UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 29, 2016 CHAIRMAN Mr. Paul Gallay Mr. James Bacon Riverkeeper 20 Secor Road Ossining, NY 10562
Dear Messrs. Gallay and Bacon:
On behalf of the Commission, I am responding to your letter of May 17, 2016, in which you express concerns regarding recent briefings that the Commissioners and their staffs received on the status of inspections at Indian Point Unit 2 regarding baffle-former bolts. You note that two briefings were conducted by the NRC staff on April 19, 2016, but that Riverkeeper, as a party to the ongoing license renewal proceeding, did not learn of the briefings until the NRC staff's counsel informed the Atomic Safety and licensing Board and the parties of the briefings on April 26, 2016. You state that the Commission should have provided the parties to the adjudication with notice of the briefings and an opportunity to attend or participate. You also request that the Commission provide any relevant Commission-generated documents that may not have been provided to Staff counsel. Finally, you request reasonable advance notice of, and opportunity to attend or participate in, any future Commissioner briefings relevant to the resolution of the issues in the proceeding, including future briefings related to baffle-former bolts at Indian Point.
The Commission performs dual roles, in that it has general supervisory authority over the staff's activities and also sits in a quasi-judicial capacity in adjudications. Those two roles are kept separate. The separation of functions rule, set forth in 10 C.F.R. § 2.348, protects the fairness and transparency of the agency's adjudicatory process by placing certain restrictions on communications between the Commission and the NRC staff who are involved in the technical review of an issue that is being adjudicated within a contested proceeding-in this case, the Indian Point license renewal adjudication. The separation of functions rule is designed to prevent off the record communications on the merits of contested issues; however, the rule is not intended to prevent the NRC staff from communicating to the Commission or individual Commissioners matters unrelated to the specific issue that is the subject of a contested proceeding. The staff's April 19 briefings on the baffle-former bolt inspections were limited to a description of the baffle plates and bolts, applicable regulatory requirements, and current status of the inspection results at Indian Point Units 2 and 3. No prohibited communications took place, as the matters at issue in the adjudication were not discussed.
Requests for agency documents such as the one you made in your letter are appropriately directed to the agency's Freedom of Information Act (FOIA) process. However, in response to a recent FOIA request the NRC has made public documents that are also responsive to your request; courtesy copies of those documents are provided here.
Finally . you request notice and an opportunity to attend future briefings of the Commission . The April 19 briefings were not "meetings" subject to the Sunshine Act because a quorum of Commissioners was not present for either briefing . As such, public notice was not required. The NRC will provide public notice of Commission meetings when required by law.
but the Commissioners may receive additional non-public briefings as part of their obligation to supervise the NRC staff. Because the Commission continues to sit in a quasi-judicial capacity in the Indian Point license renewal proceeding , any such briefing will not address disputed issues in the license renewal proceeding.
A copy of your letter and this response will be served on the parties to the Indian Point license renewal adjudication.
Enclosures:
As stated
Briefing on In Baffle B lnspe n April 19, 2016 1 Prot<<ting hople anJ the Emnronmmt Enclosure 1
Ccn'9 Barrel
---~HoW DawnSprinc
___,__....., 1 Rod Gulcle Tube Example Baffle-former B I location
,...._ -Core Barrel
- - 1111rm1I Shield Lower Core Plate -Pr11sun V.1111 Plate Lower Support Column l&1i *;--~
Bottom-mounted ln1trume11tatlon Core Support Plate Function of baffle-former assembly is to direct coolant flow through the core. It also provides lateral support to the core during a seismic event or loss-of-coola_nt_accident LOCA).
2
Locking tab 3 Protecting People and the Environment
........... _ te**me through gaps between adjacent ptates
- Fuel degradation (baffle jetting erosion)
- Increased core bypass flow (less fuel cooling)
- Baffle plates impacting fuel assemblies during LOCA event, potentially leading to
.- grid deformation 4 Protecting People and the Environment
y nc
- Section XI mandates gen examination f rea tor vesse every 1O years
- All PWRs have been performing every 10 years during the first 40 years of operation 5 Protecting People and the Environment
G . gin is based on NRC-approved
- To manage aging of RVI, IP2 committed to enhanced inspections following MRP-227-A, consistent with NRC guidance 6 Prot<<ting People and the Environment
~ .....__...,*
- In t (b e i ) n p~c effective full power ea
- 100°/o of bolts
- Inspect every 10 years thereafter
~ v~* t-ff Lw"' - .-
7 Protecting People anJ the Environment
I n
- Con ultrasonic an 1sua e former bolts
- Results:
- All baffle edge-bolts were acceptable
- @)otal baffle-former bolt identified as failed
- 182 ultrasonic testing failures
- 31 visually identified as protruding
- 14 inaccessible, conservatively assumed failed
- Bolts to be sent out for analysis by Westinghouse and LPI. an independent engineering firm 8 Prot<<ting People anJ the Environment
ing le ng (
- Developing plans to replace ba bolts
- Developing safety ev n of
- Developing analysis to support baffle-forme assembly return to service (if not all bolts are replaced)
Indian Point Unit 3 {IP3)
- Developing evaluation of baffle-former assembly considering information from IP2
- Evaluating schedule for future baffle bolt examinations, currently planned in 2019 9 Proucting People anti the Environment
- Baseline Inspections bei la to:
o Verify Entergy completes bolt re I t and analyses that ensure the baffle-former assembly will perform intended safety fu nctions o Review Entergy's evaluation of the as-found conditions to independently assess the safety significance and whether there were prior performance issues 10 Protecting People anJ the Environment
i
- Less operating time than IP2
- No current indication off lea significant problem with baffle-for Analysis for other Westinghouse plants have demonstrated significant margin regarding the total number of required bolt Will reassess IP3 functionality based on results of IP2 analysis currently in progress *
- Resident Inspectors onsite to independently assess if conditions change
- NRC will review Entergy's evaluation of IP3 and their plans for future baffle-former assembly exams 11 Protecting People anJ the Environment
r-w-..:a* ti 0
- Over 12,000 baffle-form r sonica y
-' 1 inspected to date .:
4'f
- Only 3.6°/o defective (potentially cracked)
- Excluding IP2 results, 2o/o defective
- Several plants of similar age or older to IP2 have inspected
- These older plants have found no more than 10°/o defective bolts 12 Protecting People anJ the Environment
- R I be h r d through the EPRI M te Program ( ) L
- Changes can be made in response to operating experience 13 Protecting People anti the Environment
R glP2 ca
- Decide if regulatory action needed n.
- Operati*ng experience with affl
- IP2 root cause Its
- Operability of IP2 under all desfgn basis conditions with as-tound defective bolts
- Potential actions could include acceleration of baseline inspection schedule, shorten reinspection interval, or no change
- Could implement through modification to guidance, or generic communication if warranted by safety impact 14 Protecting People and the Environment
April 19, 2016 Function of baffle-former assembly is to direct coolant flow through the core. It also provides. lateral support to the core during a seismic event or loss-of-coolant accident (LOCA).
2 Enclosure 2
""""6............
Locking tab 3
amllllillrs offailed cause:
- Flow ....... .-OUUhpps tJet . .. * *
- tt plat8s
- FUll....-UOn (baffle
-....ion) oVOl'f;IM.
- lnctHMd COft! bypass flow (less fuel coolfng, 4 h,e~ P'"
- Baffle plates Impacting fuel assemblies during LOCA event, potentially leading to P""' '"e JjHd deformation
- 0e.t\),~... I )(c..<-
4
- Section XI manda_, ....,. ~.,.. .OOltdJIM examination of~*' Wiii_. ..._.,...
every 10 years
- All PWRs have been perfonning every
- ftm 40 operation Guidan is based on NRC-approv
- To manage aging of RVI, IP2 committed to enhanced inspections following MRP-227-A. consistent with NRC guidance 6
-:LA5GC...
- ')
I 1a effective full powe ~1. .
de.,....~ri-
' l\A.&.c..--..,.....
- 100'K bo
- Inspect every t.***
- All PWRs with baffle-former bolts must perform these inspections (most PWR designs) 7 7 Aa.',*~\cqj ' 6
- Results
- All baffle edge-bolts were accepla .
- 227 total baffle-fonner bolt identified as failed 2::::t~b
- 182 ultrasonic testing faRures
- 31 visually identified as protruding { f:t,.fu.A. .. ;) bo I
- 14 inaccessibl'i conservatively assumed failed ( c..rr
- Botts to be sent out for analysis by Westinghouse and LPI, an independent engineering firm 8 ~5' ~.-.o. so C""'
Indian Point Unit 3 (IP3)
- Developing evaluation of baffle-fonner assembly C1)1'sidering information from IP2 n '
1 1 curren y p anne in 20 1 9 4
- Evaluatting schedd~le fo r tuture. ba!~ bolt §la~Qn~
~ "'f!.. w\ ,"""
- , c.Uo. -"tK.
v'~Jr;.
