NRR E-mail Capture - Nine Mile 2 - Acceptance Review of LAR Associated with Modification of TS 2.1.1 Safety Limit Minimum Critical Power Ratios (SLMCPR)
ML15271A114
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/28/2015
From: Mozafari B
Plant Licensing Branch 1
To: Reynolds R
Exelon Corp
References
TAC MF6714
Download: ML15271A114 (2)


Text

NRR-PMDAPEm Resource From: Mozafari, Brenda Sent: Monday, September 28, 2015 11:36 AM To: 'Ronnie.Reynolds@exeloncorp.com' Cc: Beasley, Benjamin; Jackson, Christopher; Elliott, Robert; MacFee, William; Chereskin, Alexander

Subject:

Nine Mile 2 - Acceptance Review of LAR associated with Modification of TS 2.1.1 Safety Limit Minimum Critical Power Ratios (SLMCPR) (TAC No. MF6714)

By letter dated September 03, 2015 (ADAMS Accession No. ML15253A185), Exelon Generation Company, LLC (EGC) requested a license amendment request (LAR) for for Nine MilePoint Nuclear Station, Unit 2 (NMP2). The proposed change is to modify Technical Specification (TS) 2.1.1 ("Reactor Core SLs").

Specifically, this change incorporates revised Safety Limit Minimum Critical Power Ratios (SLMCPRs) due to the cycle specific analysis performed by Global Nuclear Fuel for Nine Mile Point Nuclear Station, Unit 2 (NMP2), Cycle 16.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Brenda L. Mozafari Senior Project Manager, NRR/DORL U.S. Nuclear Regulatory Commission Nine Mile Point 1 and 2 Power Plants 301-415-2020 email: brenda.mozafari@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2412 Mail Envelope Properties (Brenda.Mozafari@nrc.gov20150928113600)

Subject:

Nine Mile 2 - Acceptance Review of LAR associated with Modification of TS 2.1.1 Safety Limit Minimum Critical Power Ratios (SLMCPR) (TAC No. MF6714)

Sent Date: 9/28/2015 11:36:23 AM Received Date: 9/28/2015 11:36:00 AM From: Mozafari, Brenda Created By: Brenda.Mozafari@nrc.gov Recipients:

"Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>

Tracking Status: None "Jackson, Christopher" <Christopher.Jackson@nrc.gov>

Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov>

Tracking Status: None "MacFee, William" <William.MacFee@nrc.gov>

Tracking Status: None "Chereskin, Alexander" <Alexander.Chereskin@nrc.gov>

Tracking Status: None

"'Ronnie.Reynolds@exeloncorp.com'" <Ronnie.Reynolds@exeloncorp.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2001 9/28/2015 11:36:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: