ML15224A510
| ML15224A510 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 12/09/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML15224A508 | List: |
| References | |
| NUDOCS 8202050364 | |
| Download: ML15224A510 (2) | |
See also: IR 05000269/1981030
Text
...........
~.
Duke Power Company
ATTN:
Mr. W. 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
Charlotte, NC 28242
Gentlemen:
Subject:
Report Nos.
'
, 50-270/81-30, and 50-287/81-30
This refers to the routine safety inspection conducted by Mr. W. T. Orders of
this office on October 15 - November 20, 1981, of activities authorized by NRC
Operating License Nos. DPR-38, DPR-47, and DPR-55 for the Oconee Nuclear
facility. Our preliminary findings were discussed with Mr. J. E. Smith, Station
Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
O During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A. Elements to be included in your response are delineated in
Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure(s)
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application tq withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
W
Enclosures:
(See page 2)
8202050364 820127
PDR ADOCK 05000269
G
I
Duke Power Company
2
Enclosures:
1. Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-269/81-30,
50-270/81-30, and 50-287/81-30
cc w/encl:
J. E. Smith, Station Manager
bcc w/encl:
NRC Resident Inspector
Document Management Branch
State of South Carolina
RII
I
I
DMyers:dt
yant
gg
-144/81
1V 7/81
1
/81