f II
- Baseline In
- ~*
- s be lemented to:
o Verify Entergy completes bolt replacement and analyses that ensure the baffle-former assembly will perfonn intended safety functions o Review Entergy's evaluation of the as-found conditions to
- ndependently assess the safety significance and whether there wer4 prilll performance issues
\Q NJ ~J, r<!s;Jo.1, 10 .f) I '-'f Prolwti*1 &/II-'*&11innurlnt1
Only n la Section visual ins ns
- Over 12,000 baffle-former inspected to date
- Only 3.6% defective (potentially cracked)
- Excluding IP2 results, 249,{, defective
- Several plants of similar age or older to IP2 have inspected
- These older plants have found no more than 10%
defective bolts I\'~ ~fr'"'"
12
Res t s through the EPRI Progra (M P}
- Changes can be made in response to operating experience 13 cause,
- Decide If regulatory action
- Operating experience with pec:tJona
- IP2 root cause analyala results
- Operabinty of IP2 under aH deelgn bails conditions with as-tound defective bolts
- Potential actions could include acceleration of baseline inspection schedule, shorten reinspectlon interval, or no change
- Could implement through modification to guidance, or generic communication if warranted by safety Impact
Bloomer, Tamara From: Cubbage, Amy Sent: Thursday, April 21, 2016 10:00 AM To: Ostendorff, William Cc: Bloomer, Tamara
Subject:
FW: Updated Info on Indian Point From: Bowen, Jeremy Sent: Thursday, April 21, 2016 9:54 AM To: Valliere, Nanette <Nanette.Valliere@nrc.gov>; Fuller, Justin <Justin.Fuller@nrc.gov>; Castleman, Patrick
<Patrick.Castleman@nrc.gov>; Cubbage, Amy <Amy.Cubbage@nrc.gov>; Krsek, Robert <Robert.Krsek@nrc.gov>
Cc: Clark, Theresa <Theresa.Clark@nrc.gov>
Subject:
Updated Info on Indian Point Good morning all, Region I held a call with Indian Point management yesterday to discuss the current status of the baffle bolts. Because there were some related questions during the briefings earlier this week, I'm passing along the latest information.
Unit 2
- The specialized tool is onsite and being used to replace the baits
- Entergy plans to replace all 227 bolts that failed UT
- Current rate of replacement is 7-9 bolts per day
- The site will have access to the specialized tool for as long as needed Unit 3
- Site senior management (Site VP) indicated their intent to move up inspection of U3 to the 2017 outage (from 2019) o No formal public announcements or notifications about these plans have been made o Entergy needs to still line up resources to ensure the plan can be accomplished as desired I'll keep you informed as things progress. Please let me know if you have any questions.
- Thanks, Jeremy 1
Enclosure 3
RIVERKEEPER.
May 17, 2016 Stephen G. Bums, Chainnan Kristine L. Svinicki William C. Ostendorff Jeff Baran U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Indian Point License Renewal Proceeding, Docket Nos. 50-247-LR. 50-286.LR
Dear Commissioners:
We support and applaud your interest in the safety issues raised by recent inspections at Indian Point Unit 2, which showed that over one-quarter of the baftle-former bolts within the plant's reactor core are degraded or missing. The continued supervisory engagement of the Commissioners on this important issue - which is unprecedented in the history of foreign and domestic nuclear plant operations - is vital for ensuring the safe operation of both Indian Point nuclear facilities, which are located 24 miles north of New York City and in the most densely populated area surrounding any nuclear facility in the nation.
While we are heartened to know of the Commissioners' attention to these safety issues at Indian Point, we write to remind you that your supervisory activities must comply with NRC regulations for the fair conduct of NRC adjudicatory proceedin~ including the prohibition against ex pa11e conducts on relevant issues. See ~nerally 10 C.F.R. §§ 2.347, 2.348; 5 U.S.C. § 557. We are particularly concerned that on April 19, 2016, NRC Commissioners and/or their Senior Executive Staff received two briefings from NRC Staff about the recent inspections at Indian Point Unit 2 and the safety implications of these results for both Indian Point Unit 2 and Indian Point Unit 3. Although Riverkeeper is a party to the on-going relicensing proceeding for Indian Point and has relevant contentions pending before the agency, we did not learn of the briefinp until a week later via a letter &om NRC Staff counsel to the Atomic Safety and Licensing Board ("ASLB").
See Letter from NRC Staff Counsel Sherwin E. Turk to ASLB Judge Lawrence G.
McDade, et al. re: Entergy Nuclear Operations, Inc. (Apr. 26, 2016) (and two attachments thereto).
