ML16092A212

From kanterella
Jump to navigation Jump to search
NRC Staff 50th Status Report
ML16092A212
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/01/2016
From: Sherwin Turk
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, RAS 51043
Download: ML16092A212 (7)


Text

April 1, 2016 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR/286-LR

)

(Indian Point Nuclear Generating )

Units 2 and 3) )

NRC STAFFS 50th STATUS REPORT IN RESPONSE TO THE ATOMIC SAFETY AND LICENSING BOARDS ORDER OF FEBRUARY 16, 2012 In accordance with the Atomic Safety and Licensing Boards (Board) Order (Granting NRC Staffs Unopposed Time Extension Motion and Directing Filing of Status Updates)

(Order), issued on February 16, 2012, the NRC Staff (Staff) herewith provides its 50th monthly status report to the Board.

Safety Issues

1. Track 2 Safety Issues. Hearings on the three Track 2 safety contentions related to the License Renewal Application (LRA) for Indian Point Units 2 and 3 (IP2 and IP3) were held on November 16-19, 2015. On February 5, 2016, the State of New York (New York) filed a motion seeking the late admission of six documents as exhibits related to the Track 2 contentions; answers to that motion were filed on February 16, 2016. 1 On February 19, 2019, the Board granted New Yorks Motion, conditioned upon its filing of expert testimony demonstrating the relevance, materiality and reliability of the proposed exhibits. In accordance 1 State of New York Motion for Leave to File Six Documents as Additional Exhibits (Feb. 5, 2016); NRC Staff Answer to State of New York Motion for Leave to File Six Documents as Additional Exhibits (Feb. 16, 2016); Entergys Answer to State of New York Motion for Leave to File Six Documents as Additional Exhibits (Feb. 16, 2016).

with the Boards Order, 2 New York filed its supplemental testimony on March 4, 2016; Entergy and the Staff filed responsive testimony on March 18, 2016; New Yorks reply testimony was due April 1, 2016, but, as discussed infra, has been deferred. 3 The Board suspended the schedule for filing proposed findings of fact and conclusions pending its receipt of the parties supplemental testimony, 4 and stated that the evidentiary record will be closed within 10 days after the Board receives the supplemental testimony, unless the Board finds that it requires additional testimony on the proposed exhibits. 5

2. Baffle-Former Assembly Bolt Inspection Findings. On March 29, 2016, the Applicant notified the Board and parties that (a) its ongoing inspection of baffle-former assembly bolts in the Indian Point Unit 2 (IP2) reactor pressure vessel had identified indications and other degradation requiring replacement of 227 of 832 baffle-former bolts, (b) it was reporting this event to the NRC pursuant to 10 C.F.R. § 50,72, (c) it has entered its inspection findings into its Corrective Action Program and is taking appropriate corrective actions, and (d) it would initiate consultations among the parties to discuss the potential impact of these findings on the adjudication of Contentions NYS-25 and NYS-38/RK-TC-5. 6 On March 30, 2016, Entergy filed a joint motion on behalf of the parties, requesting the temporary 2 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Order (Requesting Expert Testimony on New Yorks Proposed Exhibits and Suspending Deadline for Filing Proposed Findings of Fact and Law) (Feb. 19, 2016).

3 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Order (Granting New Yorks Motion for Extension of Time) (Mar. 15, 2016). The filing of New Yorks reply testimony has been deferred. See discussion infra at 2-3.

4 See Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Order (Setting Post-Hearing Briefing Schedule) (Dec. 7, 2015) 5 Order of February 19, 2016, at 3.

