-We -it PWagner IE 5'I RC'C RIngram ACRS--10 L PDR HOrnstein EReeves ORB#4 Rdg EBlackwood GLainas Gray File OELD M.ILoS Dockets Nos. 50-269, 50-270 and 50-287 Mr. Hal B. Tucker Vice President - Nuclear Production Duke Power Company P. 0. Box 33189 422 South Church Street Charlotte, North Carolina 28242
Dear Mr. Tucker:
In response to your September 13, 1982 letter concerning the reactor building purge system at the Oconee Nuclear Station, the NRC positions and guidance contained in our July 7 and July 17, 1981 letters remains unchanged. In order for us to approve any purging above cold shutdown conditions, we would require verification that the purge system meets the operability requirements stated in the above referenced letters.
This verification would need to include a favorable staff evaluation regarding the environmental qualification of the purge system, and in particular the system values.
Since you have not, as yet, provided system operability information, we have no basis for a decision on the applicability of limited purging.
When information is provided which indicates that the purge system meets the operability requirements, we will consider allowing limited purging for safety related reasons only.
We, therefore, request that you provide us a schedule for submitting this information within 30 days.
You further commit, in accordance with our Interim Position, that "Duke will continue to maintain the purge valves at Oconee closed except when in (the) cold shutdown mode".
We concur with this position, but request that you apply for a license amendment to incorporate a provision into the Oconee Technical Specifications (TSs) which requires the purge valves to be locked or sealed closed (NUREG-0737 Item II.E.4.2.6) whenever above the cold shutdown conditions until such time that valve operability has been verified.
Since the penetrations containing the purge valves are presently Type B leak tested, in accordance with TS 4.4.1.2, we further request that your TS submittal contain a requirement that these valves be leak tested at intervals not to exceed six months in accordance with our previous guidance.
OFFICEO OFFICM E SURNAME 8210180323 820930 DATE!
- PDR ADOCK 05000269 P
PDR NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981-335-960
Mr. Hal B. Tucker
-29 If you have any questions on this subject, please contact your Project Manager.
Si nce rely, Gus C. Lainas, Assistant Director for Operating Reactors Division of Licensing cc:
See next page OFFICEO..
ER.1.Jfl..
B e8jtjL A.4.:DL.. AD-d :DL.................
SURNAME pWagner/cb EReeve GLainas DATE 9// (82 9
82 9
9/O /82 NRC FORM 318 (10-80) NRCMO0240 OFFICIAL RECORD COPY USGPO: 1981-335-960
Duke Power Company cc w/enclosure(s):
Mr. William L. Porter Duke Power Company P. 0. Box 33189 422 South Church Street Office of Intergovernmental Relations Charlotte, North Carolina 28242 116 West Jones Street Raleigh, North Carolina 27603 Honorable James M. Phinney County Supervisor of Oconee County Walhalla, South Carolina 29621 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission, Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Regional Radiation Representative EPA Region IV 345 Courtland Street, N.E.
Atlanta, Georgia 30308 William T. Orders Senior Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 610 Seneca, South Carolina 29678 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Manager, LIS NUS Corporation 2536 Countryside Boulevard Clearwater, Florida 33515 J. Michael McGarry, III, Esq.
DeBevoise & Liberman 1200 17th Street, N.W.
Washington, D. C. 20036