Technical Requirements Manual, Affected Pages, Revision 16
ML15335A498
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/20/2015
From:
Northern States Power Co, Xcel Energy
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15335A486 List:
References
L-MT-15-088
Download: ML15335A498 (8)


Text

TRM Control Rod Block Instrumentation 3.3.2.1 Monticello 3.3.2.1-1 Revision 16 3.3 INSTRUMENTATION 3.3.2.1 Control Rod Block Instrumentation TLCO 3.3.2.1 The control rod block instrumentation for each Function in Table 3.3.2.1-1 shall be OPERABLE.

APPLICABILITY:

According to Table 3.3.2.1-1 ACTIONS


NOTE-----------------------------------------------------------

Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. ------------NOTE-------------

Only applicable to Functions 1, 2, 3 and 5.

One or more Functions with one required channel inoperable.

A.1 Restore channel to OPERABLE status.

7 days B. ------------NOTE-------------

Only applicable to Functions 1, 2, 3, and 5.

One or more Functions with two required channels inoperable.

B.1 Place channel in the tripped condition.

OR B.2 Suspend control rod withdrawal.

Immediately Immediately C. One or more required Function 4 channels inoperable.

C.1 Place channel in the tripped condition.

OR C.2 Suspend control rod withdrawal.

Immediately Immediately

TRM Control Rod Block Instrumentation 3.3.2.1 Monticello 3.3.2.1-2 Revision 16 SURVEILLANCE REQUIREMENTS


NOTE-----------------------------------------------------------

1.

Refer to Table 3.3.2.1-1 to determine which TSRs apply for each Control Rod Block Function.

2.

When a channel is placed in an inoperable status solely for performance of required Surveillance, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains control rod block capability.

SURVEILLANCE FREQUENCY TSR 3.3.2.1.1 Perform CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TSR 3.3.2.1.2


NOTE-------------------------------

1. For Function 1.b, not required to be performed if SRM detectors are secured in the full-in position.
2. For Function 2.a and 2.b, not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.

Perform CHANNEL FUNCTIONAL TEST.

7 days TSR 3.3.2.1.3 Perform CHANNEL FUNCTIONAL TEST.

92 days TSR 3.3.2.1.4 Perform CHANNEL CALIBRATION.

12 months TSR 3.3.2.1.5


NOTE-------------------------------

1. Neutron detectors are excluded.
2. For Function 2.a and 2.b, not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.

Perform CHANNEL CALIBRATION.

24 months TSR 3.3.2.1.6 Perform CHANNEL CALIBRATION.

24 months TSR 3.3.2.1.7 Perform CHANNEL FUNCTIONAL TEST.

184 days

TRM Control Rod Block Instrumentation 3.3.2.1 Monticello 3.3.2.1-3 Revision 16 Table 3.3.2.1-1 (Page 1 of 2)

Control Rod Block Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE

1.

Source Range Monitors

a.

Upscale 2(a), 5 1

TSR 3.3.2.1.1 TSR 3.3.2.1.2 TSR 3.3.2.1.5 1.16 x 105cps

b.

Detector Not Fully Inserted 2(b), 5(b) 1 TSR 3.3.2.1.2 TSR 3.3.2.1.5 NA

2.

Intermediate Range Monitors

a.

Downscale 2(c), 5(c) 2(d)

TSR 3.3.2.1.1 TSR 3.3.2.1.2 TSR 3.3.2.1.5 3/125 divisions of full scale

b.

Upscale 2, 5 2(d)

TSR 3.3.2.1.1 TSR 3.3.2.1.2 TSR 3.3.2.1.5 109.5/125 divisions of full scale

3.

Average Power Range Monitors

a.

Simulated Thermal Power - High 1

3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 0.61W + 61.2% RTP(e) and < 110% RTP

b.

Downscale 1

3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 2/125 divisions of full scale

c.

Neutron Flux - High (Setdown) 2 3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 15%

4.

Scram Discharge Volume

a.

East Water Level High 1, 2 1

TSR 3.3.2.1.3 TSR 3.3.2.1.4 40 gal

b.

West Water Level High 1, 2 1

TSR 3.3.2.1.3 TSR 3.3.2.1.4 40 gal (a)

With IRMs on Range 6 or below.

