Enclosure 1, Compliance with NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML16014A755
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 01/14/2016
From: Davison K
Northern States Power Co, Xcel Energy
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16014A753 List:
References
EA-12-049, L-PI-16-001, TAC MF0832, TAC MF0833, TAC MF0834, TAC MF0835
Download: ML16014A755 (7)


Text

L-PI-16-001 NSPM PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 COMPLIANCE WITH NRC ORDER EA-12-049, "ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS"

1.0 INTRODUCTION

On March 12, 2012, the NRC staff issued Order EA-12-049, "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," (Reference 1) to all NRC power reactor licensees and holders of construction permits in active or deferred status. Reference 1 was immediately effective and directed Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, to develop, implement and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. Specific requirements were outlined in Attachment 2 of Reference 1.

In response to NRC Order EA-12-049, NSPM developed and submitted an Overall Integrated Plan (OIP) (Reference 3) describing the diverse and flexible mitigation strategies (FLEX) for responding to beyond-design-basis external events at PINGP. As required by the NRC Order, NSPM has submitted five OIP status updates at six-month intervals (References 6, 7, 8, 9, and 11).

In Reference 4, NSPM requested relaxation of the schedule requirements for full implementation of Order EA-12-049 for PINGP Unit 2. The relaxati'on request was specific to the FLEX Storage Building construction, equipment storage, and equipment deployment time validation and was based on construction delays. By Reference 5, the NRC granted a 60 day schedule relaxation. However, NSPM completed construction of the FLEX building prior to startup from 2R29, and therefore, full compliance with Order EA-12-049 was achieved without implementation of the 60-day relaxation.

In accordance with Reference 1, licensees are required to complete full implementation with the Order no later than two refueling cycles after submittal of the OIP, or December 31, 2016, whichever comes first. The second refueling outage after the Reference 3 submittal for PINGP Unit 2 occurred in the Fall of 2015. Additionally, the Order requires that licensees report when full compliance has been achieved. The NRC staff has requested that the compliance report be submitted within 60 days of commencing unit startup from the implementation outage. The information provided in this Enclosure documents Unit 2 compliance with NR~ Order EA-12-049.

Page 1 of 7

L-PI-16-001 2.0 OPEN ITEM RESOLUTION NSPM Open and pending items from the NRC Interim Staff Evaluation (ISE) (Reference 12) and NRC Audit Report (Reference 13) have been addressed by NSPM. The issues identified as open or pending in the NRC Audit Report are listed below:

ISE Confirmatory Items (CI):

Cl 3.1.1.2.A, Deployment of FLEX Equipment, Open Cl 3.2.1.2.A, Reactor Coolant Pump Seals, Pending Cl 3.2.4.9.A, Fuel Consumption, Open Audit Report Safety Evaluation (SE) Items:

SE.16, Spent Fuel Pool (SFP) Spray, Open SE.18, Develop integrated flooding strategy, Open SE.19, Accumulator borated water injection calculation, Open SE.20, N+1 Capability for FLEX 480 VAC portable generators, Open Responses to the above items are provided in the NSPM Fukushima Response online reference portal with the exception of SE.20 that was described as a compliance change in the fifth six-month status report (Reference 11 ). The above items are summarized in Enclosure 2 to this letter. These items are complete pending NRC closure. NSPM had no ISE Open Items and no Licensee Identified Open Items.

3.0 Milestone Schedule-Items Complete Unit 2 Milestone Completion Date Submit 60 Day Status Report (Reference 2)

October 2012 Submit Overall Integrated Plan (Reference 3)

February 2013 Submit First Six-Month Status Update (Reference 6)

August 2013 Commence Engineering Modification Design - Phase 2 & 3 September 2013 Submit Second Six-Month Status Update (Reference 7)

February 2014 National SAFER Response Center Operational August 2015 Procure Equipment November 2015 Submit Third Six-Month Status Update (Reference 8)

August 2014 Commence Installation for Online Modifications-Phase 2 June 2015 and 3 Page 2 of 7

L-PI-16-001 Implement Storage Unit 2 Milestone Issue Maintenance Procedures Implement Training Submit Fourth Six-Month Status Update (Reference 9)

Submit Phase 2 Staffing Assessment (Reference 1 0)

Implement Communication Recommendations Issue Procedures updated for FLEX strategies Submit Fifth Six-Month Status Update (Reference 11)

Unit 2 Implementation Outage Validation Walk-throughs Submit Completion Report-Unit 2 4.0 Order EA-12-049 Compliance Elements Summary Strategies-Complete NSPM Completion Date November 2015 November 2015 November 2015 February 2015 May 2015 June 2015 November 2015 August 2015 December 2015 October 2015 Complete with this submittal The PINGP Unit 2 strategies are in compliance with Order EA-12-049. Strategy related Open Items, Confirmatory Items, or Audit Questions/Audit Report Open Items have been addressed by NSPM as discussed in Section 2.0 above.

Modifications - Complete The modifications required to support the FLEX strategies for PINGP Unit 2 have been fully implemented in accordance with the station design control process.

Equipment-Procured and Maintenance & Testing - Complete The equipment required to implement the FLEX strategies for PINGP Unit 2 has been procured in accordance with NEI 12-06 (Reference 14), Section 11.1 and 11.2, received at PINGP, initially tested/performance verified as identified in NEI 12-06, Section 11.5, and is available for USE).

Maintenance and testing will be conducted through the use of the PINGP Preventative Maintenance Program such that equipment reliability is achieved and maintained.

