ML15261A377

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-269/98-15,50-270/98-15 & 50-287/98-15 on 981102-06,981116-20 & 981211 & Nov.Expresses Concern Re Violation Because NRC Identified Failures to Update DPC UFSAR That DPC 1998 UFSAR Review Project Failed to Identify
ML15261A377
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/23/1998
From: Casto C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mccollum W
DUKE POWER CO.
Shared Package
ML15261A378 List:
References
50-269-98-15, 50-270-98-15, 50-287-98-15, EA-98-552, NUDOCS 9901200354
Download: ML15261A377 (5)


See also: IR 05000269/1998015

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:9901200354

DOC.DATE: 98/12/23

NOTARIZED: NO

DOCKET #

ACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.

05000269

50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.

05000270

50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.

05000287

AUTH.NAME

AUTHOR AFFILIATION

CASTO,C.H.

Region 2 (Post 820201)

RECIP.NAME

RECIPIENT AFFILIATION

MCCOLLUM,W.R.

Duke Power Co.

C

SUBJECT: Forwards insp repts 50-269/98-15,50-270/98-15 & 50-287/98-15

on 981102-06,981116-20 & 981211 & NOV.Expresses concern re

A

violation because NRC identified failures to update DPC

UFSAR that DPC 1998 UFSAR Review Project failed to identify.

T

DISTRIBUTION CODE: IE01F COPIES RECEIVED:LTR

ENCL/

SIZE:

E

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response

G

NOTES:

0

RECIPIENT

COPIES

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

R

PD2-2 PD

1

1

LABARGE,D

1

1

Y

INTERNAL: ACRS

2

2

AEOD/SPD/RAB

1

1

AEOD

1

1

DEDRO

1

1

LE CENTM:>"

1

1

NRR/DRCH/HOHB

1

1

2

NRR/DRPM/PECB

1

1

NRR/DRPM/PERB

1

1

NUDOCS-ABSTRACT

1

1

OE DIR

1

1

OGC/HDS2

1

1

RGN2

FILE

01

1

1

D

EXTERNAL: LITCO BRYCE,J H

1

1

NOAC

1

1

NRC PDR

1

1

NUDOCS FULLTEXT

1

1

0

C

E

LADED FROM

ELECTRONIC* F

'r

NOTE TO ALL "RIDS" RECIPIENTS:

O PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION,

CONTACT THE DOCUMENT CONTROL

DESK (DCD) ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES REQUIRED: LTTR

19

ENCL

19

December 23, 1998

EA 98-552

Duke Energy Corporation

ATTN: Mr. W. R. McCollum

Vice President

Oconee Site

P. 0. Box 1439

Seneca, SC 29679

SUBJECT:

NRC INSPECTION REPORT 50-269/98-15, 50-270/98-15, 50-287/98-15, AND

NOTICE OF VIOLATION

Dear Mr. McCollum:

This refers to the inspection conducted on November 2-6, November 16-20, and December 11,

1998, at the Oconee facility. The purpose of the inspection was to follow up on open items

regarding potential design basis issues with the emergency feedwater system and inaccurate

statements in the Updated Final Safety Analysis Report (UFSAR) about the emergency

feedwater system. The enclosed report presents the results of this inspection.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred. This violation is cited in the enclosed Notice of Violation (Notice) and

the circumstances surrounding the violation are described in detail in the enclosed inspection

report. The violation is of concern because the NRC identified failures to update your UFSAR

that your 1998 UFSAR Review Project failed to identify.

Although you implemented corrective actions to update the FSAR on November 18, 1998, the

safety evaluation for the first example of the violation may have failed to identify an unreviewed

safety question. Therefore, because your initial corrective actions appear to be inadequate, you

are required to respond to this letter in accordance with the instructions specified in the enclosed

Notice.

Two apparent violations were also identified and are being considered for escalated

enforcement action in accordance with the "General Statement of Policy and Procedures for

NRC Enforcement Actions" (Enforcement Policy), NUREG-1600. The first apparent violation

involves an inadequate procedure for manually connecting alternate emergency electrical power

to a high pressure injection pump. The second apparent violation involves three examples of

the failure to perform or inadequate 10 CFR 50.59 safety evaluations for changes to procedures

affecting the ability to supply alternate emergency electrical power to a high pressure injection

pump. Accordingly, no Notice of Violation is presently being issued for these inspection findings.

