ML15078A430

From kanterella
Jump to navigation Jump to search
Senior Reactor and Reactor Operator Initial License EXAMINATIONS-MILLSTONE Power Station, Unit 3
ML15078A430
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/18/2015
From: Diane Jackson
Division of Reactor Safety I
To: Heacock D
Dominion Resources
Jackson D
Shared Package
ML15072A211 List:
References
Download: ML15078A430 (3)


Text

[Type text]

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 18, 2015 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS - MILLSTONE POWER STATION, UNIT 3

Dear Mr. Heacock:

In a telephone conversation on March 13, 2015, between Mr. David Silk, Chief Examiner, Mr. Manan Patel, Examiner and Mr. Michael Siebert, Exam Project Manager, arrangements were made for the administration of licensing examinations at Millstone Power Station, Unit 3, during the weeks of September 14 and September 21, 2015. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of July 20, 2015.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by June 16, 2015. The written examinations, operating tests, and the supporting reference materials identified in Attachment 3 of ES-201 will be due by July 16, 2015. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

D. Heacock 2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html.

D. Heacock 3 Thank you for your cooperation in this matter. Mr. Siebert has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. David Silk at (610) 337-5372, or myself at (610) 337-5306.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.: 50-423 License No.: NPF-49 cc: Distribution via ListServ

D. Heacock 3 Thank you for your cooperation in this matter. Mr. Siebert has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. David Silk at (610) 337-5372, or myself at (610) 337-5306.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.: 50-423 License No.: NPF-49 cc: Distribution via ListServ Distribution w/encl: (via e-mail)

D. Dorman, RA E. DiPaolo, DRP T. Laviolette, DRP, AA D. Lew, DRA J. DeBoer, DRP K. MorganButler, RI OEDO H. Nieh, DRP J. Ambrosini, DRP, SRI RidsNrrPMMillstone M. Scott, DRP B. Haagensen, DRP, RI Resource R. Lorson, DRS L. McKown, DRP, RI RidsNrrDorlLpl1-1 Resource J. Trapp, DRS D. Jackson, DRS ROPreports Resource R. McKinley, DRP M. Patel, DRS S. Shaffer, DRP C. Bixler, DRS DOCUMENT NAME: G:\DRS\Operations Branch\Silk\Exam FY15-MS3 Sept 14 (U01903)\120dayexamltr.docx ADAMS PKG: ML15072A211 ADAMS ACCESSION NO.: ML15078A430 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CBixler MPatel DEJackson DATE 3/18/2015 3/18/2015 3/18/2015 OFFICIAL RECORD COPY