44
,L Distribution:
N 1 0 9Docket files ACRS (16)
NRC PDR JHeltemes, AEOD L PDR Gray file TERA Dockets Nos. 50-269-J NSIC 50-27 NRR Rdg.
and 50-287 ORB#4 Rdg.
DEisenhut TNovak Mr. William 0. Parker, Jr.
GLainas Vice President -Steam Production RTedesco Duke Power Company RReid P. 0. Box 2178
_MFairtile 422 South Church Street DVerrelli Charj1otte, North Carolina 28242 RIngram Attorney, OELD
Dear Mr. Parker:
OI&E (3)
This letter is In response to your June 2, 1980 letter requesting guidance concerning our May 7, 1980 letter on five addltional TMI-2 related require ments for operating reactors.
I.A.1.3 Shift Manning - Provide your response 30 days from receipt of the separate correspondence indicated in our May 7, 1980 letter.
II.K.3.3 Safety and Relief Valves - Use the implementation schedule of ; submit report by January 1, 1981, but start using data from April 1, 1980.
II.K.3.5 Automatic Trip of RC Pumps during LOCA - We recognize the possible need for revision of the schedule for this item. We will keep the licensees for operating pressurized water reactors informed of any change of scope or schedule. In the meantime, our schedule is not changed.'
II.K.3.17 Outage of ECC Systems - The 14 day outage for HPCI given in our May 7, 1980 letter uses boiling water reactors as an example. This item applies to all light water reactors and should be included in your response.
II.K.3.25 Effect of Loss of AC Power on Reactor Recirculation Pump Seal Coolers, II.K.3.29 Performance of Isolation Condensers and II.K.3.44 Single Failure - These three items are applicable to BWRs, only.
II.K.3.30 Revised SBLOCA Methods - The proper scheduled implementation date is that shown in Enclosure 1, July 1, 1983.
Sincerely,I Gilginal 5igned by Robert W. Rid 6
Robert W. Reid, Chief Op rating Reactors Branch #4 Di ision of Licensine
.RB#:DQL pr
-C L
See next pagMFairtile:kb r e11 k
Sj06//80 06/
0/80 06/88 06 0
-!MAC #
100
,2 1j9 76) NPRCM 0240-S OVFN NTPINTIMG fIEj?-
939
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 10, 1980 Dockets Nos. 50-269, 50-270 and 50-287 Mr. William 0. Parker, Jr.
Vice President - Steam Production Duke Power Company P. 0. Box 2178 422 South Church Street Charlotte, North Carolina 28242
Dear Mr. Parker:
This letter is in response to your June 2, 1980 letter requesting guidance concerning our May 7, 1980 letter on five additional TMI-2 related require ments for operating reactors.
I.A.1.3 Shift Manning - Provide your response 30 days from receipt of the separate correspondence indicated in our May 7, 1980 letter.
II.K.3.3 Safety and Relief Valves - Use the implementation schedule of ; submit report by January 1, 1981, but start using data from April 1, 1980.
II.K.3.5 Automatic Trip of RC Pumps During LOCA -
We recognize the possible need for revision of the schedule for this item. We will keep the licensees for operating pressurized water reactors informed of any change of scope or schedule. In the meantime, our schedule is not changed.
II.K.3.17 Outage of ECC Systems - The 14 day outage.for HPCI given in our May 7, 1980 letter uses boiling water reactors as an example. This item applies to all light water reactors and should be included in your response.
II.K.3.25 Effect of Loss of AC Power on Reactor Recirculation Pump Seal Coolers, II.K.3.29 Performance of Isolation.Condensers and II.K.3.44 Single Failure - These three items are applicable to BWRs only.
II.K.3'.30 Revised SBLOCA Methods - The proper scheduled implementation date is that shown in Enclosure 1, July 1, 1983.
Sincerely, Robert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing cc:
See next page
Cu:e Power Company cc wI/enclosure(s):
Mr. William L. Porter Mr. Robert B. Borsum Duke Power Company Babcock & Wilcox P. 0. Box 2178 Nuclear Power Generation Division 422 South Church Street Suite 420, 7735 Old Georgetown Road Charlotte, North Carolina 28242 Bethesda, Maryland 20014 Oonee Public Library Manager, LIS 201 South Spring Street NUS Corporation Walhalla, South Carolina 29691 2536 Countryside Boulevard Clearwater, Florida 33515 Honorable James M. Phinney County Supervisor of Oconee County J. Michael McGarry, III, Esq.
Ihalla, South Carolina 29621 DeBevoise & Liberman 1200 17th Street, N.W.
Washington, 0. C. 20036 Director, Technical Assessment Division Office of Radiation Programs (AW-459)
U. S.-Environmental Protection Agency Office of Intergovernmental Relations Crystal Mall #2 116 West Jones Street Aington, Virginia 204W50 Raleigh, North. Carolina 27603 U. S. Environmental Protection Agency Region IV.Office ATT:
EIS COORDINATOR 345 Courtland Street, N.E.
Atlanta, Georgia 30308 Mr. Francis Jape U. S. Nuclear Regulatory Commission P. 0. Box 7 Seneca, South Carol ina 29678