(b)

With SRM channel count rate < 100 cps and IRMs on Range 2 or below.

(c)

With IRMs on Range 2 or above.

(d)

There must be at least one OPERABLE IRM channel monitoring each core quadrant.

(e) 0.55(W - Delta W) + 55.5% when Technical Specification 3.3.1.1 Function 2.b, is reset for single loop operation per LCO 3.4.1, Recirculation Loops Operating. The value of Delta W is defined in the COLR.

Single loop operation is not permitted while operating in the MELLLA+ operating domain.

(f)

Each APRM channel provides input to both trip systems.

TRM Control Rod Block Instrumentation 3.3.2.1 Monticello 3.3.2.1 Last Revision 16 Table 3.3.2.1-1 (Page 2 of 2)

Control Rod Block Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE

5.

Average Power Range Monitors (Automated Backup Stability Protection (BSP))

a.

Slope 1(g) 3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 1.3

b.

Constant Power Line 1(g) 3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 30% RTP

c.

Constant Flow Line 1(g) 3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 58.8% Rated Drive Flow (RDF)

d.

Flow Breakpoint 1(g) 3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 34.5% RDF (f)

Each APRM channel provides input to both trip systems.

(g)

Required only when the Automated BSP Scram Region is implemented in accordance with Technical Specification 3.3.1.1.

NSP Transmission Lines 3.8.1 Monticello 3.8.1-1 Revision 16 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 Northern States Power (NSP) Transmission Lines TLCO 3.8.1 Two NSP transmission lines and associated switchgear shall be OPERABLE to supply power to the offsite circuits required by LCO 3.8.1, "AC Sources - Operating."

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required NSP transmission line and associated switchgear inoperable.

A.1 Verify, by administrative means, both emergency diesel generators (EDGs) are OPERABLE.

AND A.2 Restore required NSP transmission line and associated switchgear to OPERABLE status.

Immediately 7 days B. Required Action and associated Completion Time of Condition A not met.

OR Two required NSP transmission lines and associated switchgear inoperable.

B.1 Enter TLCO 3.0.3 Immediately

NSP Transmission Lines 3.8.1 Monticello 3.8.1-2 Revision 16 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.8.1.1 The following Substation Switchyard Battery measurements shall be taken:

a. Pilot cell specific gravity and voltage;
b. Temperature of cells adjacent to the pilot cell; and
c. Overall battery voltage.

7 days TSR 3.8.1.2 The following Substation Switchyard Battery measurements shall be taken:

a. Voltage of each cell (to the nearest 0.01 volt);
b. Specific gravity of each cell; and
c. Temperature of every fifth cell.

92 days

Control Rod Block Instrumentation B 3.3.2.1 Monticello B 3.3.2.1-1 Revision 16 B 3.3 INSTRUMENTATION B 3.3.2.1 Control Rod Block Instrumentation BASES The control rod block functions are provided to prevent excessive control rod withdrawal so that MCPR remains above the Safety Limit (Technical Specification 2.1.1). The trip logic for this function is 1 out of n; e.g., any trip on one of the four APRM's, eight IRM's, four SRM's, or two scram discharge volume water level channels will result in a rod block. For each Control Rod Block Function, there are two trip systems, with the exception of the scram discharge volume water level trip function, which only feeds one trip system. The scram discharge volume water level instrumentation includes one sensor on each of the two scram discharge volumes. This assures that no control rod is withdrawn unless enough capacity is available in either scram discharge volume to accommodate a scram. The setting is selected to initiate a rod block no later than the scram that is initiated on scram discharge volume high water level.

The minimum instrument channel requirements for the IRM may be reduced by one for a short period of time to allow for maintenance, testing, or calibration. See Section 7.3 FSAR.