6 Letter from Paul M. Bessette, Esq. to the Board (Licensing Board Notification of Preliminary Indian Point Unit 2 Baffle-Former Assembly Bolt Inspection Findings) (Mar. 29, 2016).

deferral of further filings, including New Yorks supplemental reply testimony. 7 On April 1, 2016, the Board granted the parties Joint Motion, deferring the scheduling of post-hearing filings and further evidentiary submissions for a minimum of 35 days, to be rescheduled by order of the Board, and requiring the parties to file a status report no later than May 6, 2016. 8

3. Other Safety Issues. There has been no change in this item since the Staff filed its previous status report. The Staff is reviewing issues associated with two recent Interim Staff Guidance (ISG) documents (LR-ISG-2012-02 and LR-ISG-2013-01). 9 The Staff has not yet determined whether these matters will be addressed in an SER Supplement; the Staff will provide further information to the Board regarding these issues when available.

Environmental Issues

4. FSEIS Supplement. On December 22, 2015, the Staff issued its draft second supplement (Volume 5) to the Final Supplemental Environmental Impact Statement (FSEIS) for license renewal of IP2 and IP3. 10 As stated previously, the Staff expects to issue Final Supplement 2 to the Indian Point FSEIS in September 2016. 11
5. Contention NYS-35/36. There has been no change in this item since the Staff filed its previous status report. On July 14, 2011, the Board issued LBP-11-17, granting 7 Joint Motion for Track 2 Hearing Schedule Deferral (Mar. 30, 2016) (Joint Motion).

8 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Order (Adopting Joint Motion for Track 2 Hearing Schedule Deferral) (Apr. 1, 2016).

9 See (1) Notice of Issuance, Interim Staff Guidance; LR-ISG-2012-02; Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation, 78 Fed. Reg. 70,076 (Nov. 22, 2013); (2) Notice of Issuance, Interim Staff Guidance; LR-ISG-2013-01; Aging Management of Loss of Coating or Lining Integrity for Internal Coatings/ Linings on In-Scope Piping, Piping Components, Heat Exchangers, and Tanks, 79 Fed. Reg. 68,308 (Nov. 14, 2014).

10 Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 38 Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Draft Report for Comment, NUREG-1437, Supplement 38, Vol. 5 (Dec. 2015) (Draft FSEIS Supplement 2). See Letter from Sherwin E. Turk to the Board (Dec. 22, 2015), at 1.

11 See Letter from Sherwin E. Turk to the Board (Dec. 22, 2015), at 2.

summary disposition on Contention NYS-35/36 (Implementation of Cost-Beneficial SAMAs) in favor of New York. 12 On February 18, 2015, the Commission granted the Staff and Entergys petitions for review of the Boards rulings on Contention NYS-35/36, and instructed the Staff to respond to four questions. 13 As required, the Staff filed its response on March 30, 2015; replies were filed by Entergy and New York on May 11, 2015.

6. Contention NYS-40. In May 2013, the Applicant submitted the results of its completed engineering project cost estimates for severe accident mitigation alternatives (SAMAs) that previously had been identified as potentially cost-beneficial. 14 The Applicant noted that it was submitting the information to support resolution of certain issues identified in LBP-11-17, concerning Contention NYS-35/36. The Staff presented its evaluation of the information in Draft FSEIS Supplement 2, issued on December 22, 2015. On February 22, 2016, New York filed a motion for leave to file new Contention NYS-40, purportedly based on the Staffs Draft FSEIS Supplement; 15 answers to Contention NYS-40 were filed by Entergy and the Staff on March 18, 2016; New York filed its reply on March 25, 2016. 16 12 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), LBP-11-17, 74 NRC 11, petition for review granted, CLI-15-3, 81 NRC 217 (Feb. 18, 2015).

13 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), CLI-15-3, 81 NRC 217 (Feb. 18, 2015).

14 See Letter from Kathryn M. Sutton, Esq., et al., to the Board (May 7, 2013), attaching Letter from Fred Dacimo (Entergy) to the NRC Document Control Desk, NL-13-075 (May 6, 2013) (ADAMS Accession No. ML13142A014).

15 See State of New York Motion for Leave [to File] Contention NYS-40 (Feb. 22, 2016), and State of New York Contention NYS-40 (Feb. 22, 2016). See also Entergy Nuclear Operations, Inc.

(Indian Point Nuclear Generating Units 2 and 3),Order (Granting Entergys Motion [for] Clarification)

(July 9, 2013), at 3.

16 See (1) NRC Staffs Answer to State of New Yorks Motion for Leave to File Contention NYS-40 (Mar. 18, 2016); (2) Entergys Opposition to Proposed New York State Contention NYS-40 Regarding Severe Accident Mitigation Alternatives (Mar. 18, 2016); and (3) State of New York Reply in Support of Contention NYS-40 (Mar. 25, 2016).

7. Contention NYS-12C (SAMAs). There has been no change in this item since the Staff filed its previous status report. On February 14, 2014, New York filed a petition for Commission review of the Boards decision in LBP-13-13, 17 concerning its resolution of Contention NYS-12C; 18 on April 28, 2014, New York filed a petition for review of the Boards Order denying its motion to reopen and reconsider that decision. 19 On February 18, 2015, the Commission granted New Yorks petition for review and directed the parties to respond to eight related questions. 20 In accordance with the Commissions Order, initial briefs were filed by the Staff, Entergy, New York, and the State of Connecticut on March 30, 2015; reply briefs were filed by the Staff, Entergy and New York on April 29, 2015.
8. Contention RK-EC-11. On March 8, 2016, Riverkeeper, Inc. filed a new contention (Contention RK-EC-11), asserting that the Staffs Draft FSEIS Supplement improperly relies upon the Commissions Continued Storage Rule and the Continued Spent Fuel Storage GEIS. 21 Answers to Riverkeepers new contention are due April 4, 2016.

17 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), LBP-13-13, 78 NRC 246 (Nov. 27, 2013).

18 State of New York Petition for Review of Atomic Safety and Licensing Board Decision LBP-13-13 With Respect to Consolidated Contention NYS-12C (Feb. 14, 2014). On March 9, 2015, the Commission issued a Memorandum and Order resolving the Staffs, Entergys and Hudson River Sloop Clearwaters petitions for review of other portions of LBP-13-13. See Entergy Nuclear Operations, Inc.

(Indian Point Nuclear Generating Units 2 and 3), CLI-15-6, 81 NRC 340 (2015) (reversing the Boards resolution of Contention NYS-8 (Transformers), and reversing in part, and affirming in part, its resolution of Contention CW-EC3A (Environmental Justice).

19 See (1) State of New York Petition for Review of Atomic Safety and Licensing Boards April 1, 2014 Decision Denying the States Motion to Reopen the Record and for Reconsideration of the Boards November 27, 2013 Partial Initial Decision Concerning Consolidated Contention NYS-12C (Apr. 28, 2014); (2) Order (Denying New Yorks Motion to Reopen the Record; Setting Deadline for New or Amended Contention) (Apr. 1, 2014).

20 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), CLI-15-2, 81 NRC 213 (Feb. 18, 2015).

21 See (1) Riverkeepers Request for Admission of New Environmental Contention (Mar. 8, 2016); (2) letter from Paul Gallay, Esq., to the Board (Mar. 9, 2016).

9. Other Matters. The Staff is not currently aware of any other matter that has the potential to impact the schedule for hearings in this proceeding. In accordance with the Boards direction (Order, at 2), the Staff will notify the Board as soon as any other event with potential to alter the hearing schedule arises.

Respectfully submitted,

/Signed (electronically) by/

Sherwin E. Turk Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1533 E-mail: Sherwin.Turk@nrc.gov Dated at Rockville, Maryland this 1st day of April 2016

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247/286-LR

)

(Indian Point Nuclear Generating )

Units 2 and 3) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (as revised), I hereby certify that copies of the foregoing NRC STAFFS 50th STATUS REPORT IN RESPONSE TO THE ATOMIC SAFETY AND LICENSING BOARDS ORDER OF FEBRUARY 16, 2012, dated April 1, 2016, have been served upon the Electronic Information Exchange (the NRCs E-Filing System), in the above-captioned proceeding, this 1st day of April 2016.

/Signed (electronically) by/

Sherwin E. Turk Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1533 E-mail: Sherwin.Turk@nrc.gov

April 1, 2016 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR/286-LR

)

(Indian Point Nuclear Generating )

Units 2 and 3) )

NRC STAFFS 50th STATUS REPORT IN RESPONSE TO THE ATOMIC SAFETY AND LICENSING BOARDS ORDER OF FEBRUARY 16, 2012 In accordance with the Atomic Safety and Licensing Boards (Board) Order (Granting NRC Staffs Unopposed Time Extension Motion and Directing Filing of Status Updates)

(Order), issued on February 16, 2012, the NRC Staff (Staff) herewith provides its 50th monthly status report to the Board.

Safety Issues

1. Track 2 Safety Issues. Hearings on the three Track 2 safety contentions related to the License Renewal Application (LRA) for Indian Point Units 2 and 3 (IP2 and IP3) were held on November 16-19, 2015. On February 5, 2016, the State of New York (New York) filed a motion seeking the late admission of six documents as exhibits related to the Track 2 contentions; answers to that motion were filed on February 16, 2016. 1 On February 19, 2019, the Board granted New Yorks Motion, conditioned upon its filing of expert testimony demonstrating the relevance, materiality and reliability of the proposed exhibits. In accordance 1 State of New York Motion for Leave to File Six Documents as Additional Exhibits (Feb. 5, 2016); NRC Staff Answer to State of New York Motion for Leave to File Six Documents as Additional Exhibits (Feb. 16, 2016); Entergys Answer to State of New York Motion for Leave to File Six Documents as Additional Exhibits (Feb. 16, 2016).

with the Boards Order, 2 New York filed its supplemental testimony on March 4, 2016; Entergy and the Staff filed responsive testimony on March 18, 2016; New Yorks reply testimony was due April 1, 2016, but, as discussed infra, has been deferred. 3 The Board suspended the schedule for filing proposed findings of fact and conclusions pending its receipt of the parties supplemental testimony, 4 and stated that the evidentiary record will be closed within 10 days after the Board receives the supplemental testimony, unless the Board finds that it requires additional testimony on the proposed exhibits. 5

2. Baffle-Former Assembly Bolt Inspection Findings. On March 29, 2016, the Applicant notified the Board and parties that (a) its ongoing inspection of baffle-former assembly bolts in the Indian Point Unit 2 (IP2) reactor pressure vessel had identified indications and other degradation requiring replacement of 227 of 832 baffle-former bolts, (b) it was reporting this event to the NRC pursuant to 10 C.F.R. § 50,72, (c) it has entered its inspection findings into its Corrective Action Program and is taking appropriate corrective actions, and (d) it would initiate consultations among the parties to discuss the potential impact of these findings on the adjudication of Contentions NYS-25 and NYS-38/RK-TC-5. 6 On March 30, 2016, Entergy filed a joint motion on behalf of the parties, requesting the temporary 2 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Order (Requesting Expert Testimony on New Yorks Proposed Exhibits and Suspending Deadline for Filing Proposed Findings of Fact and Law) (Feb. 19, 2016).

3 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Order (Granting New Yorks Motion for Extension of Time) (Mar. 15, 2016). The filing of New Yorks reply testimony has been deferred. See discussion infra at 2-3.

4 See Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Order (Setting Post-Hearing Briefing Schedule) (Dec. 7, 2015) 5 Order of February 19, 2016, at 3.

6 Letter from Paul M. Bessette, Esq. to the Board (Licensing Board Notification of Preliminary Indian Point Unit 2 Baffle-Former Assembly Bolt Inspection Findings) (Mar. 29, 2016).

deferral of further filings, including New Yorks supplemental reply testimony. 7 On April 1, 2016, the Board granted the parties Joint Motion, deferring the scheduling of post-hearing filings and further evidentiary submissions for a minimum of 35 days, to be rescheduled by order of the Board, and requiring the parties to file a status report no later than May 6, 2016. 8

3. Other Safety Issues. There has been no change in this item since the Staff filed its previous status report. The Staff is reviewing issues associated with two recent Interim Staff Guidance (ISG) documents (LR-ISG-2012-02 and LR-ISG-2013-01). 9 The Staff has not yet determined whether these matters will be addressed in an SER Supplement; the Staff will provide further information to the Board regarding these issues when available.