In addition, please be advised that the number and characterization of apparent violations

described in the enclosed inspection report may change as a result of further NRC review.

An open predecisional enforcement conference to discuss these apparent violations will be held

with you during January 1999. We will contact you to arrange a specific date. The decision to

9901200354 981223

PDR ADOCK 05000269

G

PDRM

2

hold a predecisional enforcement conference does not mean that the NRC has determined that a

violation has occurred or that enforcement action will be taken. This conference is being held to

obtain information to enable the NRC to make an enforcement decision, such as a common

understanding of the facts, root causes, missed opportunities to identify the apparent violation

sooner, corrective actions, significance of the issues and the need for lasting and effective

corrective action. In particular, we expect you to address the past safety significance of the

inadequate procedures (when different versions of procedures were in place and different

equipment was installed). We also expect you to address the safety significance of the

inadequate procedures with regard to various potential initiating events during which they would

be relied upon, including high energy line break and tornado. In addition, this is an opportunity

for you to point out any errors in our inspection report and for you to provide any information

concerning your perspectives on 1) the severity of the violations, 2) the application of the factors

that the NRC considers when it determines the amount of a civil penalty that may be assessed in

accordance with Section VI.B.2 of the Enforcement Policy, and 3) any other application of the

Enforcement Policy to this case, including the exercise of discretion in accordance with Section

VII.

You will be advised by separate correspondence of the results of our deliberations on this matter.

No response regarding these apparent violations is required at this time.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

Original signed by

Charles A. Casto

Charles A. Casto, Deputy Director

Division of Reactor Projects

Docket Nos.: 50-269, 50-270, 50-287

License Nos.: DPR-38, DPR-47, DPR-55

Enclosures:

1. Notice of Violation

2. NRC Inspection Report 50-269/98-15,

50-270/98-15, 50-287/98-15

3. Enforcement Policy (excerpt)

cc w/encls: (See page 3)

3

cc w/encls:

J. E. Burchfield

Compliance

County Supervisor of

Duke Energy Corporation

Oconee County

P. 0. Box 1439

Walhalla, SC 29621

Seneca, SC 29679

Manager, LIS

Paul R. Newton

NUS Corporation

Legal Department (PB05E)

2650 McCormick Drive

Duke Energy Corporation

Clearwater, FL 34619-1035

422 South Church Street

Charlotte, NC 28242

L. A. Keller, Manager

Nuclear Regulatory Licensing

Rick N. Edwards

Duke Energy Corporation

Framatome Technologies

526 S. Church Street

1700 Rockville Pike, Suite 525

Charlotte, NC 28201-0006

Rockville, MD 20852

Karen E. Long

J. Michael McGarry, Ill, Esq.

Assistant Attorney General

Winston and Strawn

N. C. Department of Justice

1400 L Street, NW

P. 0. Box 629

Washington, D. C. 20005

Raleigh, NC 27602

Mel Fry, Director

Steven P. Shaver

Division of Radiation Protection

Senior Sales Engineer

N. C. Department of Environmental

Westinghouse Electric Company

Health & Natural Resources

5929 Carnegie Boulevard, Suite 500

3825 Barrett Drive

Charlotte, NC 28209

Raleigh, NC 27609-7721

(Distribution w/encls - See page 4)

Virgil R. Autry, Director

Div. of Radioactive Waste Mgmt.

S. C. Department of Health and

Environmental Control

2600 Bull Street

Columbia, SC 29201

DEC

4

Distribution w/encls:

D. LaBarge, NRR

R. Carroll, Rll

C. Ogle, RII

K. Landis, RII

C. Payne, Rll

A. Boland, RII

J. Lieberman, OE

OE:EA File (B. Summers)

PUBLIC

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

78128 Rochester Highway

Seneca, SC 29672

OFFICE

RII:DRS

RII:DRS

RII:DRP,

RII:DRS

SIGNATURE

(7f

y&1t

&1

W

NAME

RSchin

KLandis5it

COgle

ABo

d

VMcCree

DATE

121Q1/98

121 $198

2I&r

/98

/98

12

/98

12)

198

121

/98

c_

_

N 1

NO 1

YE

NO

(NFS

NO

-YES

NO

YES

NO

YES

OFFICIAL RECORD COPY

DOCU

T NAME S:\\D1lINPUTS\\OCO

s .wpd