ML15307A356
| ML15307A356 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/03/2015 |
| From: | Office of Nuclear Material Safety and Safeguards |
| To: | Duke Energy Florida, Seminole Electric Cooperative |
| John B. Hickman, 301-415-3017 | |
| Shared Package | |
| ML15307A352 | List: |
| References | |
| CAC MF5210 | |
| Download: ML15307A356 (1) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. 0. C. 20555 DUKE ENERGY FLORIDA. INC.
SEMINOLE ELECTRIC COOPERATIVE, INC.
DOCKET NO. 50-302 CRYSTAL RlVER UNIT 3 NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 2 license No. DPR-72 l.
The Nuclear Regulatory Commission (the Convnission) having found that :
. 0 t '01' C'r*
- r ~. v* L l}. ~ -.* :: J(C.l'flli l.
- --->7***
A.
The application ftled by Florida Power Corporation.
and SEMINOLE ELECTRIC COOPERATIVE, INC. (the licensees) as supplemented by letter dated December 9, 1976, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter 1;
- a.
Construction of the Crystal River Unit 3 Nuclear Generating Plant (facility) has been substantial1y completed in conformity with Provisional Construction Permit No. CPPR-51 and the application, as.
amended, the provisions of the Act and the rules and regulations of the Conmhsion; C.
The facility will operate in conformity with the app11cation, as amended, the pro*isions o~ the Act, and the rules and regulations of the Cormiission:
- *On April 29, 2013, t he name "Flori da Power Corporati on" was changed to "Duke Enerqy Florida, Inc. "
Facility Operating License No. DPR-72 1
Amendment No: 248 48