MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-03-28028 March 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-013, Submittal of Periodic Reports2024-03-28028 March 2024 Submittal of Periodic Reports L-2024-044, Revised Steam Generator Tube Inspection Reports2024-03-19019 March 2024 Revised Steam Generator Tube Inspection Reports L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-014, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-025, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-02-22022 February 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-008, Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2024-02-0909 February 2024 Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owners Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owners Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update 2024-09-25
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-098, And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23151A4362023-05-24024 May 2023 License Amendment Request Revision 3 for the Technical Specifications Conversion to NUREG - 1431 Revision 5 ML23151A4372023-05-24024 May 2023 Attachment 3: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database ML23095A0082023-04-0404 April 2023 Attachment 2 - Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-051, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information2022-03-29029 March 2022 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information L-2021-213, Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology2021-11-19019 November 2021 Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology L-2021-207, Response to Request for Additional Information for ISI Relief Request No. 102021-10-25025 October 2021 Response to Request for Additional Information for ISI Relief Request No. 10 L-2021-197, Response to Request for Additional Information for ISI Relief Request No. 102021-10-15015 October 2021 Response to Request for Additional Information for ISI Relief Request No. 10 ML21258A3792021-09-14014 September 2021 Response to Request for Additional Information, Relief Requests 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1), Extension of Inspection Interval for Turkey Point Unit 3 and Unit 4 Reactor. L-2020-111, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report2020-06-24024 June 2020 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report L-2020-081, Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor2020-06-0808 June 2020 Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor L-2020-083, Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re2020-05-21021 May 2020 Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re L-2020-071, Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements2020-04-16016 April 2020 Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements L-2020-064, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information2020-04-0909 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information ML20098F3412020-04-0707 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information L-2019-135, Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications2019-07-22022 July 2019 Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications ML19158A5032019-06-0707 June 2019 NRC to NMFS, NRC Responses to NMFS Requests for Additional Information for Turkey Point ESA Section 7 Consultation L-2019-114, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response2019-06-0404 June 2019 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response L-2019-048, Response to Request for Additional Information (Rai), Subsequent License Renewal Application Safety Review Revision 1, Second Submittal Set 82019-03-15015 March 2019 Response to Request for Additional Information (Rai), Subsequent License Renewal Application Safety Review Revision 1, Second Submittal Set 8 L-2019-037, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses2019-03-0606 March 2019 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses L-2019-033, Response to Requests for Additional Information Subsequent License Renewal Application Safety Review Revision 1, Set 8 First Submittal Responses2019-03-0101 March 2019 Response to Requests for Additional Information Subsequent License Renewal Application Safety Review Revision 1, Set 8 First Submittal Responses ML19056A1252019-02-25025 February 2019 Turky Point SLRA RAIs 1 2 3 4 5 6 7 8 9 11 - Set 8 Rev 1 Irradiated Concrete-Steel Responses L-2019-012, Response to Follow-on NRC RAI No. B.2.3.9-1 a2019-02-13013 February 2019 Response to Follow-on NRC RAI No. B.2.3.9-1 a L-2019-023, Response to Request for Additional Information Regarding License Amendment Request 265, Revise NFPA-805 License Condition for Reactor Coolant Pump Seals2019-01-31031 January 2019 Response to Request for Additional Information Regarding License Amendment Request 265, Revise NFPA-805 License Condition for Reactor Coolant Pump Seals L-2018-234, Subsequent License Renewal Application Safety Review Request for Additional Information (RAI) Set 5 Response 4.3.5-2 Revision2018-12-21021 December 2018 Subsequent License Renewal Application Safety Review Request for Additional Information (RAI) Set 5 Response 4.3.5-2 Revision L-2018-223, Subsequent License Renewal Application Safety Review - November 15, 2018 Public Meeting Action Item Responses2018-12-14014 December 2018 Subsequent License Renewal Application Safety Review - November 15, 2018 Public Meeting Action Item Responses L-2018-222, Subsequent License Renewal Application Safety Review - November 13, 2018 Public Meeting Discussion Topic Responses2018-12-12012 December 2018 Subsequent License Renewal Application Safety Review - November 13, 2018 Public Meeting Discussion Topic Responses L-2018-218, Supplemental Response to Request for Additional Information (RAI) Set 1, Subsequent License Renewal Application Environmental Review2018-11-28028 November 2018 Supplemental Response to Request for Additional Information (RAI) Set 1, Subsequent License Renewal Application Environmental Review L-2018-191, Supplemental Responses Requests for Additional Information (RAI) Set 7 Subsequent License Renewal Application Safety Review2018-11-28028 November 2018 Supplemental Responses Requests for Additional Information (RAI) Set 7 Subsequent License Renewal Application Safety Review L-2018-193, Set 6 Responses to Request for Additional Information (RAI) on Subsequent License Renewal Application Safety Review2018-11-0202 November 2018 Set 6 Responses to Request for Additional Information (RAI) on Subsequent License Renewal Application Safety Review L-2018-166, WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings.2018-10-31031 October 2018 WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings. ML18299A1142018-10-24024 October 2018 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 4 Responses L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses2018-10-17017 October 2018 Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items2018-10-17017 October 2018 Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items ML18296A0242018-10-16016 October 2018 Set 3 Response to Request for Additional Information to Subsequent License Renewal Application Safety Review ML18299A1162018-10-15015 October 2018 Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal 2024-09-24
[Table view] |
Text
~SEP 2 52015 FP~oL-201 5-226 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-000,1 RE: Turkey Point Unit 3 and Unit 4 Docket Nos. 50-250 and 50-251 Fourth 10-Year Inservice Inspection Interval Response to Request for Additional Information for Relief Requests Nos. 16 and 17 By letter L-2015-020, dated February 13, 2015 (Agency-wide Documents Access and Management System (ADAMS), Accession No. ML15062A279), Florida Power & Light Company (FPL) submitted Relief Requests Relief Requests 16 and 17 (RR-16 and RR-17) for the Fourth Inservice Inspection (ISI) Interval for Turkey Point Nuclear Units 3 and 4.
The Nuclear Regulatory Commission (NRC) Staff reviewed RR-16 and RR-17 and identified areas where they need additional information and clarification in order to complete their review.
On September 1, 2015, Ms. Audrey Klett, NRC Project Manager for Turkey Point Units 3 and 4 provided the request for additional information (RAI) via electronic mail and requested the response to these RAI questions by October 1, 2015.
The enclosure to this letter contains the NRC's Request for Additional Information (RAl) questions for RR-16 and RR-17, and the corresponding FPL responses.
If there are any questions regarding this request, please contact Mr. Mitch Guth, Turkey Point Licensing Manager, at (305) 246-6698.
Th~_*Sincerely Toas Summers Site Vice-President Turkey Point Nuclear Plant Enclosure cc: Regional Administrator, Region II, USNRC Project Manager, NRR, USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant Florida Power & Light Company /( .
9760 S.W. 344'h Street Homestead, FL 33035
FPL Letter L-2015-226 ENCLOSURE Florida Power & Light Company Turkey Point Units 3 and 4 Fourth Ten-Year Inservice Inspection Interval Relief Requests 16 and 17 Responses to NRC Request for Additional Information (RAI)
Questions
L-201 5-226, Enclosure Page 1 of 2 NRC RAI-1:
Regarding RR-16 and RR-17, Examination Category B-D, Item 83.120, Full Penetration Welded Nozzles in Vessels:
Beginning with the 1999 Addenda of the ASME Code, Section Xl, volumetric examination requirements for Examination Category B-D, Item B3.120, Pressurizer Nozzle Inside Radius Sections have been removed from Table IWB-2500-1. Thus, no volumetric examination is required by the licensee's adopted version of the ASME Code. However, the NRC imposed volumetric requirements per 10 CFR 50.55a(b)(2)(xxi), which states the following:
(xxi)Section XI condition: Table IWB-2500-1 examination requirements. (A) Table IWB-2500-1 examination requirements: First provision. The provisions of Table IWB 2500-1, Examination Category B-D, Full Penetration Welded Nozzles in Vessels, Items 83.40 and 83.60 (Inspection Program A) and Items B3.120 and 83.140 (Inspection Program B) of the 1998 Edition must be applied when using the 1999 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section. A visual examination with magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria in Table IWB-3512-1, 1997 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, with a limiting assumption on the flaw aspect ratio (i.e., alI = 0.5), may be performed instead of an ultrasonic examination.
