Text
Oct. 15, 2015 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSHITTAL 2015-41364 USER INFORMATION:
GERLACH*ROSEY N EMPL# :028401 CA# : 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSEY M 10/15/2 015 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no T0C will be issued with the updated material.
TRMl - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 10/05/2015 ADD MANUAL TABLE OF CONTENTS DATE: 10/14/2015 CATEGORY: DOCUMENTS TYPE: TRM1 pt0t
'V
Oct. 15, 2015 Page 2 of 2 ID: TEXT 3.3.4 REMOVE: REV:7 ADD: REV: 8 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT B3.3.4 ADD: REV: 5 REMOVE: REV: 4 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT LOES REMOVE: REV: 82 ADD: REV: 83 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
- SES MANUAL Manual an~e: TEMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: 10/ 14/2 015 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 83 10/14/2015
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 25 04/28/2015
Title:
TABLE OF CONTENTS TEXT 1.1 1 01/31/2014 **
Til:USE AND APPLICATION DEFINITIONS *' -
TEXT 2.1 2 04/28/2015 '
Title:
PLANT PROGRAMS AND SETPOINTS PLANT-PROGRAMS° TEXT 2.2 10 7 °°0!/31/2014*
Title:
PLANT PROGRAMS AND SETP0ONTS ILNSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 -**5*, 03705/2015
Title:
TECHNICAL REQUIREMENT F9R OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)
APPLICABILITY '...* "<
TET .11- 1 11/09/2007 Title : REACTIVITY iCONqTROLh SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION I*ATWS-ARI ) INSTRUMENTATION TEXT 3.1.2 i "*0 11/18/2002
Title:
REACTIVITY*ICONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 5 04/16/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &
CHECK VALVE TEXT 3.2.1 15 04/28/2015
Title:
CORE OPERATING LIMITS REPORT (COLR)
Report Date: 10/15/15 Page !1 Page of of 16 16 Report Date: 10/15/15
SSES MANTJAT Manual Name:* TRM1
- iManual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0 11/18/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 8 10/14/2015
Title:
INSTRUMENTATION TEN POST-ACCIDENT MONITORING INSTRUMENTATION LDCN 4552 TEXT 3.3.5 0 11/18/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4 04/29/2014
Title:
INSTRUMENTATION TEN ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3 04/17/2008
Title:
OPEN INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 S
Title:
WATER MONITORING 1 03/05/2015 INSTRUMENTATION 0 Report Date: 10/15/15 Page 22 Page of of 16 16 Report Date: 10/15/15
RSES MANUqAL
. : Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Manual Namne: TRMIl TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2 04/17/2008
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 2 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLoW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005
Title:
EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007
Title:
EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/18/2002
Title:
EMERGENCy CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3..6.2 2 04/29/2014
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 10/15/15 Page.3 Page.3 of of 16 i_66 Report Date: 10/15/15
SSES MANUJAIL Manual Name:* TRMI
- .Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0 11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/18/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK CUBS) AND GROUND WATER LEVEL TEXT 3.7.3.1 2 04/16/2009
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3 04/16/2009 0
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 10 09/27/2012
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 10/15/15 Page 4 of of 16 16 Report Date* 10/15/15
- anual Name: TRM1 M..i*
SManual
Title:
TECHNICAL REQUIREMENTS MANU~IAL UNIT 1 TEXT 3.7.5.1 1 03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSEROFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION
- MONITORING S.TEXT 3.7.8 5 03/05/2015
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 2 01/31/2014
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004 Ti~le: PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 0 04/16/2009
Title:
STRUCTURAL INTEGRITY TEXT 3.8.1 2 04/05/2010
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS h TEXT 3.8.2.2 2 12/14/2004 F.
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMVAL OVERLOAD PROTECTION -
AUTOMATIC Pae/o 6RprtDt:1/51 Page
- of 16 Report Date: 1,0/15/15
SSES MANTTAI Manual N~ame: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANU]TAL UNIT 1 TEXT 3.8.3 2 03/05,/20*15 Title : ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0 11/18/2002
Title:
ELECTRICAL POWER 24 VTDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1 ' 11/14/2013 "
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 *1 12/08/2011
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 *1 06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/18/20026
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/18/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006
Title:
MISCELLANEOUS SEAL SOURCE CONTAMINATION
'TEXT 3.10.2 2 08/08/2006
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 2 04/17/2008
- Title: MISCELLANEOUS LEADING EDGE FLOW M~ETER (LEFM)6 Page 6 of i_66 Report Date: 10/15/15
SSES MANUAL*
O*Manual Name: TRM1 W:* Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 2 10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 .3 03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002
Title:
RADIOACTIVE. EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 5 04/28/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE Report Date: 10/15/15 Page 2 7-- of of 16 i__66 Report Date: 10/15/15
SSES MANUAL Manual Name : TRMI i Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.1 5 03/05/2015
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11-/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM Report Date: 10/15/15 Page 8 Page of of 16 16 Report Date: 10/15/15
SSES M~ANUAL Manual Name : TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 5 03/05/2015
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION CTRO) APPLICABILITY TEXT B3.1.1 2 04/29/2014
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 03/31/2006
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 1 01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2008
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 5 10/14/2015
Title:
INSTRUMENTATION BASES TRN POST ACCIDENT MONITORING (PAN) INSTRUMENTATION LDCN 4552 TEXT B3.3.5 2 11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Report Date: 10/15/15 Pages Page 9-- of of 16 166 Report Date: 10/15/15
SSES MA1~1TJAL Manual Name : TRMI
- -Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 5 01/31/2014
Title:
INSTRUMENTATION BASES TRN ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 1 11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22./2003
Title:
INSTRUMENTATION BASES TEN REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT B3.3.9 3 04/17/2008
Title:
OPEN INSTRUMIENTATION TEXT B3o3.10 3 08/09/2010
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS STEXT B3.3.11 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3o4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Report Date: 10/15/15 Page 10 Page 100 of of 16 16 Report Date: 10/15/15
S~ES MANUAL
- Manual Name:
Manual TRMI
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 2 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW PATE RESTRICTION TEXT B3.5.1 0 11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1* 11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMETATION TEXT B3.5.3 1 11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UIES) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM STEXT B3.7.3.2 2 04/26/2006 i
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page i!i of 16 Report Date: 10/15/15
SSES MANUJAI Manual flame: TRMI
'- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 0 TEXT B3.7.3.3 0 11/19/2002
Title:
- PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 3 04/29/2014
Title:
- PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3..7.3.5 1 04/26/2006 Title : PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006 Title : PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002 Title : PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3 7.3.8 3 09/27/2012 Title : PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002 Title : PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002 Title : PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION-MONITORING INSTRUMENTATION Page 12 of 16 Report Date: 10/15/15
SSES MAAL
. I: Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Manual Name: TEdKI TEXT B3.7.8 4 01/3 1/2 014
Title:
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 2 12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 1 04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 2 12/08/2011
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013 Titles BATTERY MAINTENANCE AND MONITORING PROGRAM Report Date: 10/15/15 13 Page i__33 of of 16 16 Report Date: 10/15/15
SSES MANTJAI Manual Name : TRMI
- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 03/31/2006
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 1 04/17/2008
Title:
MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)
TEXT B3 .11.1. 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2 002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Report Date: 10/15/15 Page 14 Page IA4 of of 16 16 Report Date: 10/15/15
SSE~S MANUAL W**O~iManual Manual Name: TRMI
Title:
TECHNICAL REQUIRETMENTS MANUAL UNIT 1 TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5 07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMNT SYSTEM TEXT B3.11.2.6 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 5 03/05/2015
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Report Date: 10/15/15 Page i5~
Page 15 of of 16 16 Report Date: 10/15/15
SSES MANAL Manual Name : TRMI SManual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 10/15/15 Page 16 Page 16 of of 16 16 Report Date: 10/15/15
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 04/2312015 1.0 USE AND APPLICATION Page TRM / 1.0-1 10/04/2002 Page TRM / 1.0-2 01/21/2014 Page TRM / 1.0-3 10/04/2002 2.0 PLANT PROGRAMS Page TRM / 2.0-1 04/23/2015 Pages TRM / 2.0-2 and TRM / 2.0-3 0 1/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 01/21/2014 Page TRM / 2.0-6 03/27/2008 Page TRM / 2.0-7 /, 05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM /2.0-12 03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-14"\, -\ 11/15/2004
\
Page TRM / 2.0-15 11/15/2005
\
3.0 APPLICABILITY :Y' **
Pages TRM / 3.0-1 and TR /3.0-2 02/19/2015 Page TRM /3.0-3 /. .**, , 03/15/2002 O Page TRM / 3.0-4 ' '7/ 02/19/2015 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.i-1, \ ' 10/31/2007 Pages TRM /'3~.'1,2 anid Tl*M / 3.1-3 08/31/1998 Pages 3.1-4 an*d,31-,5 \ 08/31/1998 Page TRMI 3.-1-6 , , 03/22/2006 Page-TRM / 3.11* 04/07/2009 Page TRM /'3.'1-8 03/27/2008 Pages RM / 3.1-9 and TRM / 3.1-9a 02/18/1999
/,Pa~geTRM/'3.1-10 02/18181999
\CORgE OPERATING LIMITS REPORT 3.2
',Page TRM / 3.2-1 07/07/1999 Pages TRM / 3.2-2 through TRM / 3.2-54 04/21/2015 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1 999 Page TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 03/10/2011 TRM/LOES-1 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT I1 TRM / LOES-1 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / 3.3-7 10/31/2007 Page TRM / 3.3-8 08/31/1998 Page TRM / 3.3-9 10/07/2015 Page TRM I 3.3-9a 06130/2010 Page TRM / 3.3-10 10/31/2007 Page TRMI/3.3-11 10/07/2015 Page TRM / 3.3-11a 10/07/2015 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/14/1 998 Page TRM I 3.3-15 04/11/2014 Page TRM I 3.3-16 01/07/2011 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 through TRM / 3.3-21 10/22/2003 Page TRM / 3.3-22 03/27/2008 Page TRM / 3.3-22a 11/15/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d 03/22/2006 Page TRM / 3.3-23 12/03/2004 Pages TRM / 3.3-24 and TRM / 3.3-25 05/16/2003 Page TRM / 3.3-26 10/22/2003 Page TRM / 3.3-27 02/19/2015 Page TRM / 3.3-28 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages TRM / 3.4-2 through TRM / 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page TRM / 3.4-9 08/31/1998 Page TRM / 3.4-10 10/31/2007 Page TRM / 3.4-11 08/31/1998 Page TRM / 3.4-12 03/27/2008 Page TRM I 3.4-13 03/31/2006 Pages TRM / 3.4-14 and TRM I 3.4-15 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages TRM I 3.5-2 and TRM / 3.5-3 08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5 10/31/2007 Pages 3.5-6 and 3.5-7 08/31/1998 SUSQUEHANNA ,- UNIT 1 TRM / LOES-2 SUSQEHANA-UITITRM LOS-2 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.6 CONTAINMENT Page 3.6-1 08/31/1998 Pages TRM / 3.6-2 and TRM / 3.6-2a 04/16/2014 Page 3.6-3 08/31/1998 Page TRM / 3.6-4 01/07/2002 Page 3.6-5 08/31/1998 Pages TRM / 3.6-6 through TRM I 3.6-8 12/31/2002 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Pages TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM I 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 12/29/1999 Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7.13 04/07/2009 Page T.RM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Page TRM / 3.7-25 08/02/1999 Page TRM / 3.7-26 09/25/2012 Page TRM I 3.7-27 11/24/2011 Pages TRM / 3.7-28 through TRM I 3.7-34a 09/25/2012 Page TRM / 3.7-35 03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37 02/01/1999 Page TRM / 3.7-38 02/19/2015 Page TRM / 3.7-39 08/31/1998 Page TRM / 3.7-40 03/31/2006 Page TRM / 3.7-41 05/24/2012 Pages TRM I 3.7-41a through TRM / 3.7-41c 05/24/2012 Page TRM / 3.7-42 09/04/2008 Page TRM / 3.7-43 08/31/1998 Page TRM / 3.7-44 02/19/2015 Pages TRM / 3.7-45 and TRM / 3.7-46 10/05/2006 Page TRM / 3.7-47 06/07/2007 TRM / LOES-3 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA UNIT I SUSQUEHANNA-UNIT1 TRM / LOES-3 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECH NICAL REQUIREM ENTS MAN UAL)
Section Title Effective Date Page TRM / 3.7-48 10/05/2006 Page TRM / 3.7-49 06/07/2007 Pages TRM / 3.7-49a and TRM / 3.7-49b 10/05/2006 Page TRM / 3.7-50 01/21/2014 Page TRM I 3.7-51 08/16/2006 Page TRM / 3.7-52 *12103/2004 Page TRM / 3.7-53 04/15/2003 Page TRM / 3.7-54 07/29/1999 Pages TRM / 3.7-55 through TRM / 3.7-57 04/01/2009 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Page TRM / 3.8-2 01/28/2005 Pages TRM / 3.8-3 and TRM /3.8-4 03/25/2010 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Page TRM / 3.8-7 10/31/2007 Pages TRM / 3.8-8 through TRM I 3.8-10 12/03/2004 Page TRM / 3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 02/19/2015 Page TRM / 3.8-14 08/31/1998 Pages TRM / 3.8-15 through TRM ! 3.8-17 04/02/2002 Page 3.8-18 08/31/1998 Page TRM I 3.8-19 04/02/2002 Page 3.8-20 08/31/1998 Pages TRM / 3.8-21 and TRM / 3.8-22 06/06/1999 Page TRM / 3.8-23 11/07/2013 Pages TRM / 3.8-24 and TRM / 3.8-25 11/30/2011 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Pages TRM / 3.8-28 and TRM I 3.8-29 05/28/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages TRM / 3.10-2 and TRM / 3.10-3 08/31/1998 Page TRM / 3.10-4 08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6 03/22/2006 Page TRM / 3.10-7 06/10/2010 Page TRM / 3.10-8 03/27/2008 TRM / LOES-4 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT I1 TRM / LOES-4 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages TRM / 3.11-2 and TRM / 3.11-3, 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page TRM / 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages TRM / 3.11-7 and TRM I 3.11I-8 08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10 10/09/2012 Pages TRM /3.11-11 and TRM /3.11-12 08/31/1998 Page TRM / 3.11-13 02/19/2015 Page TRM / 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM /3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11i/14/2006 Page TRM / 3.11-24 06/18/2013 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM / 3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM / 3.11.30 and TRM /3.11.31 01/21/2004 Page TRM / 3.11.32 04/23/2015 Page TRM / 3.11-33 03/31/2006 Page TRM / 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Page TRM I 3.11-40 02/19/2015 Pages TRM / 3.11-41 through TRM / 3.11-43 08/31/1998 Page TRM / 3.1,1-44 08/01/2006 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CON~TROLS Pages 4.0-1 through 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages 4.0-5 through 4.0-8 08/31/1998 TRM / LOES-5 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA UNIT I SUSQUEHANNA-UNIT1 TRM / LOES-5 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MAN UAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 02/19/2015 Page TRM / B 3.0-4a and TRM I B 3.0-4b 02/19/2015 Page TRM / B 3.0-5 02/19/2015 Page TRM / B] 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B] 3.0-12 03/15/2002 Pages TRM / B 3.0-13 through TRM / B] 3.0-15 02/19/2015 REACTIVITY CONTROL SYSTEMS BASES B 3.1 Page TRM / B 3.1-1 07/1 3/1 999 Page TRM / B 3.1-2 04/16/2014 Page TRM / B 3.1-3 10/31/2007 Page B] 3.1-4 08/31/1998 Page TRM / B 3.1-5 11/15/2005 Pages TRM / B] 3.1-6 and TRM / B 3.1-7 03/22/2006 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3' INSTRUMENTATION BASES Page TRM / B] 3.3-1 01/21/2014 Page TRM / B 3.3-2 03/10/2011 Page TRM / B 3.3-2a 10/31/2.007 Page TRM / B 3.3-3 12/11/2008 Page TRM / B 3.3-3a 10/31/2007 Page TRM / B 3.3-4 06/30/2010 Page TRM / B 3.3-5 10/07/2015 Page TRM / B 3.3-6 06/30/2010 Page TRM / B 3.3-7 10/07/2015 Page TRM / B. 3.3-8 06/30/2010 Page TRM / B 3.3-9 10/31/2007 Pages TRM / B 3.3-10 through TRM / B 3.3-12 01/07/2011 Page TRM /B 3.3-13 01/21/2014 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 10/31/2007 Pages TRM / B 3.3-15 and TRM / B 3.3-16 10/22/2003 Page TRM / B 3.3-17 03/22/2006 Pages TRM / B 3.3-17a through TRM / B 3.3-17c 03/22/2006 Page TRM / B] 3.3-17d 03/27/2008 TRM / LOES-6 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA UNIT 1 SUSQUEHANNA-UNIT1 TRM / LOES-6 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / B 3.3-17e and TRM / B 3.3-17f 03/22/2006 Pages TRM / B 3.3-18 and TRM / B 3.3-19 08/03/2010 Page TRM / B 3.3-20 10/22/2003 Page TRM / B 3.3-2 1 05/16/2003 Pages TRM / B 3.3-22 and TRM/IB 3.3-23 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM I B 3.4-3 04/01/2009 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM /B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Pages TRM / B 3.4-7 and TRM / B 3.4-8 04/25/.2013 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 through TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/27/2008 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B.3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM / B 3.7-3 06/1 0/2010 Page TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Page TRM / B 3.7-6 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 05/29/2013 Page TRM / B 3.7-9 04/11/2014 Page TRM / B 3.7-10 08/02/1999 Page TRM I B 3.7-I0a 03/31/2006 Page TRM / B 3.7-11 08/02/1999 Page TRM / B 3.7-1 a 03/31/2006 Pages TRM / B 3.7-12 and TRM / B 3.7-13 08/02/1999 Pages TRM / B 3.7-14 and TRM / B 3.7-14a 09/25/2012 TRM / LOES-7 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA - UNIT I TRM / LOES-7
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.7-14b 11/24/2011 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 05/29/2013 Pages TRM / B 3.7-21a through TRM / B 3.7-21d 05/24/2012 Pages TRM / B 3.7-21e through TRM / B 3.7-21g 05/29/2013 Page TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Page TRM / B 3.7-24 10/05/2006 Page TRM / B 3.7-25 01/21/2014 Pages TRM / B 3.7-26 through TRM / B 3.7-28 10/05/2006 Pages TRM / B 3.7-29 and TRM / B 3.7-30 06/07/2007 Page TRM / B 3.7-30a 10/05/2006 Page TRM / B 3.7-30b 01/21/2014 Page TRM / B 3.7-31 11/30/2011 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 through TRM / B 3.7-39 04101/2009 Page TRM / B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Page TRM 1 B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/20.10 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 09/03/2004 Page TRM / B 3.8-4a 04/02/2002 Page B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-15 04/02/2002 Page TRM / B 3.8-16 11/07/2013 Page TRM / B 3.8-17 11/30/2011 Pages TRM / B 3.8-17a and TRM / B 3.8-17b 11/30/2011 Pages TRM / B 3.8-18 through TRM / B 3.8-20 05/29/2013 Pages TRM / B] 3.8-21 and TRM / B] 3.8-22 05/28/2009 Page TRM / B] 3.8-23 05/29/2013 Page TRM / B] 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B] 3.9-7 08/31/1998 TRM / LOES-8 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT I1 TRM / LOES-8 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Page TRM /B 3.10-6 03/27/2008 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/30/1998 Page TRM /B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-11a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B3.11-15 02/01/1999 Pages B] 3.11-16 through B] 3.11-19 08/30/1998 Page TRM/B[]3.11-20 04/02/2002 Page TRM/ []3.11-20a 04/02/2002 Page TRM/B3.11-21 05/13/2005 Pages TRM / B] 3.11-22 and TRM / B] 3.11-23 11/14/2006 Pages TRM / B] 3.11-23a and TRM / B] 3.11-23b 06/18/2013 Pages TRM / B] 3.11-24 and TRM / B] 3.11-25 01/21/2004 Pages B] 3.11-26 and B] 3.11-27 08/30/1998 Page TRM/B[]3.11-28 11/30/2005 Page TRM / B] 3.11-29 02/19/2015 Pages TRM / B] 3.11-30 and TRM / B] 3.11-31 05/29/2013 Page TRM / B] 3.11-32 08/30/1998 Page TRM / [3.11-33 06/30/2010 Pages B] 3.11-34 and B] 3.1 1-35 08/30/1998 Page TRM / B] 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B] 3.12-1 09/19/2007 Page TRM / B] 3.12-2 11/29/2010 Page TRM / B] 3.12-3 02/05/1999 TRM1 text LOES I10/7/2015 SUSQUEHANNA-UNIT1 TRM / LOES-9 I RM SUSQEHANA UNT LOS-9EFFECTIVE DATE 10/07/2015
TRM Post Accident Monitoring Instrumentation Rev. 8 3.3.4 3.3 Instrumentation 3.3.4 TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.