Environmental Issues

4. FSEIS Supplement. On December 22, 2015, the Staff issued its draft second supplement (Volume 5) to the Final Supplemental Environmental Impact Statement (FSEIS) for license renewal of IP2 and IP3. 10 As stated previously, the Staff expects to issue Final Supplement 2 to the Indian Point FSEIS in September 2016. 11
5. Contention NYS-35/36. There has been no change in this item since the Staff filed its previous status report. On July 14, 2011, the Board issued LBP-11-17, granting 7 Joint Motion for Track 2 Hearing Schedule Deferral (Mar. 30, 2016) (Joint Motion).

8 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Order (Adopting Joint Motion for Track 2 Hearing Schedule Deferral) (Apr. 1, 2016).

9 See (1) Notice of Issuance, Interim Staff Guidance; LR-ISG-2012-02; Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation, 78 Fed. Reg. 70,076 (Nov. 22, 2013); (2) Notice of Issuance, Interim Staff Guidance; LR-ISG-2013-01; Aging Management of Loss of Coating or Lining Integrity for Internal Coatings/ Linings on In-Scope Piping, Piping Components, Heat Exchangers, and Tanks, 79 Fed. Reg. 68,308 (Nov. 14, 2014).

10 Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 38 Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Draft Report for Comment, NUREG-1437, Supplement 38, Vol. 5 (Dec. 2015) (Draft FSEIS Supplement 2). See Letter from Sherwin E. Turk to the Board (Dec. 22, 2015), at 1.

11 See Letter from Sherwin E. Turk to the Board (Dec. 22, 2015), at 2.

summary disposition on Contention NYS-35/36 (Implementation of Cost-Beneficial SAMAs) in favor of New York. 12 On February 18, 2015, the Commission granted the Staff and Entergys petitions for review of the Boards rulings on Contention NYS-35/36, and instructed the Staff to respond to four questions. 13 As required, the Staff filed its response on March 30, 2015; replies were filed by Entergy and New York on May 11, 2015.

6. Contention NYS-40. In May 2013, the Applicant submitted the results of its completed engineering project cost estimates for severe accident mitigation alternatives (SAMAs) that previously had been identified as potentially cost-beneficial. 14 The Applicant noted that it was submitting the information to support resolution of certain issues identified in LBP-11-17, concerning Contention NYS-35/36. The Staff presented its evaluation of the information in Draft FSEIS Supplement 2, issued on December 22, 2015. On February 22, 2016, New York filed a motion for leave to file new Contention NYS-40, purportedly based on the Staffs Draft FSEIS Supplement; 15 answers to Contention NYS-40 were filed by Entergy and the Staff on March 18, 2016; New York filed its reply on March 25, 2016. 16 12 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), LBP-11-17, 74 NRC 11, petition for review granted, CLI-15-3, 81 NRC 217 (Feb. 18, 2015).

13 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), CLI-15-3, 81 NRC 217 (Feb. 18, 2015).

14 See Letter from Kathryn M. Sutton, Esq., et al., to the Board (May 7, 2013), attaching Letter from Fred Dacimo (Entergy) to the NRC Document Control Desk, NL-13-075 (May 6, 2013) (ADAMS Accession No. ML13142A014).

15 See State of New York Motion for Leave [to File] Contention NYS-40 (Feb. 22, 2016), and State of New York Contention NYS-40 (Feb. 22, 2016). See also Entergy Nuclear Operations, Inc.

(Indian Point Nuclear Generating Units 2 and 3),Order (Granting Entergys Motion [for] Clarification)

(July 9, 2013), at 3.