Page 3 of 7

L-PI-16-001 Protected Storage - Complete NSPM The storage facility required to implement the FLEX strategies for PINGP has been completed and provides protection from the applicable site hazards, with the exception of the design basis flood. The PINGP FLEX strategy during a design basis flood relies on the expected warning time and pre-deployment of SAFER equipment to the site prior to the site grade flooding. The equipment required to implement the non-flood FLEX strategies for PINGP is stored in its protected configuration.

Procedures - Complete FLEX Support Guidelines (FSGs) for PINGP Unit 2 have been developed and integrated with existing procedures. The FSGs and affected existing procedures have been validated and are available for use in accordance with the site procedure control program.

Training-Complete Training for PINGP has been implemented in accordance with an accepted training process as recommended in NEI 12-06, Section 11.6.

Staffing - Complete The staffing study for PINGP has been completed in accordance with 1 OCFR50.54(f),

"Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force review of Insights from the Fukushima Dai-ichi Accident," Recommendation 9.3, dated March 12, 2012 (Reference 15), as documented in the letter to the NRC dated May 28, 2015 (Reference 1 0). The staffing study concluded that no additional staff is required to mitigate the ELAP event.

National SAFER Response Center - Complete NSPM has established a contract with Pooled Equipment Inventory Company (PEICo) and has joined the Strategic Alliance for FLEX Emergency Response (SAFER) Team Equipment Committee for off-site facility coordination. It has been confirmed that PEl Co

  • is ready to support PINGP with Phase 3 equipment stored in the National SAFER Response Centers in accordance with the site specific SAFER Response Plan.

Validation - Complete NSPM has completed validation in accordance with industry developed guidance to assure required tasks, manual actions, and decisions for FLEX strategies are feasible and may be executed within the constraints identified in the OIP for Order EA-12-049.

Page 4 of 7

L-PI-16-001 FLEX Program Document - Established NSPM The NSPM FLEX Program Document for PINGP has been developed in accordance with the requirements of NEI12-06.

5.0

References:

1. NRC Order EA-12-049, "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," dated March 12, 2012 (ADAMS Accession No. ML12054A735).
2. NSPM Letter (L-PI-12-092) to NRC, "Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," dated October 29, 2012 (ADAMS Accession No. ML12305A287).
3. NSPM Letter (L-PI-13-007) to NRC, "Prairie Island Nuclear Generating Plant's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," dated February 26, 2013 (ADAMS Accession No. ML13060A379).
4. NSPM Letter (L-PI-15-086) to NRC, "Request for Relaxation from NRC Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," Prairie Island Nuclear Generating Plant Unit 2 (TAC No.

MF0835)," dated September 29, 2015 (ADAMS Accession No. ML15272A505).

5. NRC Letter to NSPM, "Prairie Island Nuclear Generating Plant, Unit 2-Relaxation of the Schedule Requirements For Order EA-12-049, 'Issuance Of Order To Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events' (TAC No. MF0835),"

dated October 25, 2015 (ADAMS Accession No. ML15273A291).

6. NSPM Letter (L-PI-13-080) to NRC, "Prairie Island's First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049),"

dated August 26, 2013 (ADAMS Accession No. ML13239A094).

Page 5 of 7

L-PI-16-001 NSPM

7. NSPM Letter (L-PI-14-018) to NRC, "Prairie Island Nuclear Generating Plant's Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," dated February 26, 2014 (ADAMS Accession No. ML14057A771).
8. NSPM Letter (L-PI-14-078) to NRC, "Prairie Island Nuclear Generating Plant's Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (TAC Nos. MF0834 and MF0835)," dated August 25, 2014 (ADAMS Accession No. ML14237A512).
9. NSPM Letter (L-PI-15-021) to NRC, "Prairie Island Nuclear Generating Plant's Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (TAC Nos. MF0834 and MF0835)," dated February 26, 2015 (ADAMS Accession No. ML15057A323).
10. NSPM Letter (L-PI-15-044) to NRC, "Prairie Island Nuclear Generating Plant Phase 2 Staffing Assessment in Response to March 12, 2012, Request for Information Pursuant to Title 1 0 of the Code of Federal Regulations 50.54(f) Regarding Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency Preparedness-Staffing, Requested Information Items 1, 2, and 6," dated May 28, 2015 (ADAMS Accession No. ML15154A564).
11. NSPM Letter (L-PI-15-065) to NRC, "Prairie Island Nuclear Generating Plant's Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (TAC Nos. MF0834 and MF0835)," dated August 25, 2015 (ADAMS Accession No. ML15237A403).
12. NRC Letter to NSPM, "Prairie Island Nuclear Generating Plant Units 1 and 2-Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) (TAC Nos. MF0834 and MF0835)," dated February 27, 2014 (ADAMS Accession No. ML14030A540).

Page 6 of 7

L-PI-16-001 NSPM

13. NRC Letter to NSPM, "Prairie Island Nuclear Generating Plant, Units 1 and 2 - Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 (TAC Nos. MF0834, MF0835, MF0832, and MF0833)," dated August 20, 2015 (ADAMS Accession No. ML152248396).
14. NEI 12-06, "Diverse and Flexible Coping Strategies (FLEX)

Implementation Guide," Revision 0, dated August 2012 (ADAMS Accession No. ML12242A378).

15. NRC Letter, "Request for Information Pursuant to Title 10 of the Code Of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review Of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012 (ADAMS Accession No. ML12056A046).

Page 7 of 7