ML16054A239

From kanterella
Jump to navigation Jump to search
E-44108 Attachment 9 E-mail from Greg Halnon (Firstenergy Nuclear Operating Company) to Don Shaw (Areva) for Beaver Valley Power Station and Davis-Besse Power Station
ML16054A239
Person / Time
Site: Beaver Valley, Davis Besse, 07201004
Issue date: 09/14/2015
From: Halnon G
AREVA, FirstEnergy Nuclear Operating Co
To: Shaw D
AREVA TN, Office of Nuclear Material Safety and Safeguards
Shared Package
ML16054A226 List:
References
E-44108
Download: ML16054A239 (3)


Text

E-44108 Attachment 9 E-mail from Greg Halnon (FirstEnergy Nuclear Operating Company) to Don Shaw (AREVA) for Beaver Valley Power Station and Davis-Besse Power Station

WILLIFORD Dennis (RS/IB)

From: Halnon, Gregory H <ghalnon@firstenergycorp.com>

Sent: Monday, September 14, 2015 10:39 AM To: SHAW JR Donis (BE/LO)

Cc: WILLIFORD Dennis (RS/IB); Lentz, Thomas A. (Licensing); Spiesman, Benjamin L.

Subject:

Voluntary Agreement to Implement CoC 1004 Amendment Revisions Which Remove the Requirement for a Spent Fuel Pool

Reference:

AREVA Inc. letter E-42575, from Paul Triska (AREVA) to NRC Document Control Desk, Application for Revision to the Standardized NUHOMS System - CoC 1004, Amendments 0 through 11 and Amendment 13, Docket 72-1004, dated August 24, 2015 The purpose of this communication is to confirm the following:

  • FirstEnergy Corp. is aware of and understands the proposed AREVA Inc. changes to the CoC 1004 Standardized NUHOMS System Technical Specifications and the associated UFSAR changes, which are detailed in the letter referenced above for all approved amendments.
  • We understand that these changes will result in Revision 1 to each currently approved CoC 1004 amendment.
  • We understand that the previous version of the associated amendments will be superseded in their entirety by Revision 1.
  • We agree to voluntarily implement these changes for our general licensee independent spent fuel storage installations (ISFSIs) at the following nuclear plant sites, which operate CoC 1004 Standardized NUHOMS Systems under one or more amendments:
  • Beaver Valley Power Station
  • Davis-Besse Power Station
  • In order to allow sufficient time to incorporate these changes in a quality manner, we request that AREVA work with the NRC to provide its general licensees a maximum 180-day period after the effective date of the revised amendments during which we can complete incorporation and begin storage operations under the revised amendments.

Regards, Greg Halnon Vice President, Fleet Regulatory Affairs and Laboratory Services FirstEnergy Nuclear Operating Co Akron Ohio O-330-436-1369 F- 330-325-9577 The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this 1

document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.

2

E-44108 Attachment 9 E-mail from Greg Halnon (FirstEnergy Nuclear Operating Company) to Don Shaw (AREVA) for Beaver Valley Power Station and Davis-Besse Power Station

WILLIFORD Dennis (RS/IB)

From: Halnon, Gregory H <ghalnon@firstenergycorp.com>

Sent: Monday, September 14, 2015 10:39 AM To: SHAW JR Donis (BE/LO)

Cc: WILLIFORD Dennis (RS/IB); Lentz, Thomas A. (Licensing); Spiesman, Benjamin L.

Subject:

Voluntary Agreement to Implement CoC 1004 Amendment Revisions Which Remove the Requirement for a Spent Fuel Pool

Reference:

AREVA Inc. letter E-42575, from Paul Triska (AREVA) to NRC Document Control Desk, Application for Revision to the Standardized NUHOMS System - CoC 1004, Amendments 0 through 11 and Amendment 13, Docket 72-1004, dated August 24, 2015 The purpose of this communication is to confirm the following:

  • FirstEnergy Corp. is aware of and understands the proposed AREVA Inc. changes to the CoC 1004 Standardized NUHOMS System Technical Specifications and the associated UFSAR changes, which are detailed in the letter referenced above for all approved amendments.
  • We understand that these changes will result in Revision 1 to each currently approved CoC 1004 amendment.
  • We understand that the previous version of the associated amendments will be superseded in their entirety by Revision 1.
  • We agree to voluntarily implement these changes for our general licensee independent spent fuel storage installations (ISFSIs) at the following nuclear plant sites, which operate CoC 1004 Standardized NUHOMS Systems under one or more amendments:
  • Beaver Valley Power Station
  • Davis-Besse Power Station
  • In order to allow sufficient time to incorporate these changes in a quality manner, we request that AREVA work with the NRC to provide its general licensees a maximum 180-day period after the effective date of the revised amendments during which we can complete incorporation and begin storage operations under the revised amendments.

Regards, Greg Halnon Vice President, Fleet Regulatory Affairs and Laboratory Services FirstEnergy Nuclear Operating Co Akron Ohio O-330-436-1369 F- 330-325-9577 The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this 1

document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.

2