ML15264A249

From kanterella
Jump to navigation Jump to search
Application to Amend License DPR-38,changing Tech Specs Required to Support Operation of Facility at full-rated Power During Cycle 9.BAW-1841, Oconee Unit 1,Cycle 9 Reload Rept Encl.Fee Paid
ML15264A249
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/11/1984
From: Tucker H
DUKE POWER CO.
To: Harold Denton, Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML15264A250 List:
References
NUDOCS 8409130181
Download: ML15264A249 (6)


Text

REGULATURYOWFORMATION DISTRIBUTION SYPEM (RIDS)

ACCESSION NBR:8409130181 DOUC.DTE: 84/09/1i NOTARIZED: YES DOCKET #

FACIL:50 269 Oconee Nuclear Station, Unit 1, Duke Power Co, 05000269 AUTH,NAM,1E AUTHOR AFFILIATION TUCKER,HB.

Duke Power Co, RECIPNAME:

RECIPIENT AFFILIATION DENTONH.R.

Office,of Nuclear Reactor Regulation, Director STOLZPJ,F.

Operating Reactors Branch 4

SUBJECT:

Application <to,amend LicenseDPR.38 changing Tech Specs required.to support operation of facility at full-rated power during Cycle 9,BAW-1841, "Oconee Unit 1rCycle 9 Reload Rept" encl,Fee paid.

DISTRIBUTION CODE: A00O 8E RECEIVED:LTR ENCL.-_

IZ E; TITLE: OR Submittal: General Distribution NOTES:AEOD/Ornstein:1cy, L P

0 05000269 OL:02/06/73 7

7tIS

%1, RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR ORB4 BC 01 7

7 INTERNAL:

ADM/LFMS 1

0 ELD/HDS4 1

0 NRR/DE/MTE8 1

1 NRR/DL DIR, 1

1 NRR/DL/ORAB

1.

0 NR 1

1 NRR/SI/RAB 1

1 I

04 1

1 RGN2 1

1 EXTERNAL: ACRS 09 6

6 LPDR 03 1

1 NRC PDR 02!

1 1

NSIC 05 1

1 NTIS 1

1 NOTES:

I TOTAL NUMBER UF COPIES'REQUIRLD: LTTR 27 ENCL 24

DuKE POWER COMPANY P.O. BOX 33189 CHARLOTTE, N.C. 28242 HAL B. TUGKER TELEPHONE VICE PRESIDENT (704) 373-4531 NUGLEAR PRODUCTION September 11,1984 Mr. Harold R. Denton Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:

Mr. John F. Stolz, Chief Operating Reactors Branch 4

Subject:

Oconee Nuclear Station, Unit 1 Docket No. 50-269

Dear Sir:

Pursuant to 10CFR50, § 50.90, please find attached (Attachment 1) proposed changes to the Oconee Nuclear Station (ONS) Technical Specifications which are reqired to support the operation of Oconee Unit 1 at full rated power during Cycle 9. This proposal contains changes which concern the following:

1.

Core Protection Safety Limits of Specification 2.1;

2.

Protective System Maximum Allowable Setpoints of Specificatins 2.3;

3.

Rod Position Limits of Specification 3.5.2;

4.

Power Imbalance Limits of Specification 3.5.2.

Also attached (Attachment 3) is Babcock and Wilcox Report BAW-1841, "Oconee Unit 1, Cycle 9 Reload Rep6rt".' A summary of the 'Cycle 9 operating para meters \\is included-in the report" along with safety analyses supporting operation oftheUnit 1, Cycle 9-core 4t ratedipower in accordance with the Technical Specification provided. This reload report employs a LOCA analysis incorporating the NUREG-0630 data.~ -During the refueling outage for Oconee 1 Cycle 9, sixty-four (64) fuel assemblies will be discharged. The new assembli:es (batch-'11) to be inserted are of the mark BZ type. My letter of October.7,' 1983 submitted a report entitled "Rancho Seco Cycle 7 Reload Report Volume1 - Mark BZFuel Assembly Design Report", April 1983, BAW-1781 P, for your review and approval.'

Duke's inteition to utiliz etheiark-BZ fuel assembly design in Oconee 1 Cycle 9 was addressed in my October 7th letter.

Duke submits that the changes connected with the proposed amendment do not represent a significant hazard to the public health and safety of the environ ment.

The § 50.92 standards covering the no significant hazards issue were followed in an analysis of the proposed amendment from this standpoint.

8409130181 840911 PDR ADOCK 05000269 P

PDR

Mr. Harold R. Denton September 11, 1984 Page Two Please find attached (Attachment 2) the-No Significant Hazards analysis for the proposed amendment. Duke will forward a copy of this evaluation to the South Carolina Department of Health and Environmental Control for review and a follow-up consultation with the Staff, if necessary.

Startup testing of Oconee Unit 1, Cycle 9 will be in accordance with a modified version of the report "Oconee Nuclear Station Generic Startup Physics Test Program" which was initially approved by the Staff in a March 23, 1981 letter, and modified by Duke letters dated May 29, 1981 and May 19, 1983.

The Unit 1, Cycle 9 refueling outage is scheduled to begin October 8, 1984, with a planned duration of 49 days. The NRC will be kept informed of the schedule for restart through the Project Manager.

Pursuant to 10CFR170, § 170.12, please find enclosed a check amounting to

$150, the application for amendment fee, specified by § 170.21.

Very truly yours, Hal B. Tucker RFH/ccd Attachments cc:

Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Ms. Helen Nicolaras Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. J. C. Bryant NRC Resident Inspector Oconee Nuclear Station

Mr. Harold R. Denton September 11,' 1984 Page Three cc:

Mr. Hayward Shealey, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201

Mr. Harold R. Denton, Director September.11, 1984 Page 4 HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this request for amendment of the Oconee Nuclear Station Technical Specifications, Appendix A to Facility Operating Licenses DPR-38, DPR-47, and DPR-55; and that all statements and matters set forth therein are true and correct to the best of his knowledge.

Hal B. Tucker, Vice President Subscribed and sworn to before me this 11th day of September, 1984.

Notary Pub'lic My Commission Expires:

September 20,.1984 Duke Power Company Oconee Nuclear Station Proposed Technical Specification Revision Oconee 1 Cycle 9 Remove Pages Insert Pages 2.1-1 2.1-1 2.1-2 2.1-2 2.1-3 2.1-3 2.1-7 2.1-7 2.3-2 2.3-2 2.3-3 2.3-3 2.3-8 2.3-8 2.3-11 2.3-11 3.5-15(3 pages) 3.5-15(3 pages) 3.5-18(3 pages) 3.5-18(3 pages) 3.5-21(3 pages) 3.5-21(3 pages) 3.5-24(3 pages) 3.5-24(3 pages) 3.5-27(3 pages) 3.5-27(1 page)