Notification of Compliance with NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
ML16014A754
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 01/14/2016
From: Davison K
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16014A753 List:
References
EA-12-049, L-PI-16-001, TAC MF0832, TAC MF0833, TAC MF0834, TAC MF0835
Download: ML16014A754 (2)


Text

Xcel Energy January 14, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Unit 2 Docket Number 50-306 Renewed Facility Operating License No. DPR-60 Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Welch, MN 55089 L-PI-16-001 10 CFR 2.202 10 CFR 50.4 Notification of Compliance with NRC Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," Prairie Island Nuclear Generating Plant Unit 2 (TAG No. MF0835)

References:

1. NRC Order EA-12-049, "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Basis External Events," dated March 12, 2012 (ADAMS Accession No. ML 12054A735). 2. NRC Audit Report, "Prairie Island Nuclear Generating Plant, Units 1 and 2-Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel pool Instrumentation Related to orders EA-12-049 and EA-12-051 (TAG Nos. MF0834, MF0835, MF0832 and MF0833)," dated August 20, 2015 (ADAMS Accession No. ML 15224B396).

On March 12, 2012, the NRC staff issued Order EA-12-049, "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Design-Basis External Events," (Reference

1) to all NRC power reactor licensees and holders of construction permits in active or deferred status; The Reference 1 Order was immediately effective and directed Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, to develop, implement and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event for Document Control Desk Page 2 the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. The Order directed licensees to report when full compliance with the Order requirements was achieved.

The purpose of this letter is to report that full compliance with the Order has been achieved for PINGP Unit 2. Enclosure 1 provides a summary description of the key elements associated with PINGP Unit 2 compliance to the Order. Enclosure 2 provides a summary response for each of the open and pending items from the Reference 2 audit report. Please contact Lynne Gunderson, Licensing Engineer, at 651-267-7421, if additional information or clarification is required.

  • Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

I declare under penalty of perjury that the foregoing is true and correct. Executed on January 14, 2016.

Kevin Davison Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota Enclosures (2) cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island Nuclear Generating Plant, USNRC Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC