ML15281A142
| ML15281A142 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/24/2015 |
| From: | David Silk Operations Branch I |
| To: | Dominion Nuclear Connecticut |
| Shared Package | |
| ML15072A211 | List: |
| References | |
| TAC U01903 | |
| Download: ML15281A142 (2) | |
Text
Summary of NRC comments on Op Test can be found on the summary of changes page of each of the final operating test item.
Admin Topics Outline Changes:
Three changes were made to the Administrative Topics Outline based on feedback from the NRC Chief Examiner after reviewing the outline submittal:
Comment #1: RO A.1.1 (Conduct of Operations) "Administrative requirements for shift manning activities & work hour limitations" topic is similar to the topic used on the 2011 NRC Exam.
Resolution: Changed topic to "Perform AC electrical source inoperability surveillance requirements" (l<A:
GEN.2.1.31).
Comment #2: RO A.3 (Radiation Control) "Review a radiological work procedure and survey map" topic is similar to the topic used on the 2013 NRC Exam.
Resolution: Changed topic to "Make preparations required to remove a radiation monitor from service" (l<A: GEN.2.3.5). Verified JPM content is significantly different from 2013 JPM "Actions and Expected Response for RMS Equipment Failure Alarms."
Comment #3: SRO A.3 (Radiation Control) "Determine and perform actions required to remove a radiation monitor from service "topic is similar to a topic used on the 2013 NRC Exam.
Resolution: Changed topic to "Review and approve a radioactive liquid waste discharge permit" (l<A:
GEN.2.3.6).
Summary of NRC comments on Op Test can be found on the summary of changes page of each of the final operating test item.
Admin Topics Outline Changes:
Three changes were made to the Administrative Topics Outline based on feedback from the NRC Chief Examiner after reviewing the outline submittal:
Comment #1: RO A.1.1 (Conduct of Operations) "Administrative requirements for shift manning activities & work hour limitations" topic is similar to the topic used on the 2011 NRC Exam.
Resolution: Changed topic to "Perform AC electrical source inoperability surveillance requirements" (l<A:
GEN.2.1.31).
Comment #2: RO A.3 (Radiation Control) "Review a radiological work procedure and survey map" topic is similar to the topic used on the 2013 NRC Exam.
Resolution: Changed topic to "Make preparations required to remove a radiation monitor from service" (l<A: GEN.2.3.5). Verified JPM content is significantly different from 2013 JPM "Actions and Expected Response for RMS Equipment Failure Alarms."
Comment #3: SRO A.3 (Radiation Control) "Determine and perform actions required to remove a radiation monitor from service "topic is similar to a topic used on the 2013 NRC Exam.
Resolution: Changed topic to "Review and approve a radioactive liquid waste discharge permit" (l<A:
GEN.2.3.6).