Category:E-Mail
MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24221A0082024-08-0707 August 2024 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24170B0562024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review Results for Davis-Besse, Unit No. 1 - RR-A1 ISI Impracticality ML24144A1082024-05-22022 May 2024 Acceptance Review Adoption of TSTF-569, Revise Response Time Testing Definition (EPID L-2024-LLA-0059) - Email ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23129A3122023-05-0909 May 2023 NRR E-mail Capture - Beaver Valley Unit 2 - Verbal Authorization of Alternative Request, 2-TYP-4-RV-06 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23125A1602023-05-0505 May 2023 NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23125A1462023-05-0505 May 2023 NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23122A0342023-05-0202 May 2023 NRR E-mail Capture - Beaver Valley - Request for Additional Information Regarding Unit 1 - 180 Day Steam Generator Tube Inspection Report ML23089A1252023-03-30030 March 2023 NRR E-mail Capture - Beaver Valley Upcoming Steam Generator Tube Inservice Inspection ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23079A1202023-03-20020 March 2023 NRR E-mail Capture - Acceptance Review for Beaver Valley 1 & 2 Exemption from Specific Provisions in 10 CFR 50 Appendix H ML23065A0782023-03-0303 March 2023 Final RAIs Regarding the Beaver Valley Emergency LAR (EPID L-2023-LLA-002) - Email ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besses 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22321A2392022-11-17017 November 2022 NRR E-mail Capture - (External_Sender) Beaver Valley Power Station, Units 1&2 - Clarification on LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22312A5912022-11-0808 November 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1&2 - Request for Additional Information LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22273A1132022-09-30030 September 2022 NRR E-mail Capture - Acceptance of Requested Licensing Action to Add Full Spectrum LOCA Methodology to COLR ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22277A5122022-09-19019 September 2022 NRR E-mail Capture - (External_Sender) Eh Response to Corrected SE Associated with Beaver Valley Amendments 315 and 205 Changes to the EPP ML22238A2812022-08-25025 August 2022 Request for Additional Information for Beaver Valley Unit 2 - 2R22 Steam Generator 180 Day Report ML22202A4642022-06-29029 June 2022 Emergency Plan Safety Evaluation ML22178A1322022-06-24024 June 2022 Request for Additional Information for Beaver Valley Unit 2 Steam Generator Inspection Report - Fall 2021 Refueling Outage ML22173A0402022-06-21021 June 2022 NRR E-mail Capture - Acceptance of Requested Licensing Action Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22147A0392022-05-27027 May 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley, Units 1 & 2 Amendment - Revise TS 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Separation Instrumentation ML22129A0122022-05-0606 May 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Unit 2 Amendment - Correct TS 3.1.7 Change Made by TSTF-547 ML22123A0232022-05-0202 May 2022 NRR E-mail Capture - Acceptance of Requested Licensing Action for Beaver Valley Power Station, Units 1 and 2 - Adoption of TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22153A5212022-04-15015 April 2022 Email Error in Energy Harbor Submittal and Associated SE for Beaver Valley 1 & 2 - Containment Isolation Valve Relief Request ML22101A0122022-04-0808 April 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Units 1 and 2 Amendment - Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22087A1302022-03-28028 March 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Units 1 and 2 Amendment - Adopt TSTF-577 ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22068A1822022-03-0909 March 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1 & 2 - Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5 ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21344A0392021-12-0909 December 2021 NRR E-mail Capture - Beaver Valley TSTF-577-A Acceptance Review ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21286A7892021-10-0707 October 2021 NRR E-mail Capture - Beaver Valley Acceptance Review for LAR Regarding TS 3.1.7.2 to Correct a Logic Error (L-2021-LLA-0160) ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections 2024-09-30
[Table view] |
Text
E-44108 Attachment 9 E-mail from Greg Halnon (FirstEnergy Nuclear Operating Company) to Don Shaw (AREVA) for Beaver Valley Power Station and Davis-Besse Power Station
WILLIFORD Dennis (RS/IB)
From: Halnon, Gregory H <ghalnon@firstenergycorp.com>
Sent: Monday, September 14, 2015 10:39 AM To: SHAW JR Donis (BE/LO)
Cc: WILLIFORD Dennis (RS/IB); Lentz, Thomas A. (Licensing); Spiesman, Benjamin L.
