ML15239A019
| ML15239A019 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/11/1989 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML15239A020 | List: |
| References | |
| NUDOCS 8904240235 | |
| Download: ML15239A019 (3) | |
See also: IR 05000269/1989001
Text
ACCELERATED
DITRJBUTION
DEMONSTRATION
SY3EM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8904240235
DOC.DATE: 89/04/11 NOTARIZED: NO
DOCKET #
FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.
05000269
50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.
05000270
50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.
05000287
AUTH.NAME
AUTHOR AFFILIATION
EBNETER,S.D.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
TUCKER,H.B.
Duke Power Co.
SUBJECT: Forwards Interim SALP Board Repts 50-269/89-01,50-270/89-01
& 50-287/89-01 for Aug 1987 -
Jan 1989.
DISTRIBUTION CODE: IE40D COPIES RECEIVED:LTR L ENCL
_
SIZE:
TITLE: Systematic Assessment of Licensee Performance (SALP) Report
S
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-3 LA
1
0
PD2-3 PD
1
1
D
PASTIS,H
1
1
INTERNAL: ACRS
2
2
AEOD/DOA
1
1
AEOD/DSP/TPAB
1
1
COMMISSION
5
5
S
DEDRO
1
1
NRR SHANKMAN,S
1
1
NRR/DLPQ/HFB 10
1
1
NRR/DLPQ/PEB 11
1
1
NRR/DOEA/EAB 11
1
1
NRR/DREP/EPB 10
1
1
NRR/DREP/RPB 10
1
1
NRR/DRIS DIR 9A
1
1
NRR/DRIS/SGB 9D
2
2
NRR/DRIS/SIB 9A
1
1
NRR/PMAS/ILRB12
1
1
NRR/PMAS/PTSB12
1
1
NUDOCS-ABSTRACT
1
1
AN,J
1
1
OGC/HDS2
1
1
REG FILE-
02
1
1
RGN2
FILE
01
1
1
EXTERNAL: H ST LOBBY WARD
1
1
LPDR
1
1
NRC PDR
1
1
1
1
R
D
/
S
A
D
NOTE TO ALL "RIDS" RECIPIENTS:
S
PLEASE HEP US TO REDUCE
ASTE!
(INTACT THE DOCUMENT O)TfROL DESK,
ROCM P1-37 (EXT.
20079)
O ELIMINATE YOUR NAME FRC
DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
34
ENCL
33
iP
11
989
Docket Nos. 50-269, 50-270, 50-287
License Nos. DPR-38, DPR-47, DPR-55
Duke Power Company
ATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-269/89-01, 50-270/98-01 AND
50-287/89-01
The NRC Systematic Assessment of Licensee Performance (SALP) has been completed
for your Oconee facility. The facility was evaluated for the period August 1,
1987 - January 31, 1989.
The results of the evaluation are documented in the
enclosed Interim SALP Report.
This report will be discussed with you at a
public meeting to be held at the Oconee facility on April 21,
1989, at
10:00 a.m.
The performance of your Oconee facility was evaluated in the functional areas
of Plant Operations, Radiological Controls, Maintenance/Surveillance, Emergency
Preparedness,
Security, Engineering/Technical Support,
and Safety Assess
ment/Quality Verification.
Overall performance of your Oconee facility was satisfactory during this
assessment period.
Although the functional areas evaluated during this
assessment period are not identical to those in the previous period, a close
correlation can be made for identifying changes in performance.
Strengths were identified in the areas of Plant Operations, Radiological
Controls and Emergency Preparedness.
Operations performance continued to be a strength. Management was frequently
observed in various areas of the plant providing oversight of activities and
guidance to personnel.
Operator training and experience were excellent. The
number of automatic trips were reduced well below the industry average and
below the goals you established for Oconee.
In the area of Maintenance/Surveillance performance has declined. Overall your
maintenance and surveillance programs
have experienced a decrease in
effectiveness. Over this assessment period, numerous performance problems were
identified characterized by inattention to detail, miscommunication and
procedural/personnel errors.
The Emergency Preparedness area maintained a strong performance.
A weakness
was identified in an emergency exercise which would not be expected in a SALP
Category 1 program.
However, you implemented a prompt and very effective
response to the weakness and subsequently you effectively demonstrated your
capabilities during actual events.
83904240235 890411
ADOCK 05000269
Q
Duke Power Company
2
APR 11 1989
With respect to Security,
performance declined from a Category 1 to a
Category 2. A lack of responsiveness in resolving a long standing issue
relating to the assessment capability of the closed circuit television system
and an increase in the number of violations detracted from an otherwise
favorable evaluation of the security program.
Management effort in the Engineering/Technical Support area is apparent from
the improvement in this assessment period. Management activities have resulted
in the self-identification of several significant problems. Although progress
has been made in this area, a weakness still exists in the quality of
communication between design engineering and other plant organizations.
Any comments you have concerning our evaluation of the performance of your
Oconee facility should be submitted to this office within 30 days following the
date of our meeting. These comments will be considered in development of the
Final SALP Report. Your comments and a summary of our meeting will be issued
as an appendix to the Final SALP Report.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
Stewart D. Ebneter
Regional Administrator
Enclosure:
Interim SALP Report - Oconee
cc w/encl:
M. S. Tuckman, Station Manager
State of South Carolina
bcc w/encl:
NRC Resident Inspector
DRS Technical Assistant
L. Wiens, NRR
Document Control Desk
RII
RII
RII
RH
RH i&4-
RIL/ ,,
RIIVR
-
RIL
ner
MShymlock A
d t
od
DMatthews
AGi
on
hr
WHehl
411///89
4/1/89
4/10 /89
4/
/89
4// /89
4/\\/89
4/ /
89
4/ /89