Davis-Besse Initial License Exam 2015 Simulator JPM S1

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 AG Facility: Davis-Besse Task No: 001-021-01-0100 Task

Title:

Transfer Control Rod Group 7 from the Auxiliary Power Supply K/A

Reference:

(001) A2.11 4.4/4.7 Job Performance Measure No: S1 (NEW)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Transfer Group 7 Rods to the Normal Power Supply, return ICS to Auto and manually trip the Reactor prior to automatic trip Required Materials:

DB-OP-06402, R25, Limits & Precautions and Section 4.2, Transferring Control Rod(s) from the Auxiliary Power Supply General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

Yes Validation Time:

15 minutes 1 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Transfer Group 7 Control Rods from the Auxiliary Power Supply to the Normal Power Supply, identify undesired rod motion and trip the reactor INITIAL CONDITION:

Plant stable at 50% power Group 7 Control Rods on the Auxiliary Power Supply per DB-OP-06405 Section 4.1 Rod Control Panel in MANUAL ICS REACTOR DEMAND Station in HAND ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Misalign SUPPLY PHASES between the NORMAL and AUX Power Supplies Fail Rod Stop Button:

A06A1A25S501-1 to OFF MALFUNCTIONS/FAILURE TO INSERT:

Continuous rod insertion when Reactor Demand is placed in Auto:

L502U 2 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 AG EXAMINER COPY INITIAL CONDITIONS:

Plant is stable at 50% Power Group 7 Rods are on the Auxiliary Power Supply for I&C troubleshooting Rod Control Panel in MANUAL ICS REACTOR DEMAND Station in HAND INITIATING CUES:

I&C troubleshooting is complete The Unit Supervisor directs you to transfer Group 7 Rods to the Normal Power Supply per DB-OP-06402, Section 4.2, Transferring Control Rod(s) from the Auxiliary Power Supply, and return the Rod Control Panel, ICS REACTOR DEMAND Station and the Unit Load Demand (ULD) station to Auto (Provide examinee a copy of DB-OP-06402, Section 4.2) 3 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 AG CANDIDATE COPY INITIAL CONDITIONS:

Plant is stable at 50% Power Group 7 Rods are on the Auxiliary Power Supply for I&C troubleshooting Rod Control Panel in MANUAL ICS REACTOR DEMAND Station in HAND INITIATING CUES:

I&C troubleshooting is complete The Unit Supervisor directs you to transfer Group 7 Rods to the Normal Power Supply per DB-OP-06402, Section 4.2, Transferring Control Rod(s) from the Auxiliary Power Supply, and return the Rod Control Panel, ICS REACTOR DEMAND Station and the Unit Load Demand (ULD) station to Auto 4 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Verify Rod Control Panel in MANUAL STANDARD: Observe Rod Control Panel MANUAL light ON, AUTO light OFF CUE: None SAT UNSAT
2. PERFORMANCE STEP: Verify ICS REACTOR DEMAND Station in HAND STANDARD: Observe ICS REACTOR DEMAND Station HAND light ON, AUTO light OFF CUE: None SAT UNSAT
3. PERFORMANCE STEP: Verify Rod Control Panel in SEQ BYPASS

........C........

STANDARD: Rod Control Panel SEQ BYPASS light ON CUE: None SAT UNSAT

4. PERFORMANCE STEP: Select Group 7 using GROUP SELECT switch

........C........

STANDARD: Turn GROUP SELECT switch to group 7 Comment: Evaluator will provide Independent Verification CUE: None SAT UNSAT 5 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 AG

5. PERFORMANCE STEP: Select ALL using the SINGLE SELECT switch

........C........

STANDARD: Turn SINGLE SELECT switch to ALL Comment: Evaluator will provide Independent Verification CUE: None SAT UNSAT

6. PERFORMANCE STEP: Press and release AUX

........C........

STANDARD: Press and release AUX pushbutton. Observe AUX light ON CUE: None SAT UNSAT

7. PERFORMANCE STEP: Press and release JOG SPEED

........C........

STANDARD: Press and release JOG SPEED pushbutton. Observe JOG SPEED light ON CUE: None SAT UNSAT

8. PERFORMANCE STEP: Check SUPPLY PHASES lights are ON STANDARD: Observe SUPPLY PHASES lights are ON CUE: None SAT UNSAT
9. PERFORMANCE STEP: Line up SUPPLY PHASES

........C........

STANDARD: Position Rod Control T-Handle to the Insert position until SUPPLY PHASE lights are lined up across from each other CUE: None SAT UNSAT 6 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 AG

10. PERFORMANCE STEP: Verify SYNC CONFIRM STANDARD: Observe SYNC CONFIRM light is ON CUE: None SAT UNSAT
11. PERFORMANCE STEP: Press and release CLAMP

........C........

STANDARD: Press and release CLAMP pushbutton. Observe CLAMP light ON CUE: None SAT UNSAT

12. PERFORMANCE STEP: Transfer Group to Normal Power Supply

........C........

STANDARD: Press and release MANUAL XFR button. Observe MANUAL XFR light CUE: None SAT UNSAT

13. PERFORMANCE STEP: Verify Group transferred to Normal Power Supply STANDARD: Observe PI Panel CONTROL-ON lights for Group 7 rods OFF CUE: None SAT UNSAT
14. PERFORMANCE STEP: Release Clamp

........C........

STANDARD: Press and release CLAMP REL button. Observe CLAMP light OFF CUE: None SAT UNSAT

15. PERFORMANCE STEP: Select RUN SPEED

........C........

STANDARD: Press and release RUN SPEED. Observe RUN light ON, JOG light OFF CUE: None SAT UNSAT 7 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 AG

16. PERFORMANCE STEP: Select GROUP

........C........

STANDARD: Press and release GROUP. Observe GROUP light ON CUE: None SAT UNSAT

17. PERFORMANCE STEP: Select XFR RESET

........C........

STANDARD: Press and release XFR RESET. Observe XFR RESET light ON.

CUE: None SAT UNSAT

18. PERFORMANCE STEP: Verify Group 7 controlling STANDARD: Observe PI panel CONTROL-ON lights for the group 7 ON CUE: None SAT UNSAT
19. PERFORMANCE STEP: Select OFF using SINGLE SELECT switch STANDARD: Turn SINGLE SELECT switch to OFF CUE: None SAT UNSAT
20. PERFORMANCE STEP: Select OFF using GROUP SELECT switch STANDARD: Turn GROUP SELECT switch to OFF CUE: None SAT UNSAT
21. PERFORMANCE STEP: Select SEQ control for Regulating Rods

........C........

STANDARD: Press and release SEQ. Observe SEQ light ON CUE: Sequence operation of the Rod Control Panel is directed by the Shift Manager SAT UNSAT 8 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 AG

22. PERFORMANCE STEP: Transfer rod control to AUTO

........C........

STANDARD: Press and release AUTO on the Rod Control Panel. Observe AUTO light ON and MANUAL light OFF CUE: None SAT UNSAT NOTE:

Alternate Path Starts here. When the ICS REACTOR DEMAND Station is placed in AUTO, control rods will receive a continuous IN command. The Candidate will implement the immediate actions of DB-OP-02516, CRD Malfunctions for Undesired Control Rod Motion. The ROD STOP button will be depressed and the rods will continue inserting requiring the Reactor to be tripped.

23. PERFORMANCE STEP: Transfer ICS Reactor Demand Station to Auto

........C........

STANDARD: Press and release AUTO on the ICS REACTOR DEMAND Station. Observe AUTO red light ON and HAND white light OFF CUE: None SAT UNSAT

24. PERFORMANCE STEP: Identify Undesired rod motion depress ROD STOP STANDARD: Press and hold ROD STOP button and recognize rods continue inserting COMMENT: May first attempt to stop rod motion by returning Reactor Demand Station to manual which will not stop rod motion CUE: None SAT UNSAT
25. PERFORMANCE STEP: Identify Undesired rod motion and trip Reactor

........C........

STANDARD: Press Reactor trip button and observe rods insert CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME 9 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

10 of 10

Davis-Besse Initial License Exam 2015 Simulator JPM S2

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 AG Facility: Davis-Besse Task No: 004-044-04-0100 Task

Title:

Recover from Letdown Isolation on High Temperature K/A

Reference:

(004) A4.06 3.6/3.1 Job Performance Measure No: S2 (JPM 017)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Restore Letdown through Purification Demineralizer 1 Required Materials:

DB-OP-02523, Component Cooling Water System Malfunctions, Attachment 7 General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

10 Minutes 1 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Recover from Letdown Isolation on High Temperature INITIAL CONDITION:

FPSS ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Purification Demineralizer 1 in service MU 10A open MU 10B closed MU 1903 closed MALFUNCTIONS/FAILURE TO INSERT:

Close CC 97, CCW Isolation Valve to Letdown Cooler 2 IRF KAD3 0.0 After Letdown isolates on high temperature then reopen CC 97 IRF KAD3 0.8 ACTION/CUES:

2. ACTION: Open MU 104, Purification Demin Bypass IRF BM00 1.0 CUE: MU 104 is open
6. ACTION: Close MU 104, Purification Demin Bypass IRF BM00 0.0 CUE: MU 104 is closed 2 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 AG EXAMINER COPY INITIAL CONDITIONS:

The Plant is in Mode 1 Letdown has isolated on high temperature due to a loss of CCW to Containment INITIATING CUES:

The cause of Letdown isolation has been determined and corrected The Unit Supervisor directs you to restore Letdown through Purification Demineralizer 1 using of DB-OP-02523, CCW Malfunctions (Provide the examinee a copy of Attachment 7 of DB-OP-02523) 3 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 AG CANDIDATE COPY INITIAL CONDITIONS:

The Plant is in Mode 1 Letdown has isolated on high temperature due to a loss of CCW to Containment INITIATING CUES:

The cause of Letdown isolation has been determined and corrected The Unit Supervisor directs you to restore Letdown through Purification Demineralizer 1 using of DB-OP-02523, CCW Malfunctions 4 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Direct plant operator to open MU 104, PURIFICATION DEMINERALIZER BYPASS STANDARD: Communicate with an Equipment Operator COMMENT: Step 1 shall be completed prior to step 3 CUE: MU 104 is open (given by examiner - no action required)

SAT UNSAT

2. PERFORMANCE STEP: Isolate Purification Demineralizer 1

........C........

STANDARD: Push close pushbutton on HIS MU10A, MIXED BED 1 LETDOWN INLET, using HISMU10A. Observe GREEN light ON. RED light off CUE: None SAT UNSAT 5 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 AG

3. PERFORMANCE STEP: Manually override the high temperature trip signals

........C........

STANDARD: Simultaneously depress and hold in the OPEN position:

  • MU2B, LETDOWN COOLERS INLET ISOLATION, using HISMU2B - Observe RED light ON, GREEN OFF AND
  • MU1A, RC LETDOWN COOLER 1 INLET ISOLATION, using HISMU1A - Observe RED light ON, GREEN OFF AND
  • MU1B, RC LETDOWN COOLER 2 INLET ISOLATION, using ISMU1B - Observe RED light ON, GREEN OFF until Annunciator 2-3-A LETDOWN TEMP HI clears AND TIMU8 is less than 125ºF and then release COMMENT: The critical part of this step is that all three valves can remain open after releasing their respective control switches CUE: None SAT UNSAT
4. PERFORMANCE STEP: Restore MU System to normal valve lineup

........C........

STANDARD: Push OPEN pushbutton on HIS MU10A, MIXED BED 1 LETDOWN INLET, using HISMU10A. Observe RED light ON. GREEN light off CUE: None SAT UNSAT

5. PERFORMANCE STEP: Restore MU System to normal valve lineup STANDARD: Contact EO to close MU 104, Purification Demin Bypass Valve CUE: MU 104 is closed (given by examiner - no action required)

SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the Examiner)

END TIME 6 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

7 of 7

Davis-Besse Initial License Exam 2015 Simulator JPM S3

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 AG Facility: Davis-Besse Task No: 005-012-04-0100 Task

Title:

Start Decay Heat Removal Pump 1 following a loss of DHR K/A

Reference:

(005) A2.04 2.9/2.9 Job Performance Measure No: S3 (NEW)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Place Decay Heat Pump 1 in service. Recognize DH14B, DH Cooler 1 Outlet valve failure and throttle downstream motor operated valve DH1B.

Required Materials:

DB-OP-02527, Rev. 18 Attachment 1 General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

Yes Validation Time:

20 minutes 1 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Start Decay Heat Pump 1, following a loss of running Decay Heat Pump 2 INITIAL CONDITION:

Mode 5 DH Loop 1 in STBY DH Mode per DB-OP-06012, DH and LPI Operating Procedure, Section 3.5 DH Pump 2 was in service per DB-OP-06012, DH and LPI Operating Procedure, Section 3.8 (DH Loop 2 STBY DH Mode Section 3.6 completed prior to placing in service)

DH11 and DH12 open with control power removed CC1467 closed CCW non-essential header is being supplied from CCW Loop 1 Decay Heat Pump 2 tripped ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Isolate CCW loads or throttle CC172, DH Cooler Outlet as required to maintain Loop 1 CCW flow less than 7800 gpm when CC1467 is opened per ATT 1 Step 6.3 Ensure Annunciator 3-2-H LP INJ 1 FLOW HI will come in when DH14B fails open, it has a variable setpoint (3750 gpm per DB-OP-06904)

Hang information tags indicating open on DH1517 and DH1518 MALFUNCTIONS/FAILURE TO INSERT:

When DH Pump 1 is started, DH Cooler 1 outlet valve, DH14B, will fail open 2 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 AG EXAMINER COPY INITIAL CONDITIONS:

Mode 5 Decay Heat Pump 2 breaker AD112 tripped due to a 50/51 Instantaneous Overcurrent INITIATING CUES:

The Command SRO directs you to perform Attachment 1, Starting Decay Heat Pump 1 of DB-OP-02527, Loss of Decay Heat Removal There were NO signs of cavitation on either DH Pump (Provide examinee a copy of DB-OP-02527 Attachment 1) 3 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 AG CANDIDATE COPY INITIAL CONDITIONS:

Mode 5, RCS Filled Decay Heat Pump 2 breaker AD112 tripped due to a 50/51 Instantaneous Overcurrent INITIATING CUES:

The Command SRO directs you to perform Attachment 1, Starting Decay Heat Pump 1 of DB-OP-02527, Loss of Decay Heat Removal There were NO signs of cavitation on either DH Pump 4 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Verify closed DH14B, DH CLR 1 OUTLET STANDARD: Press AUTO for DH14B using HIS DH14B. Rotate knob to Close DH14B using HIC DH14B. Observe GREEN light ON, RED light OFF COMMENT: DH14B will already be closed per standby lineup CUE: If asked, Instrument Air is in a normal lineup SAT UNSAT
2. PERFORMANCE STEP: Verify closed DH13B DH CLR 1 BYPASS STANDARD: Press AUTO for DH13B using HIS DH13B. Rotate knob to Close DH13B using HIC DH13B. Observe GREEN light ON, RED light OFF COMMENT: DH13B will already be closed per standby lineup CUE: None SAT UNSAT NOTE: Decision step here to vent pump based on cavitation. The initial cue states no evidence of cavitation on either pump so venting should be marked N/A
3. PERFORMANCE STEP: Verify DH1517 is open STANDARD: Verify DH1517 DH PUMP 1 SUCTION, is open using HIS 1517 per Operations Information Tag providing valve position CUE: None SAT UNSAT
4. PERFORMANCE STEP: Verify DH Drop Line valves are open using HIS DH11 And HIS DH12 STANDARD: Verify DH Drop Line valves are open using HIS DH11 And HIS DH12 CUE: None SAT UNSAT 5 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 AG

5. PERFORMANCE STEP: Verify Decay Heat Train 1 CCW/SW cooling is available

........C........

STANDARD: Observes CCW Pump 1 in service. Amps indicated. RED light ON Open CC1467 using HIS1467. RED light ON, GREEN light OFF Observes SWP 1 in service. Amps indicated. RED light ON COMMENT: Opening CC1467 is the only Critical portion of this step CUE: If asked, CC172 has been throttled to maintain CCW flow <7800 gpm If asked, DH Pump 1 will NOT be placed on DH/LPI Injection line 2 SAT UNSAT

6. PERFORMANCE STEP: Verify DH1B is open STANDARD: Observes HIS DH1B RED light ON, GREEN light OFF CUE: None SAT UNSAT NOTE:

Alternate Path Starts here. When Decay Heat Pump 1 is started, DH14B will fail open.

Annunciator 3-2-H LP INJ 1 FLOW HI will alarm. Alarm procedure DB-OP-02003 will be referred to and will direct throttling of DH1B to 3000 gpm.

7. PERFORMANCE STEP: Start Decay Heat Pump 1

........C........

STANDARD: Rotate HIS DH6B to start. Observe Decay Heat Pump 1 amps increase.

Observe RED light ON, GREEN light OFF. Release HIS DH6B.

CUE: None SAT UNSAT 6 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 AG

8. PERFORMANCE STEP: Respond to Annunciator 3-2-H, LP INJ 1 FLOW HI STANDARD: Refer to DB-OP-02003, Annunciator 3-2-H LP INJ 1 FLOW HI Recognize DH14B has failed open COMMENT: Annunciator 3-1-H LP INJ 1 FLOW LO should have been expected.

CUE: If asked, EO reports DH14B can NOT be operated manually, indicates full open locally, no other issues noted SAT UNSAT

9. PERFORMANCE STEP: Throttle flow with DH1B

........C........

STANDARD: Press HISDH1B-2 ON to turn on DH1B control power.

Press close to throttle DH1B using HIS DH1B to stabilize RCS Temperature and monitor pump parameters COMMENT: May initially throttle to 3000 GPM IAW Alarm procedure (DB-PF-06703 curves CC6.2 and CC6.4 not applicable)

CUE: If asked for desired flow rate, ask for recommendation SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME 7 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

8 of 8

Davis-Besse Initial License Exam 2015 Simulator JPM S4

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 AG Facility: Davis-Besse Task No: 039-011-04-0100 Task

Title:

Actions for a Steam Leak on the Gland Steam Header K/A

Reference:

(055) 051 AA2.02 3.9/4.1 Job Performance Measure No: S4 (JPM 020)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues Task Standard:

Isolate steam leak in the Gland Steam Header and Initiate and Isolate SFRCS Required Materials:

DB-OP-02525, Steam Leaks, Attachment 4 Step 9.0 General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

Yes Validation Time:

5 Minutes 1 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Perform actions for a steam leak on the Gland Steam Header INITIAL CONDITION:

Place the simulator in a Mode 3 configuration with RCS pressure at 2155 psig and RCS temperature at 532 °F with Control Rod Safety groups 1-4 withdrawn ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

None MALFUNCTIONS/FAILURE TO INSERT:

1. On Simulator page HP & LP TURBINE DRAINS & SEAL SYSTEM - TD1 fail open GS 1932 and GS 1931 to simulate a steam leak on GS.
2. Place simulator in run for 5 seconds then freeze the simulation until Examinee and Examiner are ready to start JPM
3. Take simulator to run after Examiner has read the initiating cue.

2 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 AG EXAMINER COPY INITIAL CONDITIONS:

Plant is in Mode 3 with a plant startup in progress The Reactor Coolant System is at normal operating pressure and temperature.

All systems are in a normal lineup.

INITIATING CUES:

An Equipment Operator reports a steam leak on the Gland Steam Header.

The Unit Supervisor directs you to perform step 9.0 of Attachment 4 of DB-OP-02525, Steam Leaks.

(Provide the examinee a copy of Step 9.0 of DB-OP-02525, Attachment 4) 3 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 AG CANDIDATE COPY INITIAL CONDITIONS:

Plant is in Mode 3 with a plant startup in progress The Reactor Coolant System is at normal operating pressure and temperature.

All systems are in a normal lineup.

INITIATING CUES:

An Equipment Operator reports a steam leak on the Gland Steam Header.

The Unit Supervisor directs you to perform step 9.0 of Attachment 4 of DB-OP-02525, Steam Leaks.

4 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Verify GS 2384, Main Steam System Isolation is closed STANDARD: Check GREEN light ON, RED light OFF on HIS 2384 CUE: None.

SAT UNSAT

2. PERFORMANCE STEP: Close GS 2380, Aux Steam Isolation C

STANDARD: Depress CLOSE on HIS 2380. GREEN light ON, RED light OFF.

CUE: None.

SAT UNSAT

3. PERFORMANCE STEP: Verify GS 2385, Steam Supply Bypass Valve is closed STANDARD: Check GREEN light ON, RED light OFF on HIS 2385 CUE: None.

SAT UNSAT

4. PERFORMANCE STEP: Check for steam leak isolation STANDARD: Contact Equipment Operator CUE: Leak has been isolated SAT UNSAT
5. PERFORMANCE STEP: Identify that Turbine Sealing Steam is lost STANDARD: Check 0 psig on PI 2340, Gland Steam Header Pressure and rising condenser pressure PR530 and PR541 CUE: None.

SAT UNSAT 5 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 AG

6. PERFORMANCE STEP: Trip the reactor STANDARD: Press either Reactor Trip pushbutton; Rods insert and power decreasing CUE: None.

SAT UNSAT

7. PERFORMANCE STEP: Initiate & Isolate SFRCS C

STANDARD: Press both SFRCS Initiate & Isolate pushbuttons.

CUE: None.

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME 6 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

7 of 7

Davis-Besse Initial License Exam 2015 Simulator JPM S5

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 5 AG Facility: Davis-Besse Task No: 026-002-05-0100 Task

Title:

Initiate Containment Spray K/A

Reference:

(026) A2.03 4.1/4.4 Job Performance Measure No: S5 (NEW)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Start both Containment Spray Pumps and open their respective discharge valves Stop CTMT Spray pump and close its discharge valve when leak develops Required Materials:

DB-OP-06013 Section 5.2 and 5.3 General

References:

Db-OP-02000 Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

Yes Validation Time:

15 Minutes 1 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 5 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Start both Containment Spray Pumps and open their respective discharge valves INITIAL CONDITION:

A LOCA has occurred. Containment pressure has exceeded the SFAS Level 4 setpoint and containment spray pumps have not started.

ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Insert malfunction that inhibits start of both containment spray pumps and opening of CS discharge valves. Both containment spray pump discharge valves, (CS1530 and CS1531) are closed.

MALFUNCTIONS/FAILURE TO INSERT:

Insert pipe rupture in Train 2 Containment Spray Header when Containment Spray Pump 2 is started 2 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 5 AG EXAMINER COPY INITIAL CONDITIONS:

A LOCA has occurred. Containment pressure has exceeded the SFAS Level 4 setpoint and containment spray pumps have not started INITIATING CUES:

The Unit Supervisor has directed you to manually start Containment Spray pumps 1 and 2 and spray containment in accordance with DB-OP-06013, Section 5.2 and 5.3 (Provide examinee a copy of DB-OP-06013, Section 5.2 and 5.3) 3 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 5 AG CANDIDATE COPY INITIAL CONDITIONS:

A LOCA has occurred. Containment pressure has exceeded the SFAS Level 4 setpoint and containment spray pumps have not started INITIATING CUES:

The Unit Supervisor has directed you to manually start Containment Spray pumps 1 and 2 and spray containment in accordance with DB-OP-06013, Section 5.2 and 5.3 4 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 5 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

Note: Spray pumps can be started in either sequence. If CTMT Spray Pump 2 is selected to be started first, go to step 5 and return following step 13.

1. PERFORMANCE STEP: Verify DH7B, BWST ISOLATION VALVE, is OPEN STANDARD: Observes DH7B RED light ON, GREEN light OFF CUE: None SAT UNSAT
2. PERFORMANCE STEP: OPEN CS1530, CTMT SPRAY DISCH

........C........

STANDARD: Presses OPEN on HIS 1530. Observes RED light ON, GREEN light OFF CUE: None SAT UNSAT

3. PERFORMANCE STEP: Start CTMT SPRAY PUMP 1

........C........

STANDARD: Rotates HIS 1533 to Start and releases. Observes amp increase, RED light ON and GREEN light OFF.

CUE: None SAT UNSAT

4. PERFORMANCE STEP: Verify flow indicated on FI1547, CS PUMP 1 DISCH FLOW STANDARD: Observe flow indication between 1100 GPM and 1900 GPM. Acknowledge Alarms 3-1-J, CS PMP 1 DISCH FLOW LO, and 3-3-J CS PMP 1 DISCH FLOW HI.

Observe alarm annunciators extinguish.

CUE: None SAT UNSAT Note: If CTMT Spray Pump 2 was started first. JPM is complete.

5 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 5 AG

5. PERFORMANCE STEP: Verify DH7A, BWST ISOLATION VALVE, is OPEN STANDARD: At SFAS panel verifies that DH7A GREEN light OFF and RED light ON CUE: None SAT UNSAT
6. PERFORMANCE STEP: OPEN CS1531, CTMT SPRAY DISCH

........C........

STANDARD: Presses OPEN on HIS 1531. Observes RED light ON, GREEN light OFF CUE: None SAT UNSAT

7. PERFORMANCE STEP: Start CTMT SPRAY PUMP 2

........C........

STANDARD: Rotates HIS 1532 to Start and releases. Observes amp increase, RED light ON and GREEN light OFF CUE: None SAT UNSAT

8. PERFORMANCE STEP: Verify flow indicated on FI1535, CS PUMP 2 DISCH FLOW STANDARD: Observe flow above 1900 GPM. Acknowledge Alarms 3-2-J, CS PMP 2 DISCH FLOW LO, and 3-4-J CS PMP 2 DISCH FLOW HI. Observe alarm 3-2-J extinguishes and 3-4-J CS PMP 2 DISCH FLOW HI remains in alarm (light ON).

CUE: None SAT UNSAT NOTE:

Alternate Path Starts here. When the CTMT Spray Pump 2 is started a leak will develop in Train 2 CTMT Spray Header. Alarm 3-4-J will sound and Alarm Panel 3 Procedure DB-OP-02003 will direct stopping CTMT Spray Pump 2 and closing CS1531.

9. PERFORMANCE STEP: Respond to Alarm 3-4-J, CS PMP 2 DISCH FLOW HI STANDARD: Locate Alarm Panel 3 Procedure DB-OP-02003 for alarm 3-4-J CUE: None SAT UNSAT 6 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 5 AG

10. PERFORMANCE STEP: Check for flow rate high at FI 1535 located on Panel C5716 STANDARD: Observe flow above 1900 GPM alarm setpoint CUE: None SAT UNSAT
11. PERFORMANCE STEP: Check the Containment Spray Header 2 outside Containment for a piping break or leak STANDARD: Contact Equipment Operator to look for leaks CUE: Equipment Operator reports water is spraying from the CTMT Spray line just upstream of CS 1531, CTMT Spray Discharge Valve.

SAT UNSAT

12. PERFORMANCE STEP: Stop CTMT Spray Pump 2

........C........

STANDARD: Turn HIS 1532 to Stop and release. Observe amps decrease with GREEN light ON and RED light OFF COMMENT: May press block push button but SFAS is failed for this pump CUE: None SAT UNSAT

13. PERFORMANCE STEP: Close CS 1530, CTMT Spray Discharge Valve

........C........

STANDARD: Press Close on HIS 1530. Observe GREEN light ON and RED light OFF COMMENT: May press block push button but SFAS is failed for this pump CUE: None SAT UNSAT NOTE: If CTMT Spray Pump 2 was started first, return to step 1 for placing CTMT Spray Pump 1 in service.

TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME 7 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 5 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

8 of 8

Davis-Besse Initial License Exam 2015 Simulator JPM S6

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 AG Facility: Davis-Besse Task No: 062-005-01-0100 Task

Title:

Transfer Essential 4160 Kv Bus C1 only to Alternate K/A

Reference:

(062) A4.01 3.3/3.1 Job Performance Measure No: S6 (JPM 084)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Transfer C1 bus only to Alternate Required Materials:

DB-OP-06315 Sections 3.27 with prerequisites completed General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

9 Minutes 1 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Transfer C1 only to Alternate (BD Transformer)

INITIAL CONDITION:

Mode 1 Normal system lineup ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

None MALFUNCTIONS/FAILURE TO INSERT:

None 2 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 AG EXAMINER COPY INITIAL CONDITIONS:

The Plant is in Mode 1 All systems are in a normal lineup INITIATING CUES:

The Unit Supervisor directs you to perform a live transfer of Bus C1 ONLY from the normal to the alternate power supply, using Section 3.27 of DB-OP-06315, 4160 V Switching Procedure.

(Provide examinee Section 3.27 of DB-OP-06315, 4160 V Switching Procedure with prerequisites completed) 3 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 AG CANDIDATE COPY INITIAL CONDITIONS:

The Plant is in Mode 1 All systems are in a normal lineup INITIATING CUES:

The Unit Supervisor directs you to perform a live transfer of Bus C1 ONLY from the normal to the alternate power supply, using Section 3.27 of DB-OP-06315, 4160 V Switching Procedure.

4 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Notifies Shift Manager to refer to Tech Specs STANDARD: Notifies Shift Manager to refer to Tech Specs CUE: The Shift Manager is referring to Tech Specs SAT UNSAT
2. PERFORMANCE STEP: Close ABDC1, BUS TIE XFMR BD and hold

........C........

STANDARD: Positions HIS 6220, ABDC1 to CLOSE and holds in the close position.

Observes breaker ABDC1 RED light ON, GREEN light OFF CUE: None SAT UNSAT

3. PERFORMANCE STEP: Open AC110, BUS TIE FROM C2 BUS

........C........

STANDARD: Positions HIS 6223, AC 110 to OFF and releases. Observes GREEN light ON, RED light OFF CUE: None SAT UNSAT

4. PERFORMANCE STEP: Release HIS 6220, ABDC1 STANDARD: Release HIS 6220 CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME 5 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

6 of 6

Davis-Besse Initial License Exam 2015 Simulator JPM S7

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 AG Facility: Davis-Besse Task No: 016-001-01-0100 Task

Title:

Exchange RC flow Inputs to RPS Channel 2 K/A

Reference:

(016) A4.01 2.9/2.8 Job Performance Measure No: S7 (JPM 048)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Transfer RC Flow Inputs for the Computer and NNI from RPS Channel 1 to RPS Channel 2 Required Materials:

DB-OP-06403, Reactor Protection System (RPS) and Nuclear Instrumentation System (NI)

Operating Procedure, Section 4.3 DB-OP-06407, Non-Nuclear Instrumentation System Operating Procedure, Section 4.2 General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

20 Minutes 1 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Exchange RC Flow Inputs to the Computer and NNI from RPS channel 1 to RPS Channel 2 INITIAL CONDITION:

4 RCPs in operation ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

NNI Flow Inputs selected to RPS Channel 1 MALFUNCTIONS/FAILURE TO INSERT:

None 2 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 AG EXAMINER COPY INITIAL CONDITIONS:

Maintenance is planned for RPS Channel 1 RCS flow instrumentation The RC Flow inputs are selected from RPS Channel 1 INITIATING CUES:

The Unit Supervisor directs you to exchange RC flow inputs (Computer and NNI) to RPS Channel 2 in accordance with section 4.3 of DB-OP-06403, RPS and NI Operating Procedure (Provide the examinee a copy of section 4.3 of DB-OP-06403) 3 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 AG CANDIDATE COPY INITIAL CONDITIONS:

Maintenance is planned for RPS Channel 1 RCS flow instrumentation The RC Flow inputs are selected from RPS Channel 1 INITIATING CUES:

The Unit Supervisor directs you to exchange RC flow inputs (Computer and NNI) to RPS Channel 2 in accordance with section 4.3 of DB-OP-06403, RPS and NI Operating Procedure 4 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Locate correct procedure step STANDARD: Mark step 4.3.1 N/A. Begin with step 4.3.2 in DB-OP-06403 CUE: None SAT UNSAT
2. PERFORMANCE STEP: Remove cap on Selection Panel for the alternate RC flow p

........C........ COMPUTER receptacle STANDARD: Locate the selection panel in RPS Channel 2 and rotate the cap counterclockwise to remove the cap CUE: None SAT UNSAT

3. PERFORMANCE STEP: Disconnect the amphenol connector from RC flow p computer

........C........ Sub-assembly and reconnect to alternate RC flow p receptacle STANDARD: Unscrew the amphenol connector from RPS Channel 1 input and screw in to RPS Channel 2 RC flow p input CUE: None SAT UNSAT

4. PERFORMANCE STEP: Cap the open receptacle STANDARD: Replace cap on the open receptacle CUE: None SAT UNSAT
5. PERFORMANCE STEP: Administratively document the amphenol exchange in Unit Log STANDARD: Document RPS Channel 2 supplying NNI in the procedure and inform Control Room to enter in Unit Log CUE: Another Operator will make the entry in the Unit Log 5 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 AG SAT UNSAT

6. PERFORMANCE STEP: Remove the Tave SASS Instrument string from automatic STANDARD: Refer to section 4.2 of DB-OP-06407, Non-Nuclear Instrumentation System Operating Procedure CUE: Provide the examinee a copy of section 4.2 of DB-OP-06407 SAT UNSAT
7. PERFORMANCE STEP: Select the instrument string to be tested

........C........

STANDARD: Take the test selector switch for Loop 2 Tave and Loop 1 Tave to the "A" or "B" position AND hold CUE: There is no suspected problem with the instrument string SAT UNSAT

8. PERFORMANCE STEP: Release the test selector switch

........C........

STANDARD: Test selector switch released after the Yellow MISMCH light is LIT CUE: None SAT UNSAT

9. PERFORMANCE STEP: Verify green AUTO light is OFF for instrument pair in test STANDARD: Check that the Green AUTO light is OFF CUE: None SAT UNSAT
10. PERFORMANCE STEP: Remove the cap on the Selection Panel for the alternate RC

........C........ flow p NNI receptacle STANDARD: Rotate the cap counterclockwise to remove the cap CUE: None SAT UNSAT 6 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 AG

11. PERFORMANCE STEP: Disconnect amphenol receptacle for RC flow and reconnect

........C........ to alternate RC flow NNI p receptacle STANDARD: Unscrew amphenol connector from RPS Channel 1 input and screw in to RPS Channel 2 RC flow p NNI CUE: None SAT UNSAT

12. PERFORMANCE STEP: Cap the open receptacle STANDARD: Replace cap on the open receptacle CUE: None SAT UNSAT
13. PERFORMANCE STEP: Administratively document the amphenol exchange in Unit Log STANDARD: Document RPS Channel 2 supplying NNI in the procedure and inform Control Room to enter in Unit Log CUE: Another Operator will make the entry in the Unit Log SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME 7 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

8 of 8

Davis-Besse Initial License Exam 2015 Simulator JPM S8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 AG Facility: Davis-Besse Task No: 029-003-01-0100 Task

Title:

Purge Containment in Mode 5 K/A

Reference:

(016) A2.03 2.7/3.1 Job Performance Measure No: S8 (JPM 162)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Place Containment Purge in service on Containment Required Materials:

DB-OP-06503, Containment Purge System (entire procedure), with Section 3.1 prerequisites completed General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

12 Minutes 1 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Place Containment Purge in service on Containment INITIAL CONDITION:

Mode 5 ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Turn off CTMT Purge Supply and Exhaust Fans Close dampers CV 5004, 5016, 5009 and 5021 Install fuses in SFAS cabinets Verify dampers CV 5005, 5006, 5007, and 5008 are closed MALFUNCTIONS/FAILURE TO INSERT:

None ACTION/CUES:

None 2 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 AG EXAMINER COPY INITIAL CONDITIONS:

The plant is in Mode 5.

INITIATING CUES:

The Unit Supervisor directs you to start a purge of the Containment Vessel in accordance with section 3.1 of DB-OP-06503, Containment Purge System Procedure.

The Incore Instrument Tank will NOT be purged.

(Provide the examinee a copy of DB-OP-06503, prerequisites completed) 3 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 AG CANDIDATE COPY INITIAL CONDITIONS:

The plant is in Mode 5.

INITIATING CUES:

The Unit Supervisor directs you to start a purge of the Containment Vessel in accordance with section 3.1 of DB-OP-06503, Containment Purge System Procedure.

The Incore Instrument Tank will NOT be purged.

4 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Make a plant announcement.

STANDARD: Use the GAITRONICS to announce "Attention all station personnel, starting the containment vessel purge".

CUE: None SAT UNSAT

2. PERFORMANCE STEP: Open the purge CTMT isolation valve CV5008.

........C........

STANDARD: Press the OPEN pushbutton on HIS 5008. RED light ON, GREEN light OFF COMMENT: Sequence NOT required.

CUE: None SAT UNSAT

3. PERFORMANCE STEP: Open the purge CTMT isolation valve, CV5006.

........C........

STANDARD: Press the OPEN pushbutton on HIS 5006. RED light ON, GREEN light OFF COMMENT: Sequence NOT required.

CUE: None SAT UNSAT

4. PERFORMANCE STEP: Open the purge CTMT isolation valve, CV5005.

........C........

STANDARD: Press the OPEN pushbutton on HIS 5005. RED light ON, GREEN light OFF COMMENT: Sequence NOT required.

CUE: None SAT UNSAT 5 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 AG

5. PERFORMANCE STEP: Open the purge CTMT isolation valve, CV5007.

........C........

STANDARD: Press the OPEN pushbutton on HIS 5007. RED light ON, GREEN light OFF COMMENT: Sequence NOT required.

CUE: None SAT UNSAT

6. PERFORMANCE STEP: Start CTMT purge exhaust fan.

........C........

STANDARD: Turn handswitch HIS 5013, to START.

CUE: None SAT UNSAT

7. PERFORMANCE STEP: Verify CTMT Purge Exhaust fan starts.

STANDARD: Verifies HIS 5013 RED light ON, GREEN light OFF.

COMMENT: The fan will start in approximately 120 seconds.

CUE: None.

SAT UNSAT

8. PERFORMANCE STEP: Start the CTMT purge supply fan.

........C........

STANDARD: Within 20 seconds after the exhaust fan is running, turn hand switch HIS 5003 to START.

CUE: None SAT UNSAT

9. PERFORMANCE STEP: Verify CTMT Purge Supply fan starts.

STANDARD: HIS 5003 RED light ON, GREEN light OFF.

CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner) 6 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 AG END TIME Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

7 of 9

Davis-Besse Initial License Exam 2015 In Plant JPM P1

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 1 AG Facility: Davis-Besse Task No: 001-011-05-0100 Task

Title:

Perform Attachment 5 of Control Room Evacuation per DB-OP-02508 K/A

Reference:

(004) AA1.06 4.1/4.2 Job Performance Measure No: P1 (JPM 006)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance _X_ Actual Performance ___

Classroom ___ Simulator ___ Plant _X_

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Isolate Letdown, start the Standby Makeup Pump and transfer both Makeup Pump suctions to the BWST from outside the Control Room Required Materials:

DB-OP-02508, Control Room Evacuation, Attachment 5 General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

15 Minutes 1 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 1 AG EXAMINER COPY INITIAL CONDITIONS:

A hazardous condition has forced the evacuation of the Control Room There is NO fire in the Control Room area ONLY the Immediate Actions of Trip the Reactor and Initiate and Isolate SFRCS were performed prior to evacuation Makeup Pump 1 is running INITIATING CUES:

The Unit Supervisor directs you to perform Attachment 5 of DB-OP-02508, Control Room Evacuation You have an emergency key ring The Zone 3 Operator has been provided Attachment 6 and Attachment 7 for controlling the Atmospheric Vent Valves (Provide the examinee a copy of Attachment 5 of DB-OP-02508) 2 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 1 AG CANDIDATE COPY INITIAL CONDITIONS:

A hazardous condition has forced the evacuation of the Control Room There is NO fire in the Control Room area ONLY the Immediate Actions of Trip the Reactor and Initiate and Isolate SFRCS were performed prior to evacuation Makeup Pump 1 is running INITIATING CUES:

The Unit Supervisor directs you to perform Attachment 5 of DB-OP-02508, Control Room Evacuation You have an emergency key ring The Zone 3 Operator has been provided Attachment 6 and Attachment 7 for controlling the Atmospheric Vent Valves 3 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 1 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Dispatch the Zone 3 operator to establish local manual control of the AVVs STANDARD: Sign off step per initial conditions CUE: None SAT UNSAT
2. PERFORMANCE STEP: Isolate Letdown

........C........

STANDARD: Close MU 2B, REACTOR COOLANT LETDOWN COOLER INLET ISOLATION, using the local switch on Breaker BE 1172 on MCC E11B.

Observe Green light ON Red light OFF CUE: Local switch (on BE 1172) has been placed in CLOSE. Green light goes ON Red light goes OFF SAT UNSAT

3. PERFORMANCE STEP: Start the standby Makeup Pump

........C........

STANDARD: Press local START Button on NP0372B for Makeup Pump 2 Main Oil Pump (AC). Observe Green light OFF Red light ON CUE: Local START button (on NP0372B) for Makeup Pump 2 Main Oil Pump has been pressed. Green light goes OFF, Red light goes ON SAT UNSAT 4 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 1 AG

4. PERFORMANCE STEP: Start the standby Makeup Pump STANDARD: Check Main Oil Pump discharge pressure >15 psig on PI MU106A CUE: PI MU106A reads 23 psig SAT UNSAT
5. PERFORMANCE STEP: Start the standby Makeup Pump STANDARD: Check MU Pump 2 Aux. Gear LO pump started at NP0372D. Observe Red light is LIT on NP0372D CUE: Red light is LIT on NP0372D SAT UNSAT
6. PERFORMANCE STEP: Start the standby Makeup Pump

........C........

STANDARD: CLOSE/START pressed on NP0372A to START Makeup Pump 2. Observe Green light goes OFF, Red light goes ON CUE: CLOSE/START has been pressed on NP0372A.

Green light goes OFF, Red light goes ON SAT UNSAT

7. PERFORMANCE STEP: Align makeup pumps suction to the BWST

........C........

STANDARD: NV 3971 switch placed in BWST position. Observe Bottom Red light goes OFF, Top Red light goes ON CUE: Switch NV 3971 has been placed in BWST position Bottom Red light goes OFF, Top Red light goes ON SAT UNSAT

8. PERFORMANCE STEP: Align makeup pumps suction to the BWST

........C........

STANDARD: NV 6405 switch placed in the BWST position. Observe Bottom Red light goes OFF, Top Red light goes ON CUE: Switch NV 6405 has been placed in the BWST position Bottom Red light goes OFF, Top Red light goes ON SAT UNSAT 5 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 1 AG

9. PERFORMANCE STEP: Proceed to the Radwaste Panel and establish communications with the Unit Supervisor STANDARD: Communications established with the Unit Supervisor from the Radwaste Panel CUE: Communications have been established SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME 6 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 1 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

7 of 7

Davis-Besse Initial License Exam 2015 In Plant JPM P2

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 2 AG Facility: Davis-Besse Task No: 062-094-01-0401 Task

Title:

Restore EDG to supply 4160 Essential Bus per DB-OP-02538 K/A

Reference:

(064) AA1.03 3.1/3.3 Job Performance Measure No: P2 (JPM 079)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance _X_ Actual Performance ___

Classroom ___ Simulator ___ Plant _X_

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Restore power to D1 from EDG 2 Required Materials:

DB-OP-02538, Loss of D2P and DBP, Attachment 6 Picture of top and bottom inside cubicle 13 D1 bus General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

22 Minutes 1 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 2 AG EXAMINER COPY INITIAL CONDITIONS:

The plant has experienced a loss of all AC Power and a loss of essential DC Panel D2P Bus D1 is de-energized Emergency Diesel Generator 2 is not running INITIATING CUES:

The Unit Supervisor directs you to restore Emergency Diesel Generator 2 to supply Bus D1 in accordance with Attachment 6: RESTORE POWER TO D1 BUS FROM EDG 2 of DB-OP-02538, Loss of D2P and DBP (Provide a copy of DB-OP-02538 Attachment 6) 2 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 2 AG CANDIDATE COPY INITIAL CONDITIONS:

The plant has experienced a loss of all AC Power and a loss of essential DC Panel D2P Bus D1 is de-energized Emergency Diesel Generator 2 is not running INITIATING CUES:

The Unit Supervisor directs you to restore Emergency Diesel Generator 2 to supply Bus D1 in accordance with Attachment 6: RESTORE POWER TO D1 BUS FROM EDG 2 of DB-OP-02538, Loss of D2P and DBP 3 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Open D2P07

........C........

STANDARD: Place breaker D2P07 in the OFF position. Turn the key to extend the plunger and remove the key CUE: D2P07 is in OFF.

Key has been turned and removed, the plunger is extended SAT UNSAT

2. PERFORMANCE STEP: Open D2P05

........C........

STANDARD: Place breaker D2P05 in the OFF position. Turn the key to extend the plunger and remove the key CUE: D2P05 is in OFF.

Key has been turned and removed, the plunger is extended SAT UNSAT

3. PERFORMANCE STEP: Open D2P09

........C........

STANDARD: Place breaker D2P09 in the OFF position. Turn the key to extend the plunger and remove the key CUE: D2P09 is in OFF.

Key has been turned and removed, the plunger is extended SAT UNSAT 4 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 2 AG

4. PERFORMANCE STEP: Close D2N07

........C........

STANDARD: Insert the key and turn to retract the plunger.

Place breaker D2N07 in the ON position.

CUE: Key is inserted and turned, plunger is retracted D2N07 has been placed in ON SAT UNSAT

5. PERFORMANCE STEP: Close D2N05

........C........

STANDARD: Insert the key and turn to retract the plunger.

Place breaker D2N05 in the ON position.

CUE: Key is inserted and turned, plunger is retracted D2N05 has been placed in ON SAT UNSAT

6. PERFORMANCE STEP: Close D2N09

........C........

STANDARD: Insert the key and turn to retract the plunger.

Place breaker D2N09 in the ON position.

CUE: Key is inserted and turned, plunger is retracted D2N09 has been placed in ON SAT UNSAT

7. PERFORMANCE STEP: Verify the DC control power source disconnect switches on busses DBP and DBN are closed

........C........

STANDARD: Verify the DC breakers are in the ON position COMMENT:

  • DBP07 is in the ON position is the ONLY critical step CUE: DBN02 is in the ON position DBN04 is in the ON position DBP02 is in the ON position DBP04 is in the ON position
  • DBP07 is in the ON position DBP11 is in the ON position SAT UNSAT 5 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 2 AG

8. PERFORMANCE STEP: Transfer D1 control power to alternate

........C........

STANDARD: Place knife switch in Cubicle 13 of D1 bus to ALTERNATE position CUE: Provide picture of top and bottom of inside of cubicle (door cannot be opened when bus is energized unless breaker is in the racked out position due to Arc Flash concerns). If wrong cubicle is selected you see fuse blocks and terminal strips in the top of the cubicle.

Knife switch is placed in ALTERNATE SAT UNSAT

9. PERFORMANCE STEP: Verify D1 load breakers are tripped STANDARD: Check the following breakers OPEN using indicating lights, mechanical indicators or communicate with the control room (GREEN light is LIT/position indicator at OPEN):

AD 112, LPI/DH Pump 2 (HIS DH 6A)

AD 111, HPI Pump 2 (HIS 1523)

AD 110, Bus D1 Normal Feed (HIS 6233)

AD 107, SW Pump 2 (HIS 1371) OR AD 109, SW Pump 3 as 2 (HIS 1372B)

AD 105, Makeup Pump 2 (HIS MU24B)

AACD1, XFRMR XBD to BUS D1 (HIS 6230)

CUE:

AD112, GREEN light is LIT/position indicator at OPEN OR HIS DH6A GREEN light is LIT.

AD111, GREEN light is LIT/position indicator at OPEN OR HIS 1523 GREEN light is LIT.

AD110, GREEN light is LIT/position indicator at OPEN OR HIS 6233 GREEN light is LIT AD107 (AD109) GREEN light is LIT/position indicator at OPEN OR HIS 1371(1372B) GREEN light is LIT.

AD109, NO lights lit/breaker racked OUT OR HIS NO lights lit AD105, GREEN light is LIT/position indicator at OPEN OR HIS MU24B GREEN light is LIT.

AACD1, GREEN light is LIT/position indicator at OPEN OR HIS 6230 GREEN light is LIT.

SAT UNSAT 6 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 2 AG

10. PERFORMANCE STEP: Open CB1

........C........

STANDARD: Breaker CB1 is placed in OFF in Panel C3616 CUE: Breaker CB1 is in OFF SAT UNSAT

11. PERFORMANCE STEP: Close CB2

........C........

STANDARD: Breaker CB2 is placed in ON in Panel C3616. Expects EDG 2 start.

CUE: CB2 is in ON. Emergency Diesel Generator 2 has started SAT UNSAT

12. PERFORMANCE STEP: Verify Emergency Diesel Generator 2 starts and loads D1 Bus STANDARD: Check indications of Emergency Diesel Generator 2 start.

Breaker AD101 Red light ON Speed at SI 6232A is 900 RPM Voltage at DG 2 VOLTS (P1-1076) is 4160 VAC KW load indicated on KW meter CUE: EDG 2 has started and loading is in progress SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME 7 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 2 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

8 of 8

Davis-Besse Initial License Exam 2015 In Plant JPM P3

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 3 AG Facility: Davis-Besse Task No: 078-010-04-0400 Task

Title:

Bypass and Isolate the In Service Air Dryers per DB-OP-02528, IA Malfunctions K/A

Reference:

(078) AA2.03 2.6/2.9 Job Performance Measure No: P3 (078)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance _X_ Actual Performance ___

Classroom ___ Simulator ___ Plant _X_

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Bypass and Isolate the In Service Instrument Air Dryers Required Materials:

DB-OP-02528, Instrument Air System Malfunctions, Step 4.2.2 and Attachment 20 General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

10 Minutes 1 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 3 AG EXAMINER COPY INITIAL CONDITIONS:

The plant is operating at 100% power Both sets of Instrument Air Dryers are in service due to high air usage INITIATING CUES:

The Control Room announces Instrument Air pressure is lowering The Unit Supervisor directs you to perform Attachment 20 of DB-OP-02528 to bypass and isolate the in service air dryers (Provide examinee a copy of Attachment 20 from DB-OP-02528, Instrument Air System Malfunctions) 2 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 3 AG CANDIDATE COPY INITIAL CONDITIONS:

The plant is operating at 100% power Both sets of Instrument Air Dryers are in service due to high air usage INITIATING CUES:

The Control Room announces Instrument Air pressure is lowering The Unit Supervisor directs you to perform Attachment 20 per step 4.2.2 of DB-OP-02528 to bypass and isolate the in service air dryers 3 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 3 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Bypass Instrument Air Dryers 3 & 4

........C........

STANDARD: Open IA 411, IA Dryers 3 & 4 Bypass to Receiver, by rotating handle parallel to pipe CUE: Handle for IA 411 has been placed parallel to pipe SAT UNSAT

2. PERFORMANCE STEP: Isolate Instrument Air Dryers 3 & 4

........C........

STANDARD: Close IA 419, IA Dryers 3 & 4 Inlet Isolation by rotating handle perpendicular to pipe CUE: Handle for IA 419 has been placed perpendicular to pipe SAT UNSAT

3. PERFORMANCE STEP: Isolate Instrument Air Dryers 3 & 4

........C........

STANDARD: Close IA 413, IA Dryers 3 & 4 Outlet Isolation by rotating handle perpendicular to pipe CUE: Handle for IA 413 has been placed perpendicular to pipe SAT UNSAT

4. PERFORMANCE STEP: De-energize Instrument Air Dryers 3 & 4 STANDARD: Place HIS 5941, Dryers 3 & 4 On/Off Switch in OFF. Observe GREEN light ON and RED light OFF CUE: HIS 5941 is in OFF. GREEN light is ON and RED light is OFF SAT UNSAT 4 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 3 AG

5. PERFORMANCE STEP: Bypass Instrument Air Dryers 1 & 2

........C........

STANDARD: Open IA 289, IA Dryers 1 & 2 Bypass to Receiver, by rotating handle parallel to pipe CUE: Handle for IA 289 has been placed parallel to pipe SAT UNSAT

6. PERFORMANCE STEP: Isolate Instrument Air Dryers 1 & 2

........C........

STANDARD: Close IA 24, IA Dryers 1 & 2 Inlet Isolation, by rotating handle perpendicular to pipe CUE: Handle for IA 24 has been placed perpendicular to pipe SAT UNSAT

7. PERFORMANCE STEP: Isolate Instrument Air Dryers 1 & 2

........C........

STANDARD: Close IA 31, IA Dryers 1 & 2 Outlet Isolation, by rotating handle perpendicular to pipe CUE: Handle for IA 31 has been placed perpendicular to pipe SAT UNSAT

8. PERFORMANCE STEP: De-energize Instrument Air Dryers 1 & 2 STANDARD: Place HIS 5940, Dryers 1 & 2 On/Off Switch in OFF. Observe GREEN light ON and RED light OFF CUE: HIS 5940 is in OFF. GREEN light is ON and RED light is OFF SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME 5 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - 3 AG Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________