ML15261A395
| ML15261A395 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 02/12/1999 |
| From: | Casto C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mccollum W DUKE POWER CO. |
| Shared Package | |
| ML15261A396 | List: |
| References | |
| 50-269-98-11, 50-270-98-11, 50-287-98-11, NOED-98-6-011, NOED-98-6-11, NUDOCS 9903100089 | |
| Download: ML15261A395 (4) | |
See also: IR 05000269/1998011
Text
NOED 98-6-011
Duke Energy Corporation
ATTN: Mr. W. R. McCollum
Vice President
Oconee Nuclear Station
P. 0. Box 1439
Seneca, SC 29679
SUBJECT.
NRC INSPECTION REPORT 50-269/98-11, 50-270/98-11, 50-287/98-11 AND
Dear Mr. McCollum:
On January 16, 1999, the Nuclear Regulatory Commission (NRC) completed an integrated
inspection at your Oconee 1, 2, and 3 reactor facilities. The enclosed report presents the results
of that inspection.
During the seven-week period covered by this inspection, your conduct of activities at the
Oconee facilities was generally characterized by safety conscious operations, maintenance, and,
engineering practices. Based on the inspection finding, one violation of NRC requirements is
cited in the enclosed Notice of Violation (Notice), and the circumstances surrounding the
violation aredescribed in detail in the enclosed report. However, the NRC has concluded that
information regarding the reasons for the violation, the corrective actions taken and planned to
correct the violation and prevent recurrence are already adequately addressed in this report.
Therefore, you are not required to respond to this letter unless the description therein does not
accurately reflect your corrective actions or your position. In that case, or if you choose to
provide additional information, you should follow the instructions specified in the enclosed
Notice.
Also, during the inspection period, the NRC received your response dated December 14, 1998,
to Violation 50-269,270,287/98-09-02. We have evaluated your response and found that it
meets the requirements of 10 CFR 2.201. We will examine the implementation of your
corrective actions during future inspections
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosures, and any response you provide will be placed in the NRC Public Document Room
(PDR).
Sincerely,
Orig signed by Charles A. Casto
Charles A. Casto
Deputy Director
Division of Reactor Projects
Docket Nos. 50-269, 50-270, 50-287, 72-04
License Nos. DPR-38, DPR-47, DPR-55, SNM-2503
Enclosures: (See page 2)
OFFICIAL COPY
0212
WlOO~s
0 5 0 0 0
R
2
Enclosures:
2. Inspection Report 50-269/98-11,
50-270/98-11, 50-287/98-11
cc w/encls:
J. E. Burchfield
L. A. Keller, Manager
Compliance
Nuclear Regulatory Licensing
Duke Energy Corporation
Duke Energy Corporation
P. O. Box 1439
526 S. Church Street
Seneca, SC 29679
Charlotte, NC 28201-0006
Lisa Vaughn
Peggy Force
Legal Department (PB05E)
Assistant Attorney General
Duke Energy Corporation
N. C. Department of Justice
422 South Church Street
P. 0. Box 629
Charlotte, NC 28242
Raleigh, NC 27602
Rick N. Edwards
Steven P. Shaver
Framatome Technologies
Senior Sales Engineer
1700 Rockville Pike, Suite 525
Westinghouse Electric Company
Rockville, MD 20852
5929 Carnegie Boulevard, Suite 500
Charlotte, NC 28209
Anne Cottington
Winston and Strawn
Distribution w/encls: (See page 3)
1400 L Street, NW
Washington, D. C. 20005
Mel Fry, Director
Division of Radiation Protection
N. C. Department of Environmental
Health & Natural Resources
3825 Barrett Drive
Raleigh, NC 27609-7721
Virgil R. Autry, Director
Div. of Radioactive Waste Mgmt.
S. C. Department of Health and
Environmental Control
2600 Bull Street
Columbia, SC 29201
County Supervisor of
Oconee County
Walhalla, SC 29621
Manager, LIS
NUS Corporation
2650 McCormick Drive
Clearwater, FL 34619-1035
3
S Distribution w/encls:
D. LaBarge, NRR
R. Carroll, RII
C. Ogle, RII
C. Payne, RII
PUBLIC
NRC Resident Inspector
OFFICE
RII:OCONEE
RII:OCONEE
RII:OCONEE
RII:OCONEE
RII:DRP
RII:DRS
RII:DRS
SIGNATURE
-A'
.
- _
,
'
NAME
MSCOTT
DBILLINGS
SFREEMAN
ECHRISTNOT
FJap
/
--
Thomas
EGirard
DATE
2/
/99
2/
/99
2/
/99
2/
/99
2/ 1 T
2/
2/
/99
COPY?
YES
NO
YES
NO
YES
NO
YES
NO
YES
(N0
YES
NO
NO
OFFICIAL RECORD COPY
DOCUMENT NAME: G:\\0NS9811.NU2
OFFICE
R I:DRS
RII:DRS
RII:DRS
RII:DRS
RII:DRS
RII:DRS
S
SIGNATURE
'L-
,-
//_______
zL
NAME
RRMoore
PFillion
NMerriweather
GWiseman
WSotor
WStansberry
AB and
DATE
2/ /
/99
2//
/99
2//aL /99
2/
/
bb
/9 9
2/ .L
/99
/
COPY?
Y
N
YE
NO
O
( YE
N
tYESyNO
YES
NO
YE
NO
OFFICIAL RECORD COPY
DOCUMENT NAME: G:\\0NS9811.NU2
OFFICE
RII:DRP
SIGNATURE
NAME
COgle
-_-ES
DATE
21 /}99
21
199
2/
199
2/
199
21
/99
2/
/99
2/
/99
?
YES )
NO
YES
NO
,YES
NO
YES
NO
YES
NO
YES
NO
YES
N
OFFIMAL RECORD COPY
DOCUMENT NAME: G:1ONS9811.NU2
iv' See-
3
Distribution w/encls:
D. LaBarge, NRR
R. Carroll, RII
C. Ogle, Rll
C. Payne, RII
PUBLIC
NRC Resident Inspector
OFFICE
RI
RII:OCONEE
RH:
EE
R
E
RII:DRP
RII:DRS
RII:DRS
SIGNATURE
NAME
NSCOTT
DBILLINGS
SFREEMAN
ECHRISTNOT
FJape
MThomas
EGirard
DATE
2/
/99
2/ )q
/99
2
/99
2f
/99
2/
/99
2/
/99
2/
/99
[COPY?
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
OFFICIAL RECORD COPY
DOCUMENT NAME: G\\ONS9811.NU2
OFFICE
RIORI:DRS
RII:DRS
RIl:DRS
RII:DRS
RII:DRS
RII:DRS
SIGNATURE
NAME
RMoore
PFillion
NMerriweather
CWiseman
uSartor
Stansberry
DATE
2/
/99
2/
/99
2/
/99
2/
/99
2/
/99
2/
/99
2/
/99
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
OFFICIAL REcD COPY
DOCUMENT NAME: G\\0NS9811.NU2
TOTAL P.02