NOV - 6 1981
Duke Power Company
ATTN:
Mr. W. 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
Charlotte, NC
28242
Gentlemen:
Subject:
Report Nos. 50-269/81-24, 50-270/81-24 and 50-287/81-24
This refers to the routine safety inspection conducted by Mr. N. Economos of this
office on October 2-9,
1981,
of activities authorized by NRC Operating License
Nos. DPR-38, DPR-47 and DPR-55 for the Oconee facility. Our preliminary findings
were discussed with Mr. J. E. Smith, Station Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it
was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen
dix A. Elements to be included in your response are delineated in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4),
it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1),
such application must
be accompanied by
an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it
is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
8201270326 811229
PDR ADOCK
5000269
0
ADC~ 0
Duke Power Company
2
NOV -6 1981
part of the affidavit. If we -do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
1. Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-269/81-24
50-270/81-24 and 50-287/81-24
cc w/encl:
J. E. Smith, Station Manager
bcc w/encl:
NRC Resident Inspector
Document Management Branch
State of North Carolina
RII
RII
Ru
RII
R I
N conomos:aw
ARHerdt
CEMurphy
Ig
o
s
e acgg
RC ewis
10/30/81
10//81
10/y /81
10/a3/81
10/5'/81
81