Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 August 31, 2016 Lawrence G. McDade, Chair Dr. Michael F. Kennedy Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23 Mail Stop: T-3 F23 Washington, D.C. 20555 Washington, D.C. 20555 Dr. Richard E. Wardwell Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Mail Stop: T-3 F23 Washington, D.C. 20555 In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.

(Indian Point Nuclear Generating Unit Nos. 2 and 3)

Docket Nos. 50-247-LR/286-LR

Dear Administrative Judges:

In my letter to the Atomic Safety and Licensing Board of May 12, 2016, I transmitted a copy of the NRC Staffs first quarterly integrated inspection report for Indian Point Units 2 and 3 (IP2 and IP3). In my letter, I noted that the Staff expects to present updated information concerning the baffle-former bolts in its quarterly inspection report for the period of April 1 -

June 30, 2016, to be issued in August 2016.

The NRC Staff (Staff) has now issued its second quarterly integrated inspection report for IP2 and IP3, entitled Indian Point Nuclear Generating - Integrated Inspection Report 05000247/2016002 and 05000286/2016002, dated August 30, 2016 (available at ADAMS Accession No. ML16243A245). A copy of the integrated inspection report is enclosed herewith and is simultaneously being provided to the parties.

The enclosed inspection report addresses NRC inspection activities at IP2 and IP3 during the period of April 1 - June 30, 2016. Issues related to baffle-former bolts are discussed at various places in the report (e.g., pages 3, 7-8, 14-18, 19-20, and 31-34).

Respectfully,

/Signed (electronically) by/

Sherwin E. Turk Counsel for NRC Staff

Enclosure:

As stated Cc w/Encl.: EIE Service List

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247/286-LR

)

(Indian Point Nuclear Generating )

Units 2 and 3) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (as revised), I hereby certify that copies of the foregoing letter from Sherwin E. Turk to the Atomic Safety and Licensing Board, dated August 31, 2016, along with the enclosed Indian Point Nuclear Generating - Integrated Inspection Report 05000247/

2016002 and 05000286/2016002 dated August 30, 2016, have been served upon the Electronic Information Exchange (the NRCs E-Filing System), in the above-captioned proceeding, this 31st day of August, 2016.

/Signed (electronically) by/

Sherwin E. Turk Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 287-9194 E-mail: Sherwin.Turk@nrc.gov