NRC Staff is a party and litigant in the Indian Point adjudicatory proceeding. S- NRC Stafrs Statement in Response to the Atomic Safety and Licensing Board's Order of February 3, 2012 (Feb. 8, 2012) (ML12039A298). Thus, contacts between NRC adjudicatory employees (including the Commission and its staff) and the NRC Staff are subject to the NRC's ex parte rules. See Philadelphia Electric Co. (Limerick Generating www.rlvertrMper.org
- 20 Secor Road* Ossining. New York 10562
- t 914.478.-4501
- f 914 478 4527
NRC Commissioners May 17, 2016 Page2 Station, Units land 2), ALAB-785 20 NRC 848, 883 n.161 (1984). While certain communications solely between NRC adjudicatory employees and NRC Staff may be permissible (i.e., communications relating to generic issues or providing mere status updates), NRC Staff counsel's April 26 letter includes two attachments which suggest that NRC Staffs April 19 briefings covered more substantive issues that are directly relevant to Riverkeeper's pending contentions. See Memorandum from Jeremy S. Bowen to Houman Rasouli re: Summary of April 19, 2016 Briefings for the Commissioners on Indian Point Baftle Bolts (April 22, 2016); Briefing on Indian Point Baftle Bolt Inspections (April 19, 2016). Therefore, we respectfully submit that the Commission should have provided the parties to this proceeding with notice of the briefing and an opportunity to attend or participate.
We appreciate receiving from NRC Staff counsel the Staff-generated documents provided at the April 19 briefing. In order to ensure the full provision of available information regarding the briefings, we also request you to provide any relevant Commission-generated documents that may not have been provided to Staff counsel, including any transcripts, recordings, or summaries of the briefings.
Finally, we request you to provide reasonable advance notice of and opportunity to attend or participate in any future briefings of the Commissioners on important issues relevant to the resolution of the contentions at issue- including any assessments of the significance of the bolt failures at Indian Point Unit 2 and/or the implications for operational safety at both Unit 2 and Unit 3.
Sincerely,
[Electronically signed by)
Paul Gallay
[Electronically signed by]
James Bacon Counsel to Riverkeeper cc: Service List www.rlverbeper.org
- 20 Secor Road* Ossining, New York 10562
- t 914 478.4501
- f 914.478.-4527
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR
) and 50-286-LR (Indian Point Nuclear Generating, )
Units 2 and 3) )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Correspondence from the Office of the Secretary in Response to May 17, 2016 Riverkeeper Letter Regarding Baffle-Former Bolts have been served upon the following persons by Electronic Information Exchange.
U.S. Nuclear Regulatory Commission Catherine L. Scott, Esq.
Office of Commission Appellate Adjudication Beth N. Mizuno, Esq.
Mail Stop O-7H4M David E. Roth, Esq.
Washington, DC 20555-0001 Sherwin E. Turk, Esq.
ocaamail@nrc.gov Brian Harris, Esq.
Anita Ghosh, Esq.
U.S. Nuclear Regulatory Commission Catherine E. Kanatas, Esq.
Office of the Secretary of the Commission Joseph Lindell, Esq.
Mail Stop O-16C1 Vinh D. Hoang, Esq.
Washington, DC 20555-0001 John Tibbetts, Paralegal hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission Office of the General Counsel U.S. Nuclear Regulatory Commission Mail Stop O-15D21 Atomic Safety and Licensing Board Panel Washington, DC 20555-0001 Mail Stop T-3F23 catherine.scott@nrc.gov; Washington, DC 20555-0001 beth.mizuno@nrc.gov; sherwin.turk@nrc.gov; brian.harris.@nrc.gov; Lawrence G. McDade, Chair david.roth@nrc.gov; Administrative Judge anita.ghosh@nrc.gov; lawrence.mcdade@nrc.gov catherine.kanatas@nrc.gov; joseph.lindell@nrc.gov; Richard E. Wardwell vinh.hoang@nrc.gov; Administrative Judge john.tibbetts@nrc.gov richard.wardwell@nrc.gov Michael F. Kennedy OGC Mail Center Administrative Judge OGCMailCenter@nrc.gov michael.kennedy@nrc.gov William B. Glew, Jr.
Alana Wase, Law Clerk Organization: Entergy alana.wase@nrc.gov 440 Hamilton Avenue, White Plains, NY 10601 wglew@entergy.com Julie Reynolds-Engel, Law Clerk Julie.Reynolds-Engel@nrc.gov
Docket Nos. 50-247-LR and 50-286-LR Correspondence from the Office of the Secretary in Response to May 17, 2016 Riverkeeper Letter Regarding Baffle-Former Bolts Elise N. Zoli, Esq. Matthew W. Swinehart, Esq.
Goodwin Proctor, LLP Covington & Burling LLP Exchange Place, 53 State Street 1201 Pennsylvania Avenue, NW Boston, MA 02109 Washington, DC 20004 ezoli@goodwinprocter.com mswinehart@cov.com Daniel Riesel, Esq. Manna Jo Greene, Environmental Director Victoria Shiah Treanor, Esq. Steven C. Filler Adam Stolorow, Esq. Peter A. Gross Natoya Duncan, Paralegal Hudson River Sloop Clearwater, Inc.
Counsel for Town of Cortlandt 724 Wolcott Ave.
Sive, Paget & Riesel, P.C. Beacon, NY 12508 460 Park Avenue mannajo@clearwater.org; New York, NY 10022 stephenfiller@gmail.com; driesel@sprlaw.com; vtreanor@sprlaw.com peter@clearwater.org astolorow@sprlaw.com; nduncan@sprlaw.com Andrew Reid, Esq.
Kathryn M. Sutton, Esq. Organization: Hudson River Sloop Paul M. Bessette, Esq. Clearwater, Inc.
Martin J. ONeill, Esq. Ved Nanda Center for International and Brooke McGlinn, Esq. Comparative Law Grant Eskelsen, Esq. 1075 Waite Drive Ryan Lighty, Esq. Boulder, CO 80303 Lesa G. Williams-Richardson, Legal Secretary lawyerreid@gmail.com Doris Calhoun, Legal Secretary Mary Freeze, Legal Secretary Morgan, Lewis & Bockius, LLP Richard Webster, Esq.
1111 Pennsylvania Avenue, NW Public Justice, P.C.
Washington, DC 20004 For Hudson River Sloop Clearwater, Inc.
ksutton@morganlewis.com 1825 K Street, NW, Suite 200 martin.oneill@morganlewis.com Washington, D.C. 20006 bmcglinn@morganlewis.com rwebster@publicjustice.net grant.eskelsen@morganlewis.com rlighty@morganlewis.com lrichardson@morganlewis.com Michael J. Delaney, Esq.
dcalhoun@morganlewis.com Director, Energy Regulatory Affairs mfreeze@morganlewis.com NYC Department of Environmental Protection 59-17 Junction Boulevard Flushing, NY 11373 Melissa-Jean Rotini, Esq. mdelaney@dep.nyc.gov Assistant County Attorney Office of Robert F. Meehan, Robert D. Snook, Esq.
Westchester County Attorney Assistant Attorney General 148 Martine Avenue, 6th Floor Office of the Attorney General White Plains, NY 10601 State of Connecticut mjr1@westchestergov.com 55 Elm Street P.O. Box 120 Hartford, CT 06141-0120 robert.snook@po.state.ct.us 2
Docket Nos. 50-247-LR and 50-286-LR Correspondence from the Office of the Secretary in Response to May 17, 2016 Riverkeeper Letter Regarding Baffle-Former Bolts David A. Repka, Esq. John J. Sipos, Esq.
Victoria Hsia, Esq. Lisa S. Kwong, Esq.
Carlos L. Sisco, Paralegal Brian Lusignan, Esq.
Winston & Strawn Mihir Desai, Esq.
1701 K Street NW Assistant Attorneys General Washington, DC 20006 Teresa Manzi, Legal Assistant drepka@winston.com Office of the Attorney General vhsia@winston.com of the State of New York CSisco@winston.com The Capitol, State Street Albany, New York 12224 Paul Gallay, Esq. john.sipos@ag.ny.gov Deborah Brown lisa.kwong@ag.ny.gov Ramona Cearley, Secretary brian.lusignan@ag.ny.gov Riverkeeper, Inc. mihir.desai@ag.ny.gov 20 Secor Road teresa.manzi@ag.ny.gov Ossining, NY 10562 pgallay@riverkeeper.org dbrown@riverkeeper.org Laura Heslin, Esq.
rcearley@riverkeeper.org Assistant Attorney General Office of the Attorney General of the State of New York Counsel for Riverkeeper 120 Broadway, 26th Floor Diane Curran, Esq. New York, New York 10271 Harmon, Curran, Spielberg, laura.heslin@ag.ny.gov and Eisenberg, L.L.P.
1726 M Street NW, Suite 600 Sean Murray, Mayor Washington, DC 20036 Kevin Hay, Village Administrator dcurran@harmoncurran.com Village of Buchanan Municipal Building 236 Tate Avenue Buchanan, NY 10511-1298 smurray@villageofbuchanan.com administrator@villageofbuchanan.com
[Original signed by Brian Newell ]
Office of the Secretary of the Commission Dated at Rockville, Maryland this 4th day of August, 2016 3