N OV 131981
Duke Power Company
ATTN:
Mr. W. 0. Parker, Jr.
D0
7
Vice President, Steam Production
pIIHQFILECOPY
P. 0. Box 2178
Charlotte, NC 28242
Gentlemen:
Subject: Report Nos.
01,
0-270/81-21,
and 50-287/81-21
This refers to the special safety inspection conducted by Mr. T. R. Collins of
this office on September 21-23, 1981, of activities authorized by NRC Operating
License Nos.
DPR-47,and DPR-55 for the Oconee Nuclear Power Station
facility.
Our preliminary findings were discussed with Mr. J. E. Smith,
Station Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
.
personnel, and observations by the inspector.
Within the scope of this inspection, no violations were disclosed.
During the inspection it
was found that certain activities under your license
appeared to deviate from commitments to the Commission
and have safety
significance. This item is identified in the Notice of Deviation enclosed
herewith as Appendix A. Please provide us in writing within 30 days of your
receipt of this letter your comments including a description of corrective
actions that have been or will be taken, corrective actions which will be taken
to avoid further deviations, and the date your corrective actions were or will be
completed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure(s)
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
0
P'DR
To6\\