MONTHYEARL-16-034, Distribution Notice for License Amendment Request to Adopt NFPA Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition).2016-02-0202 February 2016 Distribution Notice for License Amendment Request to Adopt NFPA Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition). Project stage: Request ML16047A1452016-02-22022 February 2016 Supplemental Information Needed for Acceptance of License Amendment Request to Adopt National Fire Protection Associated Standard 805 Project stage: Acceptance Review L-16-079, Supplemental Information for License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 8052016-03-0707 March 2016 Supplemental Information for License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 Project stage: Supplement ML16074A1232016-03-15015 March 2016 Acceptance of License Amendment Request to Adopt National Fire Protection Associated Standard 805 Project stage: Acceptance Review L-16-088, Conservatisms in the Fire Probabilistic Risk Analysis2016-03-17017 March 2016 Conservatisms in the Fire Probabilistic Risk Analysis Project stage: Request ML16075A1112016-03-23023 March 2016 Online Reference Portal for License Amendment Request to Adopt National Fire Protection Associated Standard 805 Project stage: Other ML16126A2362016-05-0505 May 2016 NRR E-mail Capture - Davis-Besse NFPA 805 Portal Project stage: Other ML16130A7182016-05-0909 May 2016 NRR E-mail Capture - Davis-Besse NFPA 805 Portal Project stage: Other L-16-170, Online Reference Portal for Review of National Fire Protection Association (NFPA) Standard 805 License Amendment Request2016-05-31031 May 2016 Online Reference Portal for Review of National Fire Protection Association (NFPA) Standard 805 License Amendment Request Project stage: Request ML16172A0312016-06-20020 June 2016 NRR E-mail Capture - Davis-Besse NFPA 805 Portal Project stage: Other ML16190A0752016-07-0808 July 2016 NRR E-mail Capture - Davis-Besse NFPA 805 Portal Project stage: Other ML16201A0172016-07-20020 July 2016 Regulatory Audit in Support of the License Amendment Request to Implement Risk-Informed, Performance-Based, Fire Protection Program as Allowed by Title 10 CFR, Paragraph 50.48(c) Project stage: Other L-16-232, Correction of Fire Probabilistic Risk Analysis (PRA) Results2016-07-28028 July 2016 Correction of Fire Probabilistic Risk Analysis (PRA) Results Project stage: Other ML16256A0662016-10-18018 October 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Associated Standard 805 Project stage: RAI L-16-345, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Cnfpa) Standard 8052016-12-16016 December 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Cnfpa) Standard 805 Project stage: Response to RAI L-16-371, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 8052017-01-17017 January 2017 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 Project stage: Response to RAI ML17100A1732017-04-19019 April 2017 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Associated Standard 805 Project stage: RAI L-17-189, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 8052017-06-16016 June 2017 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 Project stage: Response to RAI ML17257A1402017-09-14014 September 2017 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 Project stage: RAI ML17258A1462017-09-20020 September 2017 Summary of September 12, 2017, Meeting with Firstenergy Nuclear Operating Company Regarding Its Licensing Amendment Request to Adopt National Fire Protection Association Standard 805 at Davis-Besse Nuclear Power Station, Unit No. 1 Project stage: Meeting L-17-253, Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 8052017-10-0909 October 2017 Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 Project stage: Supplement ML17355A3722017-12-21021 December 2017 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 Project stage: RAI L-18-085, Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 8052018-04-0202 April 2018 Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 Project stage: Supplement ML18201A4122018-07-19019 July 2018 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 Project stage: RAI L-18-249, Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 8052018-11-20020 November 2018 Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 Project stage: Supplement ML19100A3062019-06-21021 June 2019 Issuance of Amendment No. 298 to Adopt National Fire Protection Association Standard 805 Project stage: Approval 2016-07-20
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, And Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 And Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-059, Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-0022023-03-0909 March 2023 Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-002 L-22-212, CFR 50.55a Request RP-5 Regarding Inservice Pump Testing2023-03-0606 March 2023 CFR 50.55a Request RP-5 Regarding Inservice Pump Testing L-23-048, Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2023-03-0101 March 2023 Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-253, Submittal of Pressure and Temperature Limits Report, Revision 52023-01-10010 January 2023 Submittal of Pressure and Temperature Limits Report, Revision 5 L-22-284, Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS)2022-12-28028 December 2022 Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2022-09-29029 September 2022 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-22-216, Submittal of Pressure and Temperature Limits Report. Revision 42022-09-27027 September 2022 Submittal of Pressure and Temperature Limits Report. Revision 4 L-22-213, Occupational Radiation Exposure Report for Year 2021 - Correction2022-09-23023 September 2022 Occupational Radiation Exposure Report for Year 2021 - Correction L-22-194, Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events2022-09-19019 September 2022 Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events L-22-203, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-22-152, Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan2022-07-0505 July 2022 Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan L-22-068, Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report2022-06-30030 June 2022 Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report L-22-037, 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2022-06-30030 June 2022 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-149, Post Accident Monitoring Report2022-06-23023 June 2022 Post Accident Monitoring Report L-22-098, Withdrawal of Proposed Inservice Inspection Alternative RR-A22022-06-22022 June 2022 Withdrawal of Proposed Inservice Inspection Alternative RR-A2 L-22-153, Readiness for NRC Supplemental Inspection Required for a White Finding2022-06-22022 June 2022 Readiness for NRC Supplemental Inspection Required for a White Finding L-22-136, Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage2022-06-0707 June 2022 Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage 2024-08-27
[Table view] |
Text
FENOC' ~
5501 North State Route 2 Oak Harbor, Ohio 43449 FirstEnergy Nuclear Operating Company Brian D. Boles 419-321-7676 Vice President, Fax: 419-321-7582 Nuclear February 2, 2016 L-16-034 10 CFR 50.4(b)(1) 10 CFR 50.91(b)(1)
ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Distribution Notice for License Amendment Request to Adopt NFPA Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)"
By letter dated December 16, 2015, FirstEnergy Nuclear Operating Company (FENOC) submitted a license amendment request to adopt NFPA Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)."
FENOC completed the required distribution for the submittal to the Nuclear Regulatory Commission (NRG) Region Ill regional administrator, the NRG resident inspector, and the State of Ohio on January 8, 2016.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-315-6810.
Sincerely,
~#~
Brian D. Boles cc: NRG Regional Administrator - Region Ill NRG Resident Inspector NRG Project Manager Executive Director, Ohio Emergency Management Agency, State of Ohio (NRG Liaison)
Utility Radiological Safety Board
FENOC' ~
5501 North State Route 2 Oak Harbor, Ohio 43449 FirstEnergy Nuclear Operating Company Brian D. Boles 419-321-7676 Vice President, Fax: 419-321-7582 Nuclear February 2, 2016 L-16-034 10 CFR 50.4(b)(1) 10 CFR 50.91(b)(1)
ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Distribution Notice for License Amendment Request to Adopt NFPA Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)"
By letter dated December 16, 2015, FirstEnergy Nuclear Operating Company (FENOC) submitted a license amendment request to adopt NFPA Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)."
FENOC completed the required distribution for the submittal to the Nuclear Regulatory Commission (NRG) Region Ill regional administrator, the NRG resident inspector, and the State of Ohio on January 8, 2016.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-315-6810.
Sincerely,
~#~
Brian D. Boles cc: NRG Regional Administrator - Region Ill NRG Resident Inspector NRG Project Manager Executive Director, Ohio Emergency Management Agency, State of Ohio (NRG Liaison)
Utility Radiological Safety Board