ML16047A070

From kanterella
Jump to navigation Jump to search
TR510, Revision 2, Evacuation Time Estimates. Part 3 of 4
ML16047A070
Person / Time
Site: Pilgrim
Issue date: 12/31/2015
From:
KLD Engineering, PC
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16047A066 List:
References
2.16.007 TR510, Rev. 2
Download: ML16047A070 (31)


Text

APPENDIX H Evacuation Regions

H EVACUATION REGIONS This appendix presents the evacuation percentages for each Evacuation Region (Table H-i and Table H-2) and maps of all Evacuation Regions. The percentages presented in Table H-i and Table H-2 are based on the methodology discussed in assumption 5 of Section 2.2 and shown in Figure 2-1.

Note the baseline ETE study assumes 20 percent of households will not comply with the shelter advisory, as per Section 2.5.2 of NUREG/CR-7002.

Pilerim Nuclear Power Station H-i KLD Eneineerine. P.C.

Evacuation Time Estimate Rev. I

Table H-i. Percent of Sub-area Population Evacuating for Each Region Basic Regions Region Site PAR Sub-area I I Description Description 1112 1 54I 6 I 7 I 8 I 9 I 10o l 11 l 2 1 Rl2-Mile Radius 2-Mile Ring R0S-Mile Radius j. 5-Mile Ring Site PAR Sub-area Rein Wind Direction From: Description r , , I 1112131 415 6 7 8 9 10 11 I 12 I I 4 4- 4 + +

R4NW, NNW, N 3060 - 0190 20% 20% 20% 20% 20% 20% 20%

RSNNE, NE, ENE 0200 -0690 2% 2%2%2%20%,2%2010 R6E 0700 - 1220 20% 20% 20% 20% 20% 20% 20%

4 + 4 + 4 4 R7ESE, SE 1230 - 1400 20% 20% 20% 20% 20% 20% 20%

RSSSE, S 1410 1830 2% 20% 20%_ 20%120%2% 0 N/A SSW, SW, WSW, W, WNW 184°-3o5° I Refer to Region R01 Region Wind Direction From: Description 1 2 3 4 5 6 7 8 9 1 1 1 R09 I NW, NNW, N 319°- 0190 RIO - 0200-021° Rll NNE, NE 022°-~056° R12 -I2002072-020620 R13 I 0670 -0690 R14 IENE 070°-103° RiS E, ESE 104°- 1090 R16 - 1°15 R17 - 1160-1290 R8IS SE13 -32 R19 I 1330 -1400 R20 ISSE, S14 -75 R21 I 1760°-1790 N/A I5SW, SW, WSW, W, WNW 1800°-3180 Refer to Region R02 Pilgrim Nuclear Power Station H-2 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Table H-2. Percent of Sub-area Population Evacuating for Each Staged Region

____Staged Evacuation.- 2-Mile Region Evacuates, then Evacuate Downwind to 5 Miles Region Wind Direction From: Description 1 2 3 4 5 6 7 8 9 10 11 1 R242NEEoEne00 5-M 1220R20% 20% 20% 20% 20% 20 20% 20%

R26 ESE, SE 1410 - 1830 0 0 0 0 0 R27 SSE, S 1840 - 35052% 0 20% 20% 20% 20% 20% 20 2%

N/A SSW, SW, WSW, W, WNW 2-Mile Ring Refer to Region R01 Sub-area(s) Shelter-in-Place Pilgrim Nuclear Power Station H-3 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-1. Region R01 Pilgrim Nuclear Power Station H-4 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-2. Region R02 Pilgrim Nuclear Power Station H-5 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

J Figure H-3. Region R03 KID Engineering, P.C.

Pilgrim Nuclear Power Station H-6 H-6 Evacuation Time Estimate Rev. 1

Figure H-4. Region R04 Pilgrim Nuclear Power Station H-7 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-S. Region R05 KLD Engineering, P.C.

Pilgrim Nuclear Power Station H-8 H-S Evacuation Time Estimate Rev. 1

Figure H-6. Region R06 Pilgrim Nuclear Power Station H-9 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-7. Region R07 Pilgrim Nuclear Power Station H-bO KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-8. Region R08 Pilgrim Nuclear Power Station H-li KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-9. Region R09 Pilgrim Nuclear Power Station H-12 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-lO. Region RIO Pilgrim Nuclear Power Station H-13 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-11. Region Rll Pilgrim Nuclear Power Station KLD Engineering, P.C.

H-14 H-14 Evacuation Time Estimate Rev. 1

Figure H-12. Region R12 Pilgrim Nuclear Power Station H-15 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-13. Region R13 Pilgrim Nuclear Power Station H-16 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-14. Region R14 Pilgrim Nuclear Power Station KLD Engineering, P.C.

H-17 H-17 Evacuation Time Estimate Rev. 1

Figure H-15. Region R15 Pilgrim Nuclear Power Station H-18 KID Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-16. Region R16 Pilgrim Nuclear Power Station H-19 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-17. Region R17 Pilgrim Nuclear Power Station H-20 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-18. Region R18 Pilgrim Nuclear Power Station H-21 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-19. Region R19 Pilgrim Nuclear Power Station H-22 KID Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-20. Region R20 Pilgrim Nuclear Power Station H-23 KID Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-21. Region R21 Pilgrim Nuclear Power Station H-24 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-22. Region R22 Pilgrim Nuclear Power Station H-25 KID Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-23. Region R23 Pilgrim Nuclear Power Station H-26 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-24. Region R24 Pilgrim Nuclear Power Station H-27 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-25. Region R25 Pilgrim Nuclear Power Station H-28 KID Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-26. Region R26 Pilgrim Nuclear Power Station H-29 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-27. Region R27 Pilgrim Nuclear Power Station H-30 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

APPENDIX H Evacuation Regions

H EVACUATION REGIONS This appendix presents the evacuation percentages for each Evacuation Region (Table H-i and Table H-2) and maps of all Evacuation Regions. The percentages presented in Table H-i and Table H-2 are based on the methodology discussed in assumption 5 of Section 2.2 and shown in Figure 2-1.

Note the baseline ETE study assumes 20 percent of households will not comply with the shelter advisory, as per Section 2.5.2 of NUREG/CR-7002.

Pilerim Nuclear Power Station H-i KLD Eneineerine. P.C.

Evacuation Time Estimate Rev. I

Table H-i. Percent of Sub-area Population Evacuating for Each Region Basic Regions Region Site PAR Sub-area I I Description Description 1112 1 54I 6 I 7 I 8 I 9 I 10o l 11 l 2 1 Rl2-Mile Radius 2-Mile Ring R0S-Mile Radius j. 5-Mile Ring Site PAR Sub-area Rein Wind Direction From: Description r , , I 1112131 415 6 7 8 9 10 11 I 12 I I 4 4- 4 + +

R4NW, NNW, N 3060 - 0190 20% 20% 20% 20% 20% 20% 20%

RSNNE, NE, ENE 0200 -0690 2% 2%2%2%20%,2%2010 R6E 0700 - 1220 20% 20% 20% 20% 20% 20% 20%

4 + 4 + 4 4 R7ESE, SE 1230 - 1400 20% 20% 20% 20% 20% 20% 20%

RSSSE, S 1410 1830 2% 20% 20%_ 20%120%2% 0 N/A SSW, SW, WSW, W, WNW 184°-3o5° I Refer to Region R01 Region Wind Direction From: Description 1 2 3 4 5 6 7 8 9 1 1 1 R09 I NW, NNW, N 319°- 0190 RIO - 0200-021° Rll NNE, NE 022°-~056° R12 -I2002072-020620 R13 I 0670 -0690 R14 IENE 070°-103° RiS E, ESE 104°- 1090 R16 - 1°15 R17 - 1160-1290 R8IS SE13 -32 R19 I 1330 -1400 R20 ISSE, S14 -75 R21 I 1760°-1790 N/A I5SW, SW, WSW, W, WNW 1800°-3180 Refer to Region R02 Pilgrim Nuclear Power Station H-2 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Table H-2. Percent of Sub-area Population Evacuating for Each Staged Region

____Staged Evacuation.- 2-Mile Region Evacuates, then Evacuate Downwind to 5 Miles Region Wind Direction From: Description 1 2 3 4 5 6 7 8 9 10 11 1 R242NEEoEne00 5-M 1220R20% 20% 20% 20% 20% 20 20% 20%

R26 ESE, SE 1410 - 1830 0 0 0 0 0 R27 SSE, S 1840 - 35052% 0 20% 20% 20% 20% 20% 20 2%

N/A SSW, SW, WSW, W, WNW 2-Mile Ring Refer to Region R01 Sub-area(s) Shelter-in-Place Pilgrim Nuclear Power Station H-3 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-1. Region R01 Pilgrim Nuclear Power Station H-4 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-2. Region R02 Pilgrim Nuclear Power Station H-5 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

J Figure H-3. Region R03 KID Engineering, P.C.

Pilgrim Nuclear Power Station H-6 H-6 Evacuation Time Estimate Rev. 1

Figure H-4. Region R04 Pilgrim Nuclear Power Station H-7 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-S. Region R05 KLD Engineering, P.C.

Pilgrim Nuclear Power Station H-8 H-S Evacuation Time Estimate Rev. 1

Figure H-6. Region R06 Pilgrim Nuclear Power Station H-9 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-7. Region R07 Pilgrim Nuclear Power Station H-bO KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-8. Region R08 Pilgrim Nuclear Power Station H-li KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-9. Region R09 Pilgrim Nuclear Power Station H-12 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-lO. Region RIO Pilgrim Nuclear Power Station H-13 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-11. Region Rll Pilgrim Nuclear Power Station KLD Engineering, P.C.

H-14 H-14 Evacuation Time Estimate Rev. 1

Figure H-12. Region R12 Pilgrim Nuclear Power Station H-15 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-13. Region R13 Pilgrim Nuclear Power Station H-16 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-14. Region R14 Pilgrim Nuclear Power Station KLD Engineering, P.C.

H-17 H-17 Evacuation Time Estimate Rev. 1

Figure H-15. Region R15 Pilgrim Nuclear Power Station H-18 KID Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-16. Region R16 Pilgrim Nuclear Power Station H-19 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-17. Region R17 Pilgrim Nuclear Power Station H-20 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-18. Region R18 Pilgrim Nuclear Power Station H-21 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-19. Region R19 Pilgrim Nuclear Power Station H-22 KID Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-20. Region R20 Pilgrim Nuclear Power Station H-23 KID Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-21. Region R21 Pilgrim Nuclear Power Station H-24 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-22. Region R22 Pilgrim Nuclear Power Station H-25 KID Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-23. Region R23 Pilgrim Nuclear Power Station H-26 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-24. Region R24 Pilgrim Nuclear Power Station H-27 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-25. Region R25 Pilgrim Nuclear Power Station H-28 KID Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-26. Region R26 Pilgrim Nuclear Power Station H-29 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1

Figure H-27. Region R27 Pilgrim Nuclear Power Station H-30 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 1