APPLICABILITY: According to Table 3.3.4-1 ACTIONS
NiOTES.
- 1. Separate condition entry is allowed for each Function.
- 2. The provisions of TRO 3.0.6 are not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Enter the Condition referenced Immediately channel inoperable, in Table 3.3.4-1 for the channel.
B. As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of monitoring in Table 3.3.4-1. the appropriate parameter(s).
AND B.2 Restore the required channel 7 days / 30 days (*
to OPERABLE status.
C. As required by Required C.1 Restore the required 30 days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.
D. As required by Required 0.1 Verify a minimum 14 of the Immediately Action A.1 and referenced in associated acoustic monitor Table 3.3.4-1 channels and 5 of the ADS AND SRV acoustic monitor channels are operable. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (C) COMPLETION TIME for REQUIRED ACTION B.2 is extended from 7 to 30 days during construction activities associated with the replacement of SPING equipment with VERMS equipment.
SUSQUEHANNA - UNIT 1 TRM / 3.3-9 SUSQEHANA
- NITI TR/ DATE 33-9EFFECTIVE 10/07/2015
TRM Post Accident Monitoring Instrumentation Rev. 8 3.3.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME OR D.2 Verify SRV tailpipe Immediately temperature indication and alarm are available for the AND tailpipe associated with the inoperable acoustic monitor. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter OR D.3 Verify that the following Immediately alternate monitoring methods in TS Table 3.3.3.1-1 are OPERABLE: AND Function 1 Function 2 Function 3 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Function 10 thereafter AND D.4 Restore the required 30 days channel(s) to OPERABLE status. OR At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.
SUSQUEHANNA-UNIT1 TRM / 3.3-9a UNTI RM SUSQEHANA 3.-9aEFFECTIVE DATE 06/30/2010
TRM Post Accident Monitoring Instrumentation Rev. 8 3.3.4 TECHNICAL REQUIREMENT SURVEILLANCE
NOTES---------------
- 1. Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or an associated function is available.
SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 "Perform CHANNEL FuNcTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open nloise level.
TRS 3.3.4.4. Perform CHANNEL CALIBRATION 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATION of the 92 days Primary Containment H2 and 02 Analyzers.
SUSQUEHANNA-UNIT1 TRM / 3.3-10 SUSQEHANA UNT 1 RM3.-10EFFECTIVE DATE 10/31/2007
TRM Post Accident Monitoring Instrumentation Rev. 8 3.3.4 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
- 2. Main Steam Safety/Relief Valve 1,2 1/valve D TRS 3.3.4.1 Position Indicator (Acoustic TRS 3.3.4.2 Monitor) TRS 3.3.4.3
- 3. Reactor Building Vent Noble Gas Monitor
- b. High Range(b) 1,2, (a) B TRS 3.3.4.1 1
TRS 3.3.4.4
- 4. Standby Gas Treatment System Vent Noble Gas Monitor
- b. High Range(b) 1,2, (a) B TRS 3.3.4.1 I
TRS 3.3.4.4
- 5. Turbine Building Vent Noble Gas Monitor
SUSQUEHANNA-UNIT1 TRM / 3.3-11 3.-11EFFECTIVE DATE 10107/2015 SUSQEHANA-UITITRM
TRM Post Accident Monitoring Instrumentation Rev. 8 3.3.4 TABLE 3.3.4-1 (continued)
TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
- 6. Standby Gas Treatment System Vent Stack Sampling System Flow
- 7. Turbine Building Vent Stack Sampling System Flow
- 8. Containment H2 and 02 Analyzer(b) 1,2 2 C TRS 3.3.4.1 TRS 3.3.4.5 (a) When moving irradiated fuel in the secondary containment.
(b) TRO 3.0.4.c is applicable.
SUSQUEHANNA- UNIT 1 TRM / 3.3-1 la SUSQEHANA
-UNI I TM
/3.3-DATE IaEFFECTIVE 10/07/2015
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to display plant variables that provide information required by the control room operators during accident situations. The OPERABILITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables following an accident. This capability is consistent with the recommendations of Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant Conditions During and following an Accident," NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations" and NEDO-33160-A Revision 1, "Regulatory Relaxation For The Post Accident SRV Position Indication System" (Reference 6). It should be noted that the Technical Specifications LCO 3.3.3.1 contains all Category 1, non-type A instruments and Regulatory Guide 1.97 Type A instrument (References 1 and 2). This TRO requires instruments outside of these criteria.
Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pressure suppression system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for the purpose of this TRM. The recorders are the primary method of indication used by the operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.
- TE-15703
- TE-1 5725
- TT-15703
- TT-15725
- TR-15795A
- TR-15795B Main Steam Safety/Relief Valve Position Indicators (Acoustic Monitors) provide indication when the valves are functioning. Alternate methods for monitoring SRV position include SRV Tailpipe Temperature and the following Functions from Technical Specification Table 3.3.3.1-1:
Suppression Chamber Water Level (Function 3)
Suppression Chamber Water Temperature (Function 10)
Reactor Vessel Water Level (Function 2)
Reactor Steam Dome Pressure (Function 1)
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.3-4 SUSQEHANA
-UNITI TM/B33-4EFFECTIVE DATE 06/30/2010
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The required channels for REACTOR BUILDING VENT Noble Gas Monitor, (continued) Standby Gas Treatment System Vent Noble Gas Monitor, and Turbine Building Vent Noble Gas Monitor provide information regarding the release of radioactive materials to allow for early indication of the need to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat. For the Noble Gas Monitors the only required channels are the mid range and high range.
The drywell and suppression chamber hydrogen and oxygen concentrations gas analyzers monitor hydrogen and oxygen concentration to detect combustible gas levels in primary containment. The analyzers are capable of determining hydrogen concentration in the range of 0 to 30% by volume and oxygen concentration in the range of 0 to 10% by volume, and each provide control room indication and output to a control room recorder. Each gas analyzer must be capable of sampling either the drywell or the suppression chamber. The recorders are the primary method of indication available for use by the operator during an accident, therefore the PAM Specification deals specifically with this portion of the instrument channel. The gas analyzer piping is provided with heat tracing to reduce the buildup of condensation in the system. H20 2 Analyzers can be considered OPERABLE for accident monitoring for up to 100 days with their heat tracing INOPERABLE.
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
During construction activities that replace existing SPING equipment with new VERMS equipment, the Vent Noble Gas Monitor for each release path is anticipated to be inoperable for longer than 7 days. Restoration completion time to return the affected channel to OPERABLE status to support construction activities is extended to 30 days. This condition is compensated for by the enhanced Preplanned Alternate Monitoring Plan per REQUIRED ACTION B.1.
(continued)
SUSQUEHANNA-UNIT1 TRM / B 3.3-5 SUSQEHANA
-UNI I RM
/BDATE 33-5EFFECTIVE 10/07/2015
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES ACTIONS Action 0 requirements were determined by balancing the safety significance (continued) of the system with the impact of the actions on the operating unit. The loss of the acoustic monitors is not safety significant providing the diverse and redundant alternate methods of determining SRV position are available.
System components in the control room are restorable within 30 days without unit operation impact. Components located in containment require a unit shutdown to gain access to individual components. The sYstem channels shall be restored to operable condition at earliest opportunity.
Noble gas monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.
Components of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement. Tailpipe temperature is the direct process monitoring, alternate method and is not covered by Technical Specification LCO's as are the other alternative methods.
TRS The Technical Requirement Surveillances (TRS) are modified by two Notes.
Note 1 states that the TRSs for each Post Accident Monitoring instrumentation Function are located in the SR column of Table 3.3.4-1.
Note 2 modifies the Surveillances to indicate that when a channel is placed in a inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or associated Function are available. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.3-6 SUSQEHANA
-UNI I RM
/BDATE 33-6EFFECTIVE 06/30/2010
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS The alternate means of monitoring the parameter or the associated function (continued) are:
Parameter Alternate Means/Associated Function Suppression Chamber Air One channel of Suppression Chamber Temperature Air Temperature Main Steam Safety/Relief Suppression Pool level Valve Position Indicator Suppression Pool Temperature RPV level RPV pressure SRV Tailpipe Temperature Containment H2 and 02 Analyzer One channel of Containment H2 and 02 The TRSs are defined to be performed at the specified Frequency to ensure that the TRM PAM Function is maintained OPERABLE.
TRS 3.3.4.1 Performance of the CHANNEL CHECK once every 31 days ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other- channels. It is based on the assumption that (continued)
SUSQUEHANNA-UNiT1 TRM / B 3.3-7 SUSQEHANA
-UNI I RM
/B33-7EFFECTIVE DATE 10/07/2015
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS TRS 3.3.4.1 (continued) instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to operate properly between each CHANNEL CALIBRATION.
Agreement criteria, which are determined by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability. If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.
REFERENCES 1. Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident."
- 2. NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations."
- 3. Technical Specification Amendment No. 100 to License No. NPF-22 for failed Unit 2 "5" acoustic monitor.
- 4. Technical Specification Amendment No. 169 to License No. NPF-14 for failed Unit 1 "5" acoustic monitor.
- 5. Proposed amendment No. 183 to License No. NPF-22 failed Unit 2 "J" acoustic monitor.
- 6. NEDO-33160-A, Revision 1, "Regulatory Relaxation For The Post Accident SRV Position Indication System," dated October 2006.
- 7. NRC letter, "Final Safety Evaluation For Boiling Water Reactor Owners' Group (BWROG) Topical Report (TR) NEDO-33160, Regulatory Relaxation For The Post Accident SRV [Safety Relief Valve] Position Indication System (TAC No. MC5446)," dated September 26, 2006.
SUSQUEHANNA-UNIT1 TRM / B 3.3-8 SUSQEHANA
-UNI I RM
/BDATE 33-8EFFECTIVE 06/30/2010
Oct. 15, 2015 Page 1 of 2 MANIJAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2015-41310 USER INFORMATION:
GERLACH*ROSEY N EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSEY N 10/15/2 015 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 10/05/2015 ADD MANUAL TABLE OF CONTENTS DATE: 10/14/2015 CATEGORY: DOCUMENTS TYPE: TRM2
Oct. 15, 2015 Page 2 of 2 ID: TEXT 3.3.4 ADD: REV: 8 REMOVE: REV: 7 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT B3.3.4 ADD: REV: 5 REMOVE: REV:4 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES ADD: REV: 86 REMOVE: REV:85 ANJY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INB0X.
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 10/14/2 015 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 86 10/14/2015
Title:
LIST OF EF:F'ECTIVE SECTIONS TEXT TOC 24 04/28/2015
Title:
TABLE OF CONTENTS TEXT 1.1 0 11/19/2002
Title:
use AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 11 01/31/2014
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 6 03/05/2015
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 -1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4 05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 11 04/28/2015
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
Report Date: 10/15/15 Page 1 Page ! of 15 15 Report Date: 10/15/15
SSES MANTJAI~
Manual Name : TRM2 ii*Manual
Title:
TECHNICAL REQUIREMENTS MANUJAL UNIT 2 TEXT 3,3.1 0 11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUM4ENTATION TEXT 3,3.2 3 03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3,3.3 2 11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 8 10/14/2015
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION LDCN 4553 TEXT 3.3.5 0 11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3,3.6 4 04/29/2014
Title:
INSTRUMENTATION TEN ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3,3.8 1 10/22/2003
Title:
INSTRUMENTATION TEN RPS INSTRUMENTATION TEXT 3.3.9 3 05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 1 03/05/2015
Title:
WATER MONITORING INSTRUMENTATION Report Date: 10/15/15 Page 2 Page ! of of 15 15 Report Date: 10/15/15
SSES MANUJAI
. Manual Manual
Title:
Names TECHNICAL TRM2 REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1* 11/09/2007
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 2 05/14/2009
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 1 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002
Title:
ECCS AND RCIC LONG TERN NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2 04/29/2014
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 10/15/15 Page 3~
Page of of 15 15 Report Date: 10/15/15
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0 11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/19/2002 Title : PLANT SYSTEMS ULTIMATE HEAT SINK CURS) AND GROUND WATER LEVEL TEXT 3.7.3,1 2 04/16/2009 Title : PLANT SYSTEMS FIRE SUPPRESSION WATER sUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009 Title : PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS
- TEXT 3.7.3,3 3 04/16/2009 Title : PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009 Title : PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006 Title : PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 11 09/27/2012
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 10/15/15 Page 44 Page of of 15 i_55 Report Date: 10/15/15
SSES MANUJAI
- I Manual Name : TRN2
... Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 1 03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008 S *
Title:
PLANT SYSTEMS MAIN CONDENSER 0FFGAS PRETREATMENT LOGARITHMIC MONITORING INSTRUMENTATION RADIATION
- TEXT 3.7.8 9 03/05/2015
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 2 04/29/2014
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.1 1 10/02/2009
Title:
PLANT SYSTEMS TEXT 3.8.1 3 06/20/2012
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THEEMAJL OVERLOAD PROTECTION -
CONTINUOUS
£ TEXT 3.8.2.2 2 12/14/2004 WTitle: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page ! of i_55 Report Date: 10/15/15
SSES MANUAL Manual Name : TRM2 i* Manual
Title:
TECHNICAL REQUIREMENTS MANAL UNIT 2 TEXT 3.8,3 2 06/20/2012 Title 2 ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8,4 1 02/04/2005 Title 2, ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8,5 1 11/14/2013 Title ,, ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8,6 2 12/14/2006 Title 2 ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8,7 2 10/22/2009 Title 2 BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9,1 0 11/19/2002 Title 2 REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002 Title 2 REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002 Title 2 REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006 Title 2 MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007 Title 2 MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.11.1.1 1 04/26/2006 Title 2 RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Report Date: 10/15/15 Page h6 Page of of 15 15 Report Date: 10/15/15
SSES MANTJI*
Manual Name : TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 2 10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 3 03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006
Title:
RADIOAdTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 5 03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 4 03/05/2015
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM Report Date: 10/15/15 Page 72 of of 15 15 Report Date: 10/15/15
SSES MANUAL Manual Name : TRM2
- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3 .12 .1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4 04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS TRAINING Report Date: 10/15/15 of 15 Page 88 Page of 15 Report Date: 10/15/15
SSES M.ANUJAL
. Manual Manual
Title:
Name: TECHNICAL TRM2 REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 6 03/05/2015
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION CTRO) APPLICABILITY TEXT B3.1.1 2 04/29/2014
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION A. AND CHECK VALVE TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING L,IMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 1 01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUM]ENTATION TEXT B3.3.2 2 03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2 11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION-TEXT B3.3.4 5 10/14/2015
Title:
INSTRUMENTATION BASES TEN POST ACCIDENT MONITORING (PAM) INSTRUMENTATION LDCN 4553 TEXT B3.3.5 2 11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 5 01/31/2014
Title:
INSTRUMENTATION BASES TEN ISOLATION ACTUATION INSTRUMENTATION Report Date: 10/15/15 of 15 Page ~9 Page of i_55 Report Date: 10/15/15
SSES MANUJAL Manual Name: TRM2
-. Manual
Title:
TECHNICAL REQUIREMENTS MAMATJAL UNIT 2 TEXT B3.3.7 1 11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE 0VERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3 05/.14/2009
Title:
INSTRUMENTATION BASES. LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3 02/22/2012
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASESREACTOR VESSEL MATERIALS TEXT B3.4.6 1 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Report Date: 10/15/15 Page i~.
Page of 15 i0 of 15 Report Date: 10/15/15
SSES MANUAL q SManual Manual
Title:
Name : TECHNICAL TRM2 REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0 11/19/2002
Title:
EGGS AND RCIG BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007
Title:
EGGS AND RCIG BASES EGGS AND RGIG SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007
Title:
EGGS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION GRAMBER-TO-DRYWELL VACUUJMBREAKER POSITION INDICATION TEXT B3.6.3 1 04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (URS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS Report Date: 10/15/15 12.
Page i!l of of 15 15 Report Date: 10/15/15
SSES MANUAL Manual Name: TRM2 SManual Title- TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4 2 04/29/2014
Title:
- PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006 Title : PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002 Title : PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3 09/27/2012
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002 Title : PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002 Title : PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013 Title : PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION 2 01/31/2008 TEXT B3.7.7
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFOAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 4 01/31/2 014
Title:
PLANT SYSTEMS BASES SNUBBERS Report Date: 10/15/15 Page 12 1/2 of of 15 i_55 Report Date: 10/15/15
SSES MANUJAI aW- i Manual Manual Name:
Title:
TRJA2 TECHNJICAL REQUIREMENTS MAMAL UNIT 2 TEXT B3.7.9 2 12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE IDVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2 04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3 06/20/2012
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Report Date: 10/15/15 Page 23.
Page 13 of of 15 15 Report Date: 10/15/15
SSES MANTJAL Manual Name: TRM2 SManual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COJYUIUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19 /2 002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.11i.1. 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 U 11/19/2 002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES Report Date: 10/15/15 Page 14 Page 1__{4 of of 15 15 Report Date: 10/15/15
SSES MAi*TA W:i Q Manual
Title:
Manual Name:* TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5 .07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 5 03/05/2015
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT 33.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LADUSE CENSUS TEXT B3.11.4.3 0 11/19/2 002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 10/15/15 Page i~.
Page 15 of of 15 i__55 Report Date: 10/15/15
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 86 LUST OF EFFECTIVYE SECTIONS (TIECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 04/23/2015 1.0 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM 1 1.0-2 10/04/2002 Page TRM 1/1.0-3 08/31/1998 2.0 PL.ANT PROGRAMS Page 2.0-1 08/31 /1998 Pages TRM 1 2.0-2 and TRM 2.0-3 .... 01/28/2005 Page TRM I 2.0-4 06/25/2002 Page TRM / 2.0-5 01./2.1/2014 Page TRM / 2.0-6 *,04,/15/2009 Page TRM 1 2.0-7 ", 05/15/2008 Pages TRM /2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 ' 04/15/2009 Pages TRM /2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM /2.0-15 ... 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM, / 3.0-2 02/19/2015 Page TRM /13.0-3, 03/15/2002 Page TRM I 3.0-4 02/19/2015 REACTIVITY cONTROL sYSTEMS 3.1 Page TRMI/3.i1-1 10/31/2007 Pages TRM /]3.1-2through TRM / 3.1-5 08/31/1995
.Page-TRM / 3.1-6 03/27/2007 Page-TRM 1 31-7 04/15/2009 Page TRM / 3.1-8 03/27/2007 S-Pages TRM / 3.1-9 and TRM 1 3.1-9a 02/18/1999 "Page TRM /3.1-10 02/18/1999 3.2 *CORE OPERATING .LIMITS :REPORT
...Page TRM /3.2-1 08/31/1998 Pages TRM / 3.2-2 through TRM /3.2-54 04/21/2015 3.3 INSTRUMENTATION Pages TRM 13.3-1 through TRM / 3.3-3 07/16/1999 Pages TRM / 3.3-4 and TRM /13.3-5 10/31/2007 Page TRM / 3.3-6 03/10/2011 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM 1 ,/OES-1 SUSQEHANA UNT 2 RM LOS-1EFFECTIVE DATE 10/07/2015
ii SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Rev. 86 I7 Section Title Effective Date Page TRM / 3.3-9 10/0"7/2015 Page T]RM / 3.3-9a 06/3012010 Page TRM /3.3-10 10/3112007 Page TRM / 3.3-11 10/07/2015 Page TRM / 3.3-lia 101071/2015 Page "TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 01,/0712011 Page TRM 13.3-14 12/14/1998 Page TRM / 3.3-15 04111/2014 Page TRM / 3.3-16 01/07/2011 Page TRM / 3.3-17 06114/2002 Page TRM I 3.3-18 10/311/2007 Pages TRM 13.3-19 and TRM 13.3-20 10/22/2003 Page TRM / 3.3-21 04115/2009 Page TRM / 3.3-21a 11,/15/2004 Pages T]RM /3.3-21b through TRM I 3.3-21d 03/27,/2007 Page TRM /3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM /3.3-25 10,/22/2003 Page TRM /3.3-26 02119/2015 Page TRM / 3.3-27 "04t07,/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM t 3.4-8 04/01/2009 Page 3.4-9 08/31,/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM / 3.4-12 04117/2009 Page TRM / 3.4-13 03/31/12006 Page TRM / 3.4-14 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2.005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 and 3.6-2 08/31/1998 Pages TRM ,/3.6-3 and TRM / 3.6-3a 04/16/2014 Page 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 O Pages TRM / 3.6-7 through TRM I 3.8-9 12/31/2002 I
TRM / LOES-2 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA UNIT 2 SUSQUEHANNA-UNIT2 TRM / LEES-2 EFFECTIVE DATE 10107/2015
SUSQUEHANNA STEAM ELECTRIC STATION -Rev. 86 UIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM I 3.7-1 and TRM I 3.7-2, 0712911999 Page 3.7--3 08/31/i1998 Page TRM 13.7-4 03/31/2006 Page TRM 13.7-5 04/07/2009 Pages TRM 1]3.7-6 through TRM 13.7-8 08102/1999 Pages TRM 1 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM 1 3.7-i11 01/2112.000 Page TRM 13.7-12 08/0211999 Page TRM !/3.7-13 04/07/2009 Page TRM 13.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/0211999 Page TRM 13.7-17 04/07/2009 Page TRM 13.7-18 08/02/1 999 Page TRM 13.7-19 04/07/2009 Pages TRM 13.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM 13.7-24 03/31/2006 Page TRM / 3.7-25 08/02/1999 Page TRM /3.7-26 09/25/2012 Page TRM 13.7-27 11/24/2011 Pages TRM 13.7-28 through TRM /3.7-32a 09/25/2012 O_*,. Page TRM / 3.7-33 Page TRM /3.7-34 09/25/2012 03/31/2006 Pages TRM 13.7-35 and TRM / 3.7-36 02/01/1999 Page TRM 13.7-37 02/19/2015 Page TRM /3.7-3.8 08/31/1998 Page TRM / 3.7-39 03/31/2006 Page TRM !/3.7-40 05/24/2012 Pages TRM 13.7-40a through TRM / 3.7-40c 05/24/2012 Page TRM / 3.7-41 09104/2008 Page TRM / 3.7-42 08/31/1998 Pages TRM / 3.7-43 02/19/2015 Pages TRM 1 3.7-44 and TRM / 3.7-45 10/05/2006 Page TRM /3.7-46 06/07/2007 Page TRM / 3.7-47 09/05/2012 Page TRM / 3.7-48 06/07/2007 Page TRM ! 3.7-49 03/09/2001 Page TRM / 3.7-50 08/16/2006 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 Page TRM /3.7-54 04/01/2009 Page TRM /3.7-55 09/25/2009 Page TRM /3.7-56 04/01/2009 TRM /LOES-3 EFFECTiVE DATE 10/07/2015 SUSQUEHANNA - UNIT
- UNIT 22 TRM/LOES-3 EFFECTlVE DATE 10/07/2015
SUSQUEH-ANNA STEAM ELECTRIC STATION Rev. 86" LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM /3.8-1 04/02/,2002 Page TRM / 3.8-2 0112812005 Pages TRM / 3.8-3 and TRM I 3.8-4 06/11/2012 Pages TRM / 3.8-5 and TR 1 3.8-6 04/0212002 Pages TR / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM 1 3.,8-11 0910312004 Page TRMJ]3..8-12 1210312004 Page TRM /3.8-13 06/1212012 Page TRM 13.8-14 0'8131/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM /3.8-16 and TRM 13.8-17 04/02/2002 Page 3.8-18 021,0111999 Page TRM / 3.8-19 04./0212.002 Page TRM 1 3.8-20 02101/'1999 Pages TRM / 3.8-21 and TRM /3.8-22 06106/1999 Page TRM / 3.8-23 1110,7/2013 Page TRM / 3.8-24 11/30/2,011 Page TRM 1 3.8-25 06/11/2012 Pages TRM / 3.8-25a and TRM I 3.8-25b I1/1301201.1 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Page TRM 1 3.8-28 05/28/2009 Page TRM 13.8-29 10120/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/3111998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.1.0-4 08/30/1998 Pages TRM / 3.10-5 and TRM /3.10-6 03/27/2 007 Page TRM / 3.10-7 06/10/2010 3.11 RADIOACTIVE EFFLUENTS Page TRM 1 3.11-1 103131/2006 Pages 3.11-2 through 3.11-3 08/31/1 998 Page TRM / 3.11-4 03/31/2005 Page 3.11-5 08/31/1998 Page TRM / 3.11-5 03/31/2006 Pages 3.11-7 and TRM /3.11-8 08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10 10/09/2012 Pages TRM / 3.11-11 and TRM / 3.11-12 08/31/1998 TRM / LOES-4 EFFECTIVE DATE 10/07/2015 2
SUSQU*5*NNA - UNIT SUSQUEHANNA- 'UNIT 2 TRM ! LOES-4 EFFE'CTI* DATE 10t07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 86 UIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM 1 3.11-13 _02/1 912015 Page TRM I 3.11-14 1210312004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM 1 3.11-17 03131/2006 Page 3.11-18 08/3111998 Page TRM/]3.11-19 08115/2,005 Pages TRM 13.11-20 and TRM / 3.11-21 03/31/20106 Page TRM 1 3.1-22 '04/02/2002 Page TRM ]13.11-23 11/14/2006 Page TRM 13.11-24 06/18/2,013 Page T']RM 13.11-25 04/1212007 Pages TRM 1 3.11-26 and T'IRM 1 3.11-27 01/21/2004 Page TRM 1 3.11-,28 09/08/'2009 Page TRM / 3.11-29 1.2/03/2004 Pages TRM 3.11--30 and TRM 1 3.11-31 01121/2004 Page TRM 1 3.11-32 02/19/2015 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRW /3.11-35 03/31/2006 Pages TRM ] 3.11-36 through TRM 1 3.11-39 11/30/2005 Page T]RM / 3.11-40 02/19/2015 Pages TRM 1 3.11-41 through TRM 1 3.11-44 '08/31/1998 Page TRM 1 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRW / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM 1 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM 13.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMiNISTRAT]IVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 08131/1998 Page TRM 1]4.0-4 12/11/2008 Pages TRM / 4.0-5 through TRM / 4.0-8 08/.31/1998 TRM / 'LOES-5 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA - 'UNlT SUSQUEHANNA - UNiT 22 TRM / LOES-5 EFFECTIVE DATE 10107t2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 86 LIST OF EFFECTIVE SECiTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Tlitle Effective Date 8 3.0 APPUCAB~iLITY BASES Pages TRM 1 B 3.0-1 through TRM I B 3.0-3 08/31/1998 Page TRM I B 3.0-4 02119/2015 Pages TRM I B 3.0-4a and TRM 1B 3.O-4b 02/19/2015 Page -TRM1 B 3.0-5 02/1912015 Pages T]RM / B 3.0-6 and TRM I B 3.0-7 '06/1 2/2012 Pages TRM I B 3.0-8 through TRM I1B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/1512002 Pages TRM I B 3.0-13 through TRM I B 3.0-15 02/19/2015 B 3.1 REACTIV*IIY CONTROL SYSTEMS BASES Page TRM I B 3.1-1 07/13/1999 Page TRM I B 3.1-2 0411612014 Page TRM /B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1598 Pages TRM 1 B 3.1-5 through TRM /8B3.1-7 03/27/2007 Page TRM I B 3.1-8 02/1 811999 B 3.2 CORE OPERATING UMITS BASES Page B 3.2-1 05/31]1 998 B 3.3 INSTRUMENTATION BASES Page TRM I B 3.3-1 01/21/2014 I. Page TRM I B 3.3-2 03/10/2011 Page TRM I B-3.3-2a 10/31/2007 Pages T RM 1 B 3.3-3 and TRM / B 3.3-3a 10/31/2007 Page TRM /8B 3.3-4 06/30/2010 Pages TRM / B 3.3-5 through TRM / B 3.3-7 10/07/2015 Page TRM 1 B 3.3-8 06/30/2010 Page TRM 18B3.3-9 10/31/2007 Page TRM /8B3.3-10 01/07/2011 Page TRM 18B3.3-11 02/21/2014 Pages TRM /8 3.3-12 and TRM /8B3.3-13 01/07./2,011 Page TRM /8B3.3-14 06/25/2002 Page TRM ! B 3.3-14a 10/31/2007 Page TRM /8 3.3-14b 06/14/2002 Pages TRM / B 3.3-15 through TRM ! B 3.3-17 10/22/2003 Pages TRM I B 3.3-18 and TRM /8B3.3-19 03/27/2007 Pages TRM I B 3.3-19a and TRM /8B 3.3-19Sb 03/27/2007 Page TRM /8B3.3-19Sc 04/17/2009 SUSQUEHANNA - UNIT 2 TRM I LOES-6 SUSQEHANA-UNI 2 RM LOS-6EFFECTIVE DATE 10/07/2,01!5
SUSQUEHANNA STEAM ELECTRIC STATiON Rev. 86 LIST OFEFFECTIVSECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 03127/2007.
Pages TRM 1B 3.3-19d and TRM I B 3.3-19e Page TRM I B 3.3-2,0 0211,612012 Page TRM I B 3.3-21 08103/2010 Page TR I B 3.3-22 10/22/2003 Page TRM I B 3.3-23 05/1612003 Pages TRM I B 3.3-24 and TRM I B 3.3-25 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES Page TRM I B 3.4-1 0813111998 Pages TRM 1 B 3.4-2 and TRM 1 B3.4-3 0410112009 Pages TRM / B 3.4-4 and T3RM I B 3.4-4a 1013112007 Page TRM I B 3.4-5 10/15/1999 Page B 3.4-6 0813111998 Page TRM / B 3.4-7 04/25/2013 B 3.5 ECCS AND RC1C BASES Pages B 3.5-1 and B 3.5-2 08/31/11998 Pages TRM ] B 3.5-3 and TR I B 3.5-3a 10/31/2007 Page B 3.5-4 083/3111998 Page TRM / B 3.5-5 10/3112007 8 3.6 CONTAINMENT BASES Page TRM I B 3.6-1 07/26./2001 Page TRM I B 3.6-2 02101/1999 Page B 3.6-3 08/31/]1998 Page TRM I B 3.8-4 0312912007 Page TRM I B 3.6-5 04/04/2007 Page TRM I B 3.6-6 12/03/2004 Pages TRM /' B 3.6-7 through TRM / B 3.8-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/3111998 Page TRM I B 3.7-3 06/1012010 Page TRM I B 3.7-3a 12/27/2007 Page TRM I B 3.7-4 03/31/2006 Page TRM I B 3.7-5 08/0211999 Pages TRM / B 3.7-6 and TRM I B 3.7-6a 03/31/2006 Pages T'RM I B 3.7-7 and TRM I B 3.7-7a 08/02/1 999 Page TRM / 'B 3,.7-8 08/02/1.999.
Page TRM / B 3.7-9 04/11/2014 Page TRM I B 3.7-10 08/02/1999 SUSQUEHANNA -UNIT 2 TRM ] LOES-7 SUSQEHANA UNT 2 RMLOS-7EFFECTIVE DATE 10/07/2015
SUSQUEH-ANNA STEAM ELECTRIC STATION Re
.=v.86 i*.. UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM I B 3.7-10Ca through TRM I B 3.7-1 Ia 03/3112006 Pages TRM I B 3.7-12 and TRM I B 3.7-13 08/02/1999 Pages TRM I B 3.7-14 through TRM I B 3.7-14b 0912512012 Pages TRM I B 3.7-15 and TRM I B 3.7-16 0210111999 Pages B 3.7-17 through B 3.7-2,0 08/3111998 Page TRM I B 3.7-21 05/29/2013 Pages TRM I B 3.7-21a through TRM I B 3.7-21d 051.2412012 Pages TRM I B 3.7-21e through TRM I B 3.7-21g 05/29/2013 Pages TRM I B 3.7-22 and TRM ! B 3.7-23 01J30]2008 Page TRIM! B 3.7-24 10105/2006 Page TRM I B 3.7-25 01/2112014 Pages TRM I B 3.7-26 through TRM I B 3.7-29 10/0512006 Page TRM I B 3.7-30 06/07/2007 Page TRM / B 3.7-30a 10/05/2006 Page TRM I B 3.7-30b 01121']2014 Page TRM I B 3.7-31 11/30/2011 Page TRM I B 3.7-32 03/09/2001 Page TRM I B 3.7-33 04/15/2003 Page TRM I B 3.7-34 12/0312004 Page TRM / B 3.7-35 07/]05/2.000 Pages TRM I B 3.7-36 and TRM I B 3.7-37 04/0112009 Page TRM I B 3.7-38 09/25/2009 Page TRM I B 3.7-39 04/01/2009 Page TRM I B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM I B 3.8-1 04/02/2002 Pages TRM I B 3.8-2 01/28/2005 Page TRM I B 3.8-2a 03/01/2010 Pages TRM I B 3.8-3 and TRM I B 3.8-3a 04/02/2002 Page TRM I B 3.8-4 09/03/2004 Page TRM I B 3.8-4a 04/0212002 Page TRM I B 3.8-5 08/31/1998 Pages TRM l B 3.8-6 through TRM I B 3.8-15 04/02/2002 Page TRM 18B3.8-16 11/07/2013 Page TRM / B 3.8-17 11/30/2011 Page TRM I B 3.8-17a 06111/2012 Page TRM / B 3.8-17b 11/30/2011 Pages TRM 18B3.8-18 through TRM I B 3.8-20 05/29/2013 Pages TRM /8B3.8-21 and TRM / B 3.8-22 05/28/2009 Page TRM I B 3.8-23 05/29/2013 Page TRM 18B3.8-24 ,05/2812009 e
TRM / LQES-8 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA UNIT SUSQUEHANNA-UNIT2
- 2 TRM / LOES-8 EFFECTIVE DATE 10f07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 86 LISTOF EFFECTIVE SECTIONS (]TECHNIlCAL REQUIREMENTS MANUAL)
. J.
I 9" Section Title Effective Date B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-i and B 3.9-2 08131./1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-i 08/31/1998 Pages TRM I B 3.10-2 and TiRM I B 3.10-3 03/27/2007 Pages TRM I B 3.10-4 and TRM I B 3.10-5 08123/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM I B 3.11-10 02/01/1999 Pages T-IRM / B 3.1 1-11 and TRM / B 3.1 1-11a 04/07/2000 Pages TRM I B 3.11-12 and TRMI B 3.11-13 02101/1999 Page TRM I B 3.11-14 12/03/2004 Page TRM 18B3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Pages TRM I B 3.11-20 and TRM I B 3.1 1-20a 04/0212002 Page TRM / B 3.11-21 05/13/2005 Pages TRM /B 3.11-'22 and TRM I B 3.11-23 11114/2006 Pages TRM /B 3.1 1-23a and TRM I B 3.1 1-23b 06/18/2013 Pages TRM /8B3.11-24 and TRMI]B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Page TRM / B 3.1 1-28 11/30/2005 Page TRM I B 3.11-29 02/19/2015 Pages TRM / B 3.11-30 and TRM l B 3.11-31 05/29/2013 Page TRM 18B3.11-32 08/31/1998 Page TRM /8B3.11-33 06/30/2010 Pages TRM / B 3.11-34 and TRM I B 3.11-35 08/31/1998 Page TRM 18B3.11-36 02/1 2/1 999 8.3.12 LOADS CONTROL PROGRAM BASES Page TRM I B 3.12-1 09/19/2007 Page TRM /B 3.12-2 11/29/2010 Page TRM I B 3.12-3 02/05/1999 TRM2 text LOES.doa 11JA3712015 I.:?
TRM / LOES-9 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA SUSQUEHANNA-UNIT2 - UNIT 2 TRM ] :LOES-9 EFFECTIVE DATE 10/07/2015
TRM Post Accident Monitoring instrumentation Rev. 8 3.3.4 3.3 'Instr'umentation 3.3.4 I]RM Post-Accident Monitoring Instrumentation TFRO 3.3.4 The TRM post-accidant monitoring instrumentation channels shown in T]able 3.3.4-1 shall be OPERABLE.
APPLICABILITY: According to Table 3.3.4-i ACTi3ONS NOTES
- 1. Separate condition entry is allowed for each Function.
- 2. The provisions of TRO 3.05 are not applicable.
,CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Enter the Condition Immediately channel inoperable, referenced in Table 3.3.4-1 for the channel.
B3. As required by Required 8].1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of in Table 3.3.4-1. monitoring the appropriate parameter(s).
AND 8.2 Restore the required channel 7 days / 30 days (*
to OPERABLE status.
C. As required by Required C.1 Restore the required 3D days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.
D. As required by Required DA1 Verify a minimum 14 of the immediately Action A.1 and referenced associated acoustic monitor in Table 3.3.4-1 channels and 5 of the ADS AND SRV acoustic monitor channels are operable. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (c),COMPLETION TIME for REQUIRED ACTION 8.2 is extended from 7 days to 30 days during construction activities associated with the replacement of SPING equipment with VERMS equipment.
SUSQUEHANNA-UNIT2 TRM / 3.3-9 SUSQEHANA
-UNIT2 TMDATE 10/0712015 133-9EFFECTIVE
TRM Post Accident Monitoring instrumentation 3.3.4 Rev. 8 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME OR D.2 Verify SRV tailpipe Immrediately temperature indication and alarm are available for the AND tailpipe associated with the inoperable acoustic monitor. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter OR D.3 Verify that the following Immediately alternate mnonitoring methods in TS Table 3.3.3.1-1 are OPERABLE: - AND o Function 1 S Function 2
- Function 3 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- Function 10 thereafter AND 0.4. Restore the required 30 days channel(s) to OPERABLE status. OR_
At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.
SUSQUEHANNA - UNIT 2 T* ! 3.3-9a SUSQEHANA UNT 2 RM3.-9aEFFECTIVE DATE 061.3012010
TRM Post Accident Monitoring instrumentation Rev. 8 3.3.4 TECHNICAL REQUIREMENT SURVEILLANCE
- 1. Refer to Table 3.3.4-1 to determine which TR*s apply for each Post Accident Monitoring Function.
- 2. W~hen a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or an associated function is available.
1 SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.42. Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level.
TRS 3.3.4A4 Perform CHANNEL CALUBRATION 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATION of the Primary 92 days Containment H2 and 02 Analyzers.
.9P TRM ! 3.3-10 SUSQEHANA UNT 2 RM3.-10EFFECTIVE DATE 1013112007 I
TRM Post Accident !Monitoring Instrumentation
,Q.Rev. 8 3.3.4 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OThER REFERENCED SPECIFIED REQUIRED :FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
- 2. Main Steam Safety/Relief Valve 1,2 1/valve D TRS 3.3.4.1 Position Indicator (Acoustic TRS 3.3.4.2 Monitor) TRS 3.3.4.3
- 3. Reactor Building Vent Noble Gas Monitor
~TRS 3.3.4.4
- 4. Standby 'Gas Treatment System Vent Noble Gas Monitor
- 5. Turbine Building Vent Noble Gas Monitor
- a. Mid Range(b) 1,2 1 B TRS 3.3.4.1
"]'RS 3.3.4.4
SUSQUEHANNA - UNIT 2 TRM 1 3.3-11 EFFECTIVE DATE 1010712015
TIRM Post Accident Monitoring instrumentation Rev. 8 3.3.4 I .,:
TABLE 3.3.4-1 (conhinued)
TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECiFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITlONS 'CHANNELS ACTION A.1 SURVE]LI_.ANCE
- 6. Standby Gas Treatment System Vent Stack Sampling System Flow I
- 7. Turbine Building Vent Stack Sampling System Flow
- b. Sampler flow rate monitor~b 1,2 1C TFRS 3.3.4.1.
T[RS 3.3.4.4
- 8. Containment H2 and 02 1,2 2 C T[RS 3.3.4.1 Analyzer(b) TRS 3.3.4.5 (a) When moving irradiated fuel in the secondary containment.
(b) TRO 3.0.4.c is applicable.
SUSQUEHANNA - UNIT 2 TRM 1 3.3-11a SUSQEHANA UNT RM 2IVE 3.-haEFFECT DATE 1010712015
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to .display plant variables that provide information required by the control room operators during accident situations. The OPERABIL ITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables ;following an accident_ This capability is ,consistent with the recommendations of Regulatory Guide 1.97 Revision 2, i]nstrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant Conditions During and following an Accidentf NUREG-0578, 'qTMl-2 Lessons i.eamed Task Force Status Report and Short-Term Recommendations= and NEDO-331 60-A Revision 1, *Regulatory Relaxation For The Post Accident SRV Position Indication System= (Reference 6). It should be noted that the Technical Specificatio~ns LCO 3.3.3.1 contains all ,Category 1, non-type A instruments and Regulatory Guide 1.97 Type A instrument (References 1 and 2). This TRO requires instruments outside of these criteria.
Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pr:essure suppre.ssion system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for the purposes of this TRM. The recorders are the primary method of indicaton used by operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.
LOOPA. LOOP B
- TE-25703
- TE-25725
- TT-25703
- TT-25725
- TR-25795A
- TR-25795B Main Steam SafetylRelief Valve Positon lndicators (Acoustic Monitors) provide indication when the valves are functioning. Alternate methods for monitoring SRV position include SRV Tailpipe TemPerature and the following Functions '
from Technical Specification Table 3.3.3.1-1:
Suppression Chamber Water Level (Function 3)]
Suppression ,Chamber Water Temperature (Function 10)
Reactor Vessel Water Level (Function 2)
Reactor Steam Dome Pressure (Function 1)]
,(continued)
SUSQUEHANNA - UNIT 2 TRM ] B 3.3-4 SUSQEHANA
-UNI 2 RM IBDATE 33-4EFFECTIVE 06130/2010
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3A B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES
- I TRO The required (continued) Standby Gas channels TreatmentforSystem REACTOR Vent BUILDING Noble Gas VENT Monitor.Nobleand Gas Monitor, Turbine Building Vent Noble Gas Monitor provide information regarding the release of radioactive materials to allow for early indication ,ofthe need ;to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat.
For the Noble Gas Monitors the ,only required channels are the mid range and high range.
The drywell and suppression ,chamber hydrogen and oxygen concentrations gas analyzers monitor hydrogen and oxygen concentration to detect combustible gas levels in primary containment The analyzers are capable of determining hydrogen concentration in the range of 0 to 30% by volume and oxygen concentration in the range of 0 to 10% by volume, and each provide control room indication and output to a control room recorder. Each gas analyzer mus~t be capable of sampling either the drywell or the suppression chamber. The recorders are the primary method of indication available for use by the operator during an accident2 therefore the PAM Specification deals specifically with this portion of the instrument channel. The gas analyzer piping is provided with heat tracing to reduce the buildup of condensatidn in the system. 1H202 Aihalyzers can be considered OPERABLE for accident monitoring for up to 100 days with their heat tracing INOPERABLE.
0 ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
During construction activities that replace existing SPING equipment with new VERMS equipment, the Vent Noble Gas Monitor for each release path is anticipated to be inoperable for longer than 7 days. Restoration completion time to return the affected channel to OPERABLE status to support ,construction activities is extended to 30 days. This condition is compensated for by the enhanced Preplanned Alternate Monitoring Plan per REQUIRED ACTION B3.1.
(continued)
SUSQUEHANNA - UNIT 2 TRM /:B 3.3-5 SUSQEHANA
-UNI IB33-5EFFECTIVE 2 RM DATE "1010712015
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES ACTIONS Action D :requirements were determined by balancing the safety significance of (continued) the system with the impact of the actions on the operating unit_ The 'loss of the acoustic monitors is not safety significant providing the diverse and redundant alternate methods of determining SRV position are available. System components in the control room are restorable witin 30 days without unit operation impact. Components located in containment require a unit shutdown to gain access to individual components. ,Thesystem channels shall be restored to operable condition at eaiiiest opportunity.
Noble gas monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering ,theTRO ACT*IONS.
Components ,of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement. Tailpipe temperature is the direct process monitoring, alternate method and is not covered by Technical Specification LCO's as are the other alternative methods.
TRS The Technical Requirement Surveillances (TRS) are :modified by two Notes.
Note I states that the TRSs for each Post Accident Monitoring instrumentation Function are located in the SR column of Table 3.3.4-1.
Note 2 modifies the Surveillances to indicate that when a channel is placed in a inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or associated Function are available. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.3-6 SUSQEHANA
-UNI 2 RM IBDATE 33-8EFiFECTIVE 10/0712015
TRM Post Accident Monitoring ilnstrumentation Rev. 5 B 3.3.A B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS The alternate means of monitoring the parameter or The associated function are:
(continued)
P~r'nmtf*r Suppression Chamber Air One channell of Suppressioen Cihamber Temperature Air Temperature Main Steam SafetylRellief Suppression Pool levell Valve Position 1Indilcator Suppression [Pooll Temperature RPV 1level RPV pressure SRV Tailpilpe Temaperature Containment IH2 and 02 Analyzer One channel of Containment 1-1 and '02 The TRSs are defined to be peif~ormed at the specified Frequency to ensure that the TRM PAM Function is maintained OPERABLE
((continued)
SUSQUEHANNA - UNIT 2 TRM/B &3* SUSUEHNNA-UIT TRI DATE 3~-7EFFECTIVE 101.0,712015
F i ~TRM :Post Accident Monitoring Instrumentation SRev. 5 B 3.3.4 O:- B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS TRS 3.3.4.1 (continued)
Performance of the CHANNEL CHECK once every 31 days ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. it is based .on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations be tween instrument channels could be an indication of excessive instrument drift in one of the :channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to opefate properly between each CHANNEL CALIBRATION.
Agreement criteria, which are determined by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability..
If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.
O ':-REFERENCES 1. Regulatory Guide 1.97 Revision 2, "instrumentation for Light Water Cooled Nuclear 'Power Plants to Assess Plant and Environs Conditions During and Following an Accident.)'
- 2. NUREG-0578, "iTMi-2 Lessons Learned Task Force Status Report and Short-Term Recommendations.=
- 3. Technical Specification Amendment No. 100 to License No. NPF-22. for failed Unit 2 "S" acoustic monitor.
- 4. Technical Specification Amendment No. 169 to License No. NPF-14 for failed Unit I US" acoustic monitor.
- 5. Proposed amendment No. 183 to License No. NPF-22 failed Unit 2 "Jo acoustic monitor.
- 6. NEDO-33160-A, Revision 1, ='Regulatory Relaxation For The Post '
Accident SRV Position Indication System,= dated October 2006.1
- 7. NRC letter, "Final Safety Evaluation For Boiling Water Reactor Owners' Group (BWROG) Topical Report (TR) NEDO-33160, Regulatory Relaxation For The Post Accident SRV [Safety Relief Valve] Position
, ~Indication System .(TAG No. MC5446)," dated September 26, 2005.
SUSQUEHANNA - UNIT 2 TRM/B3.3* SUSQEHANA-UITTRMlB33-8EFFECTIVE DATE 0613012010
Oct. 15, 2015 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSHITTAL 2015-41364 USER INFORMATION:
GERLACH*ROSEY N EMPL# :028401 CA# : 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSEY M 10/15/2 015 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no T0C will be issued with the updated material.