16 See (1) NRC Staffs Answer to State of New Yorks Motion for Leave to File Contention NYS-40 (Mar. 18, 2016); (2) Entergys Opposition to Proposed New York State Contention NYS-40 Regarding Severe Accident Mitigation Alternatives (Mar. 18, 2016); and (3) State of New York Reply in Support of Contention NYS-40 (Mar. 25, 2016).

7. Contention NYS-12C (SAMAs). There has been no change in this item since the Staff filed its previous status report. On February 14, 2014, New York filed a petition for Commission review of the Boards decision in LBP-13-13, 17 concerning its resolution of Contention NYS-12C; 18 on April 28, 2014, New York filed a petition for review of the Boards Order denying its motion to reopen and reconsider that decision. 19 On February 18, 2015, the Commission granted New Yorks petition for review and directed the parties to respond to eight related questions. 20 In accordance with the Commissions Order, initial briefs were filed by the Staff, Entergy, New York, and the State of Connecticut on March 30, 2015; reply briefs were filed by the Staff, Entergy and New York on April 29, 2015.
8. Contention RK-EC-11. On March 8, 2016, Riverkeeper, Inc. filed a new contention (Contention RK-EC-11), asserting that the Staffs Draft FSEIS Supplement improperly relies upon the Commissions Continued Storage Rule and the Continued Spent Fuel Storage GEIS. 21 Answers to Riverkeepers new contention are due April 4, 2016.

17 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), LBP-13-13, 78 NRC 246 (Nov. 27, 2013).

18 State of New York Petition for Review of Atomic Safety and Licensing Board Decision LBP-13-13 With Respect to Consolidated Contention NYS-12C (Feb. 14, 2014). On March 9, 2015, the Commission issued a Memorandum and Order resolving the Staffs, Entergys and Hudson River Sloop Clearwaters petitions for review of other portions of LBP-13-13. See Entergy Nuclear Operations, Inc.

(Indian Point Nuclear Generating Units 2 and 3), CLI-15-6, 81 NRC 340 (2015) (reversing the Boards resolution of Contention NYS-8 (Transformers), and reversing in part, and affirming in part, its resolution of Contention CW-EC3A (Environmental Justice).

19 See (1) State of New York Petition for Review of Atomic Safety and Licensing Boards April 1, 2014 Decision Denying the States Motion to Reopen the Record and for Reconsideration of the Boards November 27, 2013 Partial Initial Decision Concerning Consolidated Contention NYS-12C (Apr. 28, 2014); (2) Order (Denying New Yorks Motion to Reopen the Record; Setting Deadline for New or Amended Contention) (Apr. 1, 2014).

20 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), CLI-15-2, 81 NRC 213 (Feb. 18, 2015).

21 See (1) Riverkeepers Request for Admission of New Environmental Contention (Mar. 8, 2016); (2) letter from Paul Gallay, Esq., to the Board (Mar. 9, 2016).

9. Other Matters. The Staff is not currently aware of any other matter that has the potential to impact the schedule for hearings in this proceeding. In accordance with the Boards direction (Order, at 2), the Staff will notify the Board as soon as any other event with potential to alter the hearing schedule arises.

Respectfully submitted,

/Signed (electronically) by/

Sherwin E. Turk Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1533 E-mail: Sherwin.Turk@nrc.gov Dated at Rockville, Maryland this 1st day of April 2016

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247/286-LR

)

(Indian Point Nuclear Generating )

Units 2 and 3) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (as revised), I hereby certify that copies of the foregoing NRC STAFFS 50th STATUS REPORT IN RESPONSE TO THE ATOMIC SAFETY AND LICENSING BOARDS ORDER OF FEBRUARY 16, 2012, dated April 1, 2016, have been served upon the Electronic Information Exchange (the NRCs E-Filing System), in the above-captioned proceeding, this 1st day of April 2016.

/Signed (electronically) by/

Sherwin E. Turk Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1533 E-mail: Sherwin.Turk@nrc.gov