E-44108 Attachment 7 E-mail from Jim Shaw (Cooper Nuclear Station) to Don Shaw (Areva) for Cooper Nuclear Station
ML16054A237
Person / Time
Site: Cooper, 07201004  Entergy icon.png
Issue date: 09/29/2015
From: Shaw J
Nebraska Public Power District (NPPD)
To: Shaw D
AREVA TN, Office of Nuclear Material Safety and Safeguards
Shared Package
ML16054A226 List:
References
E-44108
Download: ML16054A237 (2)


Text

E-44108 Attachment 7 E-mail from Jim Shaw (Cooper Nuclear Station) to Don Shaw (AREVA) for Cooper Nuclear Station

WILLIFORD Dennis (RS/IB)

From: Shaw, Jim D. <jdshaw@nppd.com>

Sent: Tuesday, September 29, 2015 8:51 AM To: SHAW JR Donis (BE/LO)

Cc: WILLIFORD Dennis (RS/IB); Voss, Brian K.; Bray, Luann E.

Subject:

FW: Voluntary Agreement to Implement CoC 1004 Amendment Revisions Which Remove the Requirement for a Spent Fuel Pool Don,

Reference:

AREVA Inc. Letter E-42575, from Paul Triska (AREVA) to NRC Document Control Desk, Application for Revision to the Standardized NUHOMS System - CoC 1004, Amendments 0 through 11 and Amendment 13, Docket 72-1004, dated August 24, 2015 The purpose of this communication is to confirm the following:

  • Nebraska Public Power District is aware of and understands the proposed AREVA Inc. changes to the CoC 1004 Standardized NUHOMS System Technical Specifications and the associated UFSAR changes, which are detailed in the letter referenced above for all approved amendments.
  • We understand that these changes will result in Revision 1 to each currently approved CoC 1004 amendment.
  • We understand that the previous version of the associated amendments will be superseded in their entirety by Revision 1.
  • We agree to voluntarily implement these changes for our general licensee independent spent fuel storage installation (ISFSI) at the following site, which operates a CoC 1004 Standardized NUHOMS System under one or more amendments:

Cooper Nuclear Station

  • In order to allow sufficient time to incorporate these changes in a quality manner, we request that AREVA work with the NRC to provide its general licensees a maximum 180-day period after the effective date of the revised amendments during which we can complete incorporation and begin storage operations under the revised amendments.

Sincerely, Jim Shaw Licensing Manager Cooper Nuclear Station jdshaw@nppd.com 402-825-2788 1

E-44108 Attachment 7 E-mail from Jim Shaw (Cooper Nuclear Station) to Don Shaw (AREVA) for Cooper Nuclear Station

WILLIFORD Dennis (RS/IB)

From: Shaw, Jim D. <jdshaw@nppd.com>

Sent: Tuesday, September 29, 2015 8:51 AM To: SHAW JR Donis (BE/LO)

Cc: WILLIFORD Dennis (RS/IB); Voss, Brian K.; Bray, Luann E.

Subject:

FW: Voluntary Agreement to Implement CoC 1004 Amendment Revisions Which Remove the Requirement for a Spent Fuel Pool Don,

Reference:

AREVA Inc. Letter E-42575, from Paul Triska (AREVA) to NRC Document Control Desk, Application for Revision to the Standardized NUHOMS System - CoC 1004, Amendments 0 through 11 and Amendment 13, Docket 72-1004, dated August 24, 2015 The purpose of this communication is to confirm the following:

  • Nebraska Public Power District is aware of and understands the proposed AREVA Inc. changes to the CoC 1004 Standardized NUHOMS System Technical Specifications and the associated UFSAR changes, which are detailed in the letter referenced above for all approved amendments.
  • We understand that these changes will result in Revision 1 to each currently approved CoC 1004 amendment.
  • We understand that the previous version of the associated amendments will be superseded in their entirety by Revision 1.
  • We agree to voluntarily implement these changes for our general licensee independent spent fuel storage installation (ISFSI) at the following site, which operates a CoC 1004 Standardized NUHOMS System under one or more amendments:

Cooper Nuclear Station

  • In order to allow sufficient time to incorporate these changes in a quality manner, we request that AREVA work with the NRC to provide its general licensees a maximum 180-day period after the effective date of the revised amendments during which we can complete incorporation and begin storage operations under the revised amendments.