SEP -9 1981
Duke Power Company
ATTN:
Mr. W. 0. Parker, Jr.
Vice President, Steam Production
P. 0. Box 2178
Charlotte, NC
28242
Gentlemen:
Subject: Report Nos. 5(ZiiiI0 2E50-270/81-16 and 50-287/81-16
This refers to the routine safety inspection conducted by Mr. N. Economos of this
office on July 22 thru August 13,
1981, of activities authorized by NRC Operating
License Nos. DPR-38 and DPR-55 for the Oconee facility.
Our preliminary findings
were discussed with Mr. J. E. Smith, Station Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas,
the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it
was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen
dix A. Elements to be included in your response are delineated in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4),
it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your inten
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
such information. If your receipt of this letter has been delayed such that less
than seven days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
PIDR'ADOCK 050002697
Duke Power Company
2
9 1981
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
1. Appendix A, Notice of Violation
2. Inspection Report Nos. 50-269/81-16,
50-270/81-16 and 50-287/81-16
cc w/encl:
J. E. Smith, Station Manager
bcc w/encl:
NRC Resident Inspector
Document Management Branch
State of North Carolina
RIO
RII
RI
RII
os:aw .ARHert
AFGibson
PJKe
ogg
4e-/81
0 / 4/81
01/ /81
/81
/i /81