TRMl - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 10/05/2015 ADD MANUAL TABLE OF CONTENTS DATE: 10/14/2015 CATEGORY: DOCUMENTS TYPE: TRM1 pt0t
'V
Oct. 15, 2015 Page 2 of 2 ID: TEXT 3.3.4 REMOVE: REV:7 ADD: REV: 8 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT B3.3.4 ADD: REV: 5 REMOVE: REV: 4 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT LOES REMOVE: REV: 82 ADD: REV: 83 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
- SES MANUAL Manual an~e: TEMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: 10/ 14/2 015 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 83 10/14/2015
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 25 04/28/2015
Title:
TABLE OF CONTENTS TEXT 1.1 1 01/31/2014 **
Til:USE AND APPLICATION DEFINITIONS *' -
TEXT 2.1 2 04/28/2015 '
Title:
PLANT PROGRAMS AND SETPOINTS PLANT-PROGRAMS° TEXT 2.2 10 7 °°0!/31/2014*
Title:
PLANT PROGRAMS AND SETP0ONTS ILNSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 -**5*, 03705/2015
Title:
TECHNICAL REQUIREMENT F9R OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)
APPLICABILITY '...* "<
TET .11- 1 11/09/2007 Title : REACTIVITY iCONqTROLh SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION I*ATWS-ARI ) INSTRUMENTATION TEXT 3.1.2 i "*0 11/18/2002
Title:
REACTIVITY*ICONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 5 04/16/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &
CHECK VALVE TEXT 3.2.1 15 04/28/2015
Title:
CORE OPERATING LIMITS REPORT (COLR)
Report Date: 10/15/15 Page !1 Page of of 16 16 Report Date: 10/15/15
SSES MANTJAT Manual Name:* TRM1
- iManual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0 11/18/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 8 10/14/2015
Title:
INSTRUMENTATION TEN POST-ACCIDENT MONITORING INSTRUMENTATION LDCN 4552 TEXT 3.3.5 0 11/18/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4 04/29/2014
Title:
INSTRUMENTATION TEN ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3 04/17/2008
Title:
OPEN INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 S
Title:
WATER MONITORING 1 03/05/2015 INSTRUMENTATION 0 Report Date: 10/15/15 Page 22 Page of of 16 16 Report Date: 10/15/15
RSES MANUqAL
. : Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Manual Namne: TRMIl TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2 04/17/2008
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 2 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLoW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005
Title:
EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007
Title:
EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/18/2002
Title:
EMERGENCy CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3..6.2 2 04/29/2014
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 10/15/15 Page.3 Page.3 of of 16 i_66 Report Date: 10/15/15
SSES MANUJAIL Manual Name:* TRMI
- .Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0 11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/18/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK CUBS) AND GROUND WATER LEVEL TEXT 3.7.3.1 2 04/16/2009
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3 04/16/2009 0
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 10 09/27/2012
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 10/15/15 Page 4 of of 16 16 Report Date* 10/15/15
- anual Name: TRM1 M..i*
SManual
Title:
TECHNICAL REQUIREMENTS MANU~IAL UNIT 1 TEXT 3.7.5.1 1 03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSEROFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION
- MONITORING S.TEXT 3.7.8 5 03/05/2015
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 2 01/31/2014
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004 Ti~le: PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 0 04/16/2009
Title:
STRUCTURAL INTEGRITY TEXT 3.8.1 2 04/05/2010
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS h TEXT 3.8.2.2 2 12/14/2004 F.
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMVAL OVERLOAD PROTECTION -
AUTOMATIC Pae/o 6RprtDt:1/51 Page
- of 16 Report Date: 1,0/15/15
SSES MANTTAI Manual N~ame: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANU]TAL UNIT 1 TEXT 3.8.3 2 03/05,/20*15 Title : ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0 11/18/2002
Title:
ELECTRICAL POWER 24 VTDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1 ' 11/14/2013 "
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 *1 12/08/2011
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 *1 06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/18/20026
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/18/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006
Title:
MISCELLANEOUS SEAL SOURCE CONTAMINATION
'TEXT 3.10.2 2 08/08/2006
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 2 04/17/2008
- Title: MISCELLANEOUS LEADING EDGE FLOW M~ETER (LEFM)6 Page 6 of i_66 Report Date: 10/15/15
SSES MANUAL*
O*Manual Name: TRM1 W:* Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 2 10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 .3 03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002
Title:
RADIOACTIVE. EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 5 04/28/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE Report Date: 10/15/15 Page 2 7-- of of 16 i__66 Report Date: 10/15/15
SSES MANUAL Manual Name : TRMI i Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.1 5 03/05/2015
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11-/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM Report Date: 10/15/15 Page 8 Page of of 16 16 Report Date: 10/15/15
SSES M~ANUAL Manual Name : TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 5 03/05/2015
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION CTRO) APPLICABILITY TEXT B3.1.1 2 04/29/2014
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 03/31/2006
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 1 01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2008
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 5 10/14/2015
Title:
INSTRUMENTATION BASES TRN POST ACCIDENT MONITORING (PAN) INSTRUMENTATION LDCN 4552 TEXT B3.3.5 2 11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Report Date: 10/15/15 Pages Page 9-- of of 16 166 Report Date: 10/15/15
SSES MA1~1TJAL Manual Name : TRMI
- -Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 5 01/31/2014
Title:
INSTRUMENTATION BASES TRN ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 1 11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22./2003
Title:
INSTRUMENTATION BASES TEN REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT B3.3.9 3 04/17/2008
Title:
OPEN INSTRUMIENTATION TEXT B3o3.10 3 08/09/2010
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS STEXT B3.3.11 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3o4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Report Date: 10/15/15 Page 10 Page 100 of of 16 16 Report Date: 10/15/15
S~ES MANUAL
- Manual Name:
Manual TRMI
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 2 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW PATE RESTRICTION TEXT B3.5.1 0 11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1* 11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMETATION TEXT B3.5.3 1 11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UIES) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM STEXT B3.7.3.2 2 04/26/2006 i
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page i!i of 16 Report Date: 10/15/15
SSES MANUJAI Manual flame: TRMI
'- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 0 TEXT B3.7.3.3 0 11/19/2002
Title:
- PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 3 04/29/2014
Title:
- PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3..7.3.5 1 04/26/2006 Title : PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006 Title : PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002 Title : PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3 7.3.8 3 09/27/2012 Title : PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002 Title : PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002 Title : PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION-MONITORING INSTRUMENTATION Page 12 of 16 Report Date: 10/15/15
SSES MAAL
. I: Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Manual Name: TEdKI TEXT B3.7.8 4 01/3 1/2 014
Title:
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 2 12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 1 04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 2 12/08/2011
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013 Titles BATTERY MAINTENANCE AND MONITORING PROGRAM Report Date: 10/15/15 13 Page i__33 of of 16 16 Report Date: 10/15/15
SSES MANTJAI Manual Name : TRMI
- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 03/31/2006
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 1 04/17/2008
Title:
MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)
TEXT B3 .11.1. 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2 002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Report Date: 10/15/15 Page 14 Page IA4 of of 16 16 Report Date: 10/15/15
SSE~S MANUAL W**O~iManual Manual Name: TRMI
Title:
TECHNICAL REQUIRETMENTS MANUAL UNIT 1 TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5 07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMNT SYSTEM TEXT B3.11.2.6 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 5 03/05/2015
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Report Date: 10/15/15 Page i5~
Page 15 of of 16 16 Report Date: 10/15/15
SSES MANAL Manual Name : TRMI SManual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 10/15/15 Page 16 Page 16 of of 16 16 Report Date: 10/15/15
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 04/2312015 1.0 USE AND APPLICATION Page TRM / 1.0-1 10/04/2002 Page TRM / 1.0-2 01/21/2014 Page TRM / 1.0-3 10/04/2002 2.0 PLANT PROGRAMS Page TRM / 2.0-1 04/23/2015 Pages TRM / 2.0-2 and TRM / 2.0-3 0 1/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 01/21/2014 Page TRM / 2.0-6 03/27/2008 Page TRM / 2.0-7 /, 05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM /2.0-12 03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-14"\, -\ 11/15/2004
\
Page TRM / 2.0-15 11/15/2005
\
3.0 APPLICABILITY :Y' **
Pages TRM / 3.0-1 and TR /3.0-2 02/19/2015 Page TRM /3.0-3 /. .**, , 03/15/2002 O Page TRM / 3.0-4 ' '7/ 02/19/2015 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.i-1, \ ' 10/31/2007 Pages TRM /'3~.'1,2 anid Tl*M / 3.1-3 08/31/1998 Pages 3.1-4 an*d,31-,5 \ 08/31/1998 Page TRMI 3.-1-6 , , 03/22/2006 Page-TRM / 3.11* 04/07/2009 Page TRM /'3.'1-8 03/27/2008 Pages RM / 3.1-9 and TRM / 3.1-9a 02/18/1999
/,Pa~geTRM/'3.1-10 02/18181999
\CORgE OPERATING LIMITS REPORT 3.2
',Page TRM / 3.2-1 07/07/1999 Pages TRM / 3.2-2 through TRM / 3.2-54 04/21/2015 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1 999 Page TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 03/10/2011 TRM/LOES-1 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT I1 TRM / LOES-1 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / 3.3-7 10/31/2007 Page TRM / 3.3-8 08/31/1998 Page TRM / 3.3-9 10/07/2015 Page TRM I 3.3-9a 06130/2010 Page TRM / 3.3-10 10/31/2007 Page TRMI/3.3-11 10/07/2015 Page TRM / 3.3-11a 10/07/2015 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/14/1 998 Page TRM I 3.3-15 04/11/2014 Page TRM I 3.3-16 01/07/2011 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 through TRM / 3.3-21 10/22/2003 Page TRM / 3.3-22 03/27/2008 Page TRM / 3.3-22a 11/15/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d 03/22/2006 Page TRM / 3.3-23 12/03/2004 Pages TRM / 3.3-24 and TRM / 3.3-25 05/16/2003 Page TRM / 3.3-26 10/22/2003 Page TRM / 3.3-27 02/19/2015 Page TRM / 3.3-28 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages TRM / 3.4-2 through TRM / 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page TRM / 3.4-9 08/31/1998 Page TRM / 3.4-10 10/31/2007 Page TRM / 3.4-11 08/31/1998 Page TRM / 3.4-12 03/27/2008 Page TRM I 3.4-13 03/31/2006 Pages TRM / 3.4-14 and TRM I 3.4-15 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages TRM I 3.5-2 and TRM / 3.5-3 08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5 10/31/2007 Pages 3.5-6 and 3.5-7 08/31/1998 SUSQUEHANNA ,- UNIT 1 TRM / LOES-2 SUSQEHANA-UITITRM LOS-2 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.6 CONTAINMENT Page 3.6-1 08/31/1998 Pages TRM / 3.6-2 and TRM / 3.6-2a 04/16/2014 Page 3.6-3 08/31/1998 Page TRM / 3.6-4 01/07/2002 Page 3.6-5 08/31/1998 Pages TRM / 3.6-6 through TRM I 3.6-8 12/31/2002 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Pages TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM I 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 12/29/1999 Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7.13 04/07/2009 Page T.RM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Page TRM / 3.7-25 08/02/1999 Page TRM / 3.7-26 09/25/2012 Page TRM I 3.7-27 11/24/2011 Pages TRM / 3.7-28 through TRM I 3.7-34a 09/25/2012 Page TRM / 3.7-35 03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37 02/01/1999 Page TRM / 3.7-38 02/19/2015 Page TRM / 3.7-39 08/31/1998 Page TRM / 3.7-40 03/31/2006 Page TRM / 3.7-41 05/24/2012 Pages TRM I 3.7-41a through TRM / 3.7-41c 05/24/2012 Page TRM / 3.7-42 09/04/2008 Page TRM / 3.7-43 08/31/1998 Page TRM / 3.7-44 02/19/2015 Pages TRM / 3.7-45 and TRM / 3.7-46 10/05/2006 Page TRM / 3.7-47 06/07/2007 TRM / LOES-3 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA UNIT I SUSQUEHANNA-UNIT1 TRM / LOES-3 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECH NICAL REQUIREM ENTS MAN UAL)
Section Title Effective Date Page TRM / 3.7-48 10/05/2006 Page TRM / 3.7-49 06/07/2007 Pages TRM / 3.7-49a and TRM / 3.7-49b 10/05/2006 Page TRM / 3.7-50 01/21/2014 Page TRM I 3.7-51 08/16/2006 Page TRM / 3.7-52 *12103/2004 Page TRM / 3.7-53 04/15/2003 Page TRM / 3.7-54 07/29/1999 Pages TRM / 3.7-55 through TRM / 3.7-57 04/01/2009 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Page TRM / 3.8-2 01/28/2005 Pages TRM / 3.8-3 and TRM /3.8-4 03/25/2010 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Page TRM / 3.8-7 10/31/2007 Pages TRM / 3.8-8 through TRM I 3.8-10 12/03/2004 Page TRM / 3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 02/19/2015 Page TRM / 3.8-14 08/31/1998 Pages TRM / 3.8-15 through TRM ! 3.8-17 04/02/2002 Page 3.8-18 08/31/1998 Page TRM I 3.8-19 04/02/2002 Page 3.8-20 08/31/1998 Pages TRM / 3.8-21 and TRM / 3.8-22 06/06/1999 Page TRM / 3.8-23 11/07/2013 Pages TRM / 3.8-24 and TRM / 3.8-25 11/30/2011 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Pages TRM / 3.8-28 and TRM I 3.8-29 05/28/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages TRM / 3.10-2 and TRM / 3.10-3 08/31/1998 Page TRM / 3.10-4 08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6 03/22/2006 Page TRM / 3.10-7 06/10/2010 Page TRM / 3.10-8 03/27/2008 TRM / LOES-4 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT I1 TRM / LOES-4 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages TRM / 3.11-2 and TRM / 3.11-3, 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page TRM / 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages TRM / 3.11-7 and TRM I 3.11I-8 08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10 10/09/2012 Pages TRM /3.11-11 and TRM /3.11-12 08/31/1998 Page TRM / 3.11-13 02/19/2015 Page TRM / 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM /3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11i/14/2006 Page TRM / 3.11-24 06/18/2013 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM / 3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM / 3.11.30 and TRM /3.11.31 01/21/2004 Page TRM / 3.11.32 04/23/2015 Page TRM / 3.11-33 03/31/2006 Page TRM / 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Page TRM I 3.11-40 02/19/2015 Pages TRM / 3.11-41 through TRM / 3.11-43 08/31/1998 Page TRM / 3.1,1-44 08/01/2006 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CON~TROLS Pages 4.0-1 through 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages 4.0-5 through 4.0-8 08/31/1998 TRM / LOES-5 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA UNIT I SUSQUEHANNA-UNIT1 TRM / LOES-5 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MAN UAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 02/19/2015 Page TRM / B 3.0-4a and TRM I B 3.0-4b 02/19/2015 Page TRM / B 3.0-5 02/19/2015 Page TRM / B] 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B] 3.0-12 03/15/2002 Pages TRM / B 3.0-13 through TRM / B] 3.0-15 02/19/2015 REACTIVITY CONTROL SYSTEMS BASES B 3.1 Page TRM / B 3.1-1 07/1 3/1 999 Page TRM / B 3.1-2 04/16/2014 Page TRM / B 3.1-3 10/31/2007 Page B] 3.1-4 08/31/1998 Page TRM / B 3.1-5 11/15/2005 Pages TRM / B] 3.1-6 and TRM / B 3.1-7 03/22/2006 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3' INSTRUMENTATION BASES Page TRM / B] 3.3-1 01/21/2014 Page TRM / B 3.3-2 03/10/2011 Page TRM / B 3.3-2a 10/31/2.007 Page TRM / B 3.3-3 12/11/2008 Page TRM / B 3.3-3a 10/31/2007 Page TRM / B 3.3-4 06/30/2010 Page TRM / B 3.3-5 10/07/2015 Page TRM / B 3.3-6 06/30/2010 Page TRM / B 3.3-7 10/07/2015 Page TRM / B. 3.3-8 06/30/2010 Page TRM / B 3.3-9 10/31/2007 Pages TRM / B 3.3-10 through TRM / B 3.3-12 01/07/2011 Page TRM /B 3.3-13 01/21/2014 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 10/31/2007 Pages TRM / B 3.3-15 and TRM / B 3.3-16 10/22/2003 Page TRM / B 3.3-17 03/22/2006 Pages TRM / B 3.3-17a through TRM / B 3.3-17c 03/22/2006 Page TRM / B] 3.3-17d 03/27/2008 TRM / LOES-6 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA UNIT 1 SUSQUEHANNA-UNIT1 TRM / LOES-6 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / B 3.3-17e and TRM / B 3.3-17f 03/22/2006 Pages TRM / B 3.3-18 and TRM / B 3.3-19 08/03/2010 Page TRM / B 3.3-20 10/22/2003 Page TRM / B 3.3-2 1 05/16/2003 Pages TRM / B 3.3-22 and TRM/IB 3.3-23 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM I B 3.4-3 04/01/2009 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM /B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Pages TRM / B 3.4-7 and TRM / B 3.4-8 04/25/.2013 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 through TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/27/2008 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B.3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM / B 3.7-3 06/1 0/2010 Page TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Page TRM / B 3.7-6 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 05/29/2013 Page TRM / B 3.7-9 04/11/2014 Page TRM / B 3.7-10 08/02/1999 Page TRM I B 3.7-I0a 03/31/2006 Page TRM / B 3.7-11 08/02/1999 Page TRM / B 3.7-1 a 03/31/2006 Pages TRM / B 3.7-12 and TRM / B 3.7-13 08/02/1999 Pages TRM / B 3.7-14 and TRM / B 3.7-14a 09/25/2012 TRM / LOES-7 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA - UNIT I TRM / LOES-7
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.7-14b 11/24/2011 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 05/29/2013 Pages TRM / B 3.7-21a through TRM / B 3.7-21d 05/24/2012 Pages TRM / B 3.7-21e through TRM / B 3.7-21g 05/29/2013 Page TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Page TRM / B 3.7-24 10/05/2006 Page TRM / B 3.7-25 01/21/2014 Pages TRM / B 3.7-26 through TRM / B 3.7-28 10/05/2006 Pages TRM / B 3.7-29 and TRM / B 3.7-30 06/07/2007 Page TRM / B 3.7-30a 10/05/2006 Page TRM / B 3.7-30b 01/21/2014 Page TRM / B 3.7-31 11/30/2011 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 through TRM / B 3.7-39 04101/2009 Page TRM / B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Page TRM 1 B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/20.10 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 09/03/2004 Page TRM / B 3.8-4a 04/02/2002 Page B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-15 04/02/2002 Page TRM / B 3.8-16 11/07/2013 Page TRM / B 3.8-17 11/30/2011 Pages TRM / B 3.8-17a and TRM / B 3.8-17b 11/30/2011 Pages TRM / B 3.8-18 through TRM / B 3.8-20 05/29/2013 Pages TRM / B] 3.8-21 and TRM / B] 3.8-22 05/28/2009 Page TRM / B] 3.8-23 05/29/2013 Page TRM / B] 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B] 3.9-7 08/31/1998 TRM / LOES-8 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT I1 TRM / LOES-8 EFFECTIVE DATE 10/07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Page TRM /B 3.10-6 03/27/2008 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/30/1998 Page TRM /B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-11a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B3.11-15 02/01/1999 Pages B] 3.11-16 through B] 3.11-19 08/30/1998 Page TRM/B[]3.11-20 04/02/2002 Page TRM/ []3.11-20a 04/02/2002 Page TRM/B3.11-21 05/13/2005 Pages TRM / B] 3.11-22 and TRM / B] 3.11-23 11/14/2006 Pages TRM / B] 3.11-23a and TRM / B] 3.11-23b 06/18/2013 Pages TRM / B] 3.11-24 and TRM / B] 3.11-25 01/21/2004 Pages B] 3.11-26 and B] 3.11-27 08/30/1998 Page TRM/B[]3.11-28 11/30/2005 Page TRM / B] 3.11-29 02/19/2015 Pages TRM / B] 3.11-30 and TRM / B] 3.11-31 05/29/2013 Page TRM / B] 3.11-32 08/30/1998 Page TRM / [3.11-33 06/30/2010 Pages B] 3.11-34 and B] 3.1 1-35 08/30/1998 Page TRM / B] 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B] 3.12-1 09/19/2007 Page TRM / B] 3.12-2 11/29/2010 Page TRM / B] 3.12-3 02/05/1999 TRM1 text LOES I10/7/2015 SUSQUEHANNA-UNIT1 TRM / LOES-9 I RM SUSQEHANA UNT LOS-9EFFECTIVE DATE 10/07/2015
TRM Post Accident Monitoring Instrumentation Rev. 8 3.3.4 3.3 Instrumentation 3.3.4 TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.
APPLICABILITY: According to Table 3.3.4-1 ACTIONS
NiOTES.
- 1. Separate condition entry is allowed for each Function.
- 2. The provisions of TRO 3.0.6 are not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Enter the Condition referenced Immediately channel inoperable, in Table 3.3.4-1 for the channel.
B. As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of monitoring in Table 3.3.4-1. the appropriate parameter(s).
AND B.2 Restore the required channel 7 days / 30 days (*
to OPERABLE status.
C. As required by Required C.1 Restore the required 30 days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.
D. As required by Required 0.1 Verify a minimum 14 of the Immediately Action A.1 and referenced in associated acoustic monitor Table 3.3.4-1 channels and 5 of the ADS AND SRV acoustic monitor channels are operable. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (C) COMPLETION TIME for REQUIRED ACTION B.2 is extended from 7 to 30 days during construction activities associated with the replacement of SPING equipment with VERMS equipment.
SUSQUEHANNA - UNIT 1 TRM / 3.3-9 SUSQEHANA
- NITI TR/ DATE 33-9EFFECTIVE 10/07/2015
TRM Post Accident Monitoring Instrumentation Rev. 8 3.3.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME OR D.2 Verify SRV tailpipe Immediately temperature indication and alarm are available for the AND tailpipe associated with the inoperable acoustic monitor. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter OR D.3 Verify that the following Immediately alternate monitoring methods in TS Table 3.3.3.1-1 are OPERABLE: AND Function 1 Function 2 Function 3 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Function 10 thereafter AND D.4 Restore the required 30 days channel(s) to OPERABLE status. OR At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.
SUSQUEHANNA-UNIT1 TRM / 3.3-9a UNTI RM SUSQEHANA 3.-9aEFFECTIVE DATE 06/30/2010
TRM Post Accident Monitoring Instrumentation Rev. 8 3.3.4 TECHNICAL REQUIREMENT SURVEILLANCE
NOTES---------------
- 1. Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or an associated function is available.
SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 "Perform CHANNEL FuNcTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open nloise level.
TRS 3.3.4.4. Perform CHANNEL CALIBRATION 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATION of the 92 days Primary Containment H2 and 02 Analyzers.
SUSQUEHANNA-UNIT1 TRM / 3.3-10 SUSQEHANA UNT 1 RM3.-10EFFECTIVE DATE 10/31/2007
TRM Post Accident Monitoring Instrumentation Rev. 8 3.3.4 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
- 2. Main Steam Safety/Relief Valve 1,2 1/valve D TRS 3.3.4.1 Position Indicator (Acoustic TRS 3.3.4.2 Monitor) TRS 3.3.4.3
- 3. Reactor Building Vent Noble Gas Monitor
- b. High Range(b) 1,2, (a) B TRS 3.3.4.1 1
TRS 3.3.4.4
- 4. Standby Gas Treatment System Vent Noble Gas Monitor
- b. High Range(b) 1,2, (a) B TRS 3.3.4.1 I
TRS 3.3.4.4
- 5. Turbine Building Vent Noble Gas Monitor
SUSQUEHANNA-UNIT1 TRM / 3.3-11 3.-11EFFECTIVE DATE 10107/2015 SUSQEHANA-UITITRM
TRM Post Accident Monitoring Instrumentation Rev. 8 3.3.4 TABLE 3.3.4-1 (continued)
TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
- 6. Standby Gas Treatment System Vent Stack Sampling System Flow
- 7. Turbine Building Vent Stack Sampling System Flow
- 8. Containment H2 and 02 Analyzer(b) 1,2 2 C TRS 3.3.4.1 TRS 3.3.4.5 (a) When moving irradiated fuel in the secondary containment.
(b) TRO 3.0.4.c is applicable.
SUSQUEHANNA- UNIT 1 TRM / 3.3-1 la SUSQEHANA
-UNI I TM
/3.3-DATE IaEFFECTIVE 10/07/2015
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to display plant variables that provide information required by the control room operators during accident situations. The OPERABILITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables following an accident. This capability is consistent with the recommendations of Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant Conditions During and following an Accident," NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations" and NEDO-33160-A Revision 1, "Regulatory Relaxation For The Post Accident SRV Position Indication System" (Reference 6). It should be noted that the Technical Specifications LCO 3.3.3.1 contains all Category 1, non-type A instruments and Regulatory Guide 1.97 Type A instrument (References 1 and 2). This TRO requires instruments outside of these criteria.
Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pressure suppression system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for the purpose of this TRM. The recorders are the primary method of indication used by the operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.
- TE-15703
- TE-1 5725
- TT-15703
- TT-15725
- TR-15795A
- TR-15795B Main Steam Safety/Relief Valve Position Indicators (Acoustic Monitors) provide indication when the valves are functioning. Alternate methods for monitoring SRV position include SRV Tailpipe Temperature and the following Functions from Technical Specification Table 3.3.3.1-1:
Suppression Chamber Water Level (Function 3)
Suppression Chamber Water Temperature (Function 10)
Reactor Vessel Water Level (Function 2)
Reactor Steam Dome Pressure (Function 1)
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.3-4 SUSQEHANA
-UNITI TM/B33-4EFFECTIVE DATE 06/30/2010
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The required channels for REACTOR BUILDING VENT Noble Gas Monitor, (continued) Standby Gas Treatment System Vent Noble Gas Monitor, and Turbine Building Vent Noble Gas Monitor provide information regarding the release of radioactive materials to allow for early indication of the need to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat. For the Noble Gas Monitors the only required channels are the mid range and high range.
The drywell and suppression chamber hydrogen and oxygen concentrations gas analyzers monitor hydrogen and oxygen concentration to detect combustible gas levels in primary containment. The analyzers are capable of determining hydrogen concentration in the range of 0 to 30% by volume and oxygen concentration in the range of 0 to 10% by volume, and each provide control room indication and output to a control room recorder. Each gas analyzer must be capable of sampling either the drywell or the suppression chamber. The recorders are the primary method of indication available for use by the operator during an accident, therefore the PAM Specification deals specifically with this portion of the instrument channel. The gas analyzer piping is provided with heat tracing to reduce the buildup of condensation in the system. H20 2 Analyzers can be considered OPERABLE for accident monitoring for up to 100 days with their heat tracing INOPERABLE.
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
During construction activities that replace existing SPING equipment with new VERMS equipment, the Vent Noble Gas Monitor for each release path is anticipated to be inoperable for longer than 7 days. Restoration completion time to return the affected channel to OPERABLE status to support construction activities is extended to 30 days. This condition is compensated for by the enhanced Preplanned Alternate Monitoring Plan per REQUIRED ACTION B.1.
(continued)
SUSQUEHANNA-UNIT1 TRM / B 3.3-5 SUSQEHANA
-UNI I RM
/BDATE 33-5EFFECTIVE 10/07/2015
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES ACTIONS Action 0 requirements were determined by balancing the safety significance (continued) of the system with the impact of the actions on the operating unit. The loss of the acoustic monitors is not safety significant providing the diverse and redundant alternate methods of determining SRV position are available.
System components in the control room are restorable within 30 days without unit operation impact. Components located in containment require a unit shutdown to gain access to individual components. The sYstem channels shall be restored to operable condition at earliest opportunity.
Noble gas monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.
Components of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement. Tailpipe temperature is the direct process monitoring, alternate method and is not covered by Technical Specification LCO's as are the other alternative methods.
TRS The Technical Requirement Surveillances (TRS) are modified by two Notes.
Note 1 states that the TRSs for each Post Accident Monitoring instrumentation Function are located in the SR column of Table 3.3.4-1.
Note 2 modifies the Surveillances to indicate that when a channel is placed in a inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or associated Function are available. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.3-6 SUSQEHANA
-UNI I RM
/BDATE 33-6EFFECTIVE 06/30/2010
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS The alternate means of monitoring the parameter or the associated function (continued) are:
Parameter Alternate Means/Associated Function Suppression Chamber Air One channel of Suppression Chamber Temperature Air Temperature Main Steam Safety/Relief Suppression Pool level Valve Position Indicator Suppression Pool Temperature RPV level RPV pressure SRV Tailpipe Temperature Containment H2 and 02 Analyzer One channel of Containment H2 and 02 The TRSs are defined to be performed at the specified Frequency to ensure that the TRM PAM Function is maintained OPERABLE.
TRS 3.3.4.1 Performance of the CHANNEL CHECK once every 31 days ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other- channels. It is based on the assumption that (continued)
SUSQUEHANNA-UNiT1 TRM / B 3.3-7 SUSQEHANA
-UNI I RM
/B33-7EFFECTIVE DATE 10/07/2015
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS TRS 3.3.4.1 (continued) instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to operate properly between each CHANNEL CALIBRATION.
Agreement criteria, which are determined by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability. If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.
REFERENCES 1. Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident."
- 2. NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations."
- 3. Technical Specification Amendment No. 100 to License No. NPF-22 for failed Unit 2 "5" acoustic monitor.
- 4. Technical Specification Amendment No. 169 to License No. NPF-14 for failed Unit 1 "5" acoustic monitor.
- 5. Proposed amendment No. 183 to License No. NPF-22 failed Unit 2 "J" acoustic monitor.
- 6. NEDO-33160-A, Revision 1, "Regulatory Relaxation For The Post Accident SRV Position Indication System," dated October 2006.
- 7. NRC letter, "Final Safety Evaluation For Boiling Water Reactor Owners' Group (BWROG) Topical Report (TR) NEDO-33160, Regulatory Relaxation For The Post Accident SRV [Safety Relief Valve] Position Indication System (TAC No. MC5446)," dated September 26, 2006.
SUSQUEHANNA-UNIT1 TRM / B 3.3-8 SUSQEHANA
-UNI I RM
/BDATE 33-8EFFECTIVE 06/30/2010
Oct. 15, 2015 Page 1 of 2 MANIJAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2015-41310 USER INFORMATION:
GERLACH*ROSEY N EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSEY N 10/15/2 015 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 10/05/2015 ADD MANUAL TABLE OF CONTENTS DATE: 10/14/2015 CATEGORY: DOCUMENTS TYPE: TRM2
Oct. 15, 2015 Page 2 of 2 ID: TEXT 3.3.4 ADD: REV: 8 REMOVE: REV: 7 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT B3.3.4 ADD: REV: 5 REMOVE: REV:4 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES ADD: REV: 86 REMOVE: REV:85 ANJY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INB0X.
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 10/14/2 015 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 86 10/14/2015
Title:
LIST OF EF:F'ECTIVE SECTIONS TEXT TOC 24 04/28/2015
Title:
TABLE OF CONTENTS TEXT 1.1 0 11/19/2002
Title:
use AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 11 01/31/2014
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 6 03/05/2015
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 -1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4 05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 11 04/28/2015
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
Report Date: 10/15/15 Page 1 Page ! of 15 15 Report Date: 10/15/15
SSES MANTJAI~
Manual Name : TRM2 ii*Manual
Title:
TECHNICAL REQUIREMENTS MANUJAL UNIT 2 TEXT 3,3.1 0 11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUM4ENTATION TEXT 3,3.2 3 03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3,3.3 2 11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 8 10/14/2015
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION LDCN 4553 TEXT 3.3.5 0 11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3,3.6 4 04/29/2014
Title:
INSTRUMENTATION TEN ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3,3.8 1 10/22/2003
Title:
INSTRUMENTATION TEN RPS INSTRUMENTATION TEXT 3.3.9 3 05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 1 03/05/2015
Title:
WATER MONITORING INSTRUMENTATION Report Date: 10/15/15 Page 2 Page ! of of 15 15 Report Date: 10/15/15
SSES MANUJAI
. Manual Manual
Title:
Names TECHNICAL TRM2 REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1* 11/09/2007
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 2 05/14/2009
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 1 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002
Title:
ECCS AND RCIC LONG TERN NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2 04/29/2014
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 10/15/15 Page 3~
Page of of 15 15 Report Date: 10/15/15
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0 11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/19/2002 Title : PLANT SYSTEMS ULTIMATE HEAT SINK CURS) AND GROUND WATER LEVEL TEXT 3.7.3,1 2 04/16/2009 Title : PLANT SYSTEMS FIRE SUPPRESSION WATER sUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009 Title : PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS
- TEXT 3.7.3,3 3 04/16/2009 Title : PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009 Title : PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006 Title : PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 11 09/27/2012
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 10/15/15 Page 44 Page of of 15 i_55 Report Date: 10/15/15
SSES MANUJAI
- I Manual Name : TRN2
... Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 1 03/05/2015
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008 S *
Title:
PLANT SYSTEMS MAIN CONDENSER 0FFGAS PRETREATMENT LOGARITHMIC MONITORING INSTRUMENTATION RADIATION
- TEXT 3.7.8 9 03/05/2015
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 2 04/29/2014
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.1 1 10/02/2009
Title:
PLANT SYSTEMS TEXT 3.8.1 3 06/20/2012
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THEEMAJL OVERLOAD PROTECTION -
CONTINUOUS
£ TEXT 3.8.2.2 2 12/14/2004 WTitle: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page ! of i_55 Report Date: 10/15/15
SSES MANUAL Manual Name : TRM2 i* Manual
Title:
TECHNICAL REQUIREMENTS MANAL UNIT 2 TEXT 3.8,3 2 06/20/2012 Title 2 ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8,4 1 02/04/2005 Title 2, ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8,5 1 11/14/2013 Title ,, ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8,6 2 12/14/2006 Title 2 ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8,7 2 10/22/2009 Title 2 BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9,1 0 11/19/2002 Title 2 REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002 Title 2 REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002 Title 2 REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006 Title 2 MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007 Title 2 MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.11.1.1 1 04/26/2006 Title 2 RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Report Date: 10/15/15 Page h6 Page of of 15 15 Report Date: 10/15/15
SSES MANTJI*
Manual Name : TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 2 10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 3 03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006
Title:
RADIOAdTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 5 03/05/2015
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 4 03/05/2015
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM Report Date: 10/15/15 Page 72 of of 15 15 Report Date: 10/15/15
SSES MANUAL Manual Name : TRM2
- Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3 .12 .1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4 04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS TRAINING Report Date: 10/15/15 of 15 Page 88 Page of 15 Report Date: 10/15/15
SSES M.ANUJAL
. Manual Manual
Title:
Name: TECHNICAL TRM2 REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 6 03/05/2015
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION CTRO) APPLICABILITY TEXT B3.1.1 2 04/29/2014
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION A. AND CHECK VALVE TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING L,IMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 1 01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUM]ENTATION TEXT B3.3.2 2 03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2 11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION-TEXT B3.3.4 5 10/14/2015
Title:
INSTRUMENTATION BASES TEN POST ACCIDENT MONITORING (PAM) INSTRUMENTATION LDCN 4553 TEXT B3.3.5 2 11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 5 01/31/2014
Title:
INSTRUMENTATION BASES TEN ISOLATION ACTUATION INSTRUMENTATION Report Date: 10/15/15 of 15 Page ~9 Page of i_55 Report Date: 10/15/15
SSES MANUJAL Manual Name: TRM2
-. Manual
Title:
TECHNICAL REQUIREMENTS MAMATJAL UNIT 2 TEXT B3.3.7 1 11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE 0VERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3 05/.14/2009
Title:
INSTRUMENTATION BASES. LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3 02/22/2012
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASESREACTOR VESSEL MATERIALS TEXT B3.4.6 1 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Report Date: 10/15/15 Page i~.
Page of 15 i0 of 15 Report Date: 10/15/15
SSES MANUAL q SManual Manual
Title:
Name : TECHNICAL TRM2 REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0 11/19/2002
Title:
EGGS AND RCIG BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007
Title:
EGGS AND RCIG BASES EGGS AND RGIG SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007
Title:
EGGS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION GRAMBER-TO-DRYWELL VACUUJMBREAKER POSITION INDICATION TEXT B3.6.3 1 04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (URS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS Report Date: 10/15/15 12.
Page i!l of of 15 15 Report Date: 10/15/15
SSES MANUAL Manual Name: TRM2 SManual Title- TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4 2 04/29/2014
Title:
- PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006 Title : PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002 Title : PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3 09/27/2012
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002 Title : PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002 Title : PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013 Title : PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION 2 01/31/2008 TEXT B3.7.7
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFOAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 4 01/31/2 014
Title:
PLANT SYSTEMS BASES SNUBBERS Report Date: 10/15/15 Page 12 1/2 of of 15 i_55 Report Date: 10/15/15
SSES MANUJAI aW- i Manual Manual Name:
Title:
TRJA2 TECHNJICAL REQUIREMENTS MAMAL UNIT 2 TEXT B3.7.9 2 12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE IDVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2 04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3 06/20/2012
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Report Date: 10/15/15 Page 23.
Page 13 of of 15 15 Report Date: 10/15/15
SSES MANTJAL Manual Name: TRM2 SManual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COJYUIUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19 /2 002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.11i.1. 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 U 11/19/2 002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES Report Date: 10/15/15 Page 14 Page 1__{4 of of 15 15 Report Date: 10/15/15
SSES MAi*TA W:i Q Manual
Title:
Manual Name:* TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5 .07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 5 03/05/2015
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT 33.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LADUSE CENSUS TEXT B3.11.4.3 0 11/19/2 002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 10/15/15 Page i~.
Page 15 of of 15 i__55 Report Date: 10/15/15
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 86 LUST OF EFFECTIVYE SECTIONS (TIECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 04/23/2015 1.0 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM 1 1.0-2 10/04/2002 Page TRM 1/1.0-3 08/31/1998 2.0 PL.ANT PROGRAMS Page 2.0-1 08/31 /1998 Pages TRM 1 2.0-2 and TRM 2.0-3 .... 01/28/2005 Page TRM I 2.0-4 06/25/2002 Page TRM / 2.0-5 01./2.1/2014 Page TRM / 2.0-6 *,04,/15/2009 Page TRM 1 2.0-7 ", 05/15/2008 Pages TRM /2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 ' 04/15/2009 Pages TRM /2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM /2.0-15 ... 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM, / 3.0-2 02/19/2015 Page TRM /13.0-3, 03/15/2002 Page TRM I 3.0-4 02/19/2015 REACTIVITY cONTROL sYSTEMS 3.1 Page TRMI/3.i1-1 10/31/2007 Pages TRM /]3.1-2through TRM / 3.1-5 08/31/1995
.Page-TRM / 3.1-6 03/27/2007 Page-TRM 1 31-7 04/15/2009 Page TRM / 3.1-8 03/27/2007 S-Pages TRM / 3.1-9 and TRM 1 3.1-9a 02/18/1999 "Page TRM /3.1-10 02/18/1999 3.2 *CORE OPERATING .LIMITS :REPORT
...Page TRM /3.2-1 08/31/1998 Pages TRM / 3.2-2 through TRM /3.2-54 04/21/2015 3.3 INSTRUMENTATION Pages TRM 13.3-1 through TRM / 3.3-3 07/16/1999 Pages TRM / 3.3-4 and TRM /13.3-5 10/31/2007 Page TRM / 3.3-6 03/10/2011 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM 1 ,/OES-1 SUSQEHANA UNT 2 RM LOS-1EFFECTIVE DATE 10/07/2015
ii SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Rev. 86 I7 Section Title Effective Date Page TRM / 3.3-9 10/0"7/2015 Page T]RM / 3.3-9a 06/3012010 Page TRM /3.3-10 10/3112007 Page TRM / 3.3-11 10/07/2015 Page TRM / 3.3-lia 101071/2015 Page "TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 01,/0712011 Page TRM 13.3-14 12/14/1998 Page TRM / 3.3-15 04111/2014 Page TRM / 3.3-16 01/07/2011 Page TRM / 3.3-17 06114/2002 Page TRM I 3.3-18 10/311/2007 Pages TRM 13.3-19 and TRM 13.3-20 10/22/2003 Page TRM / 3.3-21 04115/2009 Page TRM / 3.3-21a 11,/15/2004 Pages T]RM /3.3-21b through TRM I 3.3-21d 03/27,/2007 Page TRM /3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM /3.3-25 10,/22/2003 Page TRM /3.3-26 02119/2015 Page TRM / 3.3-27 "04t07,/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM t 3.4-8 04/01/2009 Page 3.4-9 08/31,/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM / 3.4-12 04117/2009 Page TRM / 3.4-13 03/31/12006 Page TRM / 3.4-14 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2.005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 and 3.6-2 08/31/1998 Pages TRM ,/3.6-3 and TRM / 3.6-3a 04/16/2014 Page 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 O Pages TRM / 3.6-7 through TRM I 3.8-9 12/31/2002 I
TRM / LOES-2 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA UNIT 2 SUSQUEHANNA-UNIT2 TRM / LEES-2 EFFECTIVE DATE 10107/2015
SUSQUEHANNA STEAM ELECTRIC STATION -Rev. 86 UIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM I 3.7-1 and TRM I 3.7-2, 0712911999 Page 3.7--3 08/31/i1998 Page TRM 13.7-4 03/31/2006 Page TRM 13.7-5 04/07/2009 Pages TRM 1]3.7-6 through TRM 13.7-8 08102/1999 Pages TRM 1 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM 1 3.7-i11 01/2112.000 Page TRM 13.7-12 08/0211999 Page TRM !/3.7-13 04/07/2009 Page TRM 13.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/0211999 Page TRM 13.7-17 04/07/2009 Page TRM 13.7-18 08/02/1 999 Page TRM 13.7-19 04/07/2009 Pages TRM 13.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM 13.7-24 03/31/2006 Page TRM / 3.7-25 08/02/1999 Page TRM /3.7-26 09/25/2012 Page TRM 13.7-27 11/24/2011 Pages TRM 13.7-28 through TRM /3.7-32a 09/25/2012 O_*,. Page TRM / 3.7-33 Page TRM /3.7-34 09/25/2012 03/31/2006 Pages TRM 13.7-35 and TRM / 3.7-36 02/01/1999 Page TRM 13.7-37 02/19/2015 Page TRM /3.7-3.8 08/31/1998 Page TRM / 3.7-39 03/31/2006 Page TRM !/3.7-40 05/24/2012 Pages TRM 13.7-40a through TRM / 3.7-40c 05/24/2012 Page TRM / 3.7-41 09104/2008 Page TRM / 3.7-42 08/31/1998 Pages TRM / 3.7-43 02/19/2015 Pages TRM 1 3.7-44 and TRM / 3.7-45 10/05/2006 Page TRM /3.7-46 06/07/2007 Page TRM / 3.7-47 09/05/2012 Page TRM / 3.7-48 06/07/2007 Page TRM ! 3.7-49 03/09/2001 Page TRM / 3.7-50 08/16/2006 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 Page TRM /3.7-54 04/01/2009 Page TRM /3.7-55 09/25/2009 Page TRM /3.7-56 04/01/2009 TRM /LOES-3 EFFECTiVE DATE 10/07/2015 SUSQUEHANNA - UNIT
- UNIT 22 TRM/LOES-3 EFFECTlVE DATE 10/07/2015
SUSQUEH-ANNA STEAM ELECTRIC STATION Rev. 86" LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM /3.8-1 04/02/,2002 Page TRM / 3.8-2 0112812005 Pages TRM / 3.8-3 and TRM I 3.8-4 06/11/2012 Pages TRM / 3.8-5 and TR 1 3.8-6 04/0212002 Pages TR / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM 1 3.,8-11 0910312004 Page TRMJ]3..8-12 1210312004 Page TRM /3.8-13 06/1212012 Page TRM 13.8-14 0'8131/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM /3.8-16 and TRM 13.8-17 04/02/2002 Page 3.8-18 021,0111999 Page TRM / 3.8-19 04./0212.002 Page TRM 1 3.8-20 02101/'1999 Pages TRM / 3.8-21 and TRM /3.8-22 06106/1999 Page TRM / 3.8-23 1110,7/2013 Page TRM / 3.8-24 11/30/2,011 Page TRM 1 3.8-25 06/11/2012 Pages TRM / 3.8-25a and TRM I 3.8-25b I1/1301201.1 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Page TRM 1 3.8-28 05/28/2009 Page TRM 13.8-29 10120/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/3111998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.1.0-4 08/30/1998 Pages TRM / 3.10-5 and TRM /3.10-6 03/27/2 007 Page TRM / 3.10-7 06/10/2010 3.11 RADIOACTIVE EFFLUENTS Page TRM 1 3.11-1 103131/2006 Pages 3.11-2 through 3.11-3 08/31/1 998 Page TRM / 3.11-4 03/31/2005 Page 3.11-5 08/31/1998 Page TRM / 3.11-5 03/31/2006 Pages 3.11-7 and TRM /3.11-8 08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10 10/09/2012 Pages TRM / 3.11-11 and TRM / 3.11-12 08/31/1998 TRM / LOES-4 EFFECTIVE DATE 10/07/2015 2
SUSQU*5*NNA - UNIT SUSQUEHANNA- 'UNIT 2 TRM ! LOES-4 EFFE'CTI* DATE 10t07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 86 UIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM 1 3.11-13 _02/1 912015 Page TRM I 3.11-14 1210312004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM 1 3.11-17 03131/2006 Page 3.11-18 08/3111998 Page TRM/]3.11-19 08115/2,005 Pages TRM 13.11-20 and TRM / 3.11-21 03/31/20106 Page TRM 1 3.1-22 '04/02/2002 Page TRM ]13.11-23 11/14/2006 Page TRM 13.11-24 06/18/2,013 Page T']RM 13.11-25 04/1212007 Pages TRM 1 3.11-26 and T'IRM 1 3.11-27 01/21/2004 Page TRM 1 3.11-,28 09/08/'2009 Page TRM / 3.11-29 1.2/03/2004 Pages TRM 3.11--30 and TRM 1 3.11-31 01121/2004 Page TRM 1 3.11-32 02/19/2015 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRW /3.11-35 03/31/2006 Pages TRM ] 3.11-36 through TRM 1 3.11-39 11/30/2005 Page T]RM / 3.11-40 02/19/2015 Pages TRM 1 3.11-41 through TRM 1 3.11-44 '08/31/1998 Page TRM 1 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRW / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM 1 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM 13.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMiNISTRAT]IVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 08131/1998 Page TRM 1]4.0-4 12/11/2008 Pages TRM / 4.0-5 through TRM / 4.0-8 08/.31/1998 TRM / 'LOES-5 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA - 'UNlT SUSQUEHANNA - UNiT 22 TRM / LOES-5 EFFECTIVE DATE 10107t2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 86 LIST OF EFFECTIVE SECiTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Tlitle Effective Date 8 3.0 APPUCAB~iLITY BASES Pages TRM 1 B 3.0-1 through TRM I B 3.0-3 08/31/1998 Page TRM I B 3.0-4 02119/2015 Pages TRM I B 3.0-4a and TRM 1B 3.O-4b 02/19/2015 Page -TRM1 B 3.0-5 02/1912015 Pages T]RM / B 3.0-6 and TRM I B 3.0-7 '06/1 2/2012 Pages TRM I B 3.0-8 through TRM I1B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/1512002 Pages TRM I B 3.0-13 through TRM I B 3.0-15 02/19/2015 B 3.1 REACTIV*IIY CONTROL SYSTEMS BASES Page TRM I B 3.1-1 07/13/1999 Page TRM I B 3.1-2 0411612014 Page TRM /B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1598 Pages TRM 1 B 3.1-5 through TRM /8B3.1-7 03/27/2007 Page TRM I B 3.1-8 02/1 811999 B 3.2 CORE OPERATING UMITS BASES Page B 3.2-1 05/31]1 998 B 3.3 INSTRUMENTATION BASES Page TRM I B 3.3-1 01/21/2014 I. Page TRM I B 3.3-2 03/10/2011 Page TRM I B-3.3-2a 10/31/2007 Pages T RM 1 B 3.3-3 and TRM / B 3.3-3a 10/31/2007 Page TRM /8B 3.3-4 06/30/2010 Pages TRM / B 3.3-5 through TRM / B 3.3-7 10/07/2015 Page TRM 1 B 3.3-8 06/30/2010 Page TRM 18B3.3-9 10/31/2007 Page TRM /8B3.3-10 01/07/2011 Page TRM 18B3.3-11 02/21/2014 Pages TRM /8 3.3-12 and TRM /8B3.3-13 01/07./2,011 Page TRM /8B3.3-14 06/25/2002 Page TRM ! B 3.3-14a 10/31/2007 Page TRM /8 3.3-14b 06/14/2002 Pages TRM / B 3.3-15 through TRM ! B 3.3-17 10/22/2003 Pages TRM I B 3.3-18 and TRM /8B3.3-19 03/27/2007 Pages TRM I B 3.3-19a and TRM /8B 3.3-19Sb 03/27/2007 Page TRM /8B3.3-19Sc 04/17/2009 SUSQUEHANNA - UNIT 2 TRM I LOES-6 SUSQEHANA-UNI 2 RM LOS-6EFFECTIVE DATE 10/07/2,01!5
SUSQUEHANNA STEAM ELECTRIC STATiON Rev. 86 LIST OFEFFECTIVSECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 03127/2007.
Pages TRM 1B 3.3-19d and TRM I B 3.3-19e Page TRM I B 3.3-2,0 0211,612012 Page TRM I B 3.3-21 08103/2010 Page TR I B 3.3-22 10/22/2003 Page TRM I B 3.3-23 05/1612003 Pages TRM I B 3.3-24 and TRM I B 3.3-25 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES Page TRM I B 3.4-1 0813111998 Pages TRM 1 B 3.4-2 and TRM 1 B3.4-3 0410112009 Pages TRM / B 3.4-4 and T3RM I B 3.4-4a 1013112007 Page TRM I B 3.4-5 10/15/1999 Page B 3.4-6 0813111998 Page TRM / B 3.4-7 04/25/2013 B 3.5 ECCS AND RC1C BASES Pages B 3.5-1 and B 3.5-2 08/31/11998 Pages TRM ] B 3.5-3 and TR I B 3.5-3a 10/31/2007 Page B 3.5-4 083/3111998 Page TRM / B 3.5-5 10/3112007 8 3.6 CONTAINMENT BASES Page TRM I B 3.6-1 07/26./2001 Page TRM I B 3.6-2 02101/1999 Page B 3.6-3 08/31/]1998 Page TRM I B 3.8-4 0312912007 Page TRM I B 3.6-5 04/04/2007 Page TRM I B 3.6-6 12/03/2004 Pages TRM /' B 3.6-7 through TRM / B 3.8-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/3111998 Page TRM I B 3.7-3 06/1012010 Page TRM I B 3.7-3a 12/27/2007 Page TRM I B 3.7-4 03/31/2006 Page TRM I B 3.7-5 08/0211999 Pages TRM / B 3.7-6 and TRM I B 3.7-6a 03/31/2006 Pages T'RM I B 3.7-7 and TRM I B 3.7-7a 08/02/1 999 Page TRM / 'B 3,.7-8 08/02/1.999.
