BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, DSAR Changes

From kanterella
Jump to navigation Jump to search
Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, DSAR Changes
ML15266A271
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 09/01/2015
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15266A267 List: ... further results
References
BVY 15-046
Download: ML15266A271 (2)


Text

Vermont Yankee DSAR ChangesRevision 0FCR #UFSAR SectionPageTableFigureReason for Change26/01115.515.5-10Cancel License Renewal Commitment 43 (Vernon Hydro Station cable testing) due to designation of SBO DG as new AAC source for 10 CFR 50.63 compliance27/00115.215.2-8Editorial change to incorporate 5th ASME Code Inservice Inspection Interval details27/00213.313.3-2Updating ANSI/ANS 3.1 1978 and 1993 training standards for plant staff and Shift Technical Advisors to align with revised QA program manual and TS 6.2.B and C.27/00310.13, 10.1510.13-3, 10.13-4, 10.15-2Engineering Change 45613 Disconnection of southwest well pump from potable water system27/0047.37.3-18Engineering Change 47544 Revise main steam line high flow trip setting (Note: Change applicable only while VY was operating and is not reflected in DSAR Rev 0)27/005VariousSystem Abandonment - Decommissioning27/00614Revise Section 14 (Station Safety Analysis) to reflect permanently defueled condition - Decommissioning27/00912Engineering Change 47998 - Reactor Building crane control upgrade27/0105.2, 7.1, 7.12, 7.13, 12.2, 14.9 and 15.35.2-22, 7.1-1, 7.1-9, 7.12-15, 7.12-19, 7.13-8, 12.2-20, 14.9-6, 15.3-1, 15.3-6 7.12.2, 7.13.1,Removal of EQ Program Requirements - DecommissioningTuesday, July 21, 2015 Page 1 of 2 FCR #UFSAR SectionPageTableFigureReason for Change27/0131.9, 15.21.9-2, 15.2-3Revision to Sections 1.9 and 15.2 to align with issuance of VY QAPM Revision 027/01415AllRevise Section 15 (Aging Management Programs) to reflect the permanently defueled condition - Decommissioning27/01599.3-5, -6Engineering Change 54271 - Removal of LLRW site and other non-SSC (PUB and Maine Yankee) buildings - Decommissioning27/0165.25.2-23, -32 and -32Implement License Amendment 260 - Remove reference to Appendix J program27/0177.157.15-4, 7.15-5Remove Emergency Response Data System based on permanently defueled condition27/01910.310.3-9, 10.3-10Regulatory Commitment: Revise UFSAR to include a description of how the VY spent fuel pool design and operational characteristics meets or compares with the NUREG-1738 Industry Decommissioning Commitments and Staff Decommissioning Assumptions.27/02014Regulatory Commitment: Revise UFSAR to reflect revised fuel handling accident analysis based on permanently defueled condition27/0218.38.3-6Removal of Station Blackout Rule (10 CFR 50.63) compliance information and regulatory commitments associated with Station Blackout DG testing based on permanently defueled condition27/0238.5, 10.5, 10.6Engineering Change 50086 - Reclassification of the Standby Fuel Pool Cooling System safety classification; EC 52295 - Reclassification of the Service Water System; EC 50014 - Reclassification of the Emergency Diesel Generators and support systems27/027Defueled Safety Analysis Report Revision 0Tuesday, July 21, 2015 Page 2 of 2