING examinations. Send comments regarding burden estimate to the lnfonnation Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mall to lnfocOIIects.Resource@nrc.gov, 8l1d to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently vaNd OMB conlroj number, the NRC may not conduct or sponsor. and a pe~on is not required to respond to, the inlonnation collection.

FACILITY NRC REGION Quad Cities Nuclear Power Station. Units I and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 m

NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

I 0

I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 0

3 0

3 OPERATORS NUMBER OF SENIOR REACTOR 0

8 0

8 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 8/1/16 N/A 8/6/18 ALTERNATE DATE N/A 9/6/16 N/A 9/4/18 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF II 0

0 0

0 0

0 0

CANDIDATES NRC FORM 536 (09-2011)

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 0 Page 1 of 1 NRCFORM636 U.S. NUCLEAR REGULA TORY COMMISSION APPROVED IllY OMS: NO. 31&0.0131 EXPIRES: 01/30/2014 (Q9.2011)

EsUmaled burden per rasponse ID comply with Ulll voluntary Wonnation c:ollaction request 1 hoilr.

Thil Wonnafon IXIUIIctlon Ia Ultld ID pl!ll budgata tl1d r-far opendor OPERA TOR LICENSING examinations. Sand canmtnlll regarding burden tlti11lle Ia lhe tnfomlaton S81Yfrlea Bnlnch (T-5 F53), U.S. Nude* Reat*1orY Commlalon, Waahlnglon, DC 2055~, or by lnltmtle-EXAMINATION DATA mall to lnfocolecta.ResOUfC8Cimtl.gav, and to U1e Desk Ofllcer, Office of Information and Rag!Uioly Allaia, NEQ8.10202, (3150-0131), Ollica ot Managemllll and Budget. WlslmgiDn, DC 20503.

~ a muns Ull8d to Impose an lnformllion coloclion doea not display a cunenHy valid Of.1B control number, U1e NRC may not concb:t or !pOMOI, and a penon Is not ra<<Jjjrecclo rupond to, the lnilnnllion collldion.

FACILITY fNRC""""...,.

Three Mile Island Nuclear Station, Unit 1 I

Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 I

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS

. PROPOSED-NUMBER CY2015...

CY2016

. CY20l'7

~*..

CY2of8 NUMBER OF REACTOR 4

0 5

0 OPERATORS NUMBER OF SENIOR REACTOR 9

0 10 0

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 1

0 I

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* UMITED PROPOSED DATES PRIMARY DATE 10/12/2015 05/2212017 ALTERNATE DATE 11/09/2015 06/1212017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 IS CANDIDATES NRCFORM538 (09-20111