APPENDIX A NOTICE OF VIOLATION Duke Power Company Docket No. 50-269 Oconee 1 License No. DPR-38 As a result of the inspection conducted on July 22 thru August 13, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980),
the following violations were identified.
A.
10 CFR 50.55a requires that structures shall be constructed to quality standards commensurate with the importance of the safety function to be performed. ASME Section III (74S75) paragraph NC-4411 states in part that the manufacturer is responsible for control of the welding electrodes, pre cautions shall be taken to minimize absorption of moisture.
Contrary to the above, on July 30,.1981, welding electrodes were not being controlled and precautions were not taken to minimize moisture absorption in that a substantial number of partially consumed 308 bare wire electrodes were observed scattered about on the floor of the reactor building basement where welding on R. C. makeup system piping was in progress.
This is a Severity Level V Violation (Supplement I.E).
B.
10 CFR 50, Appendix B, Criterion V as implemented by Topical Report Duke-1-A, Section 17.1.5 requires in part that activities affecting quality shall be accomplished in accordance with the requirements imposed by instructions, procedures and drawings. Station Directive No. 3.11.4 states that all waste material in the walking and working areas around the Transfer Canal be placed in approved receptacles and removed from the area daily, or more often as necessary.
Contrary to the above, on July 22,
- 1981, cleanliness requirements in the walking and working areas around the Transfer Canal were not being observed in that various types of debris and trash including a corroded 7-Volt dry cell battery, rubber overshoes, loose rope, wire, loose plastic wrapping
- material, tape, etc.
Also a substantial amount of debris was observed floating on top of the water in the transfer Canal and, what appeared to be a rag was observed resting on the edge of the plenum.
This is a Severity Level V Violation (Supplement I.E).
8 1 1 1 0 5 0 7 7 8 8 1 1 0 2 7 PDR ADOCK 05000269 PDR
Duke Power Company 2
Docket No. 50-269 Oconee 1 License No. DPR-38 Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged viola tions; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
The responses directed by this Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
Date: SEP 9 1981