MONTHYEARML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 ML24115A2902024-04-25025 April 2024 Sec106 Tribal, Jackson-Street, Lonna-Spirit Lake Nation ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa ML24115A2932024-04-25025 April 2024 Sec106 Tribal, Johnson, Grant-Prairie Island Indian Community ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes 05000263/LER-2024-001, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A3002024-04-25025 April 2024 Sec106 Tribal, Rhodd, Timothy-Iowa Tribe of Kansas and Nebraska ML24115A2972024-04-25025 April 2024 Sec106 Tribal, Miller, Cole-Shakopee Mdewakanton Sioux Community ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A2982024-04-25025 April 2024 Sec106 Tribal, Reider, Anthony-Flandreau Santee Sioux Tribe ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A2992024-04-25025 April 2024 Sec106 Tribal, Renville, J. Garret-Sisseton Wahpeton Oyate of the Lake Travers Reservation ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin 2024-09-26
[Table view] |
Text
Xeel~~~~nergy2807~~~MonticelloMniel Nuclear Generating Plantw onYN532od7 November 20, 2015 L-MT-1 5-088 10 CFR 50.71(e)Technical Specification 5.5.9 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Update to Technical Reqiuirements Manual and Technical Specification Bases This letter provides the Northern States Power Company, a Minnesota corporation (N'SPM), d/b/a Xcel Energy, updates to the Tech'nical Requirements Manual (TRM) and Technical Specification (TS) Bases for the Monticello Nuclear Generating Plant (MNGp). The TRM is being provided in accordance with 10 CFR 50.71(e).
The TS Bases are being provided in accordance with TS 5.5.9,"Technical Specifications (TS) Bases Control Program," on a frequency consistent with 10 CFR 50.71(e).The TRM and TS Bases are being provided on the enclosed compact disc (CD). The CD provides the current copy of the entire MNGP TRM, Revision 17, and the current copy of the entire MNGP TS Bases, Revision 39. The previous update included MNGP TRM, Revision 13 and MNGP TS Bases, Revision 29. A list of changes to the TRM is provided in Table 2, "TRM Record of Revisions," located near the front of the TRM (001_TRM.pdf).
A list of changes to the TS Bases is provided in Table 2, "Technical Specification Bases Record of Revisions," located near the front of the TS Bases (002_TS Bases.pdf).
The affected pages of each revision since the previous submittal have also been provided.
The CD electronically contains the files listed below in their entirety, in accordance with the U.S. NRC, "Guidance for Electronic Submissions to the NRC,"~Revision 6.1, dated May 27, 2011.
Document Control Desk L-MT-1 5-088 Page 2 of 2 This enclosure provided via CD contains the following files in PDF format.File Name 001_TRM.pdf 002_TS Bases.pdf 003_TRM_R14.pdf 004_TRM_R15.pdf 005_TRM_R16.pdf 006_TRM_R17.pdf 007_TS BasesR30.pdf 008_TS BasesR31 .pdf 009_TS BasesR32.pdf 010_TS 011_TS BasesR34.pdf 012_TS BasesR35.pdf 013_TS BasesR36.pdf 014_TS BasesR37.pdf 015_TS BasesR38.pdf 016_TS BasesR39.pdf Summary of Commitments Document TRM, Rev 17 TS Bases, Rev 39 TRM Affected Pages, Rev TRM Affected Pages, Rev TRM Affected Pages, Rev TRM Affected Pages, Rev TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected Pages, Pages, Pages, Pages, Pages, Pages, Pages, Pages, Pages, Pages, 14 15 16 17 Rev 30 Rev 31 Rev 32 Rev 33 Rev 34 Rev 35 Rev 36 Rev 37 Rev 38 Rev 39 File Size 364 KB 2091 KB 60 KB 126 KB 110 KB 68 KB 87 KB 105 KB 234 KB 213 KB 272 KB 237 KB 230 KB 236 KB 216 KB 329 KB There are no new commitments and no revisions to existing commitments in this letter.Peter A. Gardner Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company -Minnesota Enclosure (CD)cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USN RC Minnesota Department of Commerce Xeel~~~~nergy2807~~~MonticelloMniel Nuclear Generating Plantw onYN532od7 November 20, 2015 L-MT-1 5-088 10 CFR 50.71(e)Technical Specification 5.5.9 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Update to Technical Reqiuirements Manual and Technical Specification Bases This letter provides the Northern States Power Company, a Minnesota corporation (N'SPM), d/b/a Xcel Energy, updates to the Tech'nical Requirements Manual (TRM) and Technical Specification (TS) Bases for the Monticello Nuclear Generating Plant (MNGp). The TRM is being provided in accordance with 10 CFR 50.71(e).
The TS Bases are being provided in accordance with TS 5.5.9,"Technical Specifications (TS) Bases Control Program," on a frequency consistent with 10 CFR 50.71(e).The TRM and TS Bases are being provided on the enclosed compact disc (CD). The CD provides the current copy of the entire MNGP TRM, Revision 17, and the current copy of the entire MNGP TS Bases, Revision 39. The previous update included MNGP TRM, Revision 13 and MNGP TS Bases, Revision 29. A list of changes to the TRM is provided in Table 2, "TRM Record of Revisions," located near the front of the TRM (001_TRM.pdf).
A list of changes to the TS Bases is provided in Table 2, "Technical Specification Bases Record of Revisions," located near the front of the TS Bases (002_TS Bases.pdf).
The affected pages of each revision since the previous submittal have also been provided.
The CD electronically contains the files listed below in their entirety, in accordance with the U.S. NRC, "Guidance for Electronic Submissions to the NRC,"~Revision 6.1, dated May 27, 2011.
Document Control Desk L-MT-1 5-088 Page 2 of 2 This enclosure provided via CD contains the following files in PDF format.File Name 001_TRM.pdf 002_TS Bases.pdf 003_TRM_R14.pdf 004_TRM_R15.pdf 005_TRM_R16.pdf 006_TRM_R17.pdf 007_TS BasesR30.pdf 008_TS BasesR31 .pdf 009_TS BasesR32.pdf 010_TS 011_TS BasesR34.pdf 012_TS BasesR35.pdf 013_TS BasesR36.pdf 014_TS BasesR37.pdf 015_TS BasesR38.pdf 016_TS BasesR39.pdf Summary of Commitments Document TRM, Rev 17 TS Bases, Rev 39 TRM Affected Pages, Rev TRM Affected Pages, Rev TRM Affected Pages, Rev TRM Affected Pages, Rev TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected Pages, Pages, Pages, Pages, Pages, Pages, Pages, Pages, Pages, Pages, 14 15 16 17 Rev 30 Rev 31 Rev 32 Rev 33 Rev 34 Rev 35 Rev 36 Rev 37 Rev 38 Rev 39 File Size 364 KB 2091 KB 60 KB 126 KB 110 KB 68 KB 87 KB 105 KB 234 KB 213 KB 272 KB 237 KB 230 KB 236 KB 216 KB 329 KB There are no new commitments and no revisions to existing commitments in this letter.Peter A. Gardner Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company -Minnesota Enclosure (CD)cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USN RC Minnesota Department of Commerce