Please state whether a visual examination in accordance with the requirements listed above has been completed or considered as an alternative to supplement the ultrasonic examinations on the pressurizer inside radius sections for Turkey Point 3 and 4.
FPL Response to RAI-1:
A visual examination was not performed. A visual examination was considered; however, the spray nozzle assembly configuration inside the pressurizer prohibits access for examination.
NRC RAI-2 Regarding RR-16, Examination Category R-A, Item R1.11, Risk Informed Piping Examinations:
In Attachment 2 of the application, page 5 of 31, the weld identifier for the reactor coolant reducer-to-valve weld is listed as 3"-RC-1301-1. In the Table of Attachment 2 (page 11 of 31) and corresponding Figure 18 (page 30 of 31), the weld identifier for this reducer-to-valve weld is listed as 3"-RC-1 305-1. Please clarify the correct identifier for this weld.
L-20 15-226, Enclosure Page 2 of 2 FPL Response to RAI-2 The correct identifier for this weld is 3"-RC-1 305-1.
NRC RAI-3 The following issues were identified as possible editorial errors in RR-16 and RR-
- 17. Please confirm whether the issues identified below are errors, and if so, please provide the corrected text.
- a. Regarding RR-16, Exam Category C-F-I, Item C5.11, Weld ID 14"-RHR-2305-3: In the Table (page 10 of 31 of Attachment 2), "16" is listed as the corresponding figure number. On page 28 of 31 of Attachment 2, is the figure number incorrectly labeled as "18"?
- b. Regarding RR-17, Exam category C-F-i, Item C5.21 Weld ID 3"-SI-2403-35: In the Table (page 8 of 35 of Attachment 3), should Figure 11 be deleted as a corresponding figure? It appears that only Figure 6 applies to this weld.
- c. Regarding RR-17, Exam Category C-F-I, Item C5.21, Weld ID 3"-SI-2403-36: There is a description of why the surface examination is not 100 percent for this weld under RR 16, page 5 of 31 of Attachment 2. Should this description be located in RR-1 7, page 5 of 35 of Attachment 3, instead?
FPL Response to RAI-3a Yes, the figure on page 28 of 31 should be labeled Figure 16.
FPL Response to RAI-3b Yes, the figure on page 8 of 35 should be labeled Figure 6.
FPL Response to RAI-3c Yes, the description should be located in RR-17, page 5 of 35 of Attachment 3.
~SEP 2 52015 FP~oL-201 5-226 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-000,1 RE: Turkey Point Unit 3 and Unit 4 Docket Nos. 50-250 and 50-251 Fourth 10-Year Inservice Inspection Interval Response to Request for Additional Information for Relief Requests Nos. 16 and 17 By letter L-2015-020, dated February 13, 2015 (Agency-wide Documents Access and Management System (ADAMS), Accession No. ML15062A279), Florida Power & Light Company (FPL) submitted Relief Requests Relief Requests 16 and 17 (RR-16 and RR-17) for the Fourth Inservice Inspection (ISI) Interval for Turkey Point Nuclear Units 3 and 4.
The Nuclear Regulatory Commission (NRC) Staff reviewed RR-16 and RR-17 and identified areas where they need additional information and clarification in order to complete their review.
On September 1, 2015, Ms. Audrey Klett, NRC Project Manager for Turkey Point Units 3 and 4 provided the request for additional information (RAI) via electronic mail and requested the response to these RAI questions by October 1, 2015.
The enclosure to this letter contains the NRC's Request for Additional Information (RAl) questions for RR-16 and RR-17, and the corresponding FPL responses.
If there are any questions regarding this request, please contact Mr. Mitch Guth, Turkey Point Licensing Manager, at (305) 246-6698.