Page TRM / B 3.7-9 04/11/2014 Page TRM I B 3.7-10 08/02/1999 SUSQUEHANNA -UNIT 2 TRM ] LOES-7 SUSQEHANA UNT 2 RMLOS-7EFFECTIVE DATE 10/07/2015
SUSQUEH-ANNA STEAM ELECTRIC STATION Re
.=v.86 i*.. UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM I B 3.7-10Ca through TRM I B 3.7-1 Ia 03/3112006 Pages TRM I B 3.7-12 and TRM I B 3.7-13 08/02/1999 Pages TRM I B 3.7-14 through TRM I B 3.7-14b 0912512012 Pages TRM I B 3.7-15 and TRM I B 3.7-16 0210111999 Pages B 3.7-17 through B 3.7-2,0 08/3111998 Page TRM I B 3.7-21 05/29/2013 Pages TRM I B 3.7-21a through TRM I B 3.7-21d 051.2412012 Pages TRM I B 3.7-21e through TRM I B 3.7-21g 05/29/2013 Pages TRM I B 3.7-22 and TRM ! B 3.7-23 01J30]2008 Page TRIM! B 3.7-24 10105/2006 Page TRM I B 3.7-25 01/2112014 Pages TRM I B 3.7-26 through TRM I B 3.7-29 10/0512006 Page TRM I B 3.7-30 06/07/2007 Page TRM / B 3.7-30a 10/05/2006 Page TRM I B 3.7-30b 01121']2014 Page TRM I B 3.7-31 11/30/2011 Page TRM I B 3.7-32 03/09/2001 Page TRM I B 3.7-33 04/15/2003 Page TRM I B 3.7-34 12/0312004 Page TRM / B 3.7-35 07/]05/2.000 Pages TRM I B 3.7-36 and TRM I B 3.7-37 04/0112009 Page TRM I B 3.7-38 09/25/2009 Page TRM I B 3.7-39 04/01/2009 Page TRM I B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM I B 3.8-1 04/02/2002 Pages TRM I B 3.8-2 01/28/2005 Page TRM I B 3.8-2a 03/01/2010 Pages TRM I B 3.8-3 and TRM I B 3.8-3a 04/02/2002 Page TRM I B 3.8-4 09/03/2004 Page TRM I B 3.8-4a 04/0212002 Page TRM I B 3.8-5 08/31/1998 Pages TRM l B 3.8-6 through TRM I B 3.8-15 04/02/2002 Page TRM 18B3.8-16 11/07/2013 Page TRM / B 3.8-17 11/30/2011 Page TRM I B 3.8-17a 06111/2012 Page TRM / B 3.8-17b 11/30/2011 Pages TRM 18B3.8-18 through TRM I B 3.8-20 05/29/2013 Pages TRM /8B3.8-21 and TRM / B 3.8-22 05/28/2009 Page TRM I B 3.8-23 05/29/2013 Page TRM 18B3.8-24 ,05/2812009 e
TRM / LQES-8 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA UNIT SUSQUEHANNA-UNIT2
- 2 TRM / LOES-8 EFFECTIVE DATE 10f07/2015
SUSQUEHANNA STEAM ELECTRIC STATION Rev. 86 LISTOF EFFECTIVE SECTIONS (]TECHNIlCAL REQUIREMENTS MANUAL)
. J.
I 9" Section Title Effective Date B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-i and B 3.9-2 08131./1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-i 08/31/1998 Pages TRM I B 3.10-2 and TiRM I B 3.10-3 03/27/2007 Pages TRM I B 3.10-4 and TRM I B 3.10-5 08123/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM I B 3.11-10 02/01/1999 Pages T-IRM / B 3.1 1-11 and TRM / B 3.1 1-11a 04/07/2000 Pages TRM I B 3.11-12 and TRMI B 3.11-13 02101/1999 Page TRM I B 3.11-14 12/03/2004 Page TRM 18B3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Pages TRM I B 3.11-20 and TRM I B 3.1 1-20a 04/0212002 Page TRM / B 3.11-21 05/13/2005 Pages TRM /B 3.11-'22 and TRM I B 3.11-23 11114/2006 Pages TRM /B 3.1 1-23a and TRM I B 3.1 1-23b 06/18/2013 Pages TRM /8B3.11-24 and TRMI]B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Page TRM / B 3.1 1-28 11/30/2005 Page TRM I B 3.11-29 02/19/2015 Pages TRM / B 3.11-30 and TRM l B 3.11-31 05/29/2013 Page TRM 18B3.11-32 08/31/1998 Page TRM /8B3.11-33 06/30/2010 Pages TRM / B 3.11-34 and TRM I B 3.11-35 08/31/1998 Page TRM 18B3.11-36 02/1 2/1 999 8.3.12 LOADS CONTROL PROGRAM BASES Page TRM I B 3.12-1 09/19/2007 Page TRM /B 3.12-2 11/29/2010 Page TRM I B 3.12-3 02/05/1999 TRM2 text LOES.doa 11JA3712015 I.:?
TRM / LOES-9 EFFECTIVE DATE 10/07/2015 SUSQUEHANNA SUSQUEHANNA-UNIT2 - UNIT 2 TRM ] :LOES-9 EFFECTIVE DATE 10/07/2015
TRM Post Accident Monitoring instrumentation Rev. 8 3.3.4 3.3 'Instr'umentation 3.3.4 I]RM Post-Accident Monitoring Instrumentation TFRO 3.3.4 The TRM post-accidant monitoring instrumentation channels shown in T]able 3.3.4-1 shall be OPERABLE.
APPLICABILITY: According to Table 3.3.4-i ACTi3ONS NOTES
- 1. Separate condition entry is allowed for each Function.
- 2. The provisions of TRO 3.05 are not applicable.
,CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Enter the Condition Immediately channel inoperable, referenced in Table 3.3.4-1 for the channel.
B3. As required by Required 8].1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of in Table 3.3.4-1. monitoring the appropriate parameter(s).
AND 8.2 Restore the required channel 7 days / 30 days (*
to OPERABLE status.
C. As required by Required C.1 Restore the required 3D days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.
D. As required by Required DA1 Verify a minimum 14 of the immediately Action A.1 and referenced associated acoustic monitor in Table 3.3.4-1 channels and 5 of the ADS AND SRV acoustic monitor channels are operable. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (c),COMPLETION TIME for REQUIRED ACTION 8.2 is extended from 7 days to 30 days during construction activities associated with the replacement of SPING equipment with VERMS equipment.
SUSQUEHANNA-UNIT2 TRM / 3.3-9 SUSQEHANA
-UNIT2 TMDATE 10/0712015 133-9EFFECTIVE
TRM Post Accident Monitoring instrumentation 3.3.4 Rev. 8 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME OR D.2 Verify SRV tailpipe Immrediately temperature indication and alarm are available for the AND tailpipe associated with the inoperable acoustic monitor. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter OR D.3 Verify that the following Immediately alternate mnonitoring methods in TS Table 3.3.3.1-1 are OPERABLE: - AND o Function 1 S Function 2
- Function 3 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- Function 10 thereafter AND 0.4. Restore the required 30 days channel(s) to OPERABLE status. OR_
At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.
SUSQUEHANNA - UNIT 2 T* ! 3.3-9a SUSQEHANA UNT 2 RM3.-9aEFFECTIVE DATE 061.3012010
TRM Post Accident Monitoring instrumentation Rev. 8 3.3.4 TECHNICAL REQUIREMENT SURVEILLANCE
- 1. Refer to Table 3.3.4-1 to determine which TR*s apply for each Post Accident Monitoring Function.
- 2. W~hen a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or an associated function is available.
1 SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.42. Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level.
TRS 3.3.4A4 Perform CHANNEL CALUBRATION 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATION of the Primary 92 days Containment H2 and 02 Analyzers.
.9P TRM ! 3.3-10 SUSQEHANA UNT 2 RM3.-10EFFECTIVE DATE 1013112007 I
TRM Post Accident !Monitoring Instrumentation
,Q.Rev. 8 3.3.4 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OThER REFERENCED SPECIFIED REQUIRED :FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
- 2. Main Steam Safety/Relief Valve 1,2 1/valve D TRS 3.3.4.1 Position Indicator (Acoustic TRS 3.3.4.2 Monitor) TRS 3.3.4.3
- 3. Reactor Building Vent Noble Gas Monitor
~TRS 3.3.4.4
- 4. Standby 'Gas Treatment System Vent Noble Gas Monitor
- 5. Turbine Building Vent Noble Gas Monitor
- a. Mid Range(b) 1,2 1 B TRS 3.3.4.1
"]'RS 3.3.4.4
SUSQUEHANNA - UNIT 2 TRM 1 3.3-11 EFFECTIVE DATE 1010712015
TIRM Post Accident Monitoring instrumentation Rev. 8 3.3.4 I .,:
TABLE 3.3.4-1 (conhinued)
TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECiFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITlONS 'CHANNELS ACTION A.1 SURVE]LI_.ANCE
- 6. Standby Gas Treatment System Vent Stack Sampling System Flow I
- 7. Turbine Building Vent Stack Sampling System Flow
- b. Sampler flow rate monitor~b 1,2 1C TFRS 3.3.4.1.
T[RS 3.3.4.4
- 8. Containment H2 and 02 1,2 2 C T[RS 3.3.4.1 Analyzer(b) TRS 3.3.4.5 (a) When moving irradiated fuel in the secondary containment.
(b) TRO 3.0.4.c is applicable.
SUSQUEHANNA - UNIT 2 TRM 1 3.3-11a SUSQEHANA UNT RM 2IVE 3.-haEFFECT DATE 1010712015
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to .display plant variables that provide information required by the control room operators during accident situations. The OPERABIL ITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables ;following an accident_ This capability is ,consistent with the recommendations of Regulatory Guide 1.97 Revision 2, i]nstrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant Conditions During and following an Accidentf NUREG-0578, 'qTMl-2 Lessons i.eamed Task Force Status Report and Short-Term Recommendations= and NEDO-331 60-A Revision 1, *Regulatory Relaxation For The Post Accident SRV Position Indication System= (Reference 6). It should be noted that the Technical Specificatio~ns LCO 3.3.3.1 contains all ,Category 1, non-type A instruments and Regulatory Guide 1.97 Type A instrument (References 1 and 2). This TRO requires instruments outside of these criteria.
Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pr:essure suppre.ssion system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for the purposes of this TRM. The recorders are the primary method of indicaton used by operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.
LOOPA. LOOP B
- TE-25703
- TE-25725
- TT-25703
- TT-25725
- TR-25795A
- TR-25795B Main Steam SafetylRelief Valve Positon lndicators (Acoustic Monitors) provide indication when the valves are functioning. Alternate methods for monitoring SRV position include SRV Tailpipe TemPerature and the following Functions '
from Technical Specification Table 3.3.3.1-1:
Suppression Chamber Water Level (Function 3)]
Suppression ,Chamber Water Temperature (Function 10)
Reactor Vessel Water Level (Function 2)
Reactor Steam Dome Pressure (Function 1)]
,(continued)
SUSQUEHANNA - UNIT 2 TRM ] B 3.3-4 SUSQEHANA
-UNI 2 RM IBDATE 33-4EFFECTIVE 06130/2010
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3A B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES
- I TRO The required (continued) Standby Gas channels TreatmentforSystem REACTOR Vent BUILDING Noble Gas VENT Monitor.Nobleand Gas Monitor, Turbine Building Vent Noble Gas Monitor provide information regarding the release of radioactive materials to allow for early indication ,ofthe need ;to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat.
For the Noble Gas Monitors the ,only required channels are the mid range and high range.
The drywell and suppression ,chamber hydrogen and oxygen concentrations gas analyzers monitor hydrogen and oxygen concentration to detect combustible gas levels in primary containment The analyzers are capable of determining hydrogen concentration in the range of 0 to 30% by volume and oxygen concentration in the range of 0 to 10% by volume, and each provide control room indication and output to a control room recorder. Each gas analyzer mus~t be capable of sampling either the drywell or the suppression chamber. The recorders are the primary method of indication available for use by the operator during an accident2 therefore the PAM Specification deals specifically with this portion of the instrument channel. The gas analyzer piping is provided with heat tracing to reduce the buildup of condensatidn in the system. 1H202 Aihalyzers can be considered OPERABLE for accident monitoring for up to 100 days with their heat tracing INOPERABLE.
0 ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
During construction activities that replace existing SPING equipment with new VERMS equipment, the Vent Noble Gas Monitor for each release path is anticipated to be inoperable for longer than 7 days. Restoration completion time to return the affected channel to OPERABLE status to support ,construction activities is extended to 30 days. This condition is compensated for by the enhanced Preplanned Alternate Monitoring Plan per REQUIRED ACTION B3.1.
(continued)
SUSQUEHANNA - UNIT 2 TRM /:B 3.3-5 SUSQEHANA
-UNI IB33-5EFFECTIVE 2 RM DATE "1010712015
TRM Post Accident Monitoring Instrumentation Rev. 5 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES ACTIONS Action D :requirements were determined by balancing the safety significance of (continued) the system with the impact of the actions on the operating unit_ The 'loss of the acoustic monitors is not safety significant providing the diverse and redundant alternate methods of determining SRV position are available. System components in the control room are restorable witin 30 days without unit operation impact. Components located in containment require a unit shutdown to gain access to individual components. ,Thesystem channels shall be restored to operable condition at eaiiiest opportunity.
Noble gas monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering ,theTRO ACT*IONS.
Components ,of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement. Tailpipe temperature is the direct process monitoring, alternate method and is not covered by Technical Specification LCO's as are the other alternative methods.
TRS The Technical Requirement Surveillances (TRS) are :modified by two Notes.
Note I states that the TRSs for each Post Accident Monitoring instrumentation Function are located in the SR column of Table 3.3.4-1.
Note 2 modifies the Surveillances to indicate that when a channel is placed in a inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or associated Function are available. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.3-6 SUSQEHANA
-UNI 2 RM IBDATE 33-8EFiFECTIVE 10/0712015
TRM Post Accident Monitoring ilnstrumentation Rev. 5 B 3.3.A B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS The alternate means of monitoring the parameter or The associated function are:
(continued)
P~r'nmtf*r Suppression Chamber Air One channell of Suppressioen Cihamber Temperature Air Temperature Main Steam SafetylRellief Suppression Pool levell Valve Position 1Indilcator Suppression [Pooll Temperature RPV 1level RPV pressure SRV Tailpilpe Temaperature Containment IH2 and 02 Analyzer One channel of Containment 1-1 and '02 The TRSs are defined to be peif~ormed at the specified Frequency to ensure that the TRM PAM Function is maintained OPERABLE
((continued)
SUSQUEHANNA - UNIT 2 TRM/B &3* SUSUEHNNA-UIT TRI DATE 3~-7EFFECTIVE 101.0,712015
F i ~TRM :Post Accident Monitoring Instrumentation SRev. 5 B 3.3.4 O:- B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS TRS 3.3.4.1 (continued)
Performance of the CHANNEL CHECK once every 31 days ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. it is based .on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations be tween instrument channels could be an indication of excessive instrument drift in one of the :channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to opefate properly between each CHANNEL CALIBRATION.
Agreement criteria, which are determined by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability..
If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.
O ':-REFERENCES 1. Regulatory Guide 1.97 Revision 2, "instrumentation for Light Water Cooled Nuclear 'Power Plants to Assess Plant and Environs Conditions During and Following an Accident.)'
- 2. NUREG-0578, "iTMi-2 Lessons Learned Task Force Status Report and Short-Term Recommendations.=
- 3. Technical Specification Amendment No. 100 to License No. NPF-22. for failed Unit 2 "S" acoustic monitor.
- 4. Technical Specification Amendment No. 169 to License No. NPF-14 for failed Unit I US" acoustic monitor.
- 5. Proposed amendment No. 183 to License No. NPF-22 failed Unit 2 "Jo acoustic monitor.
- 6. NEDO-33160-A, Revision 1, ='Regulatory Relaxation For The Post '
Accident SRV Position Indication System,= dated October 2006.1
- 7. NRC letter, "Final Safety Evaluation For Boiling Water Reactor Owners' Group (BWROG) Topical Report (TR) NEDO-33160, Regulatory Relaxation For The Post Accident SRV [Safety Relief Valve] Position
, ~Indication System .(TAG No. MC5446)," dated September 26, 2005.
SUSQUEHANNA - UNIT 2 TRM/B3.3* SUSQEHANA-UITTRMlB33-8EFFECTIVE DATE 0613012010