ML15224A511
| ML15224A511 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 12/09/1981 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML15224A508 | List: |
| References | |
| 50-269-81-30, 50-270-81-30, NUDOCS 8202050368 | |
| Download: ML15224A511 (1) | |
Text
..
0 APPENDIX A NOTICE OF VIOLATION Duke Power Company Docket Nos. 50-269 & 50-270 Oconee 1 and 2 License Nos. DPR-38 & DPR-47 As a result of the inspection conducted on October 15 - November 20, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980),
the following violations were identified.
A.
10 CFR 20.201(b) requires the licensee to perform radiation surveys as may be necessary in order to comply with the regulations in this part.
Contrary to the above, on October 15 adequate radiation surveys were not made in the Unit 2 chemical treatment pond area in that radiation levels in a small section of this unrestricted area were allowed to increase to 6 mr/hr which is in excess of Part 20 regulation 20.105(b).
This is a Severity Level V Violation (Supplement IV.E.2.).
B.
Technical Specification 6.4.1(h) requires that radioactive waste management systems be operated and maintained in accordance with approved procedures entailing appropriate instructions to facilitate safe operation.
Contrary to the above, on November 11, 1981, operating procedure OP/O/B/1104/34, which was being employed to operate the Unit 1 laundry and hot shower tank system did not entail suction valve position requirements, which resulted in an unsampled radioactive release.
Based on sample analysis and volume of water discharged the technical specification release limits were not exceeded.
This is a Severity Level V Violation (Supplement I.E.).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged viola tions; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
DEC 0 9 bS8 Date:
8202050368 820127 PDR ADOCK 05000269 G