Forwards IE Insp Repts 50-269/81-16,50-270/81-16 & 50-287/81-16 on 810722-0813 & Notice of Violation
ML15224A449
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/09/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15224A447 List:
References
NUDOCS 8111050776
Download: ML15224A449 (2)


See also: IR 05000269/1981016

Text

SEP -9 1981

Duke Power Company

ATTN:

Mr. W. 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

Charlotte, NC

28242

Gentlemen:

Subject: Report Nos. 5(ZiiiI0 2E50-270/81-16 and 50-287/81-16

This refers to the routine safety inspection conducted by Mr. N. Economos of this

office on July 22 thru August 13,

1981, of activities authorized by NRC Operating

License Nos. DPR-38 and DPR-55 for the Oconee facility.

Our preliminary findings

were discussed with Mr. J. E. Smith, Station Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas,

the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it

was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen

dix A. Elements to be included in your response are delineated in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4),

it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your inten

tion to file a request for withholding; and (b) submit within twenty-five days

from the date of this letter a written application to this office to withhold

such information. If your receipt of this letter has been delayed such that less

than seven days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

PIDR'ADOCK 050002697

Duke Power Company

2

SEP

9 1981

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report Nos. 50-269/81-16,

50-270/81-16 and 50-287/81-16

cc w/encl:

J. E. Smith, Station Manager

bcc w/encl:

NRC Resident Inspector

Document Management Branch

State of North Carolina

RIO

RII

RI

RII

os:aw .ARHert

AFGibson

PJKe

ogg

4e-/81

0 / 4/81

01/ /81

/81

/i /81