ML15335A482

From kanterella
Jump to navigation Jump to search
Update to Technical Requirements Manual and Technical Specification Bases
ML15335A482
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/20/2015
From: Gardner P A
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15335A486 List:
References
L-MT-15-088
Download: ML15335A482 (2)


Text

Xeel~~~~nergy2807~~~MonticelloMniel Nuclear Generating Plantw onYN532od7 November 20, 2015 L-MT-1 5-088 10 CFR 50.71(e)Technical Specification 5.5.9 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Update to Technical Reqiuirements Manual and Technical Specification Bases This letter provides the Northern States Power Company, a Minnesota corporation (N'SPM), d/b/a Xcel Energy, updates to the Tech'nical Requirements Manual (TRM) and Technical Specification (TS) Bases for the Monticello Nuclear Generating Plant (MNGp). The TRM is being provided in accordance with 10 CFR 50.71(e).

The TS Bases are being provided in accordance with TS 5.5.9,"Technical Specifications (TS) Bases Control Program," on a frequency consistent with 10 CFR 50.71(e).The TRM and TS Bases are being provided on the enclosed compact disc (CD). The CD provides the current copy of the entire MNGP TRM, Revision 17, and the current copy of the entire MNGP TS Bases, Revision 39. The previous update included MNGP TRM, Revision 13 and MNGP TS Bases, Revision 29. A list of changes to the TRM is provided in Table 2, "TRM Record of Revisions," located near the front of the TRM (001_TRM.pdf).

A list of changes to the TS Bases is provided in Table 2, "Technical Specification Bases Record of Revisions," located near the front of the TS Bases (002_TS Bases.pdf).

The affected pages of each revision since the previous submittal have also been provided.

The CD electronically contains the files listed below in their entirety, in accordance with the U.S. NRC, "Guidance for Electronic Submissions to the NRC,"~Revision 6.1, dated May 27, 2011.

Document Control Desk L-MT-1 5-088 Page 2 of 2 This enclosure provided via CD contains the following files in PDF format.File Name 001_TRM.pdf 002_TS Bases.pdf 003_TRM_R14.pdf 004_TRM_R15.pdf 005_TRM_R16.pdf 006_TRM_R17.pdf 007_TS BasesR30.pdf 008_TS BasesR31 .pdf 009_TS BasesR32.pdf 010_TS 011_TS BasesR34.pdf 012_TS BasesR35.pdf 013_TS BasesR36.pdf 014_TS BasesR37.pdf 015_TS BasesR38.pdf 016_TS BasesR39.pdf Summary of Commitments Document TRM, Rev 17 TS Bases, Rev 39 TRM Affected Pages, Rev TRM Affected Pages, Rev TRM Affected Pages, Rev TRM Affected Pages, Rev TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected Pages, Pages, Pages, Pages, Pages, Pages, Pages, Pages, Pages, Pages, 14 15 16 17 Rev 30 Rev 31 Rev 32 Rev 33 Rev 34 Rev 35 Rev 36 Rev 37 Rev 38 Rev 39 File Size 364 KB 2091 KB 60 KB 126 KB 110 KB 68 KB 87 KB 105 KB 234 KB 213 KB 272 KB 237 KB 230 KB 236 KB 216 KB 329 KB There are no new commitments and no revisions to existing commitments in this letter.Peter A. Gardner Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company -Minnesota Enclosure (CD)cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USN RC Minnesota Department of Commerce Xeel~~~~nergy2807~~~MonticelloMniel Nuclear Generating Plantw onYN532od7 November 20, 2015 L-MT-1 5-088 10 CFR 50.71(e)Technical Specification 5.5.9 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Update to Technical Reqiuirements Manual and Technical Specification Bases This letter provides the Northern States Power Company, a Minnesota corporation (N'SPM), d/b/a Xcel Energy, updates to the Tech'nical Requirements Manual (TRM) and Technical Specification (TS) Bases for the Monticello Nuclear Generating Plant (MNGp). The TRM is being provided in accordance with 10 CFR 50.71(e).

The TS Bases are being provided in accordance with TS 5.5.9,"Technical Specifications (TS) Bases Control Program," on a frequency consistent with 10 CFR 50.71(e).The TRM and TS Bases are being provided on the enclosed compact disc (CD). The CD provides the current copy of the entire MNGP TRM, Revision 17, and the current copy of the entire MNGP TS Bases, Revision 39. The previous update included MNGP TRM, Revision 13 and MNGP TS Bases, Revision 29. A list of changes to the TRM is provided in Table 2, "TRM Record of Revisions," located near the front of the TRM (001_TRM.pdf).

A list of changes to the TS Bases is provided in Table 2, "Technical Specification Bases Record of Revisions," located near the front of the TS Bases (002_TS Bases.pdf).

The affected pages of each revision since the previous submittal have also been provided.

The CD electronically contains the files listed below in their entirety, in accordance with the U.S. NRC, "Guidance for Electronic Submissions to the NRC,"~Revision 6.1, dated May 27, 2011.

Document Control Desk L-MT-1 5-088 Page 2 of 2 This enclosure provided via CD contains the following files in PDF format.File Name 001_TRM.pdf 002_TS Bases.pdf 003_TRM_R14.pdf 004_TRM_R15.pdf 005_TRM_R16.pdf 006_TRM_R17.pdf 007_TS BasesR30.pdf 008_TS BasesR31 .pdf 009_TS BasesR32.pdf 010_TS 011_TS BasesR34.pdf 012_TS BasesR35.pdf 013_TS BasesR36.pdf 014_TS BasesR37.pdf 015_TS BasesR38.pdf 016_TS BasesR39.pdf Summary of Commitments Document TRM, Rev 17 TS Bases, Rev 39 TRM Affected Pages, Rev TRM Affected Pages, Rev TRM Affected Pages, Rev TRM Affected Pages, Rev TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected TS Bases Affected Pages, Pages, Pages, Pages, Pages, Pages, Pages, Pages, Pages, Pages, 14 15 16 17 Rev 30 Rev 31 Rev 32 Rev 33 Rev 34 Rev 35 Rev 36 Rev 37 Rev 38 Rev 39 File Size 364 KB 2091 KB 60 KB 126 KB 110 KB 68 KB 87 KB 105 KB 234 KB 213 KB 272 KB 237 KB 230 KB 236 KB 216 KB 329 KB There are no new commitments and no revisions to existing commitments in this letter.Peter A. Gardner Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company -Minnesota Enclosure (CD)cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USN RC Minnesota Department of Commerce