Subject:
Voluntary Agreement to Implement CoC 1004 Amendment Revisions Which Remove the Requirement for a Spent Fuel Pool
Reference:
AREVA Inc. letter E-42575, from Paul Triska (AREVA) to NRC Document Control Desk, Application for Revision to the Standardized NUHOMS System - CoC 1004, Amendments 0 through 11 and Amendment 13, Docket 72-1004, dated August 24, 2015 The purpose of this communication is to confirm the following:
- FirstEnergy Corp. is aware of and understands the proposed AREVA Inc. changes to the CoC 1004 Standardized NUHOMS System Technical Specifications and the associated UFSAR changes, which are detailed in the letter referenced above for all approved amendments.
- We understand that these changes will result in Revision 1 to each currently approved CoC 1004 amendment.
- We understand that the previous version of the associated amendments will be superseded in their entirety by Revision 1.
- We agree to voluntarily implement these changes for our general licensee independent spent fuel storage installations (ISFSIs) at the following nuclear plant sites, which operate CoC 1004 Standardized NUHOMS Systems under one or more amendments:
- Beaver Valley Power Station
- Davis-Besse Power Station
- In order to allow sufficient time to incorporate these changes in a quality manner, we request that AREVA work with the NRC to provide its general licensees a maximum 180-day period after the effective date of the revised amendments during which we can complete incorporation and begin storage operations under the revised amendments.
Regards, Greg Halnon Vice President, Fleet Regulatory Affairs and Laboratory Services FirstEnergy Nuclear Operating Co Akron Ohio O-330-436-1369 F- 330-325-9577 The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this 1
document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
2
E-44108 Attachment 9 E-mail from Greg Halnon (FirstEnergy Nuclear Operating Company) to Don Shaw (AREVA) for Beaver Valley Power Station and Davis-Besse Power Station
WILLIFORD Dennis (RS/IB)
From: Halnon, Gregory H <ghalnon@firstenergycorp.com>
Sent: Monday, September 14, 2015 10:39 AM To: SHAW JR Donis (BE/LO)
Cc: WILLIFORD Dennis (RS/IB); Lentz, Thomas A. (Licensing); Spiesman, Benjamin L.
Subject:
Voluntary Agreement to Implement CoC 1004 Amendment Revisions Which Remove the Requirement for a Spent Fuel Pool
Reference:
AREVA Inc. letter E-42575, from Paul Triska (AREVA) to NRC Document Control Desk, Application for Revision to the Standardized NUHOMS System - CoC 1004, Amendments 0 through 11 and Amendment 13, Docket 72-1004, dated August 24, 2015 The purpose of this communication is to confirm the following:
- FirstEnergy Corp. is aware of and understands the proposed AREVA Inc. changes to the CoC 1004 Standardized NUHOMS System Technical Specifications and the associated UFSAR changes, which are detailed in the letter referenced above for all approved amendments.
- We understand that these changes will result in Revision 1 to each currently approved CoC 1004 amendment.
- We understand that the previous version of the associated amendments will be superseded in their entirety by Revision 1.
- We agree to voluntarily implement these changes for our general licensee independent spent fuel storage installations (ISFSIs) at the following nuclear plant sites, which operate CoC 1004 Standardized NUHOMS Systems under one or more amendments:
- Beaver Valley Power Station
- Davis-Besse Power Station
- In order to allow sufficient time to incorporate these changes in a quality manner, we request that AREVA work with the NRC to provide its general licensees a maximum 180-day period after the effective date of the revised amendments during which we can complete incorporation and begin storage operations under the revised amendments.
Regards, Greg Halnon Vice President, Fleet Regulatory Affairs and Laboratory Services FirstEnergy Nuclear Operating Co Akron Ohio O-330-436-1369 F- 330-325-9577 The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this 1
document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
2