Th~_*Sincerely Toas Summers Site Vice-President Turkey Point Nuclear Plant Enclosure cc: Regional Administrator, Region II, USNRC Project Manager, NRR, USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant Florida Power & Light Company /( .
9760 S.W. 344'h Street Homestead, FL 33035
FPL Letter L-2015-226 ENCLOSURE Florida Power & Light Company Turkey Point Units 3 and 4 Fourth Ten-Year Inservice Inspection Interval Relief Requests 16 and 17 Responses to NRC Request for Additional Information (RAI)
Questions
L-201 5-226, Enclosure Page 1 of 2 NRC RAI-1:
Regarding RR-16 and RR-17, Examination Category B-D, Item 83.120, Full Penetration Welded Nozzles in Vessels:
Beginning with the 1999 Addenda of the ASME Code, Section Xl, volumetric examination requirements for Examination Category B-D, Item B3.120, Pressurizer Nozzle Inside Radius Sections have been removed from Table IWB-2500-1. Thus, no volumetric examination is required by the licensee's adopted version of the ASME Code. However, the NRC imposed volumetric requirements per 10 CFR 50.55a(b)(2)(xxi), which states the following:
(xxi)Section XI condition: Table IWB-2500-1 examination requirements. (A) Table IWB-2500-1 examination requirements: First provision. The provisions of Table IWB 2500-1, Examination Category B-D, Full Penetration Welded Nozzles in Vessels, Items 83.40 and 83.60 (Inspection Program A) and Items B3.120 and 83.140 (Inspection Program B) of the 1998 Edition must be applied when using the 1999 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section. A visual examination with magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria in Table IWB-3512-1, 1997 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, with a limiting assumption on the flaw aspect ratio (i.e., alI = 0.5), may be performed instead of an ultrasonic examination.
Please state whether a visual examination in accordance with the requirements listed above has been completed or considered as an alternative to supplement the ultrasonic examinations on the pressurizer inside radius sections for Turkey Point 3 and 4.
FPL Response to RAI-1:
A visual examination was not performed. A visual examination was considered; however, the spray nozzle assembly configuration inside the pressurizer prohibits access for examination.
NRC RAI-2 Regarding RR-16, Examination Category R-A, Item R1.11, Risk Informed Piping Examinations:
In Attachment 2 of the application, page 5 of 31, the weld identifier for the reactor coolant reducer-to-valve weld is listed as 3"-RC-1301-1. In the Table of Attachment 2 (page 11 of 31) and corresponding Figure 18 (page 30 of 31), the weld identifier for this reducer-to-valve weld is listed as 3"-RC-1 305-1. Please clarify the correct identifier for this weld.
L-20 15-226, Enclosure Page 2 of 2 FPL Response to RAI-2 The correct identifier for this weld is 3"-RC-1 305-1.
NRC RAI-3 The following issues were identified as possible editorial errors in RR-16 and RR-
- 17. Please confirm whether the issues identified below are errors, and if so, please provide the corrected text.
- a. Regarding RR-16, Exam Category C-F-I, Item C5.11, Weld ID 14"-RHR-2305-3: In the Table (page 10 of 31 of Attachment 2), "16" is listed as the corresponding figure number. On page 28 of 31 of Attachment 2, is the figure number incorrectly labeled as "18"?
- b. Regarding RR-17, Exam category C-F-i, Item C5.21 Weld ID 3"-SI-2403-35: In the Table (page 8 of 35 of Attachment 3), should Figure 11 be deleted as a corresponding figure? It appears that only Figure 6 applies to this weld.
- c. Regarding RR-17, Exam Category C-F-I, Item C5.21, Weld ID 3"-SI-2403-36: There is a description of why the surface examination is not 100 percent for this weld under RR 16, page 5 of 31 of Attachment 2. Should this description be located in RR-1 7, page 5 of 35 of Attachment 3, instead?
FPL Response to RAI-3a Yes, the figure on page 28 of 31 should be labeled Figure 16.
FPL Response to RAI-3b Yes, the figure on page 8 of 35 should be labeled Figure 6.
FPL Response to RAI-3c Yes, the description should be located in RR-17, page 5 of 35 of Attachment 3.