The APRM Simulated Thermal Power - High rod block (Refs. 3 and 4) is referenced to flow and prevents operation significantly above the licensing basis power level especially during operation at reduced flow. For operation at low power (i.e., MODE 2), the APRM Neutron Flux -

High (Setdown) Function (Ref. 3) is capable of generating a rod block to prevent fuel damage resulting from abnormal operating transients in this power range. The APRMs provides gross core protection; i.e., limits the gross core power increase from withdrawal of control rods in the normal withdrawal sequence. The operator will set the APRM rod block trip settings no greater than that stated in Table 3.3.2.1-1. However, the actual setpoint can be as much as 3% greater than that stated in Table 3.3.2.1-1 for recirculation driving flows less than 50% of design and 2%

greater than that shown for recirculation driving flows greater than 50% of design due to the deviations that could be caused by inherent instrument error, operator setting error, drift of the setpoint, etc.

The APRM Backup Stability Protection (BSP) Flow-Bias rod blocks are active when the Automated Backup Stability Protection (ABSP) function is enabled. The BSP Flow-Bias rod blocks provide a rod block for reactivity transients when operating at low recirculation flows with the OPRMs out of service. These rod blocks provide a warning of potential ABSP scrams. The constant flow line and flow breakpoint are in terms of rated (recirculation) drive flow or RDF (see Ref. 5). Addition of these rod block functions was approved by Amendment No. 180 (Ref. 6).

The IRM rod block function provides local as well as gross core protection. The scaling arrangement is such that trip setting is less than a factor of 10 above the indicated level.

Analysis of the worst case accident results in rod block action before MCPR approaches the Safety Limit (Technical Specification 2.1.1).

A downscale indication of an IRM is an indication the instrument has failed or the instrument is not sensitive enough. In either case the instrument will not respond to changes in control rod motion and thus control rod motion is prevented. The downscale IRM rod block assures that there will be proper overlap between the neutron monitoring systems and thus, that adequate coverage is provided for all ranges of reactor operation. The downscale IRM rod block is set at 3/125 of full scale.

Control Rod Block Instrumentation B 3.3.2.1 Monticello B 3.3.2.1 Last Revision 16 BASES Although the operator will set the setpoints within the trip settings specified in Table 3.3.2.1-1, the actual values of the various set points can differ appreciably from the value the operator is attempting to set. The deviations could be caused by inherent instrument error, operator setting error, drift of the set point, etc. Therefore, these deviations have been accounted for in the various transient analyses.

Trip Function Deviation IRM Downscale

- 2/125 of Scale IRM Upscale

+ 2/125 of Scale APRM Downscale

- 2/125 of Scale APRM Upscale

+ 3% for recirculation driving flows < 50% of design

+ 2% for recirculation driving flows > 50% of design Scram Discharge Volume-High Level

+ 1 gallon The instrumentation in this section will be functionally tested and calibrated at regularly scheduled intervals. The 184 day CHANNEL FUNCTIONAL TEST and 24 month CHANNEL CALIBRATION surveillance frequencies for the APRM Simulated Thermal Power - High, APRM Downscale, and APRM Neutron Flux - High (Setdown) rod block functions are consistent with the NUMAC PRNMS design assumptions (Refs. 1 and 2). Although this instrumentation is not generally considered to be as important to plant safety as the Reactor Protection System, the same design reliability goals are applied. Where applicable, sensor checks are specified on a once/12 hours basis.

REFERENCES

1.

NEDC-32410P-A, Nuclear Measurement Analysis and Control Power Range Neutron Monitor (NUMAC PRNM) Retrofit Plus Option III Stability Trip Function, October 1995.

2.

NEDC-32410P-A, Supplement 1, Nuclear Measurement Analysis and Control Power Range Neutron Monitor (NUMAC PRNM) Retrofit Plus Option III Stability Trip Function, November 1997.

3.

Amendment No. 159, Issuance of Amendment Re: Request to Install Power Range Neutron Monitoring System, dated February 3, 2009. (ADAMS Accession No. ML083440681)

4.

Calculation 08-052, Instrument Setpoint Calculation - Average Power Range Monitor (APRM) Flow Biased PRNM Setpoints for EPU, Revision 2.

5.

Calculation 12-043 Average Power Range Monitor NUMAC PRNM Setpoints - MELLLA+ Automatic Backup Stability Protection (ABSP),

Revision 0.

6.

Amendment No. 180, Monticello Nuclear Generating Plant - Issuance of Amendment No. 180 to Renewed Facility Operating License Regarding MELLLA+, dated March 28, 2014. (ADAMS Accession No. ML14035A248)

TRM Control Rod Block Instrumentation 3.3.2.1 Monticello 3.3.2.1-1 Revision 16 3.3 INSTRUMENTATION 3.3.2.1 Control Rod Block Instrumentation TLCO 3.3.2.1 The control rod block instrumentation for each Function in Table 3.3.2.1-1 shall be OPERABLE.

APPLICABILITY:

According to Table 3.3.2.1-1 ACTIONS


NOTE-----------------------------------------------------------

Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. ------------NOTE-------------

Only applicable to Functions 1, 2, 3 and 5.

One or more Functions with one required channel inoperable.

A.1 Restore channel to OPERABLE status.

7 days B. ------------NOTE-------------

Only applicable to Functions 1, 2, 3, and 5.

One or more Functions with two required channels inoperable.

B.1 Place channel in the tripped condition.

OR B.2 Suspend control rod withdrawal.

Immediately Immediately C. One or more required Function 4 channels inoperable.

C.1 Place channel in the tripped condition.

OR C.2 Suspend control rod withdrawal.

Immediately Immediately

TRM Control Rod Block Instrumentation 3.3.2.1 Monticello 3.3.2.1-2 Revision 16 SURVEILLANCE REQUIREMENTS


NOTE-----------------------------------------------------------

1.

Refer to Table 3.3.2.1-1 to determine which TSRs apply for each Control Rod Block Function.

2.

When a channel is placed in an inoperable status solely for performance of required Surveillance, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains control rod block capability.

SURVEILLANCE FREQUENCY TSR 3.3.2.1.1 Perform CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TSR 3.3.2.1.2


NOTE-------------------------------

1. For Function 1.b, not required to be performed if SRM detectors are secured in the full-in position.
2. For Function 2.a and 2.b, not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.

Perform CHANNEL FUNCTIONAL TEST.

7 days TSR 3.3.2.1.3 Perform CHANNEL FUNCTIONAL TEST.

92 days TSR 3.3.2.1.4 Perform CHANNEL CALIBRATION.

12 months TSR 3.3.2.1.5


NOTE-------------------------------

1. Neutron detectors are excluded.
2. For Function 2.a and 2.b, not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.

Perform CHANNEL CALIBRATION.

24 months TSR 3.3.2.1.6 Perform CHANNEL CALIBRATION.

24 months TSR 3.3.2.1.7 Perform CHANNEL FUNCTIONAL TEST.

184 days

TRM Control Rod Block Instrumentation 3.3.2.1 Monticello 3.3.2.1-3 Revision 16 Table 3.3.2.1-1 (Page 1 of 2)

Control Rod Block Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE

1.

Source Range Monitors

a.

Upscale 2(a), 5 1

TSR 3.3.2.1.1 TSR 3.3.2.1.2 TSR 3.3.2.1.5 1.16 x 105cps

b.

Detector Not Fully Inserted 2(b), 5(b) 1 TSR 3.3.2.1.2 TSR 3.3.2.1.5 NA

2.

Intermediate Range Monitors

a.

Downscale 2(c), 5(c) 2(d)

TSR 3.3.2.1.1 TSR 3.3.2.1.2 TSR 3.3.2.1.5 3/125 divisions of full scale

b.

Upscale 2, 5 2(d)

TSR 3.3.2.1.1 TSR 3.3.2.1.2 TSR 3.3.2.1.5 109.5/125 divisions of full scale

3.

Average Power Range Monitors

a.

Simulated Thermal Power - High 1

3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 0.61W + 61.2% RTP(e) and < 110% RTP

b.

Downscale 1

3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 2/125 divisions of full scale

c.

Neutron Flux - High (Setdown) 2 3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 15%

4.

Scram Discharge Volume

a.

East Water Level High 1, 2 1

TSR 3.3.2.1.3 TSR 3.3.2.1.4 40 gal

b.

West Water Level High 1, 2 1

TSR 3.3.2.1.3 TSR 3.3.2.1.4 40 gal (a)

With IRMs on Range 6 or below.

(b)

With SRM channel count rate < 100 cps and IRMs on Range 2 or below.

(c)

With IRMs on Range 2 or above.

(d)

There must be at least one OPERABLE IRM channel monitoring each core quadrant.

(e) 0.55(W - Delta W) + 55.5% when Technical Specification 3.3.1.1 Function 2.b, is reset for single loop operation per LCO 3.4.1, Recirculation Loops Operating. The value of Delta W is defined in the COLR.

Single loop operation is not permitted while operating in the MELLLA+ operating domain.

(f)

Each APRM channel provides input to both trip systems.

TRM Control Rod Block Instrumentation 3.3.2.1 Monticello 3.3.2.1 Last Revision 16 Table 3.3.2.1-1 (Page 2 of 2)

Control Rod Block Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE

5.

Average Power Range Monitors (Automated Backup Stability Protection (BSP))

a.

Slope 1(g) 3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 1.3

b.

Constant Power Line 1(g) 3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 30% RTP

c.

Constant Flow Line 1(g) 3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 58.8% Rated Drive Flow (RDF)

d.

Flow Breakpoint 1(g) 3(f)

TSR 3.3.2.1.6 TSR 3.3.2.1.7 34.5% RDF (f)

Each APRM channel provides input to both trip systems.

(g)

Required only when the Automated BSP Scram Region is implemented in accordance with Technical Specification 3.3.1.1.

NSP Transmission Lines 3.8.1 Monticello 3.8.1-1 Revision 16 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 Northern States Power (NSP) Transmission Lines TLCO 3.8.1 Two NSP transmission lines and associated switchgear shall be OPERABLE to supply power to the offsite circuits required by LCO 3.8.1, "AC Sources - Operating."

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required NSP transmission line and associated switchgear inoperable.

A.1 Verify, by administrative means, both emergency diesel generators (EDGs) are OPERABLE.

AND A.2 Restore required NSP transmission line and associated switchgear to OPERABLE status.

Immediately 7 days B. Required Action and associated Completion Time of Condition A not met.

OR Two required NSP transmission lines and associated switchgear inoperable.

B.1 Enter TLCO 3.0.3 Immediately

NSP Transmission Lines 3.8.1 Monticello 3.8.1-2 Revision 16 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.8.1.1 The following Substation Switchyard Battery measurements shall be taken:

a. Pilot cell specific gravity and voltage;
b. Temperature of cells adjacent to the pilot cell; and
c. Overall battery voltage.

7 days TSR 3.8.1.2 The following Substation Switchyard Battery measurements shall be taken:

a. Voltage of each cell (to the nearest 0.01 volt);
b. Specific gravity of each cell; and
c. Temperature of every fifth cell.

92 days

Control Rod Block Instrumentation B 3.3.2.1 Monticello B 3.3.2.1-1 Revision 16 B 3.3 INSTRUMENTATION B 3.3.2.1 Control Rod Block Instrumentation BASES The control rod block functions are provided to prevent excessive control rod withdrawal so that MCPR remains above the Safety Limit (Technical Specification 2.1.1). The trip logic for this function is 1 out of n; e.g., any trip on one of the four APRM's, eight IRM's, four SRM's, or two scram discharge volume water level channels will result in a rod block. For each Control Rod Block Function, there are two trip systems, with the exception of the scram discharge volume water level trip function, which only feeds one trip system. The scram discharge volume water level instrumentation includes one sensor on each of the two scram discharge volumes. This assures that no control rod is withdrawn unless enough capacity is available in either scram discharge volume to accommodate a scram. The setting is selected to initiate a rod block no later than the scram that is initiated on scram discharge volume high water level.

The minimum instrument channel requirements for the IRM may be reduced by one for a short period of time to allow for maintenance, testing, or calibration. See Section 7.3 FSAR.

The APRM Simulated Thermal Power - High rod block (Refs. 3 and 4) is referenced to flow and prevents operation significantly above the licensing basis power level especially during operation at reduced flow. For operation at low power (i.e., MODE 2), the APRM Neutron Flux -

High (Setdown) Function (Ref. 3) is capable of generating a rod block to prevent fuel damage resulting from abnormal operating transients in this power range. The APRMs provides gross core protection; i.e., limits the gross core power increase from withdrawal of control rods in the normal withdrawal sequence. The operator will set the APRM rod block trip settings no greater than that stated in Table 3.3.2.1-1. However, the actual setpoint can be as much as 3% greater than that stated in Table 3.3.2.1-1 for recirculation driving flows less than 50% of design and 2%

greater than that shown for recirculation driving flows greater than 50% of design due to the deviations that could be caused by inherent instrument error, operator setting error, drift of the setpoint, etc.

The APRM Backup Stability Protection (BSP) Flow-Bias rod blocks are active when the Automated Backup Stability Protection (ABSP) function is enabled. The BSP Flow-Bias rod blocks provide a rod block for reactivity transients when operating at low recirculation flows with the OPRMs out of service. These rod blocks provide a warning of potential ABSP scrams. The constant flow line and flow breakpoint are in terms of rated (recirculation) drive flow or RDF (see Ref. 5). Addition of these rod block functions was approved by Amendment No. 180 (Ref. 6).

The IRM rod block function provides local as well as gross core protection. The scaling arrangement is such that trip setting is less than a factor of 10 above the indicated level.

Analysis of the worst case accident results in rod block action before MCPR approaches the Safety Limit (Technical Specification 2.1.1).

A downscale indication of an IRM is an indication the instrument has failed or the instrument is not sensitive enough. In either case the instrument will not respond to changes in control rod motion and thus control rod motion is prevented. The downscale IRM rod block assures that there will be proper overlap between the neutron monitoring systems and thus, that adequate coverage is provided for all ranges of reactor operation. The downscale IRM rod block is set at 3/125 of full scale.

Control Rod Block Instrumentation B 3.3.2.1 Monticello B 3.3.2.1 Last Revision 16 BASES Although the operator will set the setpoints within the trip settings specified in Table 3.3.2.1-1, the actual values of the various set points can differ appreciably from the value the operator is attempting to set. The deviations could be caused by inherent instrument error, operator setting error, drift of the set point, etc. Therefore, these deviations have been accounted for in the various transient analyses.

Trip Function Deviation IRM Downscale

- 2/125 of Scale IRM Upscale

+ 2/125 of Scale APRM Downscale

- 2/125 of Scale APRM Upscale

+ 3% for recirculation driving flows < 50% of design

+ 2% for recirculation driving flows > 50% of design Scram Discharge Volume-High Level

+ 1 gallon The instrumentation in this section will be functionally tested and calibrated at regularly scheduled intervals. The 184 day CHANNEL FUNCTIONAL TEST and 24 month CHANNEL CALIBRATION surveillance frequencies for the APRM Simulated Thermal Power - High, APRM Downscale, and APRM Neutron Flux - High (Setdown) rod block functions are consistent with the NUMAC PRNMS design assumptions (Refs. 1 and 2). Although this instrumentation is not generally considered to be as important to plant safety as the Reactor Protection System, the same design reliability goals are applied. Where applicable, sensor checks are specified on a once/12 hours basis.

REFERENCES

1.

NEDC-32410P-A, Nuclear Measurement Analysis and Control Power Range Neutron Monitor (NUMAC PRNM) Retrofit Plus Option III Stability Trip Function, October 1995.

2.

NEDC-32410P-A, Supplement 1, Nuclear Measurement Analysis and Control Power Range Neutron Monitor (NUMAC PRNM) Retrofit Plus Option III Stability Trip Function, November 1997.

3.

Amendment No. 159, Issuance of Amendment Re: Request to Install Power Range Neutron Monitoring System, dated February 3, 2009. (ADAMS Accession No. ML083440681)

4.

Calculation 08-052, Instrument Setpoint Calculation - Average Power Range Monitor (APRM) Flow Biased PRNM Setpoints for EPU, Revision 2.

5.

Calculation 12-043 Average Power Range Monitor NUMAC PRNM Setpoints - MELLLA+ Automatic Backup Stability Protection (ABSP),

Revision 0.

6.

Amendment No. 180, Monticello Nuclear Generating Plant - Issuance of Amendment No. 180 to Renewed Facility Operating License Regarding MELLLA+, dated March 28, 2014. (ADAMS Accession